IT Milestone Report Contract in Effect
-
Monthly Status Report 3 (SOW1-2012) 12/28/2012 12/28/2012
Technical Architecture Specification 1/21/2013 1/22/2013
Construction and Configuration Status Report @40%
3/29/2013 3/29/2013
Data Conversion Approach (SI) 4/12/2013 1/29/2013
Data Conversion Specification 4/12/2013 5/31/2013 L
Data Conversion Test Plan 4/12/2013 6/18/2013 L
Rule Set Specification 3/18/2013 7/19/2013 L
Software Requirements Specification (SRS)
8/6/2013 8/9/2013 An extension was granted.
User Interface Specification 3/18/2013 7/19/2013 L
Interface Design (Specification) 3/18/2013 7/19/2013 L
Security Test Plan 4/12/2013 2/15/2013
System Security Plan 4/12/2013 2/19/2013
Monthly Status Report 4 (SOW1-2012) 1/31/2013 1/31/2013
Integration Test Plan 4/12/2013 6/21/2013 L
Performance Test Plan 3/29/2013 3/29/2013
System Test Plan 4/9/2013 7/12/2013 L
Test Approach 3/19/2013 3/29/2013 L
Integration Test Data Plan 4/12/2013 6/21/2013 L
System Test Data Plan 4/12/2013 7/24/2013 L
Test Strategy 3/8/2013 3/22/2013 An extension was granted.
User Acceptance Test Plan 8/30/2013 9/13/2013 L
Construction and Configuration Status Report @60%
4/11/2013 4/11/2013
End-User Training Approach 1/31/2013 2/1/2013
End-User Training Curriculum 1/31/2013 2/1/2013
Monthly Status Report 5 (SOW1-2013) 2/28/2013 2/28/2013
Construction and Configuration Status Report @80%
5/2/2013 5/2/2013
Monthly Status Report 6 (SOW1-2013) 3/29/2013 3/29/2013
Construction and Configuration Status Report @100%
7/31/2013 7/31/2013
Monthly Status Report 7 (SOW1-2013) 4/30/2013 4/30/2013
End of Test Phase Report (QA) 8/6/2013 8/16/2013 L
-
End of Test Phase Report (Unit) 8/6/2013 8/15/2013 L
Monthly Status Report 8 (SOW1-2013) 5/31/2013 5/31/2013
Communications Plan 2/15/2013 2/15/2013
Monthly Status Report 9 (SOW1-2013) 6/28/2013 6/28/2013
Monthly Status Report 10 (SOW1-2013) 7/31/2013 7/31/2013
Monthly Status Report 11 (SOW1-2013) 8/30/2013 8/30/2013
End of Test Phase Report (Data Conversion 1)
11/1/2013 11/5/2013 L
End of Test Phase Report (Security) 11/19/2013 11/20/2013
Production Deployment Plan 6/28/2013 6/28/2013
Production Support Plan 9/27/2013 9/27/2013
End of Test Phase Report (UAT) 3/24/2014 3/24/2014
Monthly Status Report 12 (SOW1-2013) 9/30/2013 9/30/2013
Production Status Report (1.0) 12/11/2013 10/11/2013
Production Status Report (1.2) 2/25/2014 2/28/2014 An extension was granted.
