Council General Business 28 February 2005 Council General Business 28/2/05 General Manager Lord Mayor 1 ITEM 13 December Quarterly Corporate Review Report of General Manager (DD) 4/2/05 PRECIS The second Quarterly Corporate Review reports on the progress towards the achievement of Council’s Corporate Plan as at 31 December 2004. This involves an examination of the financial and operational performance of Council for the second quarter of the reporting period and a restatement of the anticipated result for the 2004/05 budgetary year. RECOMMENDATION 1 The December 2004/05 Quarterly Corporate Review be adopted. 2 Financial statements as at 31 December 2004 be adopted and revised totals of income and expenditure be approved and voted. BACKGROUND Council regularly reviews both its operational and financial performance via the Quarterly Corporate Review. Detailed progress is reported on the accomplishment of the 2004/05 objectives and projects as set out in the ten programs of the 2004-08 Corporate Plan. This Quarterly Corporate Review also contains information on projects which have been introduced after the endorsement of the 2004-08 Corporate Plan in June 2004 to provide Councillors and the community with a more accurate picture of the projects Council is currently undertaking. The Report of the General Manager contains a summary of the operational performance and major projects for the December 2004 quarter. A Budget Review Statement and Revision of Estimate, as well as a Financial Overview for the December 2004 quarter are contained within the Report of the Chief Financial Officer. PROPOSAL The review be received and revised estimates be adopted. CONSULTATION All members of the Executive and Senior Management have had input into the production of this review.

Transcript of ITEM 13 December Quarterly Corporate Review - … · ITEM 13 December Quarterly Corporate Review...

  • Council General Business 28 February 2005

    Council General Business 28/2/05

    General Manager Lord Mayor 1

    ITEM 13 December Quarterly Corporate Review Report of General Manager (DD) 4/2/05

    PRECIS The second Quarterly Corporate Review reports on the progress towards the achievement of Councils Corporate Plan as at 31 December 2004. This involves an examination of the financial and operational performance of Council for the second quarter of the reporting period and a restatement of the anticipated result for the 2004/05 budgetary year.

    RECOMMENDATION 1 The December 2004/05 Quarterly Corporate Review be adopted. 2 Financial statements as at 31 December 2004 be adopted and revised totals

    of income and expenditure be approved and voted.

    BACKGROUND Council regularly reviews both its operational and financial performance via the Quarterly Corporate Review. Detailed progress is reported on the accomplishment of the 2004/05 objectives and projects as set out in the ten programs of the 2004-08 Corporate Plan. This Quarterly Corporate Review also contains information on projects which have been introduced after the endorsement of the 2004-08 Corporate Plan in June 2004 to provide Councillors and the community with a more accurate picture of the projects Council is currently undertaking. The Report of the General Manager contains a summary of the operational performance and major projects for the December 2004 quarter. A Budget Review Statement and Revision of Estimate, as well as a Financial Overview for the December 2004 quarter are contained within the Report of the Chief Financial Officer.

    PROPOSAL The review be received and revised estimates be adopted.

    CONSULTATION All members of the Executive and Senior Management have had input into the production of this review.

  • Council General Business 28 February 2005

    Council General Business 28/2/05

    2 General Manager Lord Mayor

    NEIGHBOURHOOD COMMITTEES

    The Quarterly Corporate Review is an internally produced document that reports on the progress of the 2004-08 Corporate Plan. Therefore in the preparation of this document there was no need for consultation with neighbourhood committees.

    PLANNING AND POLICY IMPACT This document reports on the progress achieved towards the 2004-08 Corporate Plan.

    ECOLOGICAL SUSTAINABILITY

    Ecological Sustainable Development (ESD) is about changing the way Council and the community works and lives. It provides a framework for deciding on a sustainable future for our children and our environment.

    FINANCIAL IMPLICATIONS These, along with the Section 94 Contributions and investments, are contained within part B of the Quarterly Corporate Review.

    OPTIONS 1 Council adopts the report as presented. 2 Council makes variations to the Quarterly Corporate Review.

    CONCLUSION This Quarterly Corporate Review has been prepared following input and assistance from all divisions to the organisation. It is submitted for Councils consideration.

    ATTACHMENTS December 2004 Quarterly Corporate Review (Separate Attachment).

  • WOLLONGONG CITY COUNCIL

    2ND QUARTERLY CORPORATE REVIEW

    DECEMBER 2004

    II NN DD EE XX

    RREEPPOORRTT OOFF GGEENNEERRAALL MMAANNAAGGEERR ....................................................................................................................................................................II RREEPPOORRTT OOFF CCHHIIEEFF FFIINNAANNCCIIAALL OOFFFFIICCEERR ........................................................................................................................................ VVII PART A CCOORRPPOORRAATTEE RREEVVIIEEWW FFOORR 22NNDD QQUUAARRTTEERR 22000044//22000055 CITY DEVELOPMENT .................................................................................................................1 INFRASTRUCTURE...................................................................................................................20 ENVIRONMENT AND HEALTH....................................................................................................53 COMMERCIAL DEVELOPMENT ..................................................................................................65 WASTE MANAGEMENT ............................................................................................................76 RECREATION AND NATURAL RESOURCES ................................................................................85 COMMUNITY AND CULTURAL SERVICES..................................................................................112 LIBRARY SERVICES...............................................................................................................138 ORGANISATIONAL SERVICES .................................................................................................146 ENVIRONMENTAL MANAGEMENT PROGRAM............................................................................185 PART B FFIINNAANNCCIIAALL SSUUMMMMAARRYY//DDEETTAAIILLSS UNDERSTANDING THE QCR FINANCIAL INFORMATION ............................................................189 WHOLE OF COUNCIL BUDGET................................................................................................194 INTRODUCED DURING QUARTER ............................................................................................197 MAJOR VARIATIONS..............................................................................................................201 PROJECTS PROPOSED FOR CARRYOVER................................................................................218 RESTRICTED CASH FIVE YEAR SUMMARY ...........................................................................221 DETAILED RESTRICTED ASSETS ............................................................................................222 SUMMARY OF S94 CONTRIBUTIONS.......................................................................................240 SECTION 94 LOCAL UNITS MAP.............................................................................................249

  • PAGE I GENERAL MANAGERS REPORT

    QQUUAARRTTEERRLLYY CCOORRPPOORRAATTEE RREEVVIIEEWW DDEECCEEMMBBEERR 22000044

    RREEPPOORRTT OOFF GGEENNEERRAALL MMAANNAAGGEERR

    IINNTTRROODDUUCCTTIIOONN I present to you the review of the second quarter of the 2004/05 financial year. This review reflects the financial and operational performance of the organisation for this period and reports on the achievement of the objectives contained within the 2004-2008 Corporate Plan. OOPPEERRAATTIIOONNAALL PPEERRFFOORRMMAANNCCEE The 2004/05 Enterprise Agreement for Wollongong City Council employees was ratified and implemented by the Industrial Relations Commission in late October 2004. Management have forwarded a draft copy of the 2005-08 Enterprise Agreement to unions for comment and commencement of negotiations.

    Residents and businesses involved in small and larger scale development in the City now have a more streamlined process regarding the advertising of their proposal after Council endorsed changes to the Notification Policy. The amended Notification Policy defines the type of notification required for particular developments. The period and process of notification are now more applicable to the scale, type and location of the proposal.

    New exercise equipment installed at Beaton Park Leisure Centre has enabled the redesign of the former circuit area. The Parks Express Circuit is now located in the former cardio area. The gymnasium layout has also been redesigned and offers a more open and spacious floor plan. In addition the Lakeside Leisure Centre equipment has been installed in both the cardio and circuit areas resulting in increased visitation to the Centre. The 2004 Viva la Gong festival showcased Wollongong at its most creative and innovative. Over 287 artists were employed to create exhibitions, performances and events in response to the theme Metamorphosis looking at the development and transformation of our city. Over 1,600 members of our community and 377 local businesses contributed their time and creativity to produce 39 events in 30 of Wollongongs cultural venues. An estimated 31,000 people attended events during the 10 day festival. During this quarter Councils Rise and Shine Program resulted in a record 116 different community groups participating in the annual 13 week spring clean-up. Over 50 tonnes of rubbish were collected from creeks, bushland, dune areas and other public locations. The annual Rise and Shine Program presentation night was held in December with more than 150 certificates being given to individuals, community groups and schools for their efforts throughout the year.

    Councils commitment to water education continued during this quarter. In October the focus was on water conservation strategies to coincide with Water Week which was held between 18 and 24 October. Five community workshops addressing water conservation issues were conducted. Community FACT sheets were produced for water conservation, grey water and rainwater tanks.

    A pilot of the community participation program Our Waterways was conducted during October. The program was extended into November and December with five (5) additional workshops addressing water conservation and pollution issues. The website for the Our Waterways program was developed during November and December and is ready for launch in January 2005.

  • PAGE II GENERAL MANAGERS REPORT

    The major consultation period of the Sustainability Begins at Home Program was completed in December, culminating in a Celebration Dinner to thank program sponsors, business partners, workshop presenters and members of the community. A presentation was given providing information on program activities and preliminary results. Approximately 30 home audits (energy, water and waste) were conducted as part of the Sustainability Begins at Home Program throughout the quarter. Each individual home received a report identifying the water and energy rating for the home as well as recommendations to assist improvement of the energy star rating as appropriate. The Environment & Health Division completed a draft Green Procurement and Purchasing Policy for Council to be incorporated into our purchasing policy. Comments were received following internal review and these are being incorporated into the policy for finalisation.

    As a part of Councils Surf Sense education program, a Surf Safety Workshop was conducted by Councils Lifeguard Service at the Wollongong University. The workshop was held specifically for international students who are unfamiliar with surf safety issues. Multi-lingual information brochures were also distributed.

    During December Council arranged two series of street meetings with residents in Coalcliff, Bulli, Woonona, Mt Ousley and Cordeaux Heights which provided an avenue for residents to discuss their bushfire concerns in these areas and informed them of the design of the bushfire asset protection zones and the nature of the works required at these sites to reduce the bushfire risk. This also involved a presentation by the Rural Fire Service with information on how to prepare your property, reduce bushfire risks around your house and protect yourself in a bushfire emergency.

