ISSUES AND CHALLENGES FACING THE PLASTICS … Raw Materials...(reacting faster to market...
Transcript of ISSUES AND CHALLENGES FACING THE PLASTICS … Raw Materials...(reacting faster to market...
ISSUES AND CHALLENGES FACING THE PLASTICS INDUSTRY, An Exclusive Seminar for MPMA Members 22nd April 2013 Venue: Kinta Riverfront Hotel & Suites, Gopeng Hall Raw Materials – Present and Future Regional/World Capacities and Trends Avdo Niksic – Nick Managing Director – Asia Pacific & India ChemOrbis [email protected]
ISSUES AND CHALLENGES FACING THE PLASTICS INDUSTRY, An Exclusive Seminar for MPMA Members 23rd April 2013 Venue: MPMA Conference Room, Butterworth Raw Materials – Present and Future Regional/World Capacities and Trends Avdo Niksic – Nick Managing Director – Asia Pacific & India ChemOrbis [email protected]
About ChemOrbis
Platform dedicated to plastics since 2001
Neutral and impartial
Hosting global and refined community
Offering complementary services Dynamic Market Intelligence
Handy Analysis Tools
Flexible Trading Tools
Ideal Advertising Media
International Events & Conferences
Plastics Industry Almanac Releases
Offices
Global and Refined Community
Breakdown by Geography Breakdown by Type
Americas 20%
Asia 32%
Europe 28%
ISC 8% MEA
11%
ROW 1%
Other 31%
Plastic End Product
Manufacturer 60%
Polymer Producer
1%
Polymer Trader/Dist.
8%
The value proposition of ChemOrbis grows as the size and quality of our community grows.
Coverage
Geographical Product
We cover all key spot markets (reacting faster to market developments)
China
SEA/India
Turkey
Egypt
Italy
Coverage will soon be expanded to cover Americas, NWE, Russia, GCC and Africa.
We cover commodity polymers i.e. PE, PP, PVC, PS, PET, ABS
As well as their feedstocks and monomers i.e. crude oil, naphtha, ethylene, propylene, VCM, styrene.
Also machinery and equipment, molds, professional services like logistics, transportation, customs clearance are supported on our trading platforms.
CO is In-depth & Diversified
5000 Sources 250,000 Prices
56%
7%
37%
Converter
Producer
Trader/Distributor
32%
22%
46%
Converter
Producer
Trader/Distributor
All types (producers, traders, converters) + All sizes = remarkable crosscheck ability
World’s Polymers Barometers
0
5,000
10,000
15,000
20,000
25,000
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
Turkey
Italy
China
Different market dynamics
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
Jan
-08
Mar
-08
May
-08
Jul-
08
Sep
-08
No
v-0
8
Jan
-09
Mar
-09
May
-09
Jul-
09
Sep
-09
No
v-0
9
Jan
-10
Mar
-10
May
-10
Jul-
10
Sep
-10
No
v-10
Jan
-11
Mar
-11
May
-11
Jul-
11
Sep
-11
No
v-11
Jan
-12
Mar
-12
May
-12
Jul-
12
Sep
-12
No
v-12
Jan
-13
Mar
-13
May
-13
Jul-
13
Sep
-13
No
v-13
Crude Oil (e)' (dollarsper barrel)
Natural GasWellhead' (dollarsper thousand cubicfeet)
Coal' (dollars permillion Btu)
US PE and PVC exports 2000-2013
0
100
200
300
400
500
600
700
800
900
1,000
PE PVC
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
USA capacity expansions
January-February Westlake Cracker 565 USA Expansion shutdown 60 d
Capacity of Petro-2 cracker will be expanded by 105,000 tons/year during the maintenance that started on Jan 10. The original shutdown date was Q4, 2012. Expansion to be completed by H2 February.
2015 Westlake Cracker 545 USA Delayed Expansion
Expansion at Lake Charles, LA. Expansion delayed from 2013 to 2015
Mid- 2014 Westlake Ethylene 285 US Expansion
The company will add more than 90,000 tons/year of ethylene production capacity to reach around 300,000 tons/year in line with the conversion of its Calvert City, Kentucky steam cracker to ethane feedstock from propane
End 2012 Dow Cracker 390 USA Restart of idled cracker
Restart of idled cracker at St. Charles, LA
April -June 2012 BASF-Total Cracker 60 USA Expansion 50 d Plant will shut April 18, 2012 for expansion by 60,000 t/y.
