It takes a Village to
Build a Windmill:
Community Renewables’ role in Nova Scotia’s transition from King Coal to Cleaner Energy
November 11, 2016
Paul Black
© Fisherwick Collaborations Inc. 2016
![Page 2: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/2.jpg)
Where Our
Story is Set • One of
Canada’s four
founding
provinces
• Population ~ 1
million
• Major
industries: - Resources
- PSE
- Government
• Peak electrical
demand
(winter) ~2200
MW
© Fisherwick Collaborations Inc. 2016
![Page 3: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/3.jpg)
Nova Scotia’s Journey
© Fisherwick Collaborations Inc. 2016
![Page 4: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/4.jpg)
Pace of Change is Quickening
Around the World
© Fisherwick Collaborations Inc. 2016
![Page 5: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/5.jpg)
But before you set off....
© Fisherwick Collaborations Inc. 2016
![Page 6: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/6.jpg)
Strategy Goal = 100% renewable energy in
Barbados
What “job(s)”are you hiring a sustainable transition
strategy to do? © Fisherwick Collaborations Inc. 2016
![Page 7: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/7.jpg)
FROM KING COAL TO THE BEST
GREENHOUSE GAS TRAJECTORY IN
CANADA IN UNDER A DECADE
Nova Scotia A Case Study
© Fisherwick Collaborations Inc. 2016
![Page 8: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/8.jpg)
Nova Scotia ~2005: A Standing
Start
The Policy & Politics
• Vertically-integrated,
monopoly electrical
utility
• ‘Pocketbook’ issues
front & centre for
public
• Commodity
fluctuations
• Environmental
consciousness
increasing
Electricity Supply
© Fisherwick Collaborations Inc. 2016
![Page 9: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/9.jpg)
© Fisherwick Collaborations Inc. 2016
Liberals
All Party Support
![Page 10: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/10.jpg)
COMFIT:
The
Program The Parameters
• Distribution connect
(no additional
transmission build-out
costs)
• Secure financing -
fixed price through
FIT rate, allow private
sector to own up to
49% to facilitate cost
of capital
• Multiple sources of
generation - wind,
hydro, forest
biomass; *but not
solar*
• Soft ceiling of
available generation
~100 MW
© Fisherwick Collaborations Inc. 2016
![Page 11: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/11.jpg)
COMFIT: Who is Eligible
• First Nations/Indigenous bands
• Municipal governments
• Universities
• CEDIFs
• Non-profits
© Fisherwick Collaborations Inc. 2016
![Page 12: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/12.jpg)
COMFIT: How to Power
It • Wind energy: ≤50kW (w/ 5MW cap);
primary focus >50kW
• Biomass combined heat and power
(Not restricted to eligible groups
where heat is used by owner)
• Small-scale in-stream tidal energy
• Run-of-river hydroelectric
© Fisherwick Collaborations Inc. 2016
![Page 13: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/13.jpg)
COMFIT: Results In Brief
Program “closed” effective Summer 2015
Approximately ~204.6 MW awarded to 105
sponsors - not all will ultimately be
commissioned
Technologies = vast majority wind projects, +
• 16 Biomass
• 3 Tidal
• 1 Hydro
Project sizes range from 0.05 to 7.05 MW
© Fisherwick Collaborations Inc. 2016
![Page 14: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/14.jpg)
Results: Who Generates
© Fisherwick Collaborations Inc. 2016
![Page 15: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/15.jpg)
Transition Impact = Among the
Most Renewables in North
America
© Fisherwick Collaborations Inc. 2016
![Page 16: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/16.jpg)
Transition Impact:
GHG Reductions = Best in
Canada
© Fisherwick Collaborations Inc. 2016
![Page 17: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/17.jpg)
Transition Impact:
Electricity Rates
© Fisherwick Collaborations Inc. 2016
![Page 18: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/18.jpg)
Silver buckshot v. Silver bullet
© Fisherwick Collaborations Inc. 2016
Fossil Fuels
Wind, Hydro, Solar, Biomass, Tidal, Natural Gas, Coal
![Page 19: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/19.jpg)
© Fisherwick Collaborations Inc. 2016
![Page 20: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect](https://reader034.fdocuments.us/reader034/viewer/2022051812/6029ffa01b4fc00d1f65feae/html5/thumbnails/20.jpg)
© Fisherwick Collaborations Inc. 2016