Go-Live Transition Guides 6/7/2013 6/21/2013 L
Project Team Capability Transfer Approach
2/28/2014 2/28/2014
System Run Book 2/7/2014 2/7/2014
End-User Training Evaluation Report 11/15/2013 11/18/2013 L
Instructor-Led Training Courseware 6/28/2013 6/21/2013
Web-Based Training Courseware 6/28/2013 6/18/2013
Instructor-Led Training Courseware (UPDATE)
12/6/2013 11/15/2013
Monthly Maintenance, Enhancement, and Operations Report – October 2013
1/27/2014 1/27/2014
Monthly Status Report 13 (SOW1-2013) 10/31/2013 10/31/2013
Monthly Maintenance, Enhancement, and Operations Report – November 2013
1/27/2014 1/27/2014
Monthly Status Report 14 (SOW1-2013) 11/29/2013 11/27/2013
Monthly Maintenance, Enhancement, and Operations Report – December 2013
1/27/2014 1/27/2014
-
Monthly Maintenance, Enhancement, and Operations Report – January 2014
2/7/2014 2/7/2014
Monthly Maintenance, Enhancement, and Operations Report – February 2014
3/7/2014 3/7/2014
Monthly Maintenance, Enhancement, and Operations Report – March 2014
4/8/2014 4/8/2014
Monthly Maintenance, Enhancement, and Operations Report – April 2014
5/13/2014 5/13/2014
Monthly Maintenance, Enhancement, and Operations Report – May 2014
6/6/2014 6/6/2014
Monthly Maintenance, Enhancement, and Operations Report – June 2014
7/8/2014 7/9/2014
Monthly Maintenance, Enhancement, and Operations Report – July 2014
8/8/2014 8/8/2014
Monthly Maintenance, Enhancement, and Operations Report – August 2014
9/5/2014 9/5/2014
Monthly Maintenance, Enhancement, and Operations Report – September 2014
10/7/2014 10/7/2014
Construction and Configuration Status Report @100% - B
4/11/2014 4/11/2014
End of Test Phase Report (Unit Testing) - B
4/23/2014 4/23/2014
End of Test Phase Report UAT- B 4/30/2014 4/30/2014
Production Status Report - B 4/4/2014 4/7/2014 L
Production Status Report - B1 4/30/2014 4/30/2014
End User Training Evaluation Report - B 4/30/2014 4/30/2014
Instructor Lead Training Courseware - B 4/30/2014 4/30/2014
Computer Based Training Courseware - B
4/30/2014 4/30/2014
Monthly Status Report 15 (SOW1-2013) 12/30/2013 1/3/2014 L
Monthly Status Report 16 (SOW1-2013) 1/31/2014 1/31/2014
Monthly Status Report 17 (SOW1-2014) 2/28/2014 2/28/2014
Monthly Status Report 18 (SOW1-2014) 3/31/2014 3/28/2014
Statement of Work 2
Monthly Status Report - April 2014 5/6/2014 5/6/2014
-
Monthly Status Report - May 2014 6/10/2014 6/10/2014
Monthly Status Report - June 2014 7/8/2014 7/8/2014
Monthly Status Report - July 2014 8/8/2014 8/8/2014
Monthly Status Report - August 2014 9/5/2014 9/5/2014
Monthly Status Report - September 2014
10/7/2014 10/7/2014
Monthly Status Report - October 2014 11/7/2014 11/7/2014
Monthly Status Report - November 2014
12/9/2014 12/9/2014
Monthly Status Report - December 2014
1/6/2015 1/6/2015
Monthly Status Report - January 2015 2/10/2015 2/10/2015
Monthly Status Report - February 2015 3/10/2015 3/10/2015
Monthly Status Report - March 2015 4/7/2015 4/7/2015
Monthly Status Report - April 2015 5/8/2015 5/8/2015
Monthly Status Report - May 2015 6/9/2015 6/9/2015
Monthly Status Report - June 2015 7/7/2015 7/7/2015
Monthly Status Report - July 2015 8/12/2015 8/12/2015
Monthly Status Report - August 2015 9/8/2015 9/8/2015
UPDATED Work Plan 5/16/2014 5/16/2014
UPDATED Project Management Plan 5/9/2014 5/9/2014
Deliverables Log 5/6/2014 5/6/2014
Fit/Gap Analysis 5/23/2014 5/23/2014
UPDATED Configuration Management Plan
