ITE Presentation

46
Page 1 Authors: Theresa A. Kirchner Kiran Karande Edward P. Markowski Old Dominion University Norfolk, VA, USA March 17, 2006 Perceived Organizational Business Continuity Readiness: Scale Development and Validation

Transcript of ITE Presentation

Page 1: ITE Presentation

Page 1

Authors:

Theresa A. KirchnerKiran KarandeEdward P. Markowski

Old Dominion UniversityNorfolk, VA, USA

March 17, 2006

Perceived Organizational Business Continuity Readiness: Scale Development and Validation

Page 2: ITE Presentation

Page 2

What is business continuity ? It provides protection for the mission, vision, and

values of the organization and mitigates the effects of disasters or severe disruptions on that mission, vision, and value set. (DRII / DRJ Glossary)

It facilitates continued performance of essential business functions / operations and the ongoing protection of vital company assets. (BCI Glossary)

It includes all measures and technologies that an organization implements to combat any potential significant disruption to its normal operations, competitive advantage, and ability to prove regulatory compliance. (Price)

It allows organizations to reasonably strive for continuous availability of processes, systems, and networks. (IBM Global Services)

Page 3: ITE Presentation

Page 3

Related definitions Business Continuity Planning (BCP)

is a process of developing advance arrangements and procedures that enable an organization to respond to an event in such a manner that critical business functions continue with planned levels of interruption or essential change. (Disaster Recovery Institute / Disaster Recovery Journal Glossary 2004)

Rooted in a crisis management approach (Shrivastave 1987, Smith 1990, Pauchant and Mitroff 1992)

Broader in scope than more traditional “disaster recovery” approaches, which emphasize after-the-fact recovery of information technology hardware / software systems (Doswell 2000)

Focuses on business processes and assets (Elliott et al. 2002)

Page 4: ITE Presentation

Page 4

Related definitions (cont) Crisis Management is an approach that:

recognizes the social and technical characteristics of business interruptions

emphasizes the contribution that managers and employees make to the resolution of interruptions

assumes that managers may build resilience into business interruptions through processes and changes to operating norms and practices

assumes that organizations themselves may play a major role in ‘incubating the potential for failure

recognizes that, if managed properly, interruptions do not inevitably result in crises

acknowledges the impact, potential or realized, of interruptions upon a wide range of stakeholders (Elliott et al. 2002)

Page 5: ITE Presentation

Page 5

Example – Business Continuity Planning

Salomon Smith Barney (part of Citigroup) in the context of the 9-11 disaster:

A pre-established virtual command center immediately began meeting to provide managerial direction.

SSB lost equipment in NY; immediately switched to an alternate hot site in NJ already staffed with employees.

2,000 employees were displaced due to the collapse at Seven World Trade Center. Based on predefined requirements, business continuity plans, and previous exercises, all employees were relocated to temporary work facilities and/or permanent locations.

Post-9/11 focus is on data replication, recovery of non-critical functions, plan currency, and crisis management planning (evacuation, communication).

Page 6: ITE Presentation

Page 6

Practical Examples Network outage “Sick building” Earthquake / fire / flood / hurricane / snowstorm WTO / World Bank protest situation Election-year party convention Major IT or operational system implementation Hacker / intruder situation Violence in the workplace Terrorist attack (or threat) Gas line explosion

Page 7: ITE Presentation

Page 7

‘Standard practice’ ‘Better practice’ Continuous Improvement

Old New Future / Virtual Disaster Recovery Business Continuity (e-continuity + ?) Management IT focus Value chain focus Virtual value chain focus

IT staff Multi-disciplinary team Intra-organizational team

Existing structure New structures Virtual structures

Protect core operations Protect entire org Protect virtual org Sustain current position Create sustainable Compelling performance advantage

Parochial view Open system view Virtual system view

Recovery emphasis Prevention / continuity Virtual value chain emphasis continuity emphasis Adapted from Elliott et al. 2002

Business Continuity – Historical Perspective

Page 8: ITE Presentation

Page 8

Literature ReviewAnalysis of recent national and international surveys to

develop insights about the current status of business continuity and mitigation of major business interruptionsCerullo and Cerullo (2004), “Business Continuity Planning: A Comprehensive Approach”

Examination of business continuity in the post-9/11 environment; notes that 85% of U.S. critical infrastructure is owned and controlled by non-governmental organizationsBovin et al. (2004), “Leading After 9/11”