Q3 2013 Williams Cracker 272 USA Expansion Debottleneck at Geismar, LA
End 2013 Ineos Cracker 115 USA Expansion Debottleneck at Chocolate Bayou, TX
2014 Westlake Cracker 113 USA Expansion Expansion at Lake Charles, LA
2013-2014 LyondellBasell Cracker 227 USA Expansion Expansion planned at Channelview, TX
2014 LyondellBasell Cracker 386 USA Expansion Expansion at Laporte, TX
Q1 2013 - Q2 2015 Williams Cracker Canada Start up
The company will build olefin processing facilities with 11,000-12,000 b/d ethane, ethylene, propane and propylene capacities by Q2 2015
June 2015 Braskem/ Grupo Idesa Cracker 1 mil Mexico Start up
Contract awarded in Oct 2012 for the Ethylene XXI petchem complex
2016 ExxonMobil Cracker 1.5 mil USA Start up
Ethylene cracker in Baytown is expected to start up in 2016.
2016 Formosa Plastics Cracker 800 USA Start up
New cracker at Point Comfort, TX
2016 OxyChem Ethylene 544 USA Start up
Contract awarded in Oct 2012 for a new ethane cracker
2016-2017 Dow Cracker World scale USA Start up
Company plans expansions and 1 new cracker to increase capacity by 2.3 mil tons/yr by 2017
2016-2017 Shell Chemical Cracker World scale USA Start up
Company is assessing where to locate a new complex using Marcellus Shale
2017 Dow Chemical Cracker World scale USA Start up
World scale ethylene cracker will be built in Texas.
Q1 2017
Chevron Phillips Chemical Cracker
1.5 million USA Start up
New ethane cracker at its Cedar Bayou complex in Texas.
After 2017 Sasol Cracker 1-1.4 mil USA Start up
Ethane cracker planned for Lake Charles, LA. Feasibility study will be completed by 2H 2013
North American shale plays
Shale gas is a global phenomenon
Shale Gas: A growing global energy source
0
200
400
600
800
1000
1200
1400
1600
Technically Recoverable Shale Gas Resources (tcf)
Proved Natural Gas Reserves
Source: EIA
Forecast
-3
-2
-1
0
1
2
3
4
5
78
80
82
84
86
88
90
92
94
2008-Q1 2009-Q1 2010-Q1 2011-Q1 2012-Q1 2013-Q1 2014-Q1
World Liquid Fuels Supply and Demand Balance million barrels per day
Implied stock change and balance (right axis)
World supply (left axis)
World demand (left axis)
Source: Short-Term Energy Outlook, February 2013
Location 2007 2008 2009 2010 2011
Bab el_Mandab 4.6 4.5 2.9 2.7 3.4
Turkish Straits 2.7 2.7 2.8 2.9 N/A
Danish Straits 3.2 2.8 3.0 3.0 N/A
Strait of Hormuz
16.7 17.5 15.7 15.9 17.0
Panama Canal 0.7 0.7 0.8 0.7 0.8
Crude Oil 0.1 0.2 0.2 0.1 0.1 Petroleum Products
0.6 0.6 0.6 0.6 0.6
Suez Canal and SUMED Pipeline
4.7 4.6 3.0 3.1 3.8
Suez Crude Oil 1.3 1.2 0.6 0.7 0.8 Suez Petroleum Products
1.1 1.3 1.3 1.3 1.4
SUMED Crude Oil 2.4 2.1 1.2 1.1 1.7
Volume of Crude Oil and Petroleum Products Transported Through World Chokepoints, 2007-2011
Middle East Pipelines
Cumulative China Imports
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
1 2 3 4 5 6 7 8 9 10 11 12
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
1 2 3 4 5 6 7 8 9 10 11 12
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
Monthly China Imports
China Imports by product
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
PVC
PS
PP
PET
PE
ABS
China versus SEA versus India
0
10,000
20,000
30,000
40,000
50,000
60,000
2006 2007 2008 2009 2010 2011 2012
China India SEA
Top 10 Exporters to China
YEAR 2009 YEAR 2008 YEAR 2007 YEAR 2006
Exporter Qty (KT) Exporter Qty (KT) Exporter Qty (KT) Exporter Qty (KT)
South Korea 3,694 1 SAME South Korea 2,941 1 SAME South Korea 2,962 1 SAME South Korea 2,895
Taiwan 2,703 2 SAME Taiwan 2,421 2 SAME Taiwan 2,782 2 SAME Taiwan 2,646
