IVERA ITLC CERTIFICATION · 1960 2020 HAD Starting in occupant safety, TASS International built a...
Transcript of IVERA ITLC CERTIFICATION · 1960 2020 HAD Starting in occupant safety, TASS International built a...
www.tassinternational.com
IVERA ITLC CERTIFICATIONIvera Kenniscafé
Gwen van Vugt – directeur TASS International Mobility Center B.V.
7 juni 2017
2Confidential
TASS Introduction (1/2)
3 Business Lines :
Integrated Safety, Automated Driving and Tyre Modelling
2 Development Methodology for Safety Critical Applications in the
Transportation Industry (Automotive Focus)
1 Frontrunner in the industry, global Presence, 200 Employees
3Confidential
Software
Services
Engineering
Homologation (as part of testing)
Testing
53%
12%
30%
Share in 2016 revenue per type. Other revenue is 5% of total sales
TASS Introduction (2/2)
14%
4Confidential
1960 2020
HAD
Starting in occupant safety, TASS International built a track record for over 30 years and was one of the first players to complement physical testing with simulation
2006: PreScan, the simulation tool for ADAS and HAD testing, released to first OEMs/Tiers
Every vehicle brought to market in 2020 has been developed using a TASS International Methodology
1987: Birth of MADYMO, the standard in occupant safety simulations
Our ambitious objective:
1990s: MF-Tyrereleased and com-mercial tyre testing services started
1960s: Shaping of later UNECEstandards for testing of seat belts, child seats and helmets
1990s:First recognized EuroNCAPtest lab
2010s: First UNECER129 certificate for Child Restraint Systems released
2013:First (active) Human Models available in MADYMO
2015: PreScanCluster setups for massive scenario analysis released
2016: First PreScancamera injection setups delivered
2016:MF-Tyre/ MF-Swift 7.0 with Real Time capabilities introduced
Passive safety systems
Active safety systems
2013:First public V2V/V2Xtest track
TASS has Always been at the Forefront of Innovation
5Confidential
TASS serves nearly All Major Automotive Companies
>80% of the leading automotive OEMs and 60% of the
top automotive suppliers are our customers
6Confidential
An international team of approx. 200 people in 11 locations
Warsaw, Poland
Bangalore, India
Istanbul, Turkey
Frankfurt, Germany
Rijswijk + Helmond,The Netherlands
Coventry, United Kingdom
Detroit, USAShanghai, China
Yokohama, Japan
Seoul, Korea
TASS International Headquarters
TASS International office (Sales, Engineering)
Agent
TASS has an International Footprint
TASS International Facilities
Confidential
Road InfrastructureFull-scale Frontal Impact
VRU Protection Systems Child Restraint System
Services : Integrated Safety Examples
Confidential
International Accreditations
12-6-2017 9
Confidential
DITCM Facilities testsite overview
10
Roadside equipment
50 fixed cameras @ 100m
9 dome cameras @ 500m
15 ITS G5 CCUs @ 500m
Road infrastructure
2 km urban roads
2 km inter-urban roads
4 km motorway
4 intersections
Confidential
Roadside equipmentSensor and V2X platform
11
Dome camera
(safety)
Fixed camera
(vehicle localization)
Communication unit
(ITS G5)
Roadside equipment
50 fixed cameras @ 100m
9 dome cameras @ 500m
15 ITS G5 CCUs @ 500m
1 dGPS base station
Confidential
Services: HAD & Connected Examples
Sensor benchmarking on public roadETSI plug-test (DSRC interoperability testing)
Platooning in public trafficCooperative local dynamic map sharing
Confidential
World of Cooperative ITS
12-6-2017 13
System Integrator
OEM
Component Suppliers
After Market OBU
Road Side Unit Traffic Management Center
Network
Equipment
Equipment
Au
ton
om
ous
Government
Regulations
Road Authority
Vehicle Authority
Insurance
Service / Telematics
Provider
Telco
V2V
Confidential
Position of TASS Mobility Center
12-6-2017 14
System Integrator
OEM
Component Suppliers
After Market OBU
Road Side Unit Traffic Management Center
Network
Equipment
Equipment
Au
ton
om
ous
Government
Regulations
Road Authority
Vehicle Authority
Insurance
Service / Telematics
Provider
Telco
V2V
Confidential
Long history in V2x technologies• Day-1 Cooperative Applications
• 1st & 4th Cooperative Mobility Services ETSI PlugTest
• Cooperative Adaptive Cruise Control (CACC)
• Cooperative Merging
• Shockwave Damping
• Precise Positioning
• Platooning
• Autonomous Parking
• Vision Inspired ADAS systems
12-6-2017 15
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Confidential
Active in advancing V2X regulations
• Dutch government • DITCM partner – Intercor Tafels for Hybrid communications
• BeterBenutten demonstration projects
• Connecting Mobility – Leading Architecture & Standardisation round-table
• Member of the TaskForce Self-Driving Vehicles for the Minister of Infrastructure
• EU C-ITS platform member
• C2C-CC member leading WG Conformance Assessment
• Viapass tolling certification
12-6-2017 16
Declaration of Amsterdam
Confidential
iTLC certification of 5 interfaces
12-6-2017 17
Confidential
1.) Initial setup
• Certification procedure according to the Homologation Triangle
• Test protocol, test cases and test reporting format
• Test tools
Our approach to certification
Manufacturer (iTLC supplier)
Technical Service (TASS)
Approval Authority (Ivera)
Test program setup
Statement ofConformity,Interface and productdocumentation
Test / Inspection report
Recognition
Quality plan
Manufacturer Compliance Statement,Product certificate
Confidential
1.) Initial setup
• Certification procedure according to the Homologation Triangle
• Test protocol, test cases and test reporting format
• Test tools
2.) Technical service execution (iTLC Certification process)
Our approach to certification
12-6-2017 19
SoCOn-site witness
Evaluation Test report Certification
Confidential
Planning
12-6-2017 20
Tasks WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10 WK11
Certification procedure
- Prepare Q&A
- Answer Q&A
- Prepare initial procedure
- Workshop
- Final procedure
- Slack time
- Ivera approval
Document set
- Refinement
- Review meeting
- Final document set
- Slack time
- Ivera approval
Tasks WK9 WK10 WK11 WK12 WK13 WK14 WK15 WK16 WK17 WK18 WK19
Test tools validation
4x iTLC technical service exec.
Slack time
Technical Service Execution
Tasks WK1 WK2 WK3
Planning resources
Technical service execution
Reporting
Thank you for your attentionQuestions?