ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1....

17
November 2016 NSW Government IT Service Management – Service Transition Standard V1.0 Policy & Innovation, ICT & Digital Government Division Department of Finance, Services & Innovation Level 23, McKell Building 2-24 Rawson Place SYDNEY NSW 2000 [email protected]

Transcript of ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1....

Page 1: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

November 2016

NSW Government

IT Service Management –

Service Transition Standard

V1.0

Policy & Innovation, ICT & Digital Government Division

Department of Finance, Services & Innovation

Level 23, McKell Building

2-24 Rawson Place

SYDNEY NSW 2000

[email protected]

Page 2: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

2

CONTENTS

1. CONTEXT 3

1.1. Background 3

1.2. Purpose 3

1.3. Scope and application 3

1.4. Policy context 3

1.5. The ICT Services Catalogue 4

2. KEY PRINCIPLES 4

3. REQUIREMENTS 5

3.1. ITSM Service Transition 5

3.2. Service level and complexity 5

3.3. Requirements tables 5

3.3.1 ITSM Service Transition – Use Cases / Scenarios 6

3.4. Elements of this standard 7

3.4.1 ITSM Service Transition requirements 7

4.4.1 Service Management requirements 10

DOCUMENT CONTROL 12

APPENDIX A – ABBREVIATIONS AND DEFINITIONS 13

APPENDIX B – REFERENCES 14

APPENDIX C – STANDARDS 15

Developing technical standards 15

Management and implementation 15

APPENDIX D – Sample Key Performance Indicators 16

Page 3: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

3

1. CONTEXT

1.1. Background

This is a technical standard developed through the NSW ICT Procurement and Technical

Standards Working Group. The standard contains technical and functional requirements that

agencies should consider when procuring IT Service Management (ITSM) Service Transition

solutions.

By defining the necessary and common elements across agencies the standard provides an

opportunity to leverage the buying power of Government as a whole, improve procurement

efficiency and increase interoperability.

1.2. Purpose

The purpose of this standard is to assist NSW Government agencies to develop, procure and

implement ITSM Service Transition solutions and tools, as well as take full advantage of their

benefits. This standard also helps agencies procure in a strategic manner that reflects the NSW

Government’s priorities as outlined in the NSW Government ICT Strategy.

This standard details the issues that need to be considered so each agency can identify the

available options that best suit their business requirements, helping agencies achieve value for

money through cost savings and improved flexibility of service offerings.

1.3. Scope and application

This standard applies to all NSW Government departments, statutory bodies and shared service

providers. It does not apply to state owned corporations, but is recommended for their

adoption.

For the purposes of this standard, ITSM Service Transition is defined as:

To ensure new, modified or retired services meet expectations of the business as

documented in the service strategy and service design stages of the lifecycle.

This standard sets out service definitions as minimum requirements that vendors must meet to

be able to offer their services through the NSW ICT Services Catalogue. Agencies should

consider any specific operational or regulatory factors that impact their requirements, and

specific requirements they have in addition to those detailed in this standard.

1.4. Policy context

The NSW Government ICT Strategy and Digital + 2016 Final Update set out the Government’s

plan to: build capability across the NSW public sector to deliver better, more customer-focused

services that are available anywhere, anytime; and to derive increased value from the

Government’s annual investment in ICT.

Developing whole of NSW Government ICT technical standards is a key initiative of the NSW

Government ICT Strategy, driven by the ICT Procurement and Technical Standards Working

Group. These standards leverage principles defined in the NSW Government ICT Strategy and

the NSW Government Cloud Policy, and they support the NSW ICT Services Catalogue.

The standards set out service definitions as minimum requirements that vendors must meet to

be able to offer their services through the NSW Services Catalogue. This helps achieve

consistency across service offerings, emphasising a move to as-a-service sourcing strategies in

Page 4: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

4

line with the NSW Government ICT Strategy, and it signals government procurement priorities

to industry.

Solutions should also assist agencies in their alignment with the NSW Government Enterprise

Architecture (NSW GEA), which encompasses all aspects of enterprise architecture activity at

the business, information, application and technology infrastructure layers. The NSW GEA is

about providing direction and practical guidance to accelerate the development of agency EA

capability and enabling a common, intra and inter agency approach to the design of digital

government.

This standard should be applied along with existing NSW Government policies and guidance,

including the NSW Digital Information Security Policy. More information on the process for the

development of standards that populate the ICT Services Catalogue is at Appendix C –

Standards.

1.5. The ICT Services Catalogue

This catalogue provides suppliers with a showcase for their products and services, and an

opportunity to outline how their offerings meet or exceed standard government requirements.

