IURPA 2009
LUIZ F. ARRUDAELETROBRAS DISTRIBUTION COMPANIESSEPTEMBER 2009
LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS
![Page 2: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/2.jpg)
2
FEDERAL DISTRIBUTION COMPANIES
Brasília
Belo Horizonte
Rio de Janeiro
São Paulo
![Page 3: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/3.jpg)
MAIN FIGURESMAIN FIGURES
Total area: 2.245.887 Km2 (around 25% of Brazil)Cities: 462Inhabitants: 11.650.457 (around 6% of the total of Brazil)5 inhabitants / km2Customers: 3 MillionEmployees : 6.000 (+ 6.000 contractors)Sold Energy: 11.290 GWhTotal Losses: 36%
![Page 4: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/4.jpg)
THE STATE OF THE STATE OF AMAZONASAMAZONASTHE STATE OF THE STATE OF AMAZONASAMAZONAS
Area: 1.558.987 Km23,2 M inhabitants2,1 inhabitant/km²62 Cities640 mil Costumers
![Page 5: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/5.jpg)
MANAUS
YAUARETÊ
IPIXUNA
DISTANCES AND TIME TO TRAVEL INSIDE AMAZONAS
São Gabriel
Panoré
Rio Juru
áRio Solimões
Rio Negro
4.618 km33 dias
1.138 km14 dias
JURUÁ
1.198 km7 dias
CAUAUARÍ
1.540 km11 dias
2.112 km14 dias
ITAMARATI
EIRUNEPÉ
3.448 km18 dias
ENVIRA3.496 km20 dias
5.600 km35 dias
GUAJARÁ
![Page 6: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/6.jpg)
ESTADO DE RONDÔNIAESTADO DE RONDÔNIA
Area: 238.513 km²1.453.756 Inhabitants6,1 Inhabitants/km²52 Cities
THE STATE OF RONDÔNIA
![Page 7: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/7.jpg)
Extensão: 251.329.186 Km2 População: 3.032.421 HabDensidade Demográfica: 12,05 Hab/Km2Municípios Atendidos: 223
THE STATE OF PIAUÍ THE STATE OF PIAUÍ Area: 251.330 Km23 Million Inhabitants12 Inhabitants / Km2223 Cities
![Page 8: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/8.jpg)
MAIN PROBLEMS
Cultural: State has the obligation to take care of everything (“to give everything”)
Poverty
During many years the states didn`t take care of the companies
![Page 9: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/9.jpg)
MAIN PROBLEMS
Lack of investment
Many customer installation without meter
Energy delivered with low quality
High residential consumption because the weather (100 degrees F and high humidity level)
![Page 10: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/10.jpg)
SOME SOLUTIONS
Improving energy quality: changing from Diesel generation to gas turbines
Implementing inspection teams ( 1 team for each 3,000 customers!!!)
Prosecuting people under Federal Criminal Laws Code
Changing meters from eletromechanical to electronic technology
AMI for Medium Voltage Customers and the biggest Low Voltage Customers (more than 4,000 KWh/month)
![Page 11: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/11.jpg)
SOME SOLUTIONS
For low income people areas
Installing electronic meters inside a box on the pole
Specific software to manage meters and other functionalities (alarms for example)
“Shielding “ the lines by using special concentric cables (to avoid illegal connections)
![Page 12: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/12.jpg)
Automation system for consumer units supplied in low (buildings of individual and collective use) and medium voltage .
Provided with the functions listed below, which can be accessed remotely via wireless, GPRS, satellite, RF or PLC (Power Line Carrier) communication:
• Cutoff and reconnection
services (LV customers)• Energy balance• Monitoring of irregularities• Demand management
through current data
collection• Time of use tariff (TOU)
when allowed by ANEEL• Prepayment
![Page 13: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/13.jpg)
Meters box – 12 single phase meters or other combinations
Single phase meter – socket type , hot swap
![Page 14: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/14.jpg)
Shielded line - details
![Page 15: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/15.jpg)
Energy balance meter box and communication for each secondary transformer
Connection box (transition from concentric cables to the meter box)
![Page 16: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/16.jpg)
Single phase cable
1- Phase 1 - Cupper
2 - insulation
3 - Neutral
4 - External insulation proper for outdoor installation
For 2 or 3 phase cables the internal conductors are made of Aluminum
Another kind of cable
Concentric cables
![Page 17: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/17.jpg)
Low voltage shielded line – more details
![Page 18: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/18.jpg)
SOME SOLUTIONSFor Medium Voltage Customers
Current and Voltage transformers installed outdoor
Compact block, casted in Cycloaliphatic resin
Compartment to allocate calibration switch, electronic meter and gateway
![Page 19: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/19.jpg)
CT
Lightning Arrester
Cables
Fuse
Cables
VT
Metering + communication box
Support
Lifting bar
![Page 20: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/20.jpg)
20
Installation
Possibility of partial replacement of each pair of (CT + VT)
![Page 21: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/21.jpg)
• 03 Current and Voltage transformers
• 03 Lightning arresters
• 01 Compartment to allocate calibration switch,
measurer and remote with:
– 01 opening sensor
– 01 heat sensor
– 01 calibration switch
– 01 electronic meter
– 01 gateway + cell phone
– Connections with protected cables (NOT
insulated)
21
![Page 22: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/22.jpg)
![Page 23: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/23.jpg)
23
Alternative for Ip > 100 [A](Fth=1,5)
![Page 24: IURPA 2009 LUIZ F. ARRUDA ELETROBRAS DISTRIBUTION COMPANIES SEPTEMBER 2009 LOSSES IN BRAZIL SOME PROBLEMS AND SOLUTIONS.](https://reader035.fdocuments.us/reader035/viewer/2022062804/56649ec85503460f94bd47c7/html5/thumbnails/24.jpg)