Page 2: IT MISSION & VISION

IT Mission

1) System Simplification : Making the IT systems & applications simple so that it can

be easily operated and understood by the end users.

2) Process Atomization : Once systems and applications are simplified, these need to

be atomized and must be tested thoroughly.

3) Reduction in Hard Copy circulation : Among the users, promoting more use of systems and

applications to reduce the Print copy of documents.

4) User Trainings : on existing and new Systems & Technologies.

Page 3: IT MISSION & VISION

IT Vision Statement

“An Online, Simple and User friendly solution which enable its users to take fast and accurate decisions with no data duplicity.”

Page 4: IT MISSION & VISION

Our existing IT InfrastructureWide-Area-Network

SutrapadaPlant

AhmedabadOffice

Noida Head Office

Haria Unit (Vapi)

Mumbai Office

SMMLMadurai

SMMLManaparai

Bhilad Plant (Vapi)

Punit Unit (Vapi)

Minarva Unit

Reliance MPLS Hub

Local WAN service

provider

Page 5: IT MISSION & VISION

SAP Landscape

Soda Ash Division Textile Division

Go-Live Feb-2010 Apr-2007

SAP Version SAP ECC 6.0 SR3 SAP ECC 6.0 SR1 (MyERP 2005)

Database Oracle 10.2.2.4 g Oracle 10.2.0.2 g

Database Size 277 GB 378 GB

Page 6: IT MISSION & VISION

SAP System Architecture implemented at GHCL Ltd, Soda Ash Plant, Sutrapada, Nr.Veraval, Gujarat. SAP – Application (Appln), Central Instance (CI), Database Instance (DB) Servers: Prd Server, QA & Dev Server, Backup Server, DR Server. Assuming max. 20% Growth per year in DB & User Ids. | Raid-10 & Raid-5 Fiber Channel Connectivity Fiber Channel Connectivity Cluster Configured Cluster Configured Raid-5

Storage for Backup Server HDD: 8 * 300 GB SAS, 15K Rpm ; 3 * 750GB 7.2Krpm

SAP Production Server (Server 1) OS UNIX on each LPAR.

CI & DB Server (LPAR2)

Appln Server 1 (LPAR1)

Min.Config. CPU: 2 * 4.2 GHz HDD: 2* 146 GB 2* 300 GB RAM: 16 GB Fiber Card: 1 nos 4Gbps Gbps LAN: 2 nos

Min.Config. CPU: 2 * 4.2 GHz HDD: 2* 146 GB 2* 300 GB RAM: 8 GB Fiber Card: 1 nos 4Gbps +1 spare Gbps LAN: 2 nos

Storage (For CI & DB) Gbps LAN: 2 nos Fiber Card: 4 nos - 4Gbp HDD: 19 * 300 GB, 15K Rpm 10 * 750GB SATA 7.2K Rpm

Gbps 8/16 Port Switch

Tape Library (Autoloader) SCSI Card: 2 nos Gbps LAN: 2 nos

Cluster (Secandary) & Backup Server (Server 2) OS UNIX on each LPAR.

CI DB Cluster (LPAR3) & TSM Backup Server

Appln Server 2 (LPAR4)

Min.Config. CPU: 2 * 4.2 GHz HDD: 2* 146 GB 2* 300 GB RAM: 16 GB Fiber Card: 1 nos Gbps LAN: 2 nos

Min.Config. CPU: 2 * 4.2 GHz HDD: 2* 146 GB 2* 300 GB RAM: 8 GB Fiber Card: 1 nos 4Gbps +1 spare Gbps LAN: 2 nos

SAP Dev & QA Server (Server 3) OS UNIX on each LPAR.

QA Server (LPAR6) Dev Server (LPAR7) Min.Config. CPU: 2 * 4.2 GHz HDD: 2* 146 GB 4 * 300 GB RAM: 16 GB Fiber Card: 1 nos 4Gbp Gbps LAN: 2 nos

Min.Config. CPU: 2 * 4.2 GHz HDD: 2* 146 GB 2 * 300 GB RAM: 8 GB Fiber Card: 1 nos 4Gbp Gbps LAN: 2 nos

