ITEM NO. 04 (A-13).doc

download ITEM NO. 04 (A-13).doc

of 5

Transcript of ITEM NO. 04 (A-13).doc

  • 8/10/2019 ITEM NO. 04 (A-13).doc

    1/5

    ITEM NO. 04 (A-13)

    1. Name of subject/Project:- e!ab"#"tat"o$ of o#% se&ers "$ N'Marea.

    *: 'es"#t"$+ a$% e!ab"#"tat"o$ of ,art of tru$ se&er at !us!a

    Na##a! $ear r"+. *os!"ar "$+! oa%.

    - Te$%er t!ereof -

    . Name of 'e,artme$t co$cer$e%: Civil Engg, Department-I (PH-circle).

    3. r"ef !"stor of t!e subject /,roject:- The proposal is for esilting an

    reha!ilitation of 11"# mm ia tr$n% se&er line passing $ner 'h$sha%

    allah an ail&a* +ine at rig. Hoshiar ingh oa for &hich / 0 E/

    &as accore !* Co$ncil vie eso. o. (-2) ate 33.4.#" for s.

    1,15,5",###/- an the etaile estimate amo$nting to s. 1,16,"",4##/-

    technicall* sanctione !* CE(C ) on 2..#" vie item no. "4. s per the

    approve raft IT &ith an estimate cost of s. 1,11,33,###/-. 7pen

    teners &ere invite from speciali8e agencies, &ho have e9ec$te the

    reha!ilitation &or%s &ith CIPP technolog*, an o$t of the three teners

    receive /s. $!hash Pro;ects 0 ar%eting +t. &ere fo$n to !e lo&est

    &ith a al oar. The

    teners &ere scr$tini8e in the epartment an %eeping into consieration

    the scope of &or% for &hich DC ha no past e9perience an the &or%

    !eing a pilot pro;ect of this %in, the rates receive in the competent

    teners &ere compare &ith the rates o!taine from Delhi >al oar on

    &hich the &or%s &ere a&are in the past $sing the same technolog* in

    orer to chec% the reasona!ilit* of rates.

    Ta%ing into acco$nt the comparison of the rates an in orer to %no& the

    etails of the &or% to !e e9ec$te !* the contractor a s$!-committee

    comprising of E-in-C in chair, E(PH), EE(P-I), ?7 an EE(P) ha calle the

    contractor for see%ing necessar* clari@cations !esies e9ploring the possi!ilit*

    of re$ction in rates. The compan* provie &ith the etails of the scope of

    &or% along&ith their costing as &ell as ecline to re$ce rates an* f$rther

    speciall* on acco$nt of the &or% !eing of small magnit$e in &hich a lot of

    infrastr$ct$re ha to !e !ro$ght in for e9ec$tion res$lting into higher cost

    inp$ts as &ell as importe material to !e $se for lining.

  • 8/10/2019 ITEM NO. 04 (A-13).doc

    2/5

    'eeping into consieration the s$!-committee recommene the acceptance

    of lo&er oAer of /s. $!hash Pro;ects 0 ar%eting +t. at their

  • 8/10/2019 ITEM NO. 04 (A-13).doc

    3/5

    !e ta%en $ring e9ec$tion to ens$re that onl* that @rm e9ec$tes the &or% &ho

    has representation/rights to $se the technolog* from the Principles. It ma*,

    therefore, !e ens$re that ecision of the co$ncil as referre to is complie

    &ith f$ll*. lso, &e nee to have inepenent

  • 8/10/2019 ITEM NO. 04 (A-13).doc

    4/5

  • 8/10/2019 ITEM NO. 04 (A-13).doc

    5/5