    Councils waste management services were promoted during National Recycling Week. Waste tips on a variety of issues were placed regularly in the Advertiser, as well as descriptions of the Annual Household Cleanup areas. The work of our Waste Management group, particularly the Green Team and Glengarry Cottage, was recognised through a win at the Illawarra Business Chamber Awards in the Access Category. Wollongong Music Week was held between 24 November and 1 December 2004. A number of events were held throughout Wollongong promoting and celebrating the Wollongong original music scene. Wollongong Youth Services hosted 2 all age events and music industry workshops. Wollongong Youth Services Entertainment Committee received an award from Music Oz for most Active Local Music Industry Young Person or Group.

    The Kids Garden Groove event to celebrate Childrens Week was held on 14 November 2004. The number of people in attendance was up by approximately 40% with 1,500 people passing through the gates over the 4 hour period. This years theme was healthy bodies and a healthy environment. Several Divisions of Council were involved in the days events. The event was a huge success with the various divisions of council having the opportunity to showcase their programs to the community. The City of Wollongong welcomed in the 2005 New Year with the New Years fEVEr in the Gong event. This community event was staged in Wollongongs Lang Park and culminated in a spectacular fireworks display. The project was managed by Council, with sponsorship funding from a number of businesses including WIN Television, IMB, City Beach Function Centre and BlueScope Steel.

  • PAGE III GENERAL MANAGERS REPORT

    MMAAJJOORR PPRROOJJEECCTTSS WWEESSTT DDAAPPTTOO PPLLAANNNNIINNGG Draft LES Chapters, Draft Structure Plan and the draft Master Plan have been received from the Master Planning consultant. The documents are currently being reviewed by the project team.

    Negotiations are currently underway with the Department of Environment & Conservation to determine the extent of additional Aboriginal archaeology studies such that the Aboriginal Heritage Management Plan can be completed and used in the finalisation of the LES, Master Plan, LEP and DCP.

    Two public information meetings were held as part of the project on 28 October and 1 November 2004.

    Dapto Town Centre Draft Masterplan is being prepared in conjunction with the draft Structure Plan for the West Dapto Release Area.

    WWOOLLLLOONNGGOONNGG FFUUTTUURREESS Buchan Consulting submitted the first draft of the Strategy Report for feedback from the Project Control Group and Community Advisory Group (CAG).

    Work on finalising an operational and tangible sustainability policy within council to be embodied into the Wollongong Futures City Strategic Directions, is ongoing.

    IINNTTEEGGRRAATTEEDD PPLLAANN FFOORR TTHHEE CCIITTYY LLEEPP On 5 October 2004, Council resolved to commence the preparation of a new draft LEP for the Local Government Area. Preliminary consultation is occurring with Statutory Authorities, local MPs, Neighbourhood Committees, community, business and environmental groups.

    Support Studies:

    - Retail Centres Study complete;

    - Draft Housing Strategy in preparation.

    CCIITTYY CCEENNTTRREE RREEVVIITTAALLIISSAATTIIOONN SSTTRRAATTEEGGYY Progress continues on:

    - New draft City Centre LEP;

    - Revised draft City Centre DCP;

    - Revised Public Domain Masterplan and new companion Technical Manual.

    Draft Access and Movement Strategy prepared November 2004.

    A Councillor workshop was held in December 2004 to discuss a number of key city wide projects including the City Centre Revitalisation Strategy.

    LLAANNDD IINNFFOORRMMAATTIIOONN SSYYSSTTEEMM ((LLIISS)) The internet module of LIS has been installed and preliminary testing has commenced. It is planned to commence a trial of a number of services early in 2005.

  • PAGE IV GENERAL MANAGERS REPORT

    MMAACCCCAABBEE PPAARRKK The City Centre landuse strategy and supporting documents will be presented to Council during the next quarter. Data collection that will lead to the development of preliminary options has commenced for the MacCabe Park Precinct Masterplan.

    IILLLLAAWWAARRRRAA EESSCCAARRPPMMEENNTT MMAANNAAGGEEMMEENNTT PPLLAANN The development of the Strategic Planning component of the draft Escarpment Plan is continuing. Consultants have undertaken an independent review of the submissions received as a result of the exhibition of the draft Plan in 2004.

    The Environment & Health Division continues to review and revise the draft Plan with completion of Escarpment Management Plan due toward the end of the first quarter of 2005.

    WWOOLLLLOONNGGOONNGG GGAATTEEWWAAYY VVIISSIITTOORR IINNFFOORRMMAATTIIOONN CCEENNTTRREE Negotiations between Council, the Department of Environment & Conservation and the RTA are continuing with a view to resolving traffic management issues associated with the development. The lodgement of the development application is delayed pending finalisation of these negotiations.

    WWIINNDDAANNGG SSUURRFF CCLLUUBB The full refurbishment of the Windang Surf Club was completed during this quarter and the facility was re-opened in December 2004.

    TTHHIIRRRROOUULL CCEENNTTRREE DDEEVVEELLOOPPMMEENNTT CCOONNTTRROOLL PPLLAANN Councils consultants have produced a preliminary draft Development Control Plan. It has been reviewed by Strategic Planning and its principles presented to the DCP Committee. The consultants are working a Masterplan and development standards into this document for presentation to the Committee in early February 2005.

    TTHHIIRRRROOUULL DDIISSTTRRIICCTT CCOOMMMMUUNNIITTYY CCEENNTTRREE AANNDD LLIIBBRRAARRYY The implementation of a successful communication and consultation strategy resulted in significant publicity on the release of the draft concept plan for the new Centre. Over 60 written responses were received with a significant portion being highly complimentary. A review of the comments and suggestions has commenced and several studies were instigated to provide information to enable the concept plan to be finalised and a DA to be submitted during the next quarter.

    CCOORRRRIIMMAALL PPEENNSSIIOONNEERRSS CCEENNTTRREE The design brief for the development of the former CWA/Community Health rooms in Memorial Park Corrimal to provide a centre to replace the old Corrimal Pensioners Centre (2 buildings) was completed prior to the project being deferred at the end of the first quarter due to other work priorities.

    TTHHIIRRRROOUULL PPOOOOLL PPUUMMPPHHOOUUSSEE The Design Division of Council is currently developing the scope of works required to maintain operational standards.

  • PAGE V GENERAL MANAGERS REPORT

    HHOORRSSLLEEYY CCHHIILLDDCCAARREE CCEENNTTRREE Negotiations continued between Council and the Department of Education and Training to facilitate a favourable outcome to the procurement of the land earmarked for the new Centre.

    AANNDDRREEWW LLYYSSAAGGHHTT PPAARRKK The development application for Andrew Lysaght Park is currently being assessed. Subject to the issue of development consent, the redevelopment of Andrew Lysaght Park will be programmed to commence at the completion of Stage 2 of the City Beach Foreshore Improvement works that are currently in progress.

    ROD OXLEY GENERAL MANAGER

  • PAGE VI RESPONSIBLE ACCOUNTING OFFICERS REPORT

    QQUUAARRTTEERRLLYY CCOORRPPOORRAATTEE RREEVVIIEEWW

    DDEECCEEMMBBEERR 22000044

    QQUUAARRTTEERRLLYY CCOORRPPOORRAATTEE RREEVVIIEEWW DDEECCEEMMBBEERR 22000044

    REPORT OF CHIEF FINANCIAL OFFICER OOVVEERRVVIIEEWW YEAR TO DATE The table provides my view of our overall financial performance against key indicators, for the year to date period to 31 December 2004. The table indicates the actual position at both Q1 and Q2 and an overall view of each financial indicator for the half-year period. YEAR TO DATE Actual Actual Budget Budget

    KEY FINANCIAL INDICATORS YTD Q1 YTD Q2 YTD Q2 Outcome

    Operating Revenues $M 35.6 70.6 71.8 Operating Costs $M (35.3) (75.1) (79.2)Capital Items $M 1.3 3.3 4.2 Operating Result $M 1.6 (1.2) (3.2)

    Total Cash Investments $M 72.2 71.9 67.9 Available Cash Assets $M 9.9 6.1 5.0 Return on Cash Invested % 5.7 5.6 5.5 Unrestricted Current Ratio x 2.2 2.2 2.0

    Assets $M 1,164.3 1,165.1 1,167.0 Liabilities $M (57.4) (59.0) (60.0)Net Assets [Equity] $M 1,106.9 1,106.1 1,107.0

    Debt Service Ratio x 1.7 1.8 2.0 Debt Borrowings $M (15.3) (17.3) (18.0)

    Rates Overdue % (14.0) (3.2) (2.0)Debtors $M 2.7 6.2 12.0

    Creditors Paid On-Time [Standard] % 72.0 82.0 80.0 Creditors $M (8.1) (7.8) (10.0)

    Regulatory Compliance The overall position at 31 December 2004 is within expectations across the broad range of indicators and on a budget outcome basis, acceptable. The Budget Review Statement deals with the full year forecast at 30 June 2005. FULL YEAR The full year 2004-05 forecast reflects a significant level of projects carried over from the prior year, and resulting in a significant forecast deficit. A similar level of carry over project expenditures should be anticipated for the current year. On this basis, I am confident that the original budget surplus remains viable. Internal control systems, monitored through the Internal Audit Program, are operating satisfactorily and there are no known breaches of regulatory compliance, and none anticipated.

  • PAGE VII RESPONSIBLE ACCOUNTING OFFICERS REPORT

    BBUUDDGGEETT RREEVVIIEEWW SSTTAATTEEMMEENNTT RREEVVIISSIIOONN OOFF FFUULLLL YYEEAARR EESSTTIIMMAATTEESS The tables in this report represent a reconciliation of movements from the original budget to the previously adopted budget [Q1] and the proposed or revised budget [Q2]. They are necessarily at the higher level of detail and are accrual based accounts and presented on a full year basis.

    With regard to the original estimate of income and expenditure, the financial statements and schedules contained within the Quarterly Corporate Review reflect overall a satisfactory outcome to budget in light of the original budget estimate and adopted principle of fiscal balance and given the necessary accounting adjustments required during the quarter.

    Available funds movement for the year to 30 June 2005 is forecast at $4.470M deficit, compared to an original budgeted surplus of $0.187M, reflecting an adverse movement for the year. This is a result of the reintroduction of prior year projects, additional items voted during the quarter offset by savings identified during the quarter. It is reasonable to expect, based on recent history, that a higher level of future carry forward projects will be identified during Q3 and Q4, improving the reported result.

    There is an improvement in the forecast operating position [Statement of Financial Performance] from the Adopted Budget to the Revised Budget position of $0.785M, attributable to items contained in the reconciliation in table 3.