Review of results of a business continuity oriented survey of 461 managers at U.K. businessesVeysey (2004), “Insurers called influential in forming continuity plans”

Page 9: ITE Presentation

Page 9

Literature Review (cont)Empirical analysis of the impact of computer disasters on

information management using sample data from 274 executivesKundu (2004), “Impact of computer disasters on information management: a study”

Outline of the expanding scope of business continuity to include all measures and technologies that an organization implements to combat any significant disruption to its normal operations, competitive advantage, and ability to prove regulatory compliance Price (2004), “The New Scope of Business Continuity”

Examination of the current and evolving status of business continuity in corporationsQuinn (2004), “Moving Business Continuity Into the Corporate Mainstream”

Page 10: ITE Presentation

Page 10

Literature Review (cont)Examination of corporate plans, strategies, and short-term

activities potentially needed to incorporate the ramifications of 9/11 eventsKennedy et al. (2003), “Scenario planning after 9/11: Managing the impact of a catastrophic event”

An academic overview of the evolving discipline of business continuityElliott, Swartz, and Herbane (2002), “Business Continuity Management: A Crisis Management Approach”

Presentation of a multidisciplinary approach to crisis management research, using psychological, social-political, and technological-structural research perspectives Pearson and Clair (1998), “Reframing Crisis Management”

Page 11: ITE Presentation

Page 11

Literature Review (cont)

A detailed business-oriented overview of the business continuity planning processStrohl Systems (1995), “The Business Continuity Planning Guide”

Leading industry publications:Disaster Recovery JournalContinuity InsightsBusiness Continuity ManagementRisk Management

Non-academic proprietary research:Gartner GroupMeta GroupMajor Business Continuity Vendors

Page 12: ITE Presentation

Page 12

Why is the research relevant ?Examples: The U.S. experienced 58 weather-related

disasters between 1980 and 2003, with normalized damages that exceeded $1 billion each and totaled $349 billion (NOAA 2004)

43% of firms hit by severe crises never reopen. Another 29% fail within two years. (Datapro Research Company 1990)

e.g. Of all business damaged by Hurricane Andrew in 1992, 80% of those lacking a business continuity plan failed within 2 years of the storm. (FEMA http://www.fema.gov/library/lib01.htm)

Page 13: ITE Presentation

Page 13

Why is the research relevant ? (cont)

Examples:

More than 75% of organizations worldwide experienced unexpected unavailability of critical business systems in 2002. (Ernst & Young Global Information Security 2002 Survey)

Downtime costs $1300 per minute on average. (Oracle)

Downtime costs major Internet players an estimated $8000 per hour. (Forrester Research)

Typical medium-sized business downtime costs average $78,000 per hour; these sites typically lose more than $1 million annually due to downtime. (IDC)

Page 14: ITE Presentation

Page 14

Cost of Downtime Revenue

• Direct loss• Compensatory payments• Lost future revenues• Billing losses• Investment losses

Productivity• Number of employees impacted X hours out X burdened hourly rate

Damaged Reputation• Customers• Suppliers• Financial markets• Banks• Business partners• Etc.

Financial Performance• Revenue recognition• Cash flow• Lost discounts (A/P)• Payment guarantees• Credit rating• Stock price

Other Expenses Temporary employees, equipment rental, overtime costs, extra shipping costs, travel expenses, opportunity costs, etc.

Copyright © 2001

Page 15: ITE Presentation

Page 15

Why is the research relevant ? (cont) Marketing perspective

• Business Continuity is a multi-billion-dollar industry.

• Major Business Continuity vendors are interested in research to identify product and service opportunities, increase sales, and maintain profitable customer relationships. (e.g. IBM, HP, AT&T, Strohl Systems, SunGard)

• Significant non-academic work is done by research organizations. (e.g. Gartner Group, Meta Group)

• Academic work, available to both business continuity vendors and customers, has the potential to fill a marketing information void for those who cannot afford research organization prices.

Page 16: ITE Presentation

Page 16

Why is the research relevant ? (cont) Managerial perspective

• In a 24x7 on-line world, managers must approximate 100% uptime and accessibility or customers will go elsewhere.“The wonder of the Web is that the customer knows about problems at the same time that you do. There’s no camouflage.” - Senior VP of electronic brokerage

• A business continuity readiness scale can provide an operational tool for managers to measure and assess readiness at both a firm level and, potentially, an industry level.