The standards, together with supplier service offerings, help to reduce red tape and duplication

of effort by allowing suppliers to submit service details only once against the standards. The

offerings are then available to all potential buyers, simplifying procurement processes for

government agencies.

Implementing this category management approach will embed common approaches,

technologies and systems to maintain currency, improve interoperability and provide better

value ICT investment across NSW Government.

2. KEY PRINCIPLES

This standard is informed by the following principles:

• End-to-end digital: Service Transition solutions should enable end-to-end digital business processes

and management.

• Control technical diversity: Service Transition solutions should help control technical diversity to

minimise costs associated with maintaining expertise in and connectivity between multiple

processing environments.

• Data security: Meet any applicable requirements of the NSW Digital Information Security Policy

and ISO 27001.

• Technology currency: Solutions should be designed to maintain technology currency for key

systems, and to maintain a pace that aligns with business context and risk profile.

• Facilitating as a service: Service Transition solutions should facilitate the agency transition to as a

service, and ensure agency alignment with broader NSW ICT Strategy.

• Interoperability: Service Transition solutions should meet applicable recognised open standards

across the elements of compute, storage, network, and pre-production and testing.

• Business continuity: Service Transition solutions should meet business continuity requirements,

particularly with transition in and out (see the NSW Digital Information Security Policy and ISO

27031-2011 for more guidance).

Page 5: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

5

3. REQUIREMENTS

3.1. ITSM Service Transition

When considering any aspect of Platform as a Service (as defined in this standard) an agency must

consider the Service Management aspects of the service(s) on offer.

The following ITSM Frameworks can be considered when assessing requirements for ITSM Service

Transition:

• ITIL

• IT for IT

• ISO/IEC 20000

• Business Process Framework (eTOM)

• COBIT

• FitSM

• Dev Ops

• Microsoft Operations Framework (MOF)

3.2. Service level and complexity

The following requirements use case tables are separated into three service levels – silver, gold and

platinum, reflecting the complexity of the ITSM Service Transition solution required:

Silver: Offerings that conform to a minimum number of processes of an identified ITSM methodology.

Gold: Offerings that conform to an identified ITSM framework and updated by the solution provider to

reflect changes to the nominated ITSM methodology.

Platinum: Offerings that conform with the NSW Government Corporate Shared Services (CSS)

Processes. Solutions to this level must be able to adapt and change at no extra cost to agencies to the

evolving requirements defined.

3.3. Requirements tables

The following tables set out the recommended business and technical requirements for NSW

Government. They provide a consistent approach for all NSW Government agencies regardless of their

size.

Key to table requirements:

� Required

� Optional, but beneficial

Explanations for each element of the following use cases are provided at section 3.4.

Page 6: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

6

3.3.1 ITSM Service Transition – Use Cases / Scenarios

‘Use cases’ for ITSM Service Transition that are anticipated in agencies are included in the table below. The corresponding requirement sections of this standard are ticked in

the columns.

Use Case / Scenario

ITSM Service Transition

ITSM Service Transition Service Management

Ch

an

ge

Ma

na

ge

me

nt

Ch

an

ge

Ev

alu

ati

on

Pro

ject

Ma

na

ge

me

nt

(Tra

nsi

tio

n P

lan

nin

g a

nd

Su

pp

ort

)

Re

lea

se a

nd

De

plo

ym

en

t

Ma

na

ge

me

nt

Se

rvic

e V

ali

da

tio

n a

nd

Te

stin

g

Se

rvic

e A

sse

t a

nd

Co

nfi

gu

rati

on

Ma

na

ge

me

nt

Kn

ow

led

ge

Ma

na

ge

me

nt

Co

mp

lia

nce

wit

h N

SW

Go

ve

rnm

en

t S

tan

da

rd

Bu

sin

ess

pro

cess

es

Se

lf-s

erv

ice

a

dm

inis

tra

tio

n

Fu

ll-s

erv

ice

ad

min

istr

ati

on

Clo

ud

co

mp

lia

nt

ho

stin

g

faci

lity

NS

W G

ov

ern

me

nt

Da

ta C

en

tre

On

sho

re/o

ffsh

ore

ma

na

ge

me

nt

Se

rvic

e l

ev

el

ma

na

ge

me

nt

Mu

lti-

serv

ice

bro

ke

r p

rov

isio

n

Silver � � � � � � � - � � � � � � �

Gold � � � � � � � - � � � � � � �

Platinum � � � � � � � � � � � � � � �

Page 7: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

7

3.4. Elements of this standard

3.4.1 ITSM Service Transition requirements

4 Generic considerations for ITSM Service Transition may include the provision of the following

components. Solutions that should address the overarching Service Transition element are included in

the service requirements below:

Generic Service Transition Requirements Silver Gold Platinum

Enterprise frameworks with integration

capabilities � � �

Workflow management � � �

Collaboration tools - � �

Integration across all other ITSM processes � � �

Policy development - � �

Data mining tools - � �

Measurement and Reporting � � �

Discovery and Audit tools - � �

(a) Project Management (Transition Planning and Support)

To provide overall planning for service transitions and coordinate the resources they require.