* 7/21/2014
Interface Plan 9/12/2014 9/13/2014
Software Requirements Specification 10/10/2014 10/10/2014
User Interface Specification 10/10/2014 10/10/2014
Rule Set Specification 10/10/2014 10/10/2014
Interface Specification 10/10/2014 10/10/2014
UPDATED Technical Architecture Specification
9/26/2014 9/26/2014
UPDATED Data Conversion Approach 8/1/2014 8/1/2014
UPDATED Data Conversion Specification 9/30/2014 9/30/2014
UPDATED Data Conversion Specification 9/30/2014 9/30/2014
-
UPDATED Data Conversion Test Plan 12/2/2014 12/2/2014
UPDATED Security Test Plan 9/26/2014 9/26/2014
Construction and Configuration Status Report @20%
11/18/2014 11/18/2014
Construction and Configuration Status Report @40%
12/19/2014 12/19/2014
Construction and Configuration Status Report @60%
1/13/2015 1/13/2015
Construction and Configuration Status Report @80%
2/13/2015 2/13/2015
Construction and Configuration Status Report @100%
3/10/2015 3/10/2015
Final Construction and Configuration State Report @ 100%
3/10/2015 3/10/2015
Final Construction and Configuration State Report @ 100%
3/10/2015 3/10/2015
End of Test Phase Report (Unit Testing) 3/24/2015 3/24/2015
End of Test Phase Report (Unit Testing) 2nd Submission
3/24/2015 3/24/2015
Test Approach 12/2/2014 12/2/2014
System Test Plan 1/16/2015 1/16/2015
Performance Test Plan 3/27/2015 3/27/2015
End of Test Phase Report for System Testing (2nd Submission)
9/9/2015 9/9/2015
Go Live Readiness Guide 2/17/2015 2/17/2015
End of Test Phase Report (UAT) (2nd Submission)
9/6/2016 7/15/2016
Production Deployment Plan (2nd resubmission)
6/23/2016 4/29/2016
Production Support Plan 8/14/2015 8/14/2015
End User Training Approach 11/25/2014 11/25/2014
End User Training Curriculum 11/25/2014 11/25/2014
UPDATE Training Courseware - Wave 2 10/1/2015 1/6/2017 Phase 2 Go-Live delay.
UPDATE Training Courseware - Wave 3 10/1/2015 1/27/2017 Phase 2 Go-Live delay.
UPDATE Training Courseware - Wave 1 10/1/2015 12/9/2016 Phase 2 Go-Live delay.
-
Project Team Capability Transfer Plan (5th submission)
6/2/2015 9/13/2016 Phase 2 Go-Live delay.
Go-Live Transition Guides (2058A) 2/3/2015 6/30/2015 Phase 2 Go-Live delay.
System Run Book (4th submission) 9/26/2016 6/17/2016
Monthly Maintenance, Enhancement, and Operations Report - January 2015
2/10/2015 2/10/2015
Monthly Maintenance, Enhancement, and Operations Report - February 2015
3/10/2015 3/10/2015
Monthly Maintenance, Enhancement, and Operations Report - March 2015
4/7/2015 4/7/2015
Monthly Maintenance, Enhancement, and Operations Report - April 2015
5/8/2015 5/8/2015
Monthly Maintenance, Enhancement, and Operations Report - May 2015
6/9/2015 6/9/2015
Monthly Maintenance, Enhancement, and Operations Report - May 2015 Addendum
6/9/2015 6/9/2015
Monthly Maintenance, Enhancement, and Operations Report - June 2015
7/7/2015 7/7/2015
Monthly Maintenance, Enhancement, and Operations Report - July 2015
8/7/2015 8/7/2015
Monthly Maintenance, Enhancement, and Operations Report - August 2015
9/8/2015 9/8/2015
Monthly Maintenance, Enhancement, and Operations Report - September 2015
10/9/2015 10/9/2015
Monthly Maintenance, Enhancement, and Operations Report - October 2015 (Addendum)
11/12/2015 11/12/2015
Monthly Maintenance, Enhancement, and Operations Report - November 2015
12/8/2015 12/8/2015
Monthly Maintenance, Enhancement, and Operations Report - December 2015
1/8/2016 1/9/2016
-