• A business continuity readiness scale can provide information for a scorecard useful for updating Boards of Directors, internal and external auditors, industry analysts, investors, and other stakeholders.

Page 17: ITE Presentation

Page 17

Why is the research relevant ? (cont)

Academic perspective

• There is very little theoretical and empirical research in the literature.

• While university classes and academic degrees are beginning to be awarded in the areas of business continuity / disaster recovery / emergency response, the coursework and textbooks are based on non-academic research and case studies.

• There are no academic constructs / scales for organizational business continuity readiness and its antecedents.

Page 18: ITE Presentation

Page 18

Proposed Construct:Perceived Organizational Business Continuity

Readiness

Related Research Questions: How is perceived organizational business

continuity readiness measured? What factors (antecedents) contribute to

perceived organizational business continuity readiness?

What are the consequences of organizational business continuity readiness?

How This Research Addresses the Gap

Page 19: ITE Presentation

Page 19

Research Plan for Scale Development Project

(following the scale development methodology of Gilbert Churchill 1979)

Phase 1

1. Specified the domain of the construct Literature search Construct definition

2. Generated the initial sample of items Literature search Depth interviews Initial item sample Focus group Refined item sample

3. Collect data Collected Round 1 data

Phase II

4. Purified the measure Factor analysis Reliability analysis Revised item sample

5. Collected data Collected Round 2 data

6. Assessed reliability Factor analysis Reliability analysis

7. Assessed validity Generated hypotheses Tested construct validity

8. Developed norms

Page 20: ITE Presentation

Page 20

The Research Process• Step 1: Defined the concept of perceived organizational

business continuity readiness.• Step 2: Generated a broad list of 56 questionnaire items to

measure the concept based on review of business / academic literature and qualitative research.

• Step 3: Collected data – Survey # 1.• Step 4: Reduced the number of questionnaire items to 23,

based on reliability and factor analysis of data from Survey # 1.

• Step 5: Collected additional data for the reduced number of questionnaire items – Survey # 2.

• Step 6: Reduced the number of survey items further, to 11, based on reliability analysis and factor analysis of data from Survey # 2. Identified 4 related categories

(factors) into which those questionnaire items fall.• Step 7: Confirmed the 11-item, 4-factor structure developed in

Step 6 (which used data from Survey # 2) with data from Survey # 1.

• Step 8: Developed norms (mean average scores) for different demographic groups.

Page 21: ITE Presentation

Page 21

Specified the Domain of the Construct

Conducted a literature search.

Developed a delineated definition of the construct:

Perceived organizational business continuity readiness:

Perceived ability of an organization to keep functioning until its normal facilities are restored after a disaster or disruptive event

Page 22: ITE Presentation

Page 22

Generated the Initial Sample of Items

Reviewed prior literature on the topic.

Examined business continuity vendor work on business continuity readiness assessment:

– Gartner Group

– IBM Global Services

– Hewlett Packard (HP)

– Hitachi Data Services

– Abbott Consulting, Inc.

Page 23: ITE Presentation

Page 23

Generated the Initial Sample of Items (cont.)

Reviewed Disaster Recovery Institute International’s “Professional Practices for Business Continuity Planners”.

Examined 3 years of weekly survey questions posted by the Disaster Recovery Journal on its website and the related results.

Conducted an experience survey using depth interviews with 5 industry experts to develop a draft set of items.

Page 24: ITE Presentation

Page 24

Generated the Initial Sample of Items (cont.)

Conducted an on-online focus group of 57 Master Certified Business Continuity Professionals (including business continuity planners, managers, and vendors) to develop a full range of items.

– Asked the participants: “How can business continuity readiness be measured?” in terms of dimensions and specific items.

– 11 participants discussed the topic in depth by proposing lists of potential measurement items. 10 additional participants commented on the appropriateness of those items.

Page 25: ITE Presentation

Page 25

Generated the Initial Sample of Items (cont.)

Developed initial item sample characteristics: (cont.)– Structured questionnaire – all respondents

replied to the same questions.

– Undisguised questionnaire – did not attempt to hide the purpose of the study.

– Method of administration – on-line survey, accessed on a self-selecting basis, either from the Disaster Recovery Journal website or from a DRJ newsletter emailed to the respondent.

Page 26: ITE Presentation

Page 26

Generated the initial sample of items (cont.)