    The deterioration in the full year operating position as reported should be recovered in Q3 and Q4 and in this regard fiscal restraint and careful budgetary management will be required.

    1 BUDGET MOVEMENT $000 FULL YEAR FORECAST 2004-05 Q2

    ORIGINAL

    ADOPTED

    REVISED

    Statement Of Financial Performance Expenses 149,911 155,290 155,790 Revenues 142,408 143,586 144,426 Surplus / (Deficit) for the Year (7,503) (11,704) (11,364) Capital Grant + Contributions 8,293 8,288 7,713 Net Surplus / (Deficit) 790 (3,415) (3,651)

    FUNDING STATEMENT Source 60,347 63,478 57,532 Application 60,160 68,733 62,002 Net Surplus / (Deficit) 187 (5,255) (4,470)

    Movement in Funding Statement from the Original Budget to the current full year projection:

    2 PROJECTED FUNDS $000 FULL YEAR FORECAST 2004-05 Q2

    VAR

    Reconciliation of Projected Funds Position Original Budget 187 Projects in progress at 30 June 2004, reintroduced into 2004-05 (5,463) Council resolutions during Q1 (173) Adopted Budget Prior to Q1 Review (5,449) Budget Adjustments identified during Q1 Review 194 Projected Funds Deficit for 2004-05 as at Q1 Review (5,255) Projects identified for Carryover during Q2 Review 917 Budget Adjustments identified during Q2 Review (132) Projected Funds Deficit for 2004-05 as at Q2 Review (4,470) The projected funds deficit for the year ended is 30 June 2005 after the December QCR is $4.470M indicating an improvement of $0.785M against the Q1 Adopted Budget. This improvement is largely due to a number of projects with a net value of $0.917M that have been deferred from the 2004-05 Budget to future periods. A detailed list of these projects is provided in Schedule 4 in Part B of this document.

  • PAGE VIII RESPONSIBLE ACCOUNTING OFFICERS REPORT

    The following is a list of the major factors that have contributed to the projected deterioration of $0.132M excluding carry-overs. A detailed list of variations is contained in the Schedule 3 in Part B.

    3 BUDGET VARIATIONS $000 FULL YEAR FORECAST 2004-05 Q2

    VAR

    RATE INCOME 505 The projected increase is a result of a number of properties that were classified as non rateable at 1 July 2004 that have become rateable after the initial rate levy was made. In addition there has been back rating of properties for previous years.

    BANK CHARGES 100 There has been a reduction in merchant service fees following changes in regulations by the Reserve Bank. The reduction in charges was also assisted by the implementation of the COSMOS facility for the payment of Council rates by phone, direct debit and internet.

    INSURANCE 600

    The Adopted Budget included $400K contribution for insurance claims that occurred whilst Council was a member of the Premsure self insurance pool. It is not anticipated that this payment will be required for 2004-05. In addition, trends on below excess payments for public liability claims indicate that the current provision of $700K will not be required fully and as such a reduction of $200K has been made in expenditure projections in this area.

    PEDESTRIAN SAFETY STRATEGY PROJECT 100 An amount of $200K grant income for the above project was included in the Adopted Budget along with a matching Council contribution of $200K. Recent advice is that only $100K of grant funds will be available in the current year, hence there has been a corresponding reduction in Councils contribution.

    LEGAL EXPENSES (250) Current trends indicate that the existing budget of $700K will not be sufficient. An interim increase has been made and expenditure trends will be further reviewed during the March QCR.

    MOTOR VEHICLE PURCHASES & DISPOSALS (398) Additional vehicles and pricing has resulted in an increased level of net expenditure. DEVELOPMENT ASSESSMENT & COMPLIANCE CONSULTANTS (342) Increased level of consultant usage as a result development assessment workloads and complexity of issues.

    EMPLOYEE COSTS (384) Revised projections indicate an increase in employee costs of $691K. The increase includes the employment of additional staff in Community Services ($105K), Leisure Centres ($30K) and for the Environmental Fund projects ($172K). These increases do not have an impact on the overall result as they have been offset by additional grant funds received, additional fees and savings in Material & Contracts budgets respectively. Further amounts are attributable to the need to backfill staff under the injury management program or extended sick leave $142K, annual review of salary packages for senior staff $90K, Industrial Relation Court ruling for compensation in place of motor vehicles allocation $36K, additional staff requirements in Development Assessment & Planning area due to back filling for extended leave and workloads $225K. This has been offset by a reduction in employee costs of $93K resulting from the dissolution of the Ombudsmans Office and other various minor changes of $16K.

    BALANCING ITEMS (63) TOTAL MOVEMENT IN FUNDING RESULT (132) In addition to the above changes that have been incorporated in the revised projections, a number of issues were considered but no adjustment has been made at this point in time and will be monitored closely through Q3: Superannuation Council has not been required to make contributions on behalf of employees who are members the Retirement and Defined Benefits Scheme superannuation fund for a number of years due to the level of surplus held in that fund. Recent advice indicates that the existing holiday period is under review. At this stage there has not been definitive advice as to commencement date or the level of the charge. Should Council be required to resume the full contribution, the annual cost would approximate $2.8M.

  • PAGE IX RESPONSIBLE ACCOUNTING OFFICERS REPORT

    An amount of $1M was set aside in restricted cash at 30 June 2004 out of savings achieved during that year in anticipation of the reintroduction of this expenditure. This cost has not been included in any of Councils financial forecasts and could have a significant impact in future. Property Damage Council provides an annual budget for rectification of damage to Council property that is below the applicable insurance excess. The budget for 2004-05 is $1.0M and as at the end of December was 66% spent. At this stage no adjustment has been made. Development Assessment Income Current income trends indicate a potential adverse variance against budget. Income achieved for the half year ending December 2004 is $1.6M or 47% of the annual budget. For the corresponding period for 2003, Council had achieved 55% of the full year income. This is an area that is subject to fluctuation both in terms of volume and value of developments caused by external factors.

    STEPHEN PAYNE CFO [ RESPONSIBLE ACCOUNTING OFFICER* ] DIRECTOR CORPORATE & GOVERNANCE

  • PAGE X RESPONSIBLE ACCOUNTING OFFICERS REPORT

    * Relevant Legislation *LOCAL GOVERNMENT (FINANCIAL MANAGEMENT) REGULATION 1999 6 Responsible accounting officer to maintain system for budgetary control The responsible accounting officer of a council must:

    (a) establish and maintain a system of budgetary control that will enable the councils actual income and expenditure to be monitored each month and to be compared with the estimate of the councils income and expenditure, and (b) if any instance arises where the actual income or expenditure of the council is materially different from its estimated income or expenditure, report the instance to the next meeting of the council. 7 Budget review statements and revision of estimates (1) Not later than 2 months after the end of each quarter, the responsible accounting officer of a council must prepare and submit to the council a budget review statement that shows, by reference to the estimate of income and expenditure set out in the management plan that the council has adopted for the relevant year, a revised estimate of the income and expenditure for that year.

    (2) A budget review statement must include or be accompanied by:

    (a) a report as to whether or not the responsible accounting officer believes that the statement indicates that the financial position of the council is satisfactory, having regard to the original estimate of income and expenditure, and

    (b) if that position is unsatisfactory, recommendations for remedial action. (3) A budget review statement must also include any information required by the Code to be included in such a statement.

  • PAGE XI RESPONSIBLE ACCOUNTING OFFICERS REPORT

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 1,352 633 (93)Materials & Contracts 152 75 0Depreciation 0 1 0Other Expenses 319 113 0Corporate Overheads (1) 0 0Internal Charges 1,850 895 0Total Expenses from Ordinary Activities 3,673 1,717 (93)

    REVENUES FROM ORDINARY ACTIVITIES

    User Charges & Fees 0 0 0Other Revenues 0 0 0Contributions - Operating 0 0 0

    Revenues from Ordinary Activities before Capital Amounts 0 0 0SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS (3,673) (1,717) 93

    NET SURPLUS (DEFICIT) (3,673) (1,717) 93

    Expenditure Funding Expenditure Funding

    Wollongong Wolves Relocation 17 (17) 17 0 0

    17 (17) 17 0 0

    Expenditure Funding Expenditure Funding

    0 0 0 0 0

    Executive Management

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget$'000

    ProposedVariation

    $'000

    Operational Expenses

    0

    1,000

    2,000

    3,000

    4,000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    0

    50

    100

    150

    200

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Project Expenditure

    0

    50

    100

    150

    200

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • PPAARRTT AA

    CCOORRPPOORRAATTEE RREEVVIIEEWW FFOORR

    22NNDD QQUUAARRTTEERR 22000044//22000055

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 1

    CCIITTYY DDEEVVEELLOOPPMMEENNTT FUNCTION MANAGER RESPONSIBLE

    Economic Development Manager Economic Development

    EECCOONNOOMMIICC DDEEVVEELLOOPPMMEENNTT

    CURRENT PROJECTS ACTIVE

    Facilitate an economic development strategy for the city, through:

    - Further research and analysis

    The Office of Economic Development has been liaising with Strategic Planning who has commissioned Buchan Consulting to undertake a City Centre Revitalisation Strategy.

    - A Wollongong Office of Economic Development (WOED)

    The Wollongong Office of Economic Development has been established and has operated since 12 July 2004.

    Council at its meeting of 22 November 2004 endorsed the nominations received for the establishment of an Economic Development Reference Group. The first meeting was held on Monday, 20 December 2004. The purpose of this Reference Group is to provide advice to Council regarding the development of economic development policy for the city and to monitor the implementation of any action plans in relation to economic development activity within the city.

    The objectives of this Reference Group are to provide advice to the Chief Executive on

    Employment opportunities for the city.

    Encourage the establishment of new businesses within the city which will create long term sustainable objectives for the city.

    Provide support to and assistance to existing businesses and organisations.

    Maintaining close working relationship with other key stakeholders and other government agencies.

    Developing policies and strategies which will encourage sustainable economic development in the city.

    Establishing close working relationships with other economic development managers within the region.

    Working in close collaboration with the University of Wollongong in securing new research and development opportunities for the Wollongong Innovation Campus.

    Promoting and continually enhancing the image of Wollongong as a proactive place to relocate and or establish new business.

  • CITY DEVELOPMENT

    2 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    Work in close cooperation with Councils Director Environment and Planning and the Strategic Planning function of Council.