Monthly Maintenance, Enhancement, and Operations Report - January 2016
2/9/2016 2/9/2016
Monthly Maintenance, Enhancement, and Operations Report - February 2016
3/8/2016 3/8/2016
Monthly Maintenance, Enhancement, and Operations Report - March 2016
4/8/2016 4/8/2016
Monthly Maintenance, Enhancement, and Operations Report - April 2016
5/6/2016 5/6/2016
Monthly Maintenance, Enhancement, and Operations Report - May 2016
6/7/2016 6/7/2016
Monthly Maintenance, Enhancement, and Operations Report - June 2016
7/8/2016 7/8/2016
Monthly Maintenance, Enhancement, and Operations Report - July 2016
8/9/2016 8/9/2016
Monthly Maintenance, Enhancement, and Operations Report - August 2016
9/9/2016 9/9/2016
Monthly Maintenance, Enhancement, and Operations Report - September 2016
10/7/2016 10/7/2016
Monthly Maintenance, Enhancement, and Operations Report - October 2016
11/8/2016 11/9/2016
Monthly Maintenance, Enhancement, and Operations Report - November 2016
12/6/2016 12/6/2016
Monthly Maintenance, Enhancement, and Operations Report - December 2016
1/10/2017 1/10/2017
Monthly Maintenance, Enhancement, and Operations Report - January 2017
2/7/2017 2/7/2017
Monthly Maintenance, Enhancement, and Operations Report - February 2017
3/7/2017 3/7/2017
Monthly Maintenance, Enhancement, and Operations Report - March 2017
4/7/2017 4/7/2017
Monthly Maintenance, Enhancement, and Operations Report - April 2017
5/9/2017 5/9/2017
-
ABE Usability Production Status Report - #1
12/19/2014 12/19/2014
ABE Usability Production Status Report - #2
*
3/27/2015
ABE Usability Production Status Report - #3
* 5/29/2015
Task Based Production Status Report * 11/14/2014
WVS System Requirements Specification
* 2/13/2015
WVS User Interface Specification * 2/13/2015
WVS Data Conversion Approach / Specification
* 3/13/2015
WVS System Test Plan * 5/8/2015
WVS Construction and Configuration Report 50%
* 5/8/2015
WVS Construction and Configuration Report 100%
* 6/23/2015
WVS System Test Results * 12/17/2015
WVS Conversion Test Results * 8/21/2015
WVS Instructor Led Training (ILT) Courseware (2nd Submission)
* 3/29/2016
WVS Training Evaluation Report * 7/15/2016
TO#13 Software Requirements Specification
* 1/16/2015
TO#13 User Interface Specification * 1/16/2015
TO#13 Interface Specification * 1/16/2015
TO#13 Interface Plan * 1/30/2015
TO#13 Construction and Configuration Report 50%
* 4/3/2015
TO#13 Construction and Configuration Report 100%
* 5/29/2015
TO #13 System Test Results * 7/31/2015
TO#13 System Run Book * 3/24/2015
LTSS User Interface Specification * 3/27/2015
March Quality Review Report (1st resubmission)
4/21/2016 5/5/2016 L
-
Group 1 Design Specifications (3rd Submisison)
4/29/2016 5/6/2016 L
Group 1 Software Requirements Specifications (4th submission)
4/29/2016 5/6/2016 L
Group 1 Configuration & Construction Status Report @ 100% (1st resubmission)
5/6/2016 5/6/2016
Group 1 End of Test Phase Report (Unit Testing) (1st resubmission)
5/6/2016 5/6/2016
Group 1 End of Test Phase Report (System Testing) (1st resubmission)
5/13/2016 5/13/2016
UPDATED Quality Management Plan (2nd resubmission)
5/6/2016 5/6/2016
Security Software Requirements Specifications (1st resubmission)
4/29/2016 5/6/2016 L
Interim Quality Review Report #1 (4th resubmission)
7/11/2016 9/9/2016 L
Preliminary System Security Plan (Part A)
7/11/2016 9/9/2016 L
Interim Quality Review Report #2 (3rd submission)
7/11/2016 9/9/2016 L
Preliminary System Security Plan (Part B)
