Iver Feasibility Study NA DP SEPT‘ 16 · 2016. 10. 3. · Iver Feasibility Study NA DP DWE SC JB...
Transcript of Iver Feasibility Study NA DP SEPT‘ 16 · 2016. 10. 3. · Iver Feasibility Study NA DP DWE SC JB...
![Page 1: Iver Feasibility Study NA DP SEPT‘ 16 · 2016. 10. 3. · Iver Feasibility Study NA DP DWE SC JB 16 - 129 Figure 6.5 Client Richings Park sustainable mitigation measures Buckinghamshire](https://reader036.fdocuments.us/reader036/viewer/2022071420/61199a230d2737404639e24d/html5/thumbnails/1.jpg)
KEYP1
P2
P3
P4
P5
P8
D1
H2
H3
H4
Swan Road short stay car parking
Swan public house car parking for use by shoppers
Extension of existing on street parking bays and new on street parking bays
Investigation of parking and waiting restrictions on Chequers Orchard and Grange Way
Implementation of parking, waiting and loading restrictions along the High Street
New crossing opposite Lounge Fifteen to west of Thorney Lane North/B470 junction- short term informal crossing and long term formal crossing
Improve drainage system along High Street northern footway
Redevelopment of HGV generating site(s)
Relief road for Iver Village - HGV Ban, 20mph zone and tra�c calming measures through Iver village
Discussions with LBH about West London Industrial Park using Wallingford Road
H7
H11
H14
H15
H16
J8
J9
J10
H11
Review of travel planning for Iver Heath and Iver Village Schools
Speed limit review for study area
Reducing HGV �ows would improve dust, noise and air quality.
Give-way priority signalised working on Bangors Road South – long term option with relief road
Give-way priority working on Thorney Lane North- long term option with relief road
New crossing on B470 High Street to west of B470/Thorney Lane North junction – long and short term options
Love Lane junction improvements.
Relocate existing dropped kerbs on Thorney Lane North to the north of St Peter's Centre further from the B470/Thorney Lane North junction.
Speed limit review for study area
H3
J9
H7
P4H7 P4
D1
H15J11
P2 P1
P3 P5 J8
H14H16
J10
H2
H2
H11
H4
Iver Feasibility Study NA DP
DWE SC JB
16 - 129 Figure 6.4Client
Iver Village Highway Mitigation Measures
Buckinghamshire County Council
SEPT‘ 16
E: [email protected]: www.odysseymarkides.com
Telephone: 0207 620 2444Fax: 0207 620 1168
Elizabeth House39 York Road
LondonSE1 7NQ
![Page 2: Iver Feasibility Study NA DP SEPT‘ 16 · 2016. 10. 3. · Iver Feasibility Study NA DP DWE SC JB 16 - 129 Figure 6.5 Client Richings Park sustainable mitigation measures Buckinghamshire](https://reader036.fdocuments.us/reader036/viewer/2022071420/61199a230d2737404639e24d/html5/thumbnails/2.jpg)
Iver Feasibility Study NA DP
DWE SC JB
16 - 129 Figure 6.5Client
Richings Park sustainable mitigation measures
Buckinghamshire County Council
SEPT ‘16
E: [email protected]: www.odysseymarkides.com
Telephone: 0207 620 2444Fax: 0207 620 1168
Elizabeth House39 York Road
LondonSE1 7NQ
W10
W2
W3
R2
R1 B2R3
R4C2B1W6
R4
B2B15
W12R2
C4
C4
W4
1
KEYR1
R2
R3
R4
W2
W4
W3
W6
W10
W12
C2
C4
B1
B2
B15
Step Free Access
Station Car Park
Cycling Strategy for Iver Station. Improve and increase cycling provision at Station.
Bus stops on Bathurst Walk and Thorney Lane South and informa-tion at Station about bus routes and cycling/walking routes.
Regular surfacing and vegetation maintenance program for Study Area.
Improve surfacing on section of footway opposite Richings Park Golf Club on North Park,
Vegetation growth needs reviewing along the eastern footway along Thorney Lane North.
Link across GWR to reconnect IVE/15 to replace Dog Kennel Bridge
Improve Grand Union Canal entrance from Thorney Lane South- improved surfacing and cycle gutter
Reinstall footway fronting Bathurst Walk along Thorney Lane South removed as part of Crossrail works.
Improve on street cycle spaces at Iver Rail Station
Investigate altering the following public footpaths to public bridle ways. IVE/34, IVE/24 & IVE/20 North Park/Richings Way to Old Slade Lane.IVE/21 & IVE/16 Grand Union Canal to Thorney Mill Road
Improved bus service provision to Iver Station needs to be reviewed in line with Crossrail Services
Physical bus stops on Bathurst Walk and Thorney Lane South.
Bus strategy within Iver required to review bus patronage and needs.
R1
R2
R3
R4
P7
W2
W4
W3
W6
W10
W12
C2
C4
H2
H3
H5
H17
Step Free Access
Station Car Park
Cycling Strategy for Iver Station. Improve and increase cycling provision at Station.
Bus stops on Bathurst Walk and Thorney Lane South and information at Station about bus routes and cycling/walking routes.
Richings Park on street parking controls or CPZ in line with Station car park
Regular surfacing and vegetation maintenance program for Study Area.
Improve surfacing on section of footway opposite Richings Park Golf Club on North Park, IVE/4
Vegetation growth needs reviewing along IVE/4, 1VE/16, IVE/11, IVE/13, IVE/15 Bangors Road South footway adjacent to Stag and Hounds, eastern footway along Thorney Lane North
Link across GWR to reconnect IVE/15 to replace Dog Kennel Bridge
Improve Grand Union Canal entrance from Thorney Lane South- improved surfacing and cycle gutter
Reinstall footway fronting Bathurst Walk along Thorney Lane South removed as part of Crossrail works.
Improve on street cycle spaces Thornbridge Road Shops and Iver Rail Station