LTO Drive LTO Drive for Direct Backup

LTO Drive

Tivoli Client on LPAR2

Tivoli Server on LPAR3

SAP Landscape – Soda Ash Division

Page 7: IT MISSION & VISION

LAN Switch Gigabyte Port HACMP for Prd Server Failover HACMP (SAP Prd Server File Systems are here.) IBM DS4300 Storage 12 * 146 GB HDDs (Raid-5) IBM SCSI LTO IBM SCSI Autoloader LTO (22 nos of Ultrium 3 400/800GB Cartridges) LAN - Gigabyte Port Ultrium 3 400/800GB (14 days cycle for Online Bkup.) IBM SCSI LTO Ultrium 3 400/800GB (Manual Backup)

P550 – 55A SAP Production Server CPU – 2 * 2.1 GHz P5 2 * 146 GB HDDs 2 * 300 GB HDDs 16 GB RAM 2 * Fiber Card 2 * LAN Card + addn 2 * 300 GB HDDs + 4 GB RAM + SCSI Backplane Existing Server after upgrade

P520 – 52A Exclusively for HACMP & DR CPU – 4 * 1.65 GHz P5, 2 * 146 GB HDD, 4 * 300 GB HDD, 16 GB RAM, 2 * Fiber Card, 2+1 * LAN Card LPAR 1 LPAR 2 CPU– 2 * 1.65 GHz 2*146 + 1* 300 GB HDDs 8 GB RAM 2 * Fiber Card 2 * LAN Card HACMP

CPU–2* 1.65 GHz 3 * 300 GB HDDs 8 GB RAM 1 * LAN Card Nr. Line DR

New Server

P520 – 52A Configured as SAP QA/Dev Server CPU – 2 * 2.1 GHz 8 * 146 HDDs 28 GB RAM 2 * Fiber Card 2 * LAN Card Existing QA/Dev Server

Periodic restoration of Production Client Backup with/without Tivoli Software.

SAP Landscape – Textile Division

Page 8: IT MISSION & VISION
Page 9: IT MISSION & VISION

Know Yourself & Improve

Page 10: IT MISSION & VISION

Core Values and its importance

Core-Values: Respect, Ownership, Trust and Integrated Team Work.

Page 11: IT MISSION & VISION

Respect

Integrated Team Work

Trust

Ownership

Page 12: IT MISSION & VISION

• Understand the Impact of Core-Values.• Importance and Timelines of

Commitments.• Sharing…….• Ask for Help whenever needed.• Show strength when required.

Be Happy and make others Happy

Working with your TeamYour People Your Asset

Page 13: IT MISSION & VISION

• Set a reminder (maintain calendar/notebook).• Keep someone updated.• Keep backup ready.• Train him as you grow.• Keep perfect documentation & help preparing

the Policies.

Manage your work

Page 14: IT MISSION & VISION

Dealing with Outside World

Dealing with End-users

• Respect every user : (Give Respect Take Respect)

• Reply responsibly : (Think, Think and then Reply)

• Take Firm & Bold Decisions. (One Problem One Solution)

Page 15: IT MISSION & VISION

Dealing with Vendors/Suppliers(Stake holders outside the company)

• Clearly express your requirement. (First impression is last impression).

• Decide the agenda before meeting.• Working with Vendors/Suppliers against your

requirement on a long term contract.• Work for a Win-Win deal.• Regularly Monitor performance of

Vendors/Suppliers.• Then …. Decide for future expansion/ continuity - Yes

or No.

Page 16: IT MISSION & VISION

Know your limits

• Self Planning : Plan your day.• Raise questions to self and work to find the

answers.• Skill up-gradation : Prepare for new

(innovation)• Documentation : Record your evaluation.

Self Development : Think, Evaluate and Adopt

Page 17: IT MISSION & VISION

Presentation

• Brief to your Team.• Present with Live Demo.• Share with your Team.

Implementation

• Thorough implementation plan.• Action Plant : You & Team (Roles & Responsibilities)

Page 18: IT MISSION & VISION

• SAP Roadmap : Implementation of SAP Business Intelligence, SAP Software upgradation, Hardware refresh etc.

• New Enhancements in SAP : CRM, SRM, Fiori etc.• Training to the end-users : Sr.Mgmt, HODs &

Operators.• Online solutions (HCM,EIS etc.)• Auto Failover VPN/WAN links : Load Balancing & Link

aggregators.• Internal & External Training programs for IT Team

Members.

IT Future Plans

Page 19: IT MISSION & VISION

• Standardization of IT Technologies (Software, Hardware & Networking) : Across all the GHCL Locations.

• Centralization of IT Services : for all the GHCL Locations.

• IT Spend Analysis on Capex and Revenue expenditures.

Page 20: IT MISSION & VISION

Thank You