7/11/2016 9/9/2016 L
Final System Security Plan (Part A) 7/20/2016 10/4/2016 L
System Quality Target Report #1 (1st resubmission)
7/20/2016 10/4/2016 L
Final System Security Plan (Part B) 7/20/2016 10/4/2016 L
System Quality Target Report #2 (3rd Submission)
6/21/2016 6/21/2016
Interim Quality Review Report #3 (4th submission)
7/1/2016 6/24/2016
Interim Quality Review Report #3 (4th submission)
7/1/2016 6/24/2016
Individual Match Target #1 (1st resubmission)
5/3/2016 5/3/2016
Benefit Match Target #1 6/21/2016 6/29/2016 L
-
System Observation Sessions Report 8/3/2015 6/27/2016 L
Additional Training Final Progress Report
1/13/2017 1/13/2017
Additional Webinars Courseware 2/7/2017 2/7/2017
Practice Environment Final Report 1/10/2017 1/10/2017
Mid-Point Onsite Support Report - 50% (Part A)
1/13/2017 1/13/2017
Final Onsite Support Report - 100% (Part A)
1/20/2017 1/20/2017
Group 4 Design Specification 1/24/2017 1/24/2017
Group 4 End of Test Phase Report (System Testing)
3/31/2017 3/31/2017
Mid-Point Onsite Support Report - 50% (Part B)
2/14/2017 2/14/2017
Final Onsite Support Report - 100% (Part B)
4/11/2017 4/11/2017
Mid-Point Onsite Support Report - 50% 5/26/2017 5/26/2017
Train-the-Trainer Approach 5/5/2017 5/5/2017
Wave 1 ILT Training Courseware & Web-Based Training Courseware
* 6/5/2015
Wave 3 ILT Training Courseware & Web-Based Training Courseware
* 6/19/2015
Wave 3 - ILT Training Courseware & Web-Based Training Courseware
* 4/8/2016
End User Training Evaluation Report - 50% (1st resubmission)
7/11/2016 6/28/2016
End User Training Evaluation Report - 100% (2nd Submission)
9/16/2016 6/21/2016
Operational Support Items Production Deployment Report
* 6/16/2016
UPDATES Go-Live Transition Guides (1st resubmission)
* 6/16/2016
Monthly Maintenance, Enhancement, and Operations Report - July 2014
* 8/8/2014
Monthly Maintenance, Enhancement, and Operations Report - August 2014
* 9/5/2014
-
Monthly Maintenance, Enhancement, and Operations Report - September 2014
* 10/7/2014
Monthly Maintenance, Enhancement, and Operations Report - October 2014
* 11/7/2014
Monthly Maintenance, Enhancement, and Operations Report - November 2014
* 12/5/2014
Monthly Maintenance, Enhancement, and Operations Report - December 2014
* 1/9/2015
Maintenance, Enhancement, and Operations Report - May 2014
* 6/6/2014
Monthly Maintenance, Enhancement, and Operations Report - June 2014
* 7/8/2014
End of Test Phase Report (Data Conversion 1)
10/13/2017 9/20/2016
End of Test Phase Report (Security) 9/29/2017 9/20/2016
Production Status Report – October 2017
10/6/2017 10/16/2017 L
End of Test Phase Report (Data Conversion 2)
11/14/2017 11/7/2017
Operational Support Items Production Deployment Report
6/5/2014 6/5/2014
Monthly Maintenance, Enhancement, and Operations Report - May 2017
6/7/2017 6/7/2017
Monthly Maintenance, Enhancement, and Operations Report - May 2017
6/7/2017 6/7/2017
Monthly Maintenance, Enhancement, and Operations Report - June 2017
7/7/2017 7/7/2017
Monthly Maintenance, Enhancement, and Operations Report - June 2017
7/7/2017 7/7/2017
Monthly Maintenance, Enhancement, and Operations Report - July 2017
8/8/2017 8/8/2017
Monthly Maintenance, Enhancement, and Operations Report - July 2017
8/8/2017 8/8/2017
-
Monthly Maintenance, Enhancement, and Operations Report - August 2017
9/8/2017 9/8/2017
Monthly Maintenance, Enhancement, and Operations Report - August 2017