    Review opportunities for a Tourist Mine in the City (2003/2004)

    Meetings of the Tourist Mine Reference Group were held on 25 November and 16 December 2004. Mr Robert Doyle, Councils Economic Development Manager, and Mr Greg Binskin from Tourism Wollongong were invited to attend future meetings.

    The Reference Group members were advised of support of this project by Minister David Campbell MP and Ms Marianne Saliba MP. A need for a business plan was identified.

    Ensure the initiatives of the Illawarra Telecommunications Task Force are carried out (2003/2004)

    The Illawarra Regional Development Board (IRDB) and Illawarra Business Chamber (IBC) are currently seeking funding to employ a business development manager on their Board.

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 3

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 676 270 0Materials & Contracts 231 91 0Other Expenses 1,210 600 0Internal Charges 24 15 0Total Expenses from Ordinary Activities 2,141 975 0

    REVENUES FROM ORDINARY ACTIVITIES

    Rates & Annual Charges 701 351 0User Charges & Fees 1 2 0Other Revenues 216 (1) 0Grants - Operating 35 0 (35)

    Revenues from Ordinary Activities before Capital Amounts 953 351 (35)SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS (1,188) (624) (35)

    NET SURPLUS (DEFICIT) (1,188) (624) (35)

    Expenditure Funding Expenditure Funding

    Economic Development Program 0 (35) 0 0 35

    0 (35) 0 0 35

    Expenditure Funding Expenditure Funding

    Minor Capital - Kembla Tce IRDBFitout 0 0 9 0 0

    0 0 9 0 0

    Economic Development

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget$'000

    ProposedVariation

    $'000

    Operational Expenses

    0

    500

    1,000

    1,500

    2,000

    2,500

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    0

    200

    400

    600

    800

    1,000

    1,200

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Project Expenditure

    0

    50

    100

    150

    200

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • CITY DEVELOPMENT

    4 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    CCIITTYY DDEEVVEELLOOPPMMEENNTT FUNCTION MANAGER RESPONSIBLE

    Strategic Planning Manager Strategic Planning

    SSTTRRAATTEEGGIICC PPLLAANNNNIINNGG

    KEY OBJECTIVE ONE DEVELOP AND IMPLEMENT URBAN PLANNING AND DESIGN STRATEGIES FOR THE CITY THAT RESULT IN ECONOMIC AND LIFESTYLE OPPORTUNITIES FOR THE COMMUNITY WITH ENHANCED ENVIRONMENTAL OUTCOMES

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..11 NNUUMMBBEERR OOFF NNEEWW PPRROOJJEECCTTSS//LLEEPPSS//DDCCPPSS//PPOOLLIICCIIEESS//SSTTRRAATTEEGGIIEESS CCOOMMPPLLEETTEEDD FFRROOMM PPRROOGGRRAAMM OORR AAGGRREEEEDD MMIILLEESSTTOONNEESS AACCHHIIEEVVEEDD

    LEPs gazetted:

    - Gateway site and Bulli Tops;

    - Edgewood Estate, Woonona.

    DCP amendment for Sandon Point to East Thirroul in force.

    SSTTRRAATTEEGGIICC PPLLAANNNNIINNGG

    KEY OBJECTIVE TWO PREPARE EASY-TO-READ AND ACCURATE ENVIRONMENTAL PLANNING INSTRUMENTS, PLANS, POLICIES AND REPORTS CONSISTENT WITH COUNCILS MANAGEMENT PLAN AND IN ACCORDANCE WITH STATUTORY REQUIREMENTS

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..11 NNUUMMBBEERR OOFF AAPPPPRROOVVEEDD DDCCPPSS//LLEEPPSS//PPOOLLIICCIIEESS RREEVVIIEEWWEEDD AANNDD UUPPDDAATTEEDD

    LEPs gazetted:

    - Gateway site, Bulli Tops;

    - Edgewood Estate, Woonona.

    DCP amendment for Sandon Point to East Thirroul in force.

    Council resolved to prepare draft LEPs for:

    - New Comprehensive LEP;

    - Two (2) lots in William James Drive, Cordeaux Heights;

    - Lot 3 Cordeaux Road, Figtree.

    Proposed Reclassifications:

    - DArcy Wentworth Carpark Warrawong;

    Church Street Balgownie;

    Mercury Street Gwynneville.

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 5

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..22 SSAATTIISSFFAACCTTIIOONN LLEEVVEELL OOFF IINNTTEERRNNAALL AANNDD EEXXTTEERRNNAALL CCUUSSTTOOMMEERRSS AANNDD SSTTAAKKEEHHOOLLDDEERRSS WWIITTHH QQUUAALLIITTYY,, LLEEGGIIBBIILLIITTYY AANNDD WWOORRKKAABBIILLIITTYY OOFF DDCCPPSS AANNDD LLEEPPSS

    No formal surveys undertaken during this period.

    SSTTRRAATTEEGGIICC PPLLAANNNNIINNGG

    KEY OBJECTIVE THREE ENCOURAGE A BROAD RANGE OF INVOLVEMENT AND CONTRIBUTION TO STRATEGIC PROJECTS BY THE COMMUNITY, BUSINESS SECTOR, GOVERNMENT AND NON-GOVERNMENT ORGANISATION

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 33..11 NNUUMMBBEERR AANNDD VVAARRIIEETTYY OOFF CCOONNSSUULLTTAATTIIOONN MMEECCHHAANNIISSMMSS IIMMPPLLEEMMEENNTTEEDD FFOORR PPRROOJJEECCTTSS ((LLEEPPSS//DDCCPPSS//PPOOLLIICCIIEESS//SSTTRRAATTEEGGIIEESS))..

    Three (3) draft LEPs on exhibition:

    - Reclassification of Balgownie Senior Citizens Club;

    - Interim Review;

    - Land adjacent to Dapto Citizens Bowling Club.

    Two (2) public information meetings held for West Dapto project.

    Meeting of Thirroul DCP Steering Committee.

    Meeting of Wollongong Futures Community Advisory Group (CAG).

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 33..22 LLEEVVEELL OOFF RREESSPPOONNSSEE TTOO CCOONNSSUULLTTAATTIIOONN PPRROOGGRRAAMMSS

    Ongoing community consultation for the Dapto and Thirroul Town Centre projects and West Dapto Release Area project is occurring through the workshops & meetings which have been held. They have been well supported.

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 33..33 SSAATTIISSFFAACCTTIIOONN LLEEVVEELL OOFF SSTTAAKKEEHHOOLLDDEERRSS TTOO TTHHEE CCOONNSSUULLTTAATTIIOONN MMEECCHHAANNIISSMMSS IIMMPPLLEEMMEENNTTEEDD

    No formal surveys were undertaken during this period. Positive community feedback was received.

    SSTTRRAATTEEGGIICC PPLLAANNNNIINNGG

    KEY OBJECTIVE FOUR PROVIDE INTERNAL CUSTOMER SERVICE THAT FACILITATES GOOD QUALITY AND EFFICIENT DECISION MAKING

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 44..11 SSAATTIISSFFAACCTTIIOONN LLEEVVEELL OONN QQUUAALLIITTYY OOFF SSEERRVVIICCEE WWIITTHH AAGGRREEEEDD SSEERRVVIICCEE DDEELLIIVVEERRYY TTIIMMEESS

    No formal surveys were undertaken during this period.

    CCUURRRREENNTT PPRROOJJEECCTTSS AACCTTIIVVEE

    West Dapto Urban Release Project

    Draft LES Chapters, Draft Structure Plan and the draft Master Plan have been received from the Master Planning consultant. The documents are currently being reviewed by the project team.

  • CITY DEVELOPMENT

    6 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    Negotiations are currently underway with the Department of Environment & Conservation to determine the extent of additional Aboriginal archaeology studies such that the Aboriginal Heritage Management Plan can be completed and used in the finalisation of the LES, Master Plan, LEP and DCP.

    We had two public information meetings as part of the project on 28 October and 1 November 2004.

    Prepare an Integrated Plan for the City

    On 5 October 2004 Council resolved to commence the preparation of a new draft LEP for the LGA. Preliminary consultation is occurring with Statutory Authorities, local MPs, Neighbourhood Committees, community, business and environmental groups.

    Support Studies:

    - Retail Centres Study complete;

    - Draft Housing Strategy in preparation.

    Review and consolidate Development Control Plans

    - Review of DCP 49 and DCP 9 has commenced.

    - Preparation of revised City Centre DCP 56 is ongoing.

    - Review of all DCPs for inclusion of appropriate asbestos control measures finalised.

    - Sex industry DCP drafted.

    - Draft DCP 54 Managing Flood Prone Lands.

    - Review of old aged care facilities Technical Policy 94/5 commenced.

    Wollongong Futures

    - Buchan Consulting submitted the first draft of the Strategy Report for feedback from the Project Control Group and Community Advisory Group (CAG).

    - Work on finalising an operational and tangible sustainability policy within council to be embodied into the Wollongong Futures City Strategic Directions, is ongoing.

    Finalise the Thirroul Centre Development Control Plan

    Councils consultants have produced a preliminary draft Development Control Plan. It has been reviewed by Strategic Planning and its principles presented to the DCP Committee. The consultants are working a Masterplan and development standards into this document for presentation to the Committee in early February 2005.

    City Centre Revitalisation Strategy

    Progress continues on:

    - New draft City Centre LEP;

    - Revised draft City Centre DCP;

    - Revised Public Domain Masterplan and new companion Technical Manual.

    - Draft Access and Movement Strategy prepared November 2004.

    - Councillor workshop in December 2004 to discuss a number of key city wide projects including the City Centre Revitalisation Strategy.

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 7

    Dapto Town Centre

    Draft Masterplan in preparation in conjunction with the draft Structure Plan for the West Dapto Release Area.

    Review of Section 94 Plans

    - Expenditure from existing plans progressing.

    - Approximately $4.1 million endorsed for expenditure for 2005/06.

    - Review of plans ongoing to enable transfer into new plans where appropriate.

    - Open Space Strategy and LEP Review progressing. These are major studies required to underpin future Contribution Plans.

    Illawarra Escarpment Conduct the Land Stability Study (Mapping) resulting form the Commission of Inquiry (COI) recommendations (2003/2004)

    Continue to develop the Strategic Planning component of the draft Escarpment Plan. The same consultants have undertaken an independent review of the submissions received as a result of the exhibition of the draft Plan in 2004.

