IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73...

12
IST 03 C 170 - 01 USE AND MAINTENANCE HANDBOOK

Transcript of IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73...

Page 1: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

ES

IST 03 C 170 - 01

USE AND MAINTENANCE HANDBOOK

Page 2: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

Dear Customer,

Thank you for choosing our company and our hot water cylinder. Please read these instructions carefully. Cylinder correct installation, operation and maintenance are illustrated below, and are to be followed by the installer and user.

2

INDEX

1 - General information page 3

2 - Technical features page 4

2.1 Part list page 4

2.2 Cylinder dimensions page 5

2.3 Table of technical data page 5

3 - Operation page 6

4 - Installation page 6

4.1 Plumbing connections page 6

5 - Wiring and connection layout page 8

6 - Start-up procedure page 8

7 - Maintenance page 8

8 - Expansion vessel kit installation (optional equipment) page 9

Page 3: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

This manual is an integral and impor-tant part of the cylinder and is to be given to the user.

Should the cylinder be sold, its pos-session transferred or the user move out of the premises, this manual is to be left with the cylinder for future user and/or installer reference.

Carefully read the instructions in this manual as they provide important information concerning safe installa-tion, use and maintenance. Keep this manual for future reference.

Cylinder installation is to be imple-mented in accordance with current regulations, manufacturer instructions, and by professionally qualified per-sonnel. “Professionally qualified per-sonnel” means people with specific technical expertise in heating system components for domestic use, certi-fied in accordance with current laws and regulations.

Incorrect installation may cause serious injury to people and animals, and damage to property.

Manufacturer shall not be held liable for any such injury and/or damage.

The cylinder is designed for domestic hot water production and accumula-tion. It is to be connected to a water heating system, domestic hot water distribution system and water main network, compatible with cylinder per-formance and power specifications.

Cylinder use other than specified is forbidden and manufacturer shall not be held liable for injury and/or damage caused by improper or incorrect use.

Cylinder exterior surface is to be clea-ned by means of a cloth dampened in products specifically made for the purpose. Do not use abrasive products or paint thinner. Do not use water.

In order to preserve efficient operation, have the cylinder serviced annually by qualified engineer.

Appliance repair is to be implemented always using manufacturer approved spare parts.

Any accessory to the cylinder has to be manufacturer approved.

Always disconnect electric power and water main supply prior to servicing the cylinder.

Should the cylinder malfunction, turn it off and have it serviced by qualified personnel.Manufacturer recommends an appro-ved and qualified Service Centre to be contacted for servicing.

3

1 - GENERAL INFORMATION

Page 4: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

4

WHPF BS cylinder main features:- Steel heat exchanger- Ceramic enamel internal coating- Removable magnesium anode- CFC and HCFC free polyurethane foam insulation- Upper inspection flange- Pump (not equipped with de-areator)- 8 bar safety valve- 5 liter expansion vessel (optional equipment)- Plumbing connections on the upper section- Water outlet on lower section (G3/4”)

13 Pump support bracket14 Plumbing connection template15 Expansion vessel fixing bracket16 Non-return valve17 30 by 21 gasket18 24 by 17 gasket19 34 by 27 by 1 gasket20 Pump (not air de-areator equipped)21 G 3⁄4” female-male elbow coupling

22 DHW 19 by 26 pipe23 5 liter DHW expansion vessel (optional equipment)32 54 by 20 self-sticking rubber 35 Cold water inlet pipe36 3⁄4” female cap37 Drain tap38 Safety valve

1 Control panel2 Expansion vessel collar3 Outlet pipe 4 Stub pipe connection to return collector8 G 3⁄4” metal ring9 G1” female reduction for G3/4” male10 G1” male reduction for G3/4” male11 120,150, 200 liter cylinder12 Lid

2.1 - Part list

pic. 1

2 - TECHNICAL FEATURES

Page 5: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

5

2.2 - Cylinder dimensions

pic. 2

L

Height mm 1055 1205 1480

BS BS BS MODEL 120 150 200

Diameter mm 560 560 560

Weight Kg 65 73 87

Capacity Liter 120 150 200

Model BS 120 BS 150 BS 200

Max operating pressure Bar 8 8 8

Max operating temperature °C 65 65 65

Heat exchanger surface Sq. meter 1,4 1,5 1,8

DHW continuous supply, ∆ T 35°C Liter/h 710 950 1170

Heat exchanger output, ∆ T 35°C KW 29 38 49

Domestic cold water inlet Ø G 3/4” G 3/4” G 3/4”

DHW outlet Ø G 3/4” G 3/4” G 3/4”

CH flow Ø G 3/4” G 3/4” G 3/4”

CH return Ø G 3/4” G 3/4” G 3/4”

DHW recirculation Ø G 3/4” G 3/4” G 3/4”

Drain Ø G 3/4” G 3/4” G 3/4”

DHW supply in 10’ liter 300 340 410

Heat-up time min 7 9 10

2.3 - Table of technical data

Page 6: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

6

DHW temperature is adjusted by means of the thermostat knob. Boiler electronics will heat water in cylinder prior to CH system water. When cylinder water tem-perature drops below set level,

DHW pump starts and CH pump stops to allow CH water to cylin-der heat exchanger. (Verify boi-ler technical specs to be com-patible with cylinder operation). Manufacturer recommends kee-

ping cylinder water temperature to 50°C, and raising temperature to 65°C every 15 days for 8 hour in order to prevent “Legionella” bacteria growth.