Solutions that should address the Project Management (Transition Planning and Support) element

are included in the service requirements below:

Project Management (Transition Planning and

Support) Requirements Silver Gold Platinum

Integration across all ITSM processes � � �

Performance Monitoring and Reporting � � �

Stakeholder management - � �

(b) Change Management

To control the lifecycle of all changes, enabling beneficial changes to be made with minimum

disruption to IT services. Solutions that should address the Change Management element are

included in the service requirements below:

Change Management Requirements Silver Gold Platinum

Integration across all ITSM processes � � �

Change Control and Reporting � � �

Risk management framework - � �

Page 8: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

8

(c) Service Asset and Configuration Management

To ensure that the assets required to deliver services are properly controlled, and that accurate and

reliable information about those assets is available when and where it is needed. Solutions that

should address the Service Asset and Configuration Management element are included in the

service requirements below:

Service Asset and Configuration Management

Requirements Silver Gold Platinum

Service Asset and Configuration Reporting � � �

Integration with other ITSM processes � � �

IT Service and Asset Audit Control � � �

IT Service and Asset Management - � �

(d) Release and Deployment Management

To plan, schedule and control the build, test and deployment of releases, and deliver new

functionality required by the business while protecting the integrity of existing services. Solutions

that should address the Release and Deployment Management element are included in the service

requirements below:

Release and Deployment Requirements Silver Gold Platinum

Audit Control � � �

Integration with other ITSM processes � � �

Release and Deployment Reporting � � �

Architecture Release design packaging - � �

Early Life Support - � �

(e) Service Validation and Testing

To ensure that a new or changed IT service matches its design specification and will meet the needs

of the business. Solutions that should address the Service Validation and Testing element are

included in the service requirements below:

Service Validation and Testing Requirements Silver Gold Platinum

Validation and Test management � � �

Service Quality and Assurance � � �

Integration with other ITSM processes � � �

Measurements and Monitoring � � �

Validation and Testing Reporting - � �

(f) Change Evaluation

To provide a consistent and standardised means of determining the performance of a service

change in the context of likely impacts on business outcomes, and on existing and proposed

services and IT infrastructure. Solutions that should address the Change Evaluation element are

included in the service requirements below:

Change Evaluation Requirements Silver Gold Platinum

Change Evaluation governance � � �

Page 9: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

9

Integration with other ITSM processes � � �

Service change performance# - � �

Service change reporting - � �

# The term ‘performance’ is used in change evaluation to mean the utilities and warranties of the

service, which provide the ability of the service to contribute to the performance of the customer’s

assets.

(g) Knowledge Management

To share perspectives, ideas, experience and information, ensuring these are available in the right

place at the right time to enable informed decisions, and to improve efficiency by reducing the

need to rediscover knowledge. Solutions that should address the Knowledge Management element

are included in the service requirements below:

Knowledge Management Requirements Silver Gold Platinum

Service Knowledge Management System (SKMS) � � �

Integration with other ITSM processes � � �

Data protection, controlled access and security � � � Data structure(s) (Data-to-information-to

Knowledge-to-Wisdom) (DIKW) - � �

Knowledge, Information and Data architecture - � �

Self-Service Knowledge management - � �

Page 10: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

10

4.4.1 Service Management requirements

(h) Compliance with NSW Government Standard Business Process

Solutions that wish to comply with this element (for Platinum services) must accept full and

ongoing compliance with the current version(s) of the NSW Government Standard Business

Processes. To be endorsed against this element, suppliers must meet the following requirements:

Compliance with NSW Government Standard Business Processes Silver Gold Platinum

The supplier’s solution meet all requirements in the appropriate

standard(s), related materials and process artefacts as defined

within the NSW Government Standard Government Processes - - �

Sign a legal contract under the ProcureIT framework related to the

appropriate standard(s) - - �

Pay for cost of on-going (annual) certification against the relevant

standard(s) - - �

(i) Self-service administration

The ability to automatically provision and de-provision for all agency resources within the system,

together with other appropriate administration and management tasks that can be delegated

from the service provider that do not impinge on the solution being provided to other customers.