United States 1,792 6 UP Japan 927 3 SAME Japan 1,227 3 SAME Japan 1,193
Saudi Arabia 1,298 5 UP Singapore 905 4 SAME Singapore 973 4 SAME Singapore 962
Japan 1,284 3 DOWN Saudi Arabia 764 6 UP United States 887 8 UP Saudi Arabia 948
Singapore 904 4 DOWN United States 720 5 DOWN Saudi Arabia 803 5 DOWN Thailand 767
Thailand 716 7 SAME Thailand 649 7 SAME Thailand 645 6 DOWN Malaysia 590
Malaysia 582 8 SAME Malaysia 474 8 SAME Malaysia 469 7 DOWN United States 551
Iran 555 #N/A NEW Hong Kong 273 9 SAME Hong Kong 344 10 UP India 396
Brazil 325 #N/A NEW Canada 229 10 SAME Canada 240 #N/A NEW Hong Kong 321
Grand Total 13,853 Grand Total 10,304 Grand Total 11,333 Grand Total 11,269
Top 10 accounts for 81% of all imports Top 10 accounts for 88% of all imports Top 10 accounts for 88% of all imports Top 10 accounts for 88%
Prev. Year Prev. Year Prev. Year
YEAR 2013 YEAR 2012 YEAR 2011 YEAR 2010
Exporter Qty (KT) Exporter Qty (KT) Exporter Qty (KT) Exporter Qty (KT)
South Korea 452 1 SAME South Korea 2,910 1 SAME South Korea 2,928 1 SAME South Korea 3,239 1 SAME
Saudi Arabia 376 2 SAME Saudi Arabia 2,380 3 UP Taiwan 2,235 2 SAME Taiwan 2,622 2 SAME
Taiwan 330 3 SAME Taiwan 2,240 2 DOWN Saudi Arabia 2,104 3 SAME Saudi Arabia 1,904 4 UP
Thailand 192 4 SAME Thailand 1,207 4 SAME Thailand 1,097 8 UP United States 1,239 3 DOWN
Iran 176 5 SAME Iran 1,152 9 UP United States 1,040 4 DOWN Japan 1,157 5 SAME
Singapore 165 7 UP United Arab Emirates 971 8 UP Japan 901 5 DOWN Singapore 945 6 SAME
United States 136 8 UP Singapore 956 7 SAME Singapore 877 6 DOWN Iran 870 9 UP
United Arab Emirates 105 6 DOWN United States 896 5 DOWN United Arab Emirates 815 10 UP Thailand 843 7 DOWN
Japan 102 9 SAME Japan 706 6 DOWN Iran 800 7 DOWN Malaysia 495 8 DOWN
Qatar 73 #N/A NEW India 407 #N/A NEW Qatar 423 #N/A NEW United Arab Emirates 274 #N/A NEW
Grand Total 2,107 Grand Total 13,826 Grand Total 13,220 Grand Total 13,589
Top 10 accounts for 85% of all imports Top 10 accounts for 85% of all imports Top 10 accounts for 84% of all imports Top 10 accounts for 84% of all imports
Prev. Year Prev. Year Prev. Year Prev. Year
SEA Exports to China
0
200
400
600
800
1,000
1,200
1,400
Thailand Singapore Malaysia Indonesia Philippines Vietnam
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
Crude oil – monomers - polymers
China SEA Imports HDPE Film
SEA local HDPE Film
HDPE – LLDPE - LDPE
HDPE – LLDPE - LDPE
Ethylene - HDPE
China SEA Local PPH
PRODUCTION NEWS
Date Company
Plant ‐
Product
Capacity
ktons/yr Location Status Duration Notes
ASIA
December 2012‐
March 2013 Daqing Petrochemical LLDPE 250 China Restart 4 m
Unit started up end‐August,
2012. Company shut it on Dec 3
after a fire at its new cracker,
planned to restart the plant in
early April. Restarted on March
28.
December 2012‐
April 2013 Daqing Petrochemical HDPE 300 China Shutdown 4 m
Unit started up end‐August,
2012. Company shut it on Dec 3
after a fire at its new cracker,
plans to restart the plant in early
April.
March‐April
Sinopec Shanghai
Petrochemical HDPE 250 China Restart 1 m
Company shut their unit in
Shanghai for maintenance on
March 10 until April 9. The unit
restarted on April 10 and was
expected to produce pipe grade.
March‐April
Sinopec Qilu
Petrochemical LDPE 140 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong started on March 11.
April‐May
Sinopec Qilu
Petrochemical HDPE 250 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong started on April 1.