3 - OPERATION

WARNING: Installation is to be performed in accordance to current regulations and by professionally qualified per-sonnel under penalty of nullity of warranty.

A) Choose a locationIt is advisable to install the cylin-der as close as possible to the boiler, in any case it is important to insulate the connection pipes.

B) Water connection and preli-minary operations- verify volume and pre-set pres-sure of DHW expansion vessel are suitable to the system- should water be particularly hard, install a water softener upstream from cylinder- should water main contain impu-rities, install a suitable filter and verify the pumps have adequate flow rate capacity and pressure head.

When the boiler is placed in a lower position with respect to the water cylinder it is advisable to install a de-aerator on the circu-lator side (3).

4 - INSTALLATION

4.1 - Plumbing connections

1: DHW flow2: Domestic cold water inlet3: Flow from boiler to cylinder4: Return from cylinder to boiler5: Recirculation inlet

1

4

5

2

3

pic. 3

Page 7: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

7

pic. 4

Page 8: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

8

pic. 5

5 - WIRING AND CONNECTION LAYOUT

S : DHW thermostatPS : DHW pump

WHPF BS 120/150/200

Power Supply

CH

onl

y bo

iler

Fill up cylinder with domestic water and bleed air in the system by opening a tap. Fill up cylinder heat exchanger with CH water and bleed air in the system. Set DHW temperature on con-trol panel, following the instructions

provided. DHW temperature is best set to 50°C.The cylinder is to be started by qua-lified personnel.

6 - START-UP PROCEDURE

In order to clean external surfaces of cylinder, use a cloth dampened in specific cleaning products. Do not use abrasive, paint thinner, or petrol-based products, etc. Do not use water.On a yearly basis, check magnesium anode fitted on the flange. It can be inspected directly, through the flange or externally by means of a tester.Should water be particularly hard, the cylinder is best to receive a decalcifi-cation treatment at least once a year.

Proceed as follows: empty cylinder by opening the drain tap, then remove the flange to access the inside of the cylin-der. Remove any calcium build up by means of a plastic or wooden spatula and rinse with water.During cleaning procedure, be very careful not to damage internal coating.Upon completion of cleaning proce-dure, install the flange and its sealing gasket (if it is damaged, fit a new one), close the drain tap and fill up the cylin-

der, checking for leaks from flange and drain tap.

7 - MAINTENANCE

Page 9: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

1 1 Expansion vessel collar (Ø 160 mm) 0COLAREB00

2 1 Expansion vessel fixing bracket 0STAFBOL01

3 1 24 by 17 mm gasket 0GUARNIZ05

4 1 DHW expansion vessel (5 liter) 0VASOESP04

5 1 Flexible hose (3/4” female by 1⁄4” female) 0TUBFLEX00

6 1 Cold water inlet 0TUINAFB00

7 1 11 by 5 mm seal 0GUARNIZ02

8 1 Hexagonal bolt (M10 by 10 mm) 0VITEESA01

9 2 Self-sticking rubber (54 by 20 mm) 411500

Article no. Quantity Description Manufacturer code

9

Expansion vessel kit – code 0KVASEBO00 – part list

1

9

3

6

5

8Cylinder flange

2

4

pic. 6

8 - EXPANSION VESSEL KIT INSTALLATION (OPTIONAL EQUIPMENT)

7

Page 10: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

10

In order to install expansion vessel kit onto the cylinder, follow the instructions below:

1) Secure bracket and collar (2) to the cylinder flange using the locking nut already in place (see pic. 7).

2) Fix all components as shown in pic. 8 ( remember to remove cap from flexible pipe coupling).

pic. 7

pic. 8

21 8

45

Page 11: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

11

Page 12: IST WHPF BS GB - fondital.com · BS BS BS MODEL 120 150 200 Diameter mm 560 560 560 Weight Kg 65 73 87 Capacity Liter 120 150 200 Model 120 BS 150 BS 200 BS pressure ating oper Max

ES

IST 03 C 170 - 01

Uff. Pubblicità Fondital IST 03 C 170 - 01 Febbraio 2005 (02/2005)