9/8/2017 9/8/2017
Monthly Maintenance, Enhancement, and Operations Report - September 2017
10/6/2017 10/6/2017
Monthly Maintenance, Enhancement, and Operations Report - September 2017
10/6/2017 10/6/2017
Monthly Maintenance, Enhancement, and Operations Report - October 2017
10/12/2017 10/12/2017
Monthly Maintenance, Enhancement, and Operations Report - October 2017
10/12/2017 10/12/2017
ABE Mobile Software Requirements Specification
3/30/2018 5/3/2016
TO 13 Production Status Report 10/6/2017 10/6/2017
System Quality Target Report #4 10/1/2018 10/1/2018
Benefit Match Target Report #2 11/7/2017 11/6/2017
Individual Match Target Report #2 11/7/2017 11/6/2017
Group 1 Production Status Report 11/10/2017 11/6/2017
TIER 1 Spring 2018 End of Design 10/23/2018 10/16/2018
TIER 1 Spring 2018 End of System Test 2/15/2019 10/16/2018
TIER 1 Spring 2018 End of User Acceptance Test
2/15/2019 10/16/2018
TIER 1 Summer 2018 End of Design 2/15/2019 11/16/2018
TIER 1 Summer 2018 End of System Test
3/15/2019 1/29/2019
TIER 1 Summer 2018 End of User Acceptance Test
1/31/2020
TIER 1 Fall 2018 End of Design 5/7/2019 3/22/2019
TIER 1 Fall 2018 End of System Test 9/6/2019 9/6/2019
TIER 1 Fall 2018 End of User Acceptance Test
6/30/2020
IES Phase 2 Deployment Report 10/31/2017 1/23/2018 L
-
Additional Training Final Progress Report
7/14/2017 7/14/2017
Practice Environment Final Report 7/14/2017 7/14/2017
Final Onsite Support - 100% 7/14/2017 7/14/2017
(Batch Thresholds) Design Specifications
10/27/2017 10/20/2017
(Batch Thresholds) Configuration & Construction Status Report at 100%
10/31/2017 10/20/2017
(Batch Thresholds) End of Test Phase Report (System Testing)
11/3/2017 10/20/2017
(Batch Thresholds) End of Test Phase Report (the UAT environment)
11/7/2017 10/20/2017
(Enhancement Requests) Configuration & Construction Status Report at 100%
11/3/2017 10/20/2017
(Enhancement Requests) End of Test Phase Report (System Testing)
11/7/2017 10/20/2017
(Enhancement Requests) End of Test Phase Report (UAT)
11/14/2017 10/20/2017
Mid-Point Training Report – 50% 10/27/2017 10/24/2017
Final Training Report – 100% 10/31/2017 11/1/2017
Training Overview and Schedule 10/27/2017 10/20/2017
Mid-Point Facilitated Practice Report - 50% (Pre-Go Live (7/1/17-10/23/17) Mid-Point Onsite Support Report – 50%)
10/27/2017 10/24/2017
Facilitated Practice Report 100 / Final Pre-Go Live (7/1/17-10/23/17) Onsite Support Report – 100%
1/9/2017 11/1/2017 L
End User Support Plan 10/27/2017 10/20/2017
Mid-Point Onsite Support Report – 50% (post- Go–Live, 10/24/17-3/16/18)
1/9/2018 2/6/2018 L
Final Onsite Support Report – 100% (post- Go–Live, 10/24/17-3/16/18)
3/27/2018 3/27/2018
Temporary Operational Support Items Production Development Report
11/3/2017 10/20/2017
-
IES Go-Live Progress Checkpoint #1 Report
11/3/2017 10/20/2017
IES Go-Live Progress Checkpoint #2 Report
11/7/2017 10/20/2017
IES Go-Live Progress Checkpoint #3 Report
11/14/2017 10/18/2017
Benefit Management Functional Design 7/11/2017 7/11/2017
Benefit Management Technical Design 9/26/2017 9/26/2017
Support of Online Testing Effort Report 10/31/2017 10/31/2017
Post-Batch Remediation Performance Testing Completion Report
10/31/2017 10/31/2017
SMA OpCon Batch Job Scheduler Installation
3/20/2018 3/20/2018
SAP Business Objects Installation 3/16/2018 3/16/2018
Mock Run Completion Report 10/31/2017 10/31/2017
Quality Metrics Baseline Report * 6/23/2017