Developed initial item sample characteristics:

56 items proposed to measure the construct– 8 items that asked for a direct respondent belief /

opinion, using a 7-point scale of agreement / disagreement, on the degree to which his/her organization has achieved business continuity readiness.

– 48 items that asked the respondent to give his assessment, using a 7-point scale of agreement / disagreement, of the degree to which his/her organization has implemented measures to improve its business continuity readiness.

Page 27: ITE Presentation

Page 27

Refined the Sample of Items

Developed initial item sample characteristics:4 additional questions:

1. What is your level of expertise in the area of business continuity planning? (Novice to Advanced / Expert)

2. Have you earned a certification in the area of business continuity planning? (Yes or No)

3. What is the size of your company (approximate number of employees - all locations) (7 ranges, from “Sole” to “10,000+”)

4. What is the primary business of your organization? (18 options, including “Other”)

Page 28: ITE Presentation

Page 28

Refined the Sample of Items (cont.)

Implemented the on-line version of the questionnaire to the ODU Inquisite server using Inquisite (ODU) survey software. (Contact: Dr. Joan Mann, ODU CBPA)

Verified that the questionnaire functioned correctly by entering a complete set of survey responses.

Asked 3 subjects without business continuity planning knowledge or experience to complete the survey to assess clarity and understandability.

Page 29: ITE Presentation

Page 29

Refined the Sample of Items (cont.)

Conducted a pre-test using input from 5 experts (practitioner and consultant) to assess content validity in terms of applicability and representation of the perceived organizational business continuity readiness dimension.

No duplication or inappropriate items were identified based on the above analysis.

Finalized the initial version of the scale.

Deleted the responses of the pre-testers.

Page 30: ITE Presentation

Page 30

Collected Data – Round 1

Survey population: Executives, managers, employees, and vendors with a specific interest in business continuity planning

Potential sampling units:

– Disaster Recovery Journal website visitors *

– Disaster Recovery Journal on-line newsletter recipients *

– Disaster Recovery Journal conference attendees

– Disaster Recovery Institute website visitors*

Selected

Page 31: ITE Presentation

Page 31

Collected Data – Round 1 (cont.)

Posted the survey announcement and link on the Disaster Recovery Journal site.

Modified and reimplemented the survey after 2 days based on belated input from one of the pre-test participants:– Enhanced survey instructions to

prepare participants for questions in the form of declarative sentences with an agree / disagree scale.

Page 32: ITE Presentation

Page 32

Collected Data – Round 1 (cont.)

Monitored the DRJ survey site daily.

Received daily status reports from Inquisite coordinator.

Monitored the Inquisite survey data results.

# of usable surveys completed: 432

Page 33: ITE Presentation

Page 33

Lessons Learned – On-line Surveys

Build a detailed plan with completion dates; allow enough time for each step of the project.

Expert interviewees and pre-testers are likely to respond with second or third responses after their initial input; sometimes their late responses are important.

Website – related lessons learned:• The host website may change; daily

monitoring is important.

• Other website items and placement on website may impact response.

• Holiday periods may impact response.

Page 34: ITE Presentation

Page 34

Lessons Learned – On-Line Surveys (cont.)

Inquisite is an excellent survey tool but currently has some drawbacks:• The entire survey cannot be printed for

review; must print 1 page at a time.• It’s often difficult or not possible to

create desired customization• What you see is not necessarily what

you get. It’s important to preview the survey itself as you build it.

Offer participants something; in this case, they responded well to the offer of research results.

Page 35: ITE Presentation

Page 35

Purified the Measure

Analyzed the results of the initial data, using:

- Reliability analysis (Cronbach’s Alpha)

- Factor analysis

Revised the questionnaire by reducing the number of items from 56 to 23.

Added 18 items to measure antecedents.

Added 10 items to collect demographic information about the respondent and the respondent’s organization.