    The Environment & Health Division continues to review and revise the draft Plan with completion of Escarpment Management Plan due toward the end of the first quarter of 2005.

    CURRENT PROJECTS NOT YET COMMENCED

    Port Kembla Main Street Control Plan/Design

    To commence at completion of Cultural & Community Services community consultation project.

    PROJECTS INTRODUCED DURING 2004/05

    Nil.

  • CITY DEVELOPMENT

    8 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 874 450 1Materials & Contracts 2,733 853 221Depreciation 12 6 0Other Expenses 186 8 0Divisional Overheads (4) (6) 0Internal Charges 10 5 0Total Expenses from Ordinary Activities 3,812 1,316 222

    REVENUES FROM ORDINARY ACTIVITIES

    User Charges & Fees 8 13 0Other Revenues 3 1 0Grants - Operating 190 188 0Contributions - Operating 650 0 (155)

    Revenues from Ordinary Activities before Capital Amounts 851 202 (155)SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS (2,961) (1,114) (377)

    Developer Contrib (Capital) ExistAsset 399 111 0

    NET SURPLUS (DEFICIT) (2,562) (1,003) (377)

    Expenditure Funding Expenditure Funding

    West Dapto Planning 100 (100) 0 0 0Review Sect 94 Plans 80 (80) 0 0 0Wollongong Futures 188 (30) 39 (20) 0Struct. Plan -Land West Dapto 1,047 (650) 489 346 (221)City Centre Revitalisation 787 (430) 173 (20) 0Review LEP 1990 0 0 2 0 0Interim Review of LEP 4 0 0 0 0Review DCP49 Nth W'gong Precinct 45 0 14 0 0S94 Planner 0 (57) 0 0 0DCP Thirroul Community Centre 6 0 0 0 0Urban Design Strategy - Dapto 135 0 96 0 0Integrated Plan for the City 425 (155) 19 (85) 0Thirroul Centre DCP 10 0 0 0 0PK Main Street Control Plan/Design 20 0 0 0 0

    2,847 (1,502) 832 221 (221)

    Expenditure Funding Expenditure Funding

    0 0 0 0 0

    Strategic Planning

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget$'000

    ProposedVariation

    $'000

    Operational Expenses

    0

    1,000

    2,000

    3,000

    4,000

    5,000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    0

    200

    400

    600

    800

    1,000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Project Expenditure

    0

    500

    1000

    1500

    2000

    2500

    3000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 9

    CCIITTYY DDEEVVEELLOOPPMMEENNTT FUNCTION MANAGER RESPONSIBLE

    Traffic and Transport Manager Strategic Planning

    TTRRAAFFFFIICC AANNDD TTRRAANNSSPPOORRTT

    KEY OBJECTIVE ONE ACHIEVE GOALS IDENTIFIED IN THE INTEGRATED TRANSPORT STRATEGY, MOVING TOGETHER

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..11 NNUUMMBBEERR OOFF PPRROOJJEECCTTSS CCOOMMPPLLEETTEEDD OORR MMIILLEESSTTOONNEESS RREEAACCHHEEDD TTHHAATT CCOOMMPPLLYY WWIITTHH TTHHEE IINNTTEEGGRRAATTEEDD TTRRAANNSSPPOORRTT SSTTRRAATTEEGGYY

    The strategies within the document Moving Together 2004 (Illawarra Regional Transport Strategy) have been used to inform the current work being undertaken in both West Dapto and Dapto Town Centre transport and traffic strategies as well as the Wollongong Railway Station Interchange and Precinct Study.

    TTRRAAFFFFIICC AANNDD TTRRAANNSSPPOORRTT

    KEY OBJECTIVE TWO IMPROVE THE PHYSICAL ROAD ENVIRONMENT TO ACHIEVE ENHANCED TRAFFIC EFFICIENCY AND SAFETY

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..11 NNUUMMBBEERR OOFF SSCCHHOOOOLLSS HHAAVVIINNGG IIMMPPRROOVVEEDD PPEEDDEESSTTRRIIAANN AANNDD TTRRAAFFFFIICC FFAACCIILLIITTIIEESS

    Lake Heights Primary School review of existing engineering treatments and signage. Current facilities adequate.

    Holy Spirit College - signage upgrade of school crossing within Gladstone Street, Bellambi.

    Corrimal Public School - crossing relocation and signage upgrade to enable a crossing supervisor to start at the school.

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..22 NNUUMMBBEERR OOFF CCIITTYY OOFF WWOOLLLLOONNGGOONNGG TTRRAAFFFFIICC CCOOMMMMIITTTTEEEE RREECCOOMMMMEENNDDAATTIIOONNSS IIMMPPLLEEMMEENNTTEEDD

    Ninety three (93).

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..33 NNUUMMBBEERR OOFF TTRRAAFFFFIICC CCOONNTTRROOLL PPLLAANNSS AAPPPPRROOVVEEDD WWIITTHHIINN 33 WWOORRKKIINNGG DDAAYYSS VVEERRSSUUSS NNUUMMBBEERR AAPPPPRROOVVEEDD IINN MMOORREE TTHHAANN 33 WWOORRKKIINNGG DDAAYYSS

    Approved within 3 working days: 19

    Approved in more than 3 working days: 11

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..44 AACCHHIIEEVVEEMMEENNTT OOFF GGUUIIDDEELLIINNEESS IINN WWOOLLLLOONNGGOONNGG BBIICCYYCCLLEE PPLLAANN

    Taskforce met in December to discuss the Wollongong Bicycle Plan.

  • CITY DEVELOPMENT

    10 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    TTRRAAFFFFIICC AANNDD TTRRAANNSSPPOORRTT

    KEY OBJECTIVE THREE PROVIDE QUALITY AND TIMELY ADVICE ON TRAFFIC, TRANSPORT AND ROAD SAFETY ISSUES RELATING TO DEVELOPMENT

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 33..11 NNUUMMBBEERR OOFF DDEEVVEELLOOPPMMEENNTT AAPPPPLLIICCAATTIIOONN RREEFFEERRRRAALLSS CCOOMMPPLLEETTEEDD WWIITTHHIINN 1100 WWOORRKKIINNGG DDAAYYSS VVEERRSSUUSS NNUUMMBBEERR CCOOMMPPLLEETTEEDD IINN MMOORREE TTHHAANN 1100 WWOORRKKIINNGG DDAAYYSS

    Completed within ten (10) working days: 62

    Completed in more than 10 working days: 72

    40% of work time is scheduled for meetings related to DAs.

    CURRENT PROJECTS ACTIVE

    Pedestrian Safety Strategy

    - Meeting with RTA representatives held to determine schedule of works. Design currently developing 40 km/hr shopping precinct work.

    - Drink Safe Walk Safe Campaign conducted as part of New Year Fever with CBD venues.

    Speed Management Strategy

    Residential priority system complete and community input received. Strategy to be launched in February 2005 by NSW Speed Blitz Blues.

    Develop systems to enhance the efficiency of the Traffic Management function

    Further information on the Traffic Committee Database used by Shoalhaven City Council was received. This system is able to be purchased and modified to suit Councils requirements at a cost of $3500 + GST and approximately $4000 to implement.

    Local Area Traffic, Transport, Parking and Access Studies

    - University Access Study (Eppell Olsen) has been completed with input from working group of RTA, Council and University.

    - University Parking Strategy details below

    - Virginia Street Local Area Study details below

    - Wollongong City centre Access and Movement Strategy document has been completed. The Wollongong City Centre & Parking Strategy underway by Eppell Olsen.

    - Wollongong Rail Station Interchange and Precinct Study in final stages following the recent (second) workshop. Preferred option has been agreed and is being developed in detail to form basis for the final Masterplan due for completion early 2005.

    Virginia Street Local Area Study (2003/04)

    Community consultation on the final report undertaken during this quarter with feedback to be collated and reported to Traffic Committee in February 2005.

    Local Area pedestrian, cycle and safety initiatives

    - Cordeaux Road Pedestrian Access and Mobility Plan Draft Report complete. It is expected to go to broader community consultation during February 2005.

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 11

    - East Woonona Pedestrian Access and Mobility Plan Draft Report complete. Feedback from community received and is being collated.

    - Operation Bounce Back established a working party and have secured education resources with the view to launch the project in February/March 2005.

    Develop and implement a Traffic Facilities Priority System (2003/2004)

    Currently being updated in preparation for developing submissions to the RTA for 2005/06 financial year.

    University Parking Strategy (2003/2004)

    Community consultation of the draft Strategy undertaken during this quarter with feedback to be collated and reported to Traffic Committee in February 2005.

    CURRENT PROJECTS NOT YET COMMENCED

    Nil.

    PROJECTS INTRODUCED DURING 2004/05

    Nil.

  • CITY DEVELOPMENT

    12 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 583 291 0Materials & Contracts 592 57 (344)Depreciation 6 4 0Other Expenses 5 3 0Divisional Overheads 4 6 0Internal Charges 0 1 0Total Expenses from Ordinary Activities 1,189 361 (344)

    REVENUES FROM ORDINARY ACTIVITIES

    User Charges & Fees 6 7 0Grants - Operating 0 21 0Contributions - Operating 0 10 0

    Revenues from Ordinary Activities before Capital Amounts 6 38 0SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS (1,184) (324) 344

    Capital Contrib RTA Existing Asset 268 23 (172)

    NET SURPLUS (DEFICIT) (916) (301) 172

    Expenditure Funding Expenditure Funding

    LATM Wollongong Feasibilty Study 15 0 0 0 0CBD Parkg Strategy Sect 94 12 (12) 0 0 0Road safety project -LG 105 (87) 47 0 0DCP - Wollongong Cycleway Plan 3 (1) 0 0 0Roads Safety Strategic Plan 10 (8) 0 0 0Tracks Model Upgrade 10 (10) 2 0 0Pedestrian Safety Strategy 400 (200) 0 (344) 172Speed Management Strategy 8 0 0 0 0Sth East Precinct (Corrimal St) Study 4 (4) 4 0 0Virginia Street, Traffic Study 10 (10) 8 0 0PAMP Study - Cordeaux Road, Unanderra 5 (5) 2 0 0

    582 (337) 63 (344) 172

    Expenditure Funding Expenditure Funding

    Safety Around Schools - RTA Projects 100 0 0 (29) 0Road Safety Program - Speed Check Unit 4 (4) 17 0 0

    104 (4) 17 (29) 0

    Traffic & Transport

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget$'000

    ProposedVariation

    $'000

    Operational Expenses

    0200400600800

    1,0001,2001,400

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    0

    50

    100

    150

    200

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Project Expenditure

    0100200300400500600700800

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 13

    CCIITTYY DDEEVVEELLOOPPMMEENNTT FUNCTION MANAGER RESPONSIBLE

    Development Assessment Manager Development Assessment and Compliance

    DDEEVVEELLOOPPMMEENNTT AASSSSEESSSSMMEENNTT

    KEY OBJECTIVE ONE EFFICIENTLY AND EFFECTIVELY DETERMINE DEVELOPMENT APPLICATIONS IN ACCORDANCE WITH RELEVANT LEGISLATION AND COUNCIL PLANS AND POLICIES

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..11 NNUUMMBBEERR OOFF DDEEVVEELLOOPPMMEENNTT AAPPPPLLIICCAATTIIOONNSS SSUUBBMMIITTTTEEDD

    During the quarter 605 development applications were lodged.