(j) Full-service administration

All provisioning, de-provisioning, together with all other administration and management tasks

required to operate the environment, are provided as part of the service offering. The only

exception will be service management of the provider which remains the sole responsibility of the

initiating agency.

(k) Cloud compliant hosting facility

All relevant cloud services for the solution may be provisioned from a compliant hosting facility. A

compliant hosting is defined as having the following attributes and/or capabilities:

• The location of the hosting facility must be identified either by name and/or location (city

and country) in any response.

• The hosting location cannot be changed without first informing the agency concerned.

• The service provider undertakes, maintains and provides access to SSAE 16 Service

Organization Control (SOC) Type II reports (or equivalent) for the services and facilities in

scope for the engagement.

• The hosting facility must comply with minimum Tier 3, as defined by the Uptime Institute,

ANSI TIA-942, or an equivalent industry standard.

• The hosting facility must be certified against ISO 27001; compliance with the following

international standards is desirable:

o ISO 9001

o ISO 27002

o ISO 20000-1:2011

o ISO 14001

Other desirable certifications may include, but are not limited to:

o PCI-DSS v3.0 or later

Page 11: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

11

o Australian Signals Directorate

o ASIO-T4

o Uptime Institute

o CSA

Also consider contractual obligations relating to the service provider allowing security assessments

and treatment of outcomes as agreed with the client.

If the hosting facilities changes to a location that is deemed unacceptable either to NSW

Government or to the agency and/or loses attributes and/or capabilities identified above, the

agency may need to consider termination of services.

(l) NSW Government Data Centre

All relevant services for the solution may be provisioned from one or both NSW Government Data

Centre(s) (GovDC). Depending on the service offering and agency requirements, it may be possible

to ‘burst’ some elements of services to other location(s), subject to agreement with the

commissioning agency.

Burst data centres must be deemed ‘compliant’. If the ‘burst’ data centre facilities change to a

location that is deemed unacceptable either to NSW Government or to the agency, the agency may

need to re-examine the ‘burst’ service or the full service.

(m) Onshore/offshore management

All solution providers must be able to articulate where their services will be provided from,

including any remote support services.

For example, with a ‘follow the sun’ support model:

• the locations of each of their support sites around the globe need to be identified

• any changes to these need to be communicated to the customer agency promptly

• if this causes issues, the agency has the right to cancel the service with appropriate notification.

(n) Service level management

Agencies will retain ultimate responsibility for service level management in any solutions

engagement which would ordinarily be covered by a Service Level Agreement (SLA). Agencies,

service-brokers and solution providers need to agree all SLA reporting and other related activities

as part of any transition-in process.

(o) Multi-service broker provision

Any solution provider must work within the confines of a multi-service provider environment

where either the agency or nominated provider will perform broker service provision. This will be

defined as one provider being made accountable for the provision of all associated services,

whether these are provided by the provider itself, or other third-party providers.

Page 12: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

12

DOCUMENT CONTROL

Document history

Status: Final

Version: 1.0

Approved by: Executive Director, Policy & Innovation

Approved on: ?? 2016

Issued by: Policy and Innovation, ICT & Digital Government Division, Department of Finance, Services &

Innovation (DFSI)

Contact: Policy and Innovation, ICT & Digital Government Division, Department of Finance, Services &

Innovation (DFSI)

Email: [email protected]

Telephone: (02) 9372 7445

Review

This standard will be reviewed as required.

Page 13: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

13

APPENDIX A – ABBREVIATIONS AND DEFINITIONS

AIIA Australian Information Industry Association

ASD Australian Security Directorate

ASIO Australian Secret Intelligence Organisation

CSA Canadian Standards Association

GovDC Government Data Centre

ICT Information & Communication Technology

ISO/TC International Organization for Standardization / Technical Committee

IT Information Technology

MAM Mobile Application Management

MDM Mobile Device Management

OS Operating System

PCI-DSS Payment Card Industry – Data Security Standard

PTS Procurement & Technical Standards

RTCE Real Time Collaborative Editing

SLA Service Level Agreement

Page 14: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

14

APPENDIX B – REFERENCES Agencies should have regard to the following statutes, NSW Government policies and standards:

• AS/NZS ISO 31000 Risk management – Principles and guidelines

• Electronic Transactions Act 2000

• Government Information (Public Access) Act 2009

• Health Records and Information Privacy Act 2002

• ISO 27031-2011 Information technology – Security techniques – Guidelines for information and

communication technology readiness for business continuity

• ISO 27001 Information technology – Security techniques – Information security management systems

