ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

19
July 13, 2005 ITE District 6 Annual Meeting Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone Master of Urban and Regional Planning Candidate Portland State University [email protected] Chris Monsere, Ph.D., P.E. Research Assistant Professor, Portland State University Robert L. Bertini, Ph.D., P.E. Associate Professor, Portland State University Director, Center for Transportation Studies

description

Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages. ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone Master of Urban and Regional Planning Candidate Portland State University [email protected] - PowerPoint PPT Presentation

Transcript of ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

Page 1: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time MessagesITE District 6 Annual MeetingJuly 13, 2005

Aaron Breakstone Master of Urban and Regional Planning CandidatePortland State [email protected]

Chris Monsere, Ph.D., P.E.Research Assistant Professor, Portland State University

Robert L. Bertini, Ph.D., P.E.Associate Professor, Portland State UniversityDirector, Center for Transportation Studies

Page 2: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Outline

• Project Overview

• Summary of Test Area

• Experimental Design

• Data Collection

• Data Comparison

• Results

• Next Steps

Page 3: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Project Overview

Goals

1. Evaluate Oregon Department of Transportation’s (ODOT) travel time estimating and reporting capabilities

2. Identify locations where additional detectors might improve estimates

Page 4: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Project Overview

• ODOT Region 1 Traffic Management Operations Center (TMOC) – 485 inductive loop detectors – 19 variable message signs

(VMS), 3 currently displaying travel times

– Advanced Traveler Information Systems (ATIS): www.TripCheck.com

Page 5: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Project Overview

• Funded by NSF• Direct fiber-optic

connection between ODOT and PSU

• 20-second loop detector data– Volume– Speed– Occupancy

• Customized travel time area

Portland Regional Transportation Archive Listing (PORTAL) http://portal.its.pdx.edu

Page 6: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Summary of Test Area

• 18 original directional freeway links

• 3 links eliminated– Construction – Detectors not functional– Not pertinent to study

Downtown Portland

£¤26

217

§̈¦5

§̈¦5§̈¦205

§̈¦84

§̈¦5

Page 7: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Experimental Design• Analysis of PORTAL

estimates to determine required number of runs

• Data collection plan– 5-10 runs required for

most links– 4 routes designed– Transitional periods

targeted– Groups with 5-7 minute

headways– Standard probe vehicle

instructions

217 Southbound: US26 Interchange to I-5 Interchange [Link 9]

0

10

20

30

40

50

60

0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 0:00

Time

Tra

ve

l T

ime

s

Cu

mu

lativ

e T

rav

el T

ime

Page 8: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Data Collection• Hardware

– Palm handheld computers

– Magellan GPS devices

• Software– ITS-GPS

Free! Available at www.its.pdx.edu

• Individual runs and groups of probe vehicles

• Variety of traffic conditions

Page 9: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Data Collection• 87 probe vehicle runs• 904 minutes (~15 hours) of collection time• 516 miles of data• 12 drivers• 7 days

Page 10: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Data Comparison• Probe data

– Individual runs downloaded

– Runs plotted on freeway network map showing link endpoints

– Pertinent data segments extracted

Page 11: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Data Comparison• Detector data

– Assignment of influence areas1. Midpoint method

2. ODOT modified midpoint method

– Aggregation1. Nearest 20-second interval

2. Average of nearest interval and 1 minute before

3. Average of nearest interval and 3 minutes before

Page 12: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• ATMS estimates reasonably accurate

P- Value -Statistical Significance

Link Number Midpoint ODOTMidpt -1

minMidpt -3

minODOT -1

minODOT -3

minLINK 2 - I-5 NB 0.073 0.103 0.034 0.071 0.038 0.079LINK 3 - I-5 NB 0.272 0.012 0.214 0.202 0.010 0.035LINK 4 - I-5 NB 0.651 0.665 0.545 0.287 0.560 0.301LINK 5 - I-5 SB 0.470 0.470 0.503 0.256 0.503 0.256LINK 6 - I-5 SB 0.435 0.095 0.676 0.605 0.052 0.045LINK 7 - I-5 SB 0.009 0.009 0.021 0.016 0.021 0.016LINK 8 - OR-217 NB 0.016 0.011 0.012 0.024 0.009 0.011LINK 9 - OR-217 SB 0.381 0.040 0.199 0.159 0.146 0.205LINK 10 - I-205 NB 0.532 0.460 0.277 0.040 0.896 0.965LINK 12 - I-205 SB 0.537 0.020 0.478 0.731 0.003 0.003LINK 13 - I-84 EB 0.273 0.070 0.518 0.402 0.098 0.077LINK 14 - I-84 WB 0.736 0.736 0.754 0.530 0.754 0.530LINK 16 - US 26 EB 0.026 0.026 0.009 0.012 0.009 0.012LINK 17 - US 26 WB 0.013 0.013 0.014 0.012 0.013 0.011