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..22 DDEEVVEELLOOPPMMEENNTT AAPPPPLLIICCAATTIIOONN TTUURRNNAARROOUUNNDD TTIIMMEE

    The average turn around time for Development Applications was 35 days.

    DDEEVVEELLOOPPMMEENNTT AASSSSEESSSSMMEENNTT

    KEY OBJECTIVE TWO IMPROVE THE LEVEL OF SATISFACTION WITH ALL STAKEHOLDERS IN THE DEVELOPMENT ASSESSMENT PROCESS

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..11 LLEEVVEELL OOFF SSAATTIISSFFAACCTTIIOONN WWIITTHH CCOOUUNNCCIILLSS PPRROOCCEESSSS BBYY SSUURRVVEEYY

    Survey document prepared and survey to be carried out fourth quarter.

    CURRENT PROJECTS ACTIVE

    Design Review Panel

    Executive Management Committee on 25 November 2004 endorsed the establishment of a Design Review Panel to be autonomously managed within Council. A report is to be prepared for the Information Folder advising of the establishment of the Design Review Panel. A review will be undertaken after 12 months of operation of the panel.

    Development Assessment Functional Review

    Final review completed and recommendation implemented December 2004.

    Review of customer service documentation

    Ongoing review and documentation revised to reflect changes in administration process.

    Review of Notification and Consultation Policy

    Notification Policy adopted at Councils Environment & Planning Committee meeting held on 5 October 2004. Draft Community Consultation Policy has been on exhibition and a report will be prepared for Councils February Environment & Planning meeting to be held 7 February 2005.

    Review of Bushfire Protection Guidelines

    The New South Wales Planning for Bushfire Protection Guidelines have been reviewed. This review has included a series of staff workshops in order for staff to endeavour to appropriately assess proposals on bushfire hazard areas.

    CURRENT PROJECTS NOT YET COMMENCED

    Nil.

    PROJECTS INTRODUCED DURING 2004/05

    Nil.

  • CITY DEVELOPMENT

    14 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 1,376 771 41Materials & Contracts 84 (3) 0Other Expenses 13 2 0Divisional Overheads 39 103 62Internal Charges 0 0 0Total Expenses from Ordinary Activities 1,512 873 102

    REVENUES FROM ORDINARY ACTIVITIES

    User Charges & Fees 2,537 1,142 0

    Revenues from Ordinary Activities before Capital Amounts 2,537 1,142 0SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS 1,025 269 (102)

    NET SURPLUS (DEFICIT) 1,025 269 (102)

    Expenditure Funding Expenditure Funding

    Sandon Point File Integrity 4 0 0 0 0Design Awards 8 0 0 0 0Design Review Panel 50 0 0 0 0Development Assessment Quality Review 30 0 0 0 0

    92 0 0 0 0

    Expenditure Funding Expenditure Funding

    0 0 0 0 0

    $'000

    ProposedVariation

    $'000

    Development Assessment

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget

    Operational Expenses

    0

    500

    1,000

    1,500

    2,000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    0500

    1,0001,5002,0002,5003,000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Project Expenditure

    0102030405060708090

    100

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 15

    CCIITTYY DDEEVVEELLOOPPMMEENNTT FUNCTION MANAGER RESPONSIBLE

    Building Compliance Manager Development Assessment and Compliance

    BBUUIILLDDIINNGG CCOOMMPPLLIIAANNCCEE

    KEY OBJECTIVE ONE IMPROVE THE LEVEL OF BUILDING COMPLIANCE

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..11 PPEERRCCEENNTTAAGGEE OOFF BBUUIILLDDIINNGG IINNSSPPEECCTTIIOONNSS CCAARRRRIIEEDD OOUUTT RREEQQUUIIRRIINNGG FFUURRTTHHEERR AACCTTIIOONN

    During the quarter a total of 500 inspections were carried out by Council acting as certifier and of this 114 required re-inspections to ensure compliance with approvals. This represents a total of 22.8%

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..22 PPEERRCCEENNTTAAGGEE OOFF BBUUIILLDDIINNGG IINNSSPPEECCTTIIOONNSS LLEEAADDIINNGG TTOO LLEEGGAALL//CCOOMMPPLLIIAANNCCEE AACCTTIIOONN

    During the quarter 17 Notices of Intent were served regarding possible breaches of building regulations and this resulted in 5 Orders being served. This represents a total of 29.41%.

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..33 PPEERRCCEENNTTAAGGEE OOFF CCOOMMPPLLAAIINNTTSS AACCTTIIOONNEEDD AANNDD RREESSOOLLVVEEDD

    During the quarter a total of 123 complaints were received in regard to building matters with 21% of these being actioned and resolved.

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..44 PPEERRCCEENNTTAAGGEE OOFF CCOOMMPPLLAAIINNTTSS WWHHIICCHH RREELLAATTEE TTOO TTHHEE AACCTTIIOONN OOFF PPRRIIVVAATTEE CCEERRTTIIFFIIEERRSS

    During the quarter 19 of the total 123 complaints related to the action of private certifiers which represents a total of 15.44%.

    BBUUIILLDDIINNGG CCOOMMPPLLIIAANNCCEE

    KEY OBJECTIVE TWO IMPROVE THE LEVEL OF SATISFACTION OF ALL STAKEHOLDERS IN THE CONSTRUCTION PROCESS

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..11 LLEEVVEELL OOFF SSAATTIISSFFAACCTTIIOONN WWIITTHH CCOOUUNNCCIILLSS PPRROOCCEESSSS BBYY SSUURRVVEEYY

    Survey document prepared and survey to be carried out fourth quarter.

    BBUUIILLDDIINNGG CCOOMMPPLLIIAANNCCEE

    KEY OBJECTIVE THREE IMPROVE THE LEVEL OF FIRE SAFETY

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 33..11 PPEERRCCEENNTTAAGGEE OOFF PPRREEMMIISSEESS IINNSSPPEECCTTEEDD RREEQQUUIIRRIINNGG FFIIRREE SSAAFFEETTYY UUPPGGRRAADDEESS

    Fire safety inspections were carried out during the normal course of duty. Of the inspections carried out 12% of premises required fire safety upgrades.

  • CITY DEVELOPMENT

    16 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 33..22 LLEEVVEELL OOFF CCOOMMPPLLIIAANNCCEE WWIITTHH FFIIRREE SSAAFFEETTYY SSTTAANNDDAARRDDSS

    Of the number of intentions issued for buildings requiring upgrades with fire safety standards, 1% required the issue of orders.

    CURRENT PROJECTS ACTIVE

    Determine the level of competitiveness with private certifiers

    Councils level of competitiveness with private certifiers for construction certificates and complying development applications is currently running at a level of 35% of total market share

    Implementation of critical stage inspections

    Critical stage inspections were successfully implemented during the last quarter. Further changes to mandatory inspections brought about by the State Government were also successfully implemented during the last quarter.

    CURRENT PROJECTS NOT YET COMMENCED

    Nil.

    PROJECTS INTRODUCED DURING 2004/05

    Nil.

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 17

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 1,447 810 65Divisional Overheads 41 109 99Total Expenses from Ordinary Activities 1,488 918 164

    REVENUES FROM ORDINARY ACTIVITIES

    User Charges & Fees 661 358 0Other Revenues 6 3 0

    Revenues from Ordinary Activities before Capital Amounts 667 361 0SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS (821) (557) (164)

    NET SURPLUS (DEFICIT) (821) (557) (164)

    Expenditure Funding Expenditure Funding

    0 0 0 0 0

    Expenditure Funding Expenditure Funding

    0 0 0 0 0

    $'000

    ProposedVariation

    $'000

    Building Compliance

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget

    Operational Expenses

    0

    500

    1,000

    1,500

    2,000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    0

    200

    400

    600

    800

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • CITY DEVELOPMENT

    18 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    CCIITTYY DDEEVVEELLOOPPMMEENNTT FUNCTION MANAGER RESPONSIBLE

    Subdivisions Manager Development Assessment and Compliance

    SSUUBBDDIIVVIISSIIOONNSS

    KEY OBJECTIVE ONE MAINTAIN AN AGREED STANDARD OF SUBDIVISION CERTIFICATE TURNAROUND TIME

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..11 PPEERRCCEENNTTAAGGEE OOFF AAPPPPLLIICCAATTIIOONNSS DDEETTEERRMMIINNEEDD WWIITTHHIINN 55 DDAAYYSS OOFF AALLLLOOCCAATTIIOONN WWHHEENN PPRROOOOFF TTHHAATT AALLLL CCOONNDDIITTIIOONNSS OOFF CCOONNSSEENNTT HHAAVVEE BBEEEENN SSAATTIISSFFIIEEDD

    During the quarter 83% of applications were determined within 5 days of allocation.

    CURRENT PROJECTS ACTIVE

    Incorporation of solar access guidelines into subdivision design

    The document The Solar Access for Lots [SAL] Guide prepared by the Sustainable Energy Development, Authority as part of the Energy Smart Homes Program has been reviewed for its suitability for use in the Wollongong Local Government Area.

    The document will be incorporated into the review of DCP 49 Multi Dwelling Development, currently being undertaken by Councils Strategic Planning Division.

    Incorporation of water sensitive design into future buildings on new subdivisions

    A scheme called BASIX has been initiated through the Environmental Planning and Assessment Amendment (Building Sustainability Index: BASIX) Regulation 2004 and State Environmental Planning Policy (Building Sustainability Index: BASIX) 2004.

