IUB and CE Utilizations

3
1. Bad KPI 2. Check IUB and CE utilizations 3. Apakah IPPAth -> Iub over IP atau AAL2Path -> IuB over E1 4. Chek di Dump 5. Check IUB Utilizations

description

IUB and CE Utilizations

Transcript of IUB and CE Utilizations

Page 1: IUB and CE Utilizations

1. Bad KPI2. Check IUB and CE utilizations3. Apakah IPPAth -> Iub over IP atau AAL2Path -> IuB over E14. Chek di Dump

5. Check IUB Utilizations

Page 2: IUB and CE Utilizations

6. Dari kedua table diatas, confirmed need Upgrade E1 dari 2E1 to 4 E17. Check CE Utilizations

Page 3: IUB and CE Utilizations

8. Sebagai additional justifikasi, melihat trend kapasitas PS and HSDP capacity (pay load)