Page 13: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• ATMS estimates reasonably accurate

Run 1

303.5

304.0

304.5

305.0

305.5

306.0

306.5

307.0

307.5

308.0

8:03:00 8:05:00 8:07:00 8:09:00 8:11:00 8:13:00 8:15:00 8:17:00 8:19:00 8:21:00

Time

Mile

po

st

Run 9

0.3

0.8

1.3

1.8

2.3

2.8

3.3

16:30:00 16:32:00 16:34:00 16:36:00 16:38:00 16:40:00 16:42:00 16:44:00 16:46:00 16:48:00

Time

Mile

post

Page 14: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• Detector density and location critical

Run 7

292.3

293.3

294.3

295.3

296.3

297.3

298.3

299.3

300.3

8:05:00 8:10:00 8:15:00 8:20:00 8:25:00 8:30:00

Time

Mile

post

Run 1

303.5

304.0

304.5

305.0

305.5

306.0

306.5

307.0

307.5

308.0

8:06:00 8:08:00 8:10:00 8:12:00 8:14:00 8:16:00

Time

Mile

post

Run 6

68.9

69.4

69.9

70.4

70.9

71.4

71.9

72.4

72.9

8:17:00 8:18:30 8:20:00 8:21:30 8:23:00 8:24:30 8:26:00 8:27:30

Time

Mile

post

Page 15: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• Incidents difficult to capture

Run 1

69.7

70.2

70.7

71.2

71.7

72.2

72.7

73.2

73.7

16:26:00 16:28:00 16:30:00 16:32:00 16:34:00 16:36:00 16:38:00 16:40:00 16:42:00

Time

Mile

post

Run 3

0.3

1.1

1.9

2.7

3.5

4.3

5.1

5.9

6.7

8:18:00 8:23:00 8:28:00 8:33:00 8:38:00 8:43:00 8:48:00 8:53:00 8:58:00

Time

Mile

post

Page 16: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Results• No uniform difference between methods• Aggregation improves accuracy

-65%

-55%

-45%

-35%

-25%

-15%

-5%

5%

15%

25%

35%

45%

55%

65%

1 2 3 4 5 6 7 8 9 12 13 14 16 17

Link

Per

cen

t E

rro

r

Midpoint

ODOT

Midpt -1 min

Midpt -3 min

ODOT -1 min

ODOT -3 min

Travel Time Observations (95% CI)

0.00

1.00

2.00

3.00

4.00

5.00

6.00

Probe Midpoint ODOT Midpt -1

min

Midpt -3

min

ODOT -1

min

ODOT -3

min

Travel Time Differences

-1.00

-0.50

0.00

0.50

1.00

1.50

2.00

Midpoint ODOT Midpt -1

min

Midpt -3

min

ODOT -1

min

ODOT -3

min

AVG MIN MAX

Page 17: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

ResultsCandidate locations for increased detection

– Recurring congestion– Detector spacing > 1 mile

1. Hwy 217 NB at MP 3.22. US-26 EB at MP 703. US-26 WB at MP 694. US-26 WB at MP 705. I-5 NB at MP 298.56. I-5 SB at MP 306.57. I-84 EB at MP 2.0

Page 18: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Next Steps

• More data– Incidents– Capture transitions

• Different algorithms

Page 19: ITE District 6 Annual Meeting July 13, 2005 Aaron Breakstone

July 13, 2005ITE District 6 Annual Meeting

Acknowledgements

• Oregon Department of Transportation– Stacy Shetler– Galen McGill– Dennis Mitchell– Jack Marchant

• Castle Rock

Consultants– Dean Deeter

• Volunteer drivers