South Australian Government Boards and Committees Information
Item No.10.0 STRENGTHENING OF POLLUTION CONTROL BOARDS AND COMMITTEES.
-
Upload
tracy-simon -
Category
Documents
-
view
217 -
download
1
Transcript of Item No.10.0 STRENGTHENING OF POLLUTION CONTROL BOARDS AND COMMITTEES.
Decisions of the 55th Meeting with PCBs/PCCs( 17.8.2009)
Consolidated requirements on;
(a) Laboratories
(b) Computerisation
(c) Staffing
(d) Infrastructure
(e) Common Waste Management facilities (CETPS, TSDF, CBMWTF)
COMPONENTS
1 Laboratories : Rs.384.7327 crores
2 Computerisation : Rs.46.9957 crores
3 Infrastructure : Rs.627.6654 crores
Total : Rs.1059.3956 crores
STAFFING NEEDS(ADDITIONAL REQUIREMENTS)
1 Additional requirement
scientific/ Technical / Computer
: 9384
4610
2 Existing staff
Scientific/ Technical
: 6055
1315 + 28791564
COMMON WASTE MANAGEMENT FACILITIES
Facilities Requirements Existing
CETPs 129 147
TSDF 36 27
CBMWTF 86 177
ANALYSIS OF REQUIREMENTS (Rs. in crores){LABORATORY}
<1.0 1-5 5-10 >10Andaman Arunachal Assam Andhra Pradesh
Lakshadweep Bihar Delhi Chhatisgarh
Chandigarh Goa Gujarat
Daman Diu Karnataka Haryana
Himachal Kerala Jammu & Kashmir
Manipur Punjab Jharkhand
Meghalaya Uttrakhand Madhya Pradesh
Mizoram Maharashtra
Nagaland Orissa
Pudducherry Rajasthan
Sikkim Tamil Nadu
Tripura Uttar Pradesh
West Bengal
Groupings of Total Requirement (Rs. in crores)
<1.0 1-10 10-50 >50
Andaman Arunachal Andhra Haryana
Chandigarh Assam Jharkhand
Daman Diu Bihar Madhya Pradesh
Lakshadweep Chhattisgarh Rajasthan
Manipur Goa Tamil Nadu
Meghalaya Delhi Uttar Pradesh
Mizoram Gujarat
Nagaland Himachal
Pudduchery J&K
Sikkim Karnataka
Tripura Kerala
Maharashtra
Orissa
Punjab
Uttrakhand
West Bengal
BLUE PRINTS ON STRENGTHENING
1 Madhya Pradesh 2 Assam
3 Lakshadweep 4 Uttar Pradesh
5 Mizoram 6 Tripura
7 Nagaland 8 Himachal Pradesh
9 Goa 10 Manipur
11 Tamil Nadu
CONTENTS OF BLUE PRINT
1. Introduction
2. Need of the Document
3. Present status of Pollution Control
4. Mandates & Activities
5. Present set-up of Board
6. Goals for Pollution Control
7. Proposal for strengthening
8. Co-ordination with State agencies
9. SPCB and Public involvement
10. Conclusion
BASIS OF ESTIMATESLaboratories : Gradation/ Locational needs
: • Central A• Zonal / Regional B• Need based C
Compliance Monitoring
• Parameters prescribed: source/ Ambient
• Performance of ETP, CETP, APCD, TSDF.
Special Tasks : • Hazard Assessment• Accident management• Ambient monitoring• State-specific R&D
CAPABILITIES OF LABORATORIES
Parameters A – Grade B –Grade C -Grade
Physical 15 14 13
Inorganic General & Non metals 21 18 13
Organic 13 9 4
Trace metals 28 18 9
Microbiological 7 5 2
Bio-assay 5 3 2
Bio-monitoring 8 6 1
Hazardous Waste 6 0 0
Soil, Sludge, Sediment 37 31 15
Ambient Air 15 10 5
Source Emission 18 18 6
Noise + + +
Vehicular emission 4 3 3
COSTING OF LABsIn Crores
A B C
6.45 1.34 0.4590
Instruments Parameters
Water waste water
55148
Hazardous waste
07
Air/ Emission 30 40
BASIS OF ESTIMATESComputerisation 1. Linkages RO HO
CPCB2. Data Management & Reports
Infrastructure : • No rented Premises for Lab•Monitoring vehicles for timely transportation of samples; and enhancing monitoring frequency.• Un-interrupted lab functioning- Power back-up
STAFFING NEEDS
Project Fellows : Analytical support on job training (PG/PhD)
Regular Scientist/ Engineer
: Concentrate on specific jobs, R&D to keep scientific tempo.
Administration & Finance
: Optimal requirement
DRAFT PROPOSAL(Funding Formula)
• Central Government
• State Government
• Own Resources of SPCB/PCC
• Bilateral programme
Time Frame