Monthly Maintenance, Enhancement, and Operations Report - October 16, 2017 through October 31, 2017
12/8/2017 12/8/2017
Monthly Maintenance, Enhancement, and Operations Report - November 2017
12/15/2017 12/15/2017
Monthly Maintenance, Enhancement, and Operations Report - December 2017
1/16/2018 1/16/2018
Monthly Maintenance, Enhancement, and Operations Report - January 2018
2/16/2018 2/16/2018
Monthly Maintenance, Enhancement, and Operations Report - February 2018
3/16/2018 3/16/2018
Monthly Maintenance, Enhancement, and Operations Report - March 2018
4/13/2018 4/13/2018
Monthly Maintenance, Enhancement, and Operations Report - April 2018
5/15/2018 5/15/2018
Monthly Maintenance, Enhancement, and Operations Report - May 2018
6/15/2018 6/15/2018
-
Monthly Maintenance, Enhancement, and Operations Report - June 2018
7/13/2018 7/13/2018
Monthly Maintenance, Enhancement, and Operations Report - July 2018
8/14/2018 8/14/2018
Monthly Maintenance, Enhancement, and Operations Report - August 2018
9/14/2018 9/14/2018
Monthly Maintenance, Enhancement, and Operations Report - September 2018
10/16/2018 10/16/2018
Monthly Maintenance, Enhancement, and Operations Report - October 2018
11/13/2018 11/13/2018
Monthly Maintenance, Enhancement, and Operations Report - November 2018
12/14/2018 12/14/2018
Monthly Maintenance, Enhancement, and Operations Report - December 2018
1/15/2019 1/15/2019
Monthly Maintenance, Enhancement, and Operations Report - January 2019
2/15/2019 2/15/2019
Monthly Maintenance, Enhancement, and Operations Report - February 2019
3/15/2019 3/15/2019
Monthly Maintenance, Enhancement, and Operations Report - March 2019
4/16/2019 4/16/2019
Monthly Maintenance, Enhancement, and Operations Report - April 2019
5/14/2019 5/14/2019
Monthly Maintenance, Enhancement, and Operations Report - May 2019
6/14/2019 6/14/2019
Monthly Maintenance, Enhancement, and Operations Report - June 2019
7/16/2019 7/16/2019
Monthly Maintenance, Enhancement, and Operations Report - July 2019
8/16/2019 8/16/2019
Monthly Maintenance, Enhancement, and Operations Report - August 2019
9/17/2019 9/17/2019
Monthly Maintenance, Enhancement, and Operations Report - September 2019
10/15/2019 10/15/2019
-
Monthly Maintenance, Enhancement, and Operations Report - October 2019
11/19/2019 11/15/2019
Monthly Maintenance, Enhancement, and Operations Report - November 2019
12/17/2019
Monthly Maintenance, Enhancement, and Operations Report - December 2019
1/14/2020
Monthly Maintenance, Enhancement, and Operations Report - January 2020
2/14/2020
Monthly Maintenance, Enhancement, and Operations Report - February 2020
3/13/2020
Monthly Maintenance, Enhancement, and Operations Report - March 2020
4/14/2020
Monthly Maintenance, Enhancement, and Operations Report - April 2020
5/15/2020
Monthly Maintenance, Enhancement, and Operations Report - May 2020
6/16/2020
Monthly Maintenance, Enhancement, and Operations Report - June 2020
7/14/2020
Monthly Maintenance, Enhancement, and Operations Report - July 2020
8/14/2020
Monthly Maintenance, Enhancement, and Operations Report - August 2020
9/15/2020
Monthly Maintenance, Enhancement, and Operations Report - September 2020
10/16/2020
Monthly Maintenance, Enhancement, and Operations Report - October 2020
11/13/2020
Note – Actual completion date represents the date vendor submitted deliverable to the state.
* Gathering information to confirm due date.