– Requirements

• ISO 24762 – IT Security Techniques – Guidelines for ICT Disaster Recovery Services

• NIST Definition of Cloud Computing SP800-145

• NSW Government Digital Information Security Policy

• NSW Government Open Data Policy

• NSW Government Cloud Policy

• NSW Government Standard for Data Quality Reporting

• NSW Government ICT Strategy

• NSW Government Digital + 2015 Final Update

• NSW Government Information Classification, Labelling and Handling Guidelines

• NSW Procurement: Small and Medium Enterprises Policy Framework

• Privacy and Personal Information Protection Act 1998

• Public Finance and Audit Act 1983

• Public Interest Disclosures Act 1994

• State Records Act 1998

• TPP 09-05 - Internal Audit and Risk Management Policy for the NSW Public Sector

Page 15: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

15

APPENDIX C – STANDARDS

Developing technical standards

Development of a standard begins with identifying the need for a new standard, which is followed by the

development of the standard in consultation with the industry and experts groups, including the Australian

Information Industry Association (AIIA).

The following diagram outlines the process.

The ICT Procurement and Technical Standards Working Group (PTS Working Group) is chaired by the

Department of Finance, Services & Innovation and includes senior representation from across NSW

Government.

Agencies engage with the PTS Working Group concerning services for inclusion in the ICT Services

Catalogue. This drives the development of technical standards, where none exist. The PTS Working Group

has the leading role in reviewing and endorsing the technical standards developed in response to agencies’

requirements.

The PTS Working Group is supported by two sub-groups responsible for the areas of Telecommunications

and Services and Solutions. The sub-groups are responsible for initial development and review of standards

relating to their areas of responsibility.

Management and implementation

There is scope to modify standards through the NSW Government ICT governance arrangements as

necessary. Standards are designed to add value, augment and be complementary to, other guidance, and

they are continually improved and updated.

This standard does not affect or override the responsibilities of an agency or any employee regarding the

management and disposal of information, data, and assets. Standards in ICT procurement must also

address business requirements for service delivery.

NSW Procurement facilitates the implementation of the standards by applying them to the goods and

services made available through the ICT Services Catalogue.

Need for new or amended standard

identified

Standard developed (Industry/agencies

consulted)

Standard approved and released by PTS

Working Group

Market engagement for services which meet the standard

Services added to Catalogue

Business requirements change

Page 16: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

16

APPENDIX D – Sample Key Performance Indicators

Key Performance Indicator (KPI) Definition

Project Management (Transition

Planning and Support)

# projects # major release rollouts under the control of project management

% projects with project charters % projects started with a signed project charter

# changes to project charter # changes to the project charter after project start

Adherence to project budget Actual vs. planned consumption of financial and personnel resources

Project delays Actual vs. planned project completion dates

Change Management

# major changes # major changes assessed by the CAB (Change Advisory Board)

#CAB Meetings # CAB (Change Advisory Board) meetings

Time for change approval/

rejection

Average time from registering an RFC with Change Management until a

decision on the RFC is reached (i.e. until it is either approved or

rejected)

Change Acceptance Rate # accepted vs. rejected RFCs

# emergency changes # emergency changes assessed by the ECAB (Emergency Change

Advisory Board)

Service Asset and Configuration

Management

Verification Frequency Frequency of physical verifications of CMS contents

# incidents owing to inaccurate

CMS information

# incidents reported due to inaccurate configuration management

information

Effort for CMS Verifications Average work effort for physical verifications of the CMS contents

CMS Coverage % configuration components kept in the CMS

Number of unauthorized

Changes detected automatically

# unauthorized changes identified as a result of audits performed using

automatic configuration update software

Number of CMS Errors # errors found in the CMS as result of an audit

Release and Deployment

Management

# releases # releases rolled out into production environment. Grouped by major

and minor releases

Duration of major deployments Average duration of major deployments from clearance until

completion

# release back-outs # releases that had to be reversed

Proportion of automatic release

distribution Proportion of new releases distributed automatically

Page 17: ITSM - Service Transition Standard v1 · ITSM Service Transition Standard 3 1. CONTEXT 1.1. Background This is a technical standard developed through the NSW ICT Procurement and Technical

ITSM Service Transition Standard

17

Key Performance Indicator (KPI) Definition

Service Validation and Testing

% failed release component

acceptance tests % release components that fail to pass acceptance tests

# identified errors # identified errors during release testing per release

Time for error fixing Time until re-submission of fixed release components

Incidents caused by new releases # incidents attributable to new releases

% failed service acceptance tests % service acceptance tests that fail to obtain customer’s sign-off