April‐May
Sinopec Qilu
Petrochemical HDPE 140 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong started on April 1.
April‐May
Sinopec Qilu
Petrochemical LLDPE 70 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong started on April 1.
Monomer
December 2012‐
April 2013 Daqing Petrochemical Ethylene 600 China Shutdown 4 m
The new ethylene unit started
production on Oct 9, 2012 to
reach a total ethylene capacity
of 1.2 mil t/y. Company shut the
cracker on Dec 3, 2012 after a
fire and plans to restart it in
early April.
April
Formosa
Petrochemicals Cracker 2.93 mil Taiwan Op rates lower
Company will cut op rates of its
3 Mailiao crackers from 100% in
March to 90% from April 1 on
poor margins. No.1, 2 and 3
crackers produce 1.2 mil t/y,
1.03 mil t/y and 700,000 t/y
ethylene, respectively.
April CPC Corp. Cracker 380 Taiwan Op rates lower
Company will maintain lower op
rates of 95% at their No.4
cracker in Linyuan indefinitely
due to poor margins and tight
availability of tank space, acc.to
market sources. Rates were
reduced on March 15.
April CPC Corp. Cracker 500 Taiwan Shutdown
Company would maintain lower
op rates of 95% at their No.5
cracker in Kaohsiung indefinitely
due to poor margins and tight
availability of tank space, acc.to
market sources. Rates were
reduced on March 15. The
cracker was down on April 5
following an explosion.
April‐May
Sinopec Qilu
Petrochemical Cracker 510 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong (No.1 cracker) started
on April 1.
April‐May
Sinopec Qilu
Petrochemical Cracker 350 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong (No. 2 cracker)
started on April 1.
March‐April SK Innovations Cracker 200 South Korea Restart 28 d
Maintenance at No.1 Ulsan
cracker started on March 7 as
scheduled. The cracker restarted
on April 3, op rates were
gradually raised to reach 100%
on April 6‐7.
April Samsung Total Cracker 1 mil South Korea Full rates
Company will keep running their
Daesan cracker at 100% capacity
in April, similar to March.
May‐July Mitsubishi Chemical Ethylene 495 Japan Shutdown 50 d
The cracker at Mizushima will be
shut for scheduled maintenance
on May 17.
June‐August Mitsui Chemical Ethylene 600 Japan Shutdown 1.5 m
Scheduled maintenance at Chiba
cracker between June 27‐August
7.
July
Chiba Chemicals
Manufacturing Ethylene 974 Japan Shutdown 1 m
Company will reform its two
steam crackers with respective
capacities of 600,000 t/y and
374,000 t/y to make them run
efficiently at lower op rates
August ‐
September Mitsubishi Chemical Ethylene 476 Japan Shutdown 50 d
The No 2 cracker at Kashima is
planned to be shut for
maintenance
September‐End
October
Formosa
Petrochemicals Ethylene 1.03 m Taiwan Shutdown 45 d
No 2 steam cracker at Mailiao is
planned to be shut for
maintenance from mid Sept
2013 to end October 2013
October‐December CPC Cracker 380 Taiwan Shutdown 2 m
Maintenance shutdown at No.4
Linyuan cracker for more than 2
months.
SOUTHEAST ASIA
March‐April PTT Global Chemical LDPE 300 Thailand Shutdown
Maintenance between late
March‐early April.
End April‐Mid‐May PTT Global Chemical HDPE 250 Thailand Shutdown 15 d
Company plans a maintenance
at Map Ta Phut plant.
Late April‐Early
May PTT Global Chemical HDPE 300 Thailand Shutdown 10 d
Company plans a maintenance
at their 2nd plant in Map Ta
Phut right after the
maintenance at their first plant.
It will take place between late
April‐early May.
May PTT Global Chemical LLDPE 400 Thailand Shutdown 24 d
Maintenance between May 6‐
30.
June‐August PTT Global Chemical HDPE 500 Thailand Shutdown
Company plans a maintenance
at 2 plants with a total capacity
of 500,000 t/y at Map Ta Phut.
One plant will be shut between
early June‐early July, while the
other will be down between
early August‐mid‐August.
Q3 2013 Petlin LDPE 255 Malaysia Shutdown 30‐45 d
Company will shut their plant at
in Kerteh, Terengganu in line
with the cracker shutdown at
their ethylene supplier Optimal
Olefins.
