ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
-
Upload
ashlyn-dicker -
Category
Documents
-
view
213 -
download
0
Transcript of ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
![Page 1: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/1.jpg)
ITS /MFT installation concept CERN 27 September 2012
Corrado Gargiulo
![Page 2: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/2.jpg)
Beam Pipe
Valve
TPC
Absorber
SIDE A
SIDE C
ITS
Layer 1,2, 3
Layer 4,5
Layer 6,7
ITS
MFT
MFT
MFT& ITS Services
Corrado Gargiulo
![Page 3: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/3.jpg)
MFT Vs SERVICES
In order to be able to extract the MFT without displacing the TPC, all MFT services should come from A-side. In case it is necessary to route some of the services to the C-side, they should be implemented so they can be connected and disconnected remotely.
A-side
C-side
![Page 4: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/4.jpg)
Beam Pipe Support C-Side
Beam Pipe intermediate support
ITS Outer Barrel
ITS Inner Barrel
MFT Vs BEAM PIPE SUPPORTS
The insertion of each half MFT has to take into account the beampipe intermediate support, which consist of an horizontal carbon bar placed inside the TPC. This is in the way of the MFT translation towards the nominal position.
![Page 5: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/5.jpg)
SUPPORT CAGE
Corrado Gargiulo
Beam Pipe
Cage (bottom-half)
Rails
BeamPipe installation on Support Cage
![Page 6: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/6.jpg)
Beam Pipe
Cage (bottom-half)
Rails
TPC
Corrado Gargiulo
BeamPipe installation on Support Cage
TPC
![Page 7: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/7.jpg)
Beam Pipe
Cage (bottom-half)
Rails
TPC
Corrado Gargiulo
TPC sliding to final positionCage hanging to TPC
TPC
![Page 8: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/8.jpg)
Beam Pipe
Cage (bottom-half)
Rails
TPC
Corrado Gargiulo
Temporary Rails removal
![Page 9: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/9.jpg)
MFT
Corrado Gargiulo
MFT +services carrersin parking position
The installation of the MFT foresees the insertion from the A-side in the TPC through a guided movement along the beam pipe.For installation purposes the MFT is divided in two halves, top and bottom, to get around the beam pipe and each half is installed independently from the other.
With the MFT mounted around the beampipe in its parking position, the beampipe vacuum valve interferes with service carriers.
In order to avoid such interference, the services carriers will be opened radially with respect to the beam line,
![Page 10: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/10.jpg)
MFT
Corrado Gargiulo
MFT +services carrers moving in
The MFT half barrel is inserted in the TPC in a position radially shifted to gain the needed clearance with the beam pipe and its intermediate support. The insertion and its final positioning is achieved by a guides system that drives the translation.
Services carriers will be progressively closed to reach the final arrangement while the detector is translated towards the interaction point.
![Page 11: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/11.jpg)
MFT
Corrado Gargiulo
Services carriers will be progressively closed to reach the final arrangement while the detector is translated towards the interaction point.
MFT +services carrers moving in
![Page 12: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/12.jpg)
MFT
Corrado Gargiulo
In the last centimeters of the translation along the z-axis the MFT approach the beampipe with a radial movement to reach the final position.
MFT +services carrersin position
![Page 13: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/13.jpg)
Layer 1,2, 3Layer 4, 5
Layer 6,7
Outer Half Barrel
Inner Half Barrel
ITS Half Barrel
ITS
![Page 14: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/14.jpg)
a) b) c)
d) e) f)
ITS Outer Layers
Corrado Gargiulo
![Page 15: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/15.jpg)
ITS Inner Layers
![Page 16: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/16.jpg)
MFT structure: guides system
Corrado Gargiulo
![Page 17: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/17.jpg)
MFT structure: guides system
rollers
Corrado Gargiulo
![Page 18: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/18.jpg)
MFT structure : guides system
guides
Corrado Gargiulo
![Page 19: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/19.jpg)
MFT structure : guides system
guides
Corrado Gargiulo
![Page 20: ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.](https://reader036.fdocuments.us/reader036/viewer/2022062713/56649cbe5503460f94983f86/html5/thumbnails/20.jpg)
~ n 4 250mmx30mm TBC
MFT services carriers
MFT services carriers
ITS layer 4,5 services carriersITS layer 6,7 services carriers