Issues of renewable energy resources development in Kazakhstan
Transcript of Issues of renewable energy resources development in Kazakhstan
Issues of renewable energy
resources development
in Kazakhstan
Ministry of Energy of
the Republic of
Kazakhstan
1
Strategic indicators of RES
development*
2020 2030 20502025
by 2050 – 50% including alternative
energy resources
*Concept of transition of the Republic of Kazakhstan to Green
economyS t r a t e g y o f d e v e l o p m e n t o f K a z a k h s t a n -
2 0 2 5
S t r a t e g y o f d e v e l o p m e n t o f K a z a k h s t a n -
2 0 5 0
3%
10%
50%
6%
2009
2020
2014
2017
2018
2013
Law of the Republic of
Kazakhstan «On support of the use of RES»
Fixed-tariff system
Creation of the Financial
and Settlement Center (FSC)
Switching to the auction
mechanism
Successful auctions
Hydroelectric power industry
Development Plan for 2020-2030
Ministry of Energy of
the Republic of
Kazakhstan
2
Scheme of support of RES in
Kazakhstan
Ministry of Energy of
the Republic of
Kazakhstan
• Purchase and sale of electricity – Financial and
Settlement Center for RES support
• Standard PPA-contract form for 20 years
on auction tariff in KZT
• Standard form of grid connection of the RES
object
• Annual indexation of tariff – taking into account
exchange rate for USD and consumer price
index
• Free transportation of RES electricity
• Priority control and dispatching of electricity
• Investment preferences in the framework
of Entrepreneurial Code
Law of the Republic of
Kazakhstan
«On support of the use of
renewable energy sources»
3%0,6%
26 FACILITIES 123 FACILITIES
1897 MW
2014 15.03.2021
Investment of
1,5 bln.$
100
2014 2020
Dynamics of tariff reduction by type
-19%
WPP -15,9 tenge
HPP -13,48 tenge
SPP -12,49 tenge
50
20
80
-30%
-64%
Number of specialists involved
Less than150
More than 1800
2014
2021
3
DYNAMIC DEVELOPMENT
RENEWABLE ENERGY 2014-2021
Ministry of Energy of
the Republic of
Kazakhstan
1 505
MW
25
auctions
signed a contract
with the FSC for 15 years
Renewable energy
capacities exposed
installed capacity
1 218,77 MW
58
companies
172
companies from 12
countries
Kazakhstan, China, Russia, Turkey, Germany, France, Bulgaria, Italy,
United Arab Emirates, Netherlands, Malaysia, Spain
AUCTION RESULTS(2018-2020)
178 MW
Investment of
160 mln.$
4
LARGE RENEWABLE ENERGY FACILITIES
Ministry of Energy of
the Republic of
Kazakhstan
626 billion tengeattracted
investments
81 billion tengetaxes paid from
renewable energy facilities
1818 permanentjobs
created
active renewable energy projects
renewable energy projects under construction
5
FURTHER DEVELOPMENT OF THE
RENEWABLE ENERGY SECTOR AND
IMPROVEMENT OF LEGISLATION
Ministry of Energy of
the Republic of
Kazakhstan
Conducting auctions for the selection of
renewable energy projects for 250 MW
Provision of incentive mechanisms for
large hydroelectric power plants
Improving the mechanism of distributed
generation of RES among the population
and SME
Increase in the volume of clean energy
by 2 times until 2025
* reflected in the Nur Otan Party program
Development of renewable energy
sources with electricity storage systems
SHARE OF RES IN TOTAL ELECTRICITY PRODUCTION, %
3.33.7
4.24.7
6
0
1
2
3
4
5
6
7
2021 2022 2023 2024 2025
Useful links: Investor guide –https://www.gov.kz/memleket/entities/energo/documents/details/68180?lang=en ;https://spaq.kz ; https://www.kazenergy.com ; https://www.korem.kz/ ; https://rfc.kegoc.kz/