Monomer
February‐April PTT Global Chemical Ethylene 460 Thailand Shutdown 40 d
Scheduled maintenance at I‐4
cracker in Map Ta Phut
June‐July PCS Ethylene 475 Singapore Shutdown 1 m
Scheduled maintenance at No 1
cracker between June 6‐July 12,
2013.
July PTT Global Chemical Ethylene 550 Thailand Shutdown 40 d
Maintenance at I‐4 No. 1 cracker
in Map Ta Phut. Company will
keep their op rates at 85% prior
to shutdown, acc.to market
reports on March 22.
September Optimal Olefins Cracker 600 Malaysia Shutdown 1.5 m
Cracker in Kertih to be shut in
early September for safety
inspections.
October Quenos Cracker 300 Australia Shutdown
Company to shut the cracker in
Botany, NSW in Q4 2013 for
maintenance.
Q4 2013
Map Ta Phut Olefins
Co. Cracker 900 Thailand Shutdown 40 d Scheduled maintenance.
2013 Shell Cracker 800 Singapore Shutdown
Maintenance shutdown in
Bukom.
EUROPE
January 2012 ‐ Mid‐
2013 LyondellBasell LDPE Germany Shutdown
The LDPE line at Wesseling that
was shut on Jan 2012 will
resume operations in mid 2013
March ‐April Polimir LDPE Russia Shutdown 2 w
Company will start a
maintenance at one of their
lines on March 24.
April‐May Kazanorgsintez LDPE 230 Russia Shutdown 1 m
Company to shut the plant on
April 18‐19 for maintenance.
End April‐May Borealis PE 500 Austria Shutdown 2 w
Schwechat plants southeast of
Vienna will be down for
scheduled maintenance.
May Borealis LDPE Sweden Shutdown 2 w
Scheduled maintenance at
Stenungsund plant.
July Kazanorgsintez PE Russia Shutdown 10 d
Company may be forced to cut
or halt production during the
Universiade event between July
6 and 17. The company has a
capacity to produce 230,000 t/y
of LDPE and 510,000 t/y of
HDPE, can also produce LLDPE.
Monomer
February‐April Versalis Cracker 380 France
Force Majeure/
Restart 4 w
Company shut Dundirk cracker
by the end of the week of Feb
18‐24 for a minor repair. FM
was declared on olefins output,
acc.to reports on Feb 26.
Restarted on March 13, but FM
remained in place.
Mid‐March‐April LyondellBasell Cracker 400 Germany Restart 2 m
Company declared force
majeure on propylene output on
Feb 21 due to an unplanned
shutdown at its
Muenchsmuenster cracker on
technical problems. FM was
effective from mid‐March.
Company resumed normal
operations and reached on spec
output on April 12. FM on
propylene output remained in
place.
Early March‐April Shell Cracker 940
The
Netherlands Shutdown 6 w
Maintenance in Moerdijk to
start on March 10 instead of
earlier reports of May.
End March‐April Versalis Cracker 745 Italy Restart 2 w
Priolo cracker was restarted in
the week April 8‐14 after being
shut on March 31 due to a
technical problem.
April
BP Refining and
Petrochemicals Cracker 540 Germany Production Issues
Company faced small
production issues at
Gelsenkirchen facility in the
week April 8‐14. Problems were
resolved by the end of that
week.
April
BP Refining and
Petrochemicals Cracker 515 Germany Production Issues
Company faced small
production issues at
Gelsenkirchen facility in the
week April 8‐14. Problems were
resolved by the end of that
week.
April ‐ June BASF Cracker 1.08 mil Belgium Shutdown 2 m
Maintenance in Antwerp to start
in H2 April and last until H2
June.
April‐June Total Petrochemicals Cracker 330 France Shutdown 2 m
Maintenance shutdown at
Carling cracker started on April
5.
August‐October Versalis Cracker 745 Italy Shutdown 2 m
Priolo cracker will be shut for
maintenance in August instead
of previously defined date of
October.
September Sabic Cracker 800
The
Netherlands Shutdown 5‐6 w
Turnaround and slight capacity
expansion.
September Ineos Cracker 600 Germany Shutdown 6 w
Scheduled maintenance at No.5
Cologne cracker.
October‐
November Repsol Cracker 700 Spain Shutdown 40 d
Tarragona cracker will be shut
for maintenance
May‐June
BP Refining and
Petrochemicals Cracker 540 Germany Shutdown 6 w Maintenance in Gelsenkirchen.
MIDDLE EAST ‐
AFRICA
Monomer
AMERICAS
March
Dow Chemical
Canada PE 650 Canada Shutdown