    BASIX focuses on reducing the amount of mains supply water used in, and greenhouse gas emissions from residential development. The BASIX Certificate clearly records what the development applicant will do to comply with the governments new water and greenhouse gas targets.

    From 1 July 2005 people who wish to build new homes in the Wollongong Local Government Area will need to include a BASIX Certificate with their development proposal.

    Create a customer service assistance package for subdivisions of up to five lots (2003/2004)

    Fact sheet has been prepared and is available for use by the general public.

    CURRENT PROJECTS NOT YET COMMENCED

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..22 LLEEVVEELL OOFF SSAATTIISSFFAACCTTIIOONN WWIITTHH CCOOUUNNCCIILLSS PPRROOCCEESSSS BBYY SSUURRVVEEYY

    Survey to be carried out within the fourth quarter of this year.

    PROJECTS INTRODUCED DURING 2004/05

    Nil.

  • CITY DEVELOPMENT

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 19

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 730 407 121Materials & Contracts 49 237 342Depreciation 15 7 0Other Expenses 22 15 0Divisional Overheads (80) (212) (161)Internal Charges 5 0 0Total Expenses from Ordinary Activities 741 455 302

    REVENUES FROM ORDINARY ACTIVITIES

    User Charges & Fees 192 102 0Other Revenues 0 0 0

    Revenues from Ordinary Activities before Capital Amounts 192 102 0SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS (550) (353) (302)

    NET SURPLUS (DEFICIT) (550) (353) (302)

    Expenditure Funding Expenditure Funding

    0 0 0 0 0

    Expenditure Funding Expenditure Funding

    0 0 0 0 0

    $'000

    ProposedVariation

    $'000

    Subdivisions

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget

    Operational Expenses

    0

    200

    400

    600

    800

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    0

    50

    100

    150

    200

    250

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • INFRASTRUCTURE

    20 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    IINNFFRRAASSTTRRUUCCTTUURREE FUNCTION MANAGER RESPONSIBLE

    Buildings Manager Engineering Services

    BBUUIILLDDIINNGGSS

    KEY OBJECTIVE ONE PROVIDE BUILDINGS THAT ARE CONSTRUCTED WITHIN BUDGET AND ON TIME

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..11 AACCTTUUAALL CCOOSSTT AANNDD CCOONNSSTTRRUUCCTTIIOONN DDUURRAATTIIOONN CCOOMMPPAARREEDD TTOO TTHHEE BBUUDDGGEETT AANNDD PPRROOJJEECCTT SSCCHHEEDDUULLEE

    Windang Surf Life Saving Club Extensions and Refurbishment - completed on time and within revised budget.

    BBUUIILLDDIINNGGSS

    KEY OBJECTIVE TWO DEVELOP AND IMPLEMENT THE ANNUAL BUILDING MAINTENANCE/ASSET MANAGEMENT PROGRAM

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..11 NNUUMMBBEERR OOFF SSCCHHEEDDUULLEEDD MMAAIINNTTEENNAANNCCEE PPRROOGGRRAAMMSS ((IINN TTEERRMMSS OOFF BBUUDDGGEETT AANNDD TTIIMMEE)) CCOOMMPPLLEETTEEDD IINN AACCCCOORRDDAANNCCEE WWIITTHH TTHHEE BBUUIILLDDIINNGG MMAAIINNTTEENNAANNCCEE//AASSSSEETT MMAANNAAGGEEMMEENNTT PPRROOGGRRAAMM

    FORECAST Vs ACTUALSCHEDULED MAINTENANCE

    0

    500,000

    1,000,000

    1,500,000

    Jul-04

    Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun-05

    $

    Forecast Actual

  • INFRASTRUCTURE

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 21

    FORECAST VS ACTUALUNSCHEDULED MAINTENANCE

    0

    500,000

    1,000,000

    Jul-04

    Sep Nov Jan Mar May

    $

    Forecast 04/05 Actual 04/05

    CURRENT PROJECTS ACTIVE

    Refurbishment of Administration Building, services, plant and equipment

    A preliminary meeting was held with DAC prior to lodgement of a Development Application and a specialist consultant, BCA, has been engaged to provide supporting documentation for the Development Application.

    Town Hall Maintenance Program

    Finalising Scope of Works.

    West Dapto Neighbourhood Centre - paint

    Works underway.

    Berkeley Community Centre - paint

    Works underway.

    CURRENT PROJECTS NOT YET COMMENCED

    Coledale Senior Citizens Centre - reroof

    Works have been deferred until 2005/06 following consultation with Community & Cultural Services Division so that these works coincide with the acoustic upgrade planned for this building.

    Fairy Meadow Beach Amenities - reroof

    Works have been programmed to commence at the conclusion of the current swimming season (May 2005).

    Harry Graham Park Amenities render and paint

    Deferred to 2005/2006.

    Cringila Community Centre paint and fence repairs

    Works programmed to commence in March 2005.

    PROJECTS INTRODUCED DURING 2004/05

    Nil.

  • INFRASTRUCTURE

    22 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 1,417 889 (11)Materials & Contracts 3,178 1,417 (170)Depreciation 1,334 656 0Other Expenses 483 287 19Divisional Overheads 49 23 0Corporate Overheads (71) (35) 0Internal Charges 45 25 0Total Expenses from Ordinary Activities 6,436 3,260 (162)

    REVENUES FROM ORDINARY ACTIVITIES

    User Charges & Fees 121 55 0Other Revenues 114 46 0

    Revenues from Ordinary Activities before Capital Amounts 234 101 0SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS (6,201) (3,159) 162

    NET SURPLUS (DEFICIT) (6,201) (3,159) 162

    Expenditure Funding Expenditure Funding

    Wind Storm August 2003 - Engineering 66 (68) 16 0 0Additional Building Maintenance 1 0 0 0 0Gutter Cleaning 30 0 0 0 0

    98 (68) 16 0 0

    Expenditure Funding Expenditure Funding

    RPZ Valves-Backflow Prevention 50 0 31 0 0Safety Equipment 50 0 6 0 0Admin Build Services Plant & Equipment 1,080 (1,080) 146 (175) 175PAC Refurbishment 60 (60) 39 255 (255)Windang SLSC 788 (323) 768 0 0Beaton Pk Roof Refurbishment 15 (4) 15 0 0Relocation to Integral Building 45 0 0 0 0Port Kembla Pool Rectification Works 309 0 328 27 0Trf to Building Maintenance Reserve 2,000 0 1,000 0 0Town Hall Maintenance Program 700 (700) 10 (351) 351City Beach - Handrail Replacement 0 0 9 15 0Admin Bldg Capital 18 0 18 60 0

    5,113 (2,167) 2,371 (168) 271

    Buildings

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget$'000

    ProposedVariation

    $'000Operational Expenses

    01,0002,0003,0004,0005,0006,0007,000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    0

    50

    100

    150

    200

    250

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Project Expenditure

    0

    1000

    2000

    3000

    4000

    5000

    6000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • INFRASTRUCTURE

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 23

    IINNFFRRAASSTTRRUUCCTTUURREE FUNCTION MANAGER RESPONSIBLE

    Operational Support Manager Engineering Services

    OOPPEERRAATTIIOONNAALL SSUUPPPPOORRTT

    KEY OBJECTIVE ONE MAXIMISE THE UTILISATION OF COUNCIL PLANT

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..11 PPLLAANNTT UUTTIILLIISSAATTIIOONN RRAATTEE TTOO MMEEEETT AAGGRREEEEDD BBEENNCCHHMMAARRKKSS

    The average plant utilisation rate for the three month period was 62%.

    MONTHLY PLANT UTILISATION RATE

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    July August September October November December

    OOPPEERRAATTIIOONNAALL SSUUPPPPOORRTT

    KEY OBJECTIVE TWO IMPROVE THE EFFICIENCY OF MATERIALS MANAGEMENT

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..11 MMOONNTTHHLLYY SSTTOOCCKK TTUURRNNOOVVEERR ((GGRREEAATTEERR TTHHAANN 6600%%))

    The average monthly stock turnover rate for the three month period was 84%.

    M ONTHLY STOCK TURNOVER RATE

    0

    20

    40

    60

    80

    100

    Jul Sept Nov Jan M ar May

    % P

    er M

    onth

    2003/2004 2004/2005

  • INFRASTRUCTURE

    24 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..22 VVAALLUUEE OOFF SSTTOOCCKK HHOOLLDDIINNGGSS IINN CCOOMMPPAARRIISSOONN WWIITTHH PPRREEVVIIOOUUSS YYEEAARR

    The value of stock holdings at the end of December 2004 was $117,685 compared to $120,265 at the same time in 2003.

    VALUE OF INVENTORY

    0

    25,000

    50,000

    75,000

    100,000

    125,000

    Jul Sept Nov Jan M ar M ay

    $ Va

    lue

    2003/2004 2004/2005

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..33 LLEEVVEELL OOFF CCUUSSTTOOMMEERR SSAATTIISSFFAACCTTIIOONN

    During the quarter, a total of 8,067 issue transactions were processed for an issue value of $288,288. During this period, a total of 48 back order requests were processed for supply of inventory materials. These requests were as a result of exceptional demand and orders were expedited for supply of the materials.

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..44 SSUUPPPPLLIIEERR DDEELLIIVVEERRYY PPEERRFFOORRMMAANNCCEE

    During the quarter, a total of 2,273 receipt transactions were processed for a receipt value of $292,845. For the same period, a total of 6 line items were returned for incorrect supply with 10 items requiring expedite action due to late supply.

    CURRENT PROJECT ACTIVE

    Evaluate the business relationship with Scania

    During the quarter, business activity with Scania remained static.

    CURRENT PROJECTS NOT YET COMMENCED

    Nil.

    PROJECTS INTRODUCED DURING 2004/05

    Nil.