Page 36: ITE Presentation

Page 36

Survey 1 Results

Factor # Items Loaded

% of Variance

Cronbach’s Alpha

1 – Emergency Response

8 18.751 .892

2 – Business Continuity Planning Exercise / Audit

6 18.477 .911

3 – Business Impact Analysis

4 14.175 .892

4 – Telecomm Readiness

3 10.577 .870

5 – Resource Sufficiency

2 8.877 .877

Total 23 70.857 .954

Factor Analysis / Reliability Results

Page 37: ITE Presentation

Page 37

Proposed Antecedents of Perceived Organizational Business Continuity Readiness

Scale

Description Developed / Assessed by

Reliability

Centralization 5-item, 5-point Likert scale

Aiken & Hage (1968), Menon et al. (1997) .876

Firm Structure (Formalization)

4-item, dichotomous (yes/no) scale

Pelham and Wilson (1996) .730

Risk Aversion (Top Manager’s)

5-item, 5-point Likert scale

Kohli & Jaworski (1993), Menon et al. (1997)

.603

(using 2 items)

Turbulence (Technological)

4-item, 5-point Likert scale

Kohli & Jaworski (1993), Menon et al. (1997)

.701

Page 38: ITE Presentation

Page 38

Collected Data – Round 2

Used a paper survey distributed in the registration packages of the 03/2005 Disaster Recovery Journal Conference

# of surveys distributed: 895

# of usable surveys completed: 126

Page 39: ITE Presentation

Page 39

Survey 2 Results – Final 11-Item Scale

Factor Analysis / Reliability Results

Factor # Items Loaded

% of Variance

Cronbach’s Alpha

1 – Business Continuity Plan Exercise

4 31.164 .942

2 – Emergency Response Readiness

3 20.384 .812

3 – Resource Sufficiency

2 16.131 .842

4 – Business Impact Analysis / (RTO/RPO)

2 15.370 .827

Total 11 83.050 .911

Page 40: ITE Presentation

Page 40

Confirmatory Factor Analysis – SEM (AMOS) Diagram – Survey 1 Data

Page 41: ITE Presentation

Page 41

Confirmatory Factor Analysis (AMOS) – Data from Survey 1

Page 42: ITE Presentation

Page 42

Norms – Survey 1 & 2 Data (n = 584) Mean

Score * n Std.

Dev. Organization Size 10,000 + 53.19 166 13.683 (# of Employees) 5,000 – 10,000 49.73 71 12.846 1,000 – 5,000 51.41 160 13.167 101 – 1,000 48.54 117 14.369 1 – 100 46.79 61 13.683 Sole 58.75 59 13.623 All Responders 50.70 579 13.711 Industry of Financial / Banking 56.85 134 11.424 Organization Lodging / Food Service /

Entertainment 54.50 6 15.808

Insurance 53.85 62 10.805 Telecommunications 52.83 29 12.439 Healthcare 50.09 32 10.816 Utilities 49.83 24 14.834 Government 48.32 56 13.040 Information Technology 47.64 58 14.637 Transportation 47.00 9 9.539 Education 43.94 17 14.350 Manufacturing 43.75 50 15.790 Retail / Wholesale 43.75 20 15.586 Other 49.05 81 14.414 All Responders 50.70 578 13.735 Experience Level Advanced / Expert 53.95 256 13.043 Intermediate 50.38 245 13.158 Novice 41.32 78 13.371 All Responders 50.74 579 13.731 BCP Yes 53.96 228 13.053 Certification No 48.63 347 3.717 All Responders 50.75 575 13.697

Page 43: ITE Presentation

Page 43

Next Steps Multigroup analysis (AMOS), using the 2

groups of data collected from the 2 surveys, to determine whether or not the factor structure and factor loadings are similar between the groups.

Additional analysis – Survey 2 antecedent data

Enhancement of questionnaire to include additional antecedents and consequences

Survey 3 data collection (using international Association of Contingency Planners members) and analysis

Page 44: ITE Presentation

Page 44

Managerial & Research Implications

Caveat: It’s perceived, not actual. First study of its type to develop a measurement scale

for perceived organizational business continuity readiness.

Useful for both business continuity vendors and practitioners, as a tool for filling a marketing information void for consultants and small vendors.

Can provide an evaluation tool for executives and an operational tool for managers, to be used to measure and assess readiness at both a firm level and, potentially, an industry level.

Might be used to formulate a scorecard, or balanced scorecard component, useful for updating Boards of Directors, internal and external auditors, industry analysts, investors, and other stakeholders.

Page 45: ITE Presentation

Page 45

Opportunities for Future Research

Conduct testing within individual organizations

Develop antecedents and consequences of perceived organizational business continuity readiness

Develop an assessment tool for actual organizational business continuity readiness, which might be compared and contrasted with this perceived organizational business continuity readiness scale.

Page 46: ITE Presentation

Page 46

Questions

and

Comments . . .