  • INFRASTRUCTURE

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 25

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 2,445 1,470 82Borrowing Costs 218 128 0Materials & Contracts 2,573 1,172 (323)Depreciation 2,178 1,155 0Other Expenses 164 496 426Divisional Overheads (97) (45) 0Corporate Overheads (16) (8) 0Internal Charges (2,910) (1,374) 13Total Expenses from Ordinary Activities 4,555 2,993 197

    REVENUES FROM ORDINARY ACTIVITIES

    User Charges & Fees 599 327 63Other Revenues 192 101 (2)Profit/Loss on Disposal of Assets 559 (133) 119

    Revenues from Ordinary Activities before Capital Amounts 1,350 295 180SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS (3,205) (2,698) (17)

    NET SURPLUS (DEFICIT) (3,205) (2,698) (17)

    Expenditure Funding Expenditure Funding

    Plant Lease Payments - Interest 218 0 133 0 0

    218 0 133 0 0

    Expenditure Funding Expenditure Funding

    Corrimal Sand Dunes - Coastal Mgmt Progr 150 (73) 0 (150) 73Carma Capital Work 52 (52) 52 0 0Stolen Rock Hammer 11 0 11 0 0Motor Vehicle:Replacement 4,402 (3,807) 0 682 (284)Motor Vehicle:Replacement 0 0 977 0 0Motor Vehicle Replacement 277 (250) 2,256 0 0Plant Renewal Purchases 450 (550) 256 (28) 0Plant Purchases - Leased Plant 2,678 (2,678) 2,015 0 0Replace Pool & Pump Equipment 45 0 26 0 0Plant lease payments 1,364 0 504 0 0Plant Replacement -Minor Plant 186 0 15 0 0

    9,615 (7,410) 6,113 504 (211)

    Operational Support

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget$'000

    ProposedVariation

    $'000

    Operational Expenses

    0

    1,000

    2,000

    3,000

    4,000

    5,000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    0200400600800

    1,0001,2001,4001,600

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Project Expenditure

    0

    2000

    4000

    6000

    8000

    10000

    12000

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • INFRASTRUCTURE

    26 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    IINNFFRRAASSTTRRUUCCTTUURREE FUNCTION MANAGER RESPONSIBLE

    Emergency Services Manager Engineering Services

    EEMMEERRGGEENNCCYY SSEERRVVIICCEESS

    ESTABLISH AND IMPLEMENT AN ANNUAL FUEL MANAGEMENT PROGRAM IN ACCORDANCE WITH THE REQUIREMENTS OF THE RURAL FIRES ACT, 1997

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..11 PPEERRCCEENNTTAAGGEE OOFF CCOOMMPPLLEETTEEDD HHAAZZAARRDD RREEDDUUCCTTIIOONN AARREEAASS TTOO PPRROOGGRRAAMMMMEEDD AARREEAASS

    The Rural Fire Service completed its 2004 program of hazard reductions by the end of August 2004, a total of 59.5 hectares having been hazard reduced during the year.

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..22 TTOOTTAALL NNUUMMBBEERR OOFF HHOOUURRSS SSPPEENNTT OONN HHAAZZAARRDD RREEDDUUCCTTIIOONN AACCTTIIVVIITTIIEESS

    Nil in the September to December quarter.

    EEMMEERRGGEENNCCYY SSEERRVVIICCEESS

    KEY OBJECTIVE TWO PROVIDE COMMUNITY AWARENESS PROGRAMS TO ASSIST IN REDUCING THE IMPACT OR LIKELIHOOD OF BUSHFIRES

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..11 NNUUMMBBEERR OOFF CCOOMMMMUUNNIITTYY AAWWAARREENNEESSSS PPRROOGGRRAAMMSS IIMMPPLLEEMMEENNTTEEDD CCOOMMPPAARREEDD WWIITTHH PPRREEVVIIOOUUSS YYEEAARR

    During the quarter, volunteer brigade members undertook 15 community awareness programs.

    COMMUNITY AWARENESS PROGRAMS

    0

    5

    10

    1520

    Jul Sep Nov Jan Mar May

    Num

    ber

    2003/2004 2004/05

    CURRENT PROJECT ACTIVE

    Evaluate the Service Level Agreement with the NSW Rural Fire Service

    At the last City of Wollongong/NSW Rural Fire Service Liaison Committee meeting held on 30 November 2004, the Fire Control Officer advised that all performance targets listed in the Service Level Agreement (SLA) are being met.

    A review of the current Service Level Agreement (SLA) has been completed and the document is being drawn up for signatures.

  • INFRASTRUCTURE

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 27

    Investigate feasibility for a new Illawarra headquarters for the NSW Rural Fire Service

    Negotiations have continued with representatives of both Shellharbour and Kiama Councils with a view to constructing an Illawarra Rural Fire Service Control Centre on available land at Albion Park Airport. A Working Party with representation from all three Councils and the RFS has been set up and conceptual plans for a regional facility have now been completed. The RFS has submitted a funding bid in the RFS Estimates for the 2005/06 financial year.

    CURRENT PROJECTS NOT YET COMMENCED

    Nil.

    PROJECTS INTRODUCED DURING 2004/05

    Nil.

  • INFRASTRUCTURE

    28 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    YTD Actual$'000

    EXPENSES FROM ORDINARY ACTIVITIES

    Employee Costs 62 34 (8)Materials & Contracts 63 38 6Depreciation 779 427 0Other Expenses 2,263 1,134 59Divisional Overheads 2 1 0Internal Charges 13 0 0Total Expenses from Ordinary Activities 3,182 1,635 58

    REVENUES FROM ORDINARY ACTIVITIES

    Grants - Operating 180 110 0

    Revenues from Ordinary Activities before Capital Amounts 180 110 0SURPLUS (DEFICIT) FROM ORDINARY ACTIVITIES BEFORE CAPITAL AMOUNTS (3,002) (1,525) (58)

    p p p

    NET SURPLUS (DEFICIT) (3,002) (1,525) (58)

    Expenditure Funding Expenditure Funding

    RFS Equip & Support 6 (6) 0 0 0

    6 (6) 0 0 0

    Expenditure Funding Expenditure Funding

    RFS Equipment 22 (22) 0 (22) 22RFS Equipment 275 (275) 110 (135) 135

    297 (297) 110 (157) 157

    Emergency Services

    CAPITAL PROJECTS (Not included in costs above)

    BUDGET REVIEWFor the Period Ended 31 December 2004

    STATEMENT OF FINANCIAL PERFORMANCE

    OPERATIONAL PROJECTS (Included in costs above)

    AnnualBudget$'000

    ProposedVariation

    $'000

    Operational Expenses

    0500

    1,0001,5002,0002,5003,0003,500

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Operational Revenue

    (50)

    0

    50

    100

    150

    200

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

    Project Expenditure

    050

    100150200250300350

    J A S O N D J F M A M J

    $000

    's

    Budget YTD Actual

  • INFRASTRUCTURE

    WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004 29

    IINNFFRRAASSTTRRUUCCTTUURREE FUNCTION MANAGER RESPONSIBLE

    Civil Infrastructure Management Manager Works

    CCIIVVIILL IINNFFRRAASSTTRRUUCCTTUURREE MMAANNAAGGEEMMEENNTT

    KEY OBJECTIVE ONE PRIORITISE THE WORKS PROGRAM EXPENDITURE TO MAXIMISE THE BENEFITS TO COUNCILS ASSETS

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 11..11 VVAALLUUEE OOFF AACCTTUUAALL EEXXPPEENNDDIITTUURREE VVEERRSSUUSS RREEQQUUIIRREEDD EEXXPPEENNDDIITTUURREE OONN CCAATTEEGGOORRIISSEEDD IINNFFRRAASSTTRRUUCCTTUURREE AASSSSEETTSS ((EEGG $$ PPEERR KKMM FFOORR RROOAADDSS,, KKEERRBB AANNDD GGUUTTTTEERRIINNGG,, FFOOOOTTPPAATTHHSS))

    Infrastructure Asset Group

    Required Annual Expenditure to maintain assets $/annum

    Annual Maintenance Budget Allocation $/annum

    Actual Maintenance Expenditure 2nd Qtr $/annum

    Total Maintenance Expenditure 2004/2005 $/annum

    Roads $14.6m $4.19 $0.95 1.79

    Footpaths $1.28m $1.45 0.23 0.52

    Kerb & Gutter $4.65m $0.17 0.06 0.11

    The required annual expenditure to maintain assets each year is taken from the pavement condition rating carried out in 2001/2002.

    ROADS - REQUIRED EXPENDITURE vs ACTUAL

    02468

    10121416

    1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

    $ (m

    illio

    ns)

    actual expenditure required expenditurebudgeted expenditure

    FOOTPATH REQUIRED EXPENDITURE vs ACTUAL

    0

    0.5

    1

    1.5

    2

    1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

    $ (m

    illio

    ns)

    actual expenditure required expenditure

    budgeted expenditure

    KERB & GUTTER REQUIRED EXPENDITURE vs ACTUAL

    0

    1

    2

    3

    4

    5

    1st Qtr 2nd Qtr 3rd Qtr 4th Qtr

    $ (m

    illio

    ns)

    actual expenditure required expenditure

    budgeted expenditure

  • INFRASTRUCTURE

    30 WOLLONGONG CITY COUNCIL QUARTERLY CORPORATE REVIEW DECEMBER 2004

    CCIIVVIILL IINNFFRRAASSTTRRUUCCTTUURREE MMAANNAAGGMMEENNTT

    KEY OBJECTIVE TWO PROMOTE STRUCTURED, PROFESSIONAL AND COST EFFECTIVE MANAGEMENT OF COUNCILS CIVIL INFRASTRUCTURE ASSETS

    PPEERRFFOORRMMAANNCCEE IINNDDIICCAATTOORR 22..11 RREEGGUULLAARR RREEPPOORRTTSS OONN CCOONNDDIITTIIOONN AASSSSEESSSSMMEENNTT OOFF TTAARRGGEETTEEDD AASSSSEETTSS

    The following indicates the program for ongoing condition assessment.

    PROGRAMMED CONDITION ASSESSMENTS

    2002 2003 2004 2005

    ROADS

    FOOTPATHS

    PAVEMENT MARKING

    SIGNS

    Solid box indicates completed works.

    Striped box indicates work in progress.

    Clear box indicates work not commenced.

    Notes Condition assessment of road pavement commenced on 7 July 2001 and completed in October 2002 Condition assessments of guardrails was also undertaken and completed in the month of October 2002. Condition assessments of footpaths commenced in October 2002 and completed in July 2003. Condition assessment of Pavement Marking commenced in July 2003 and completed in June 2004. The linemarking condition rating was completed in May 2004. Data collection for Council's signs in the road reserve

    has commenced in the month of June. To date approximately 1800 points have been collected.

    Signage Collection

    225

    13861259

    1055

    1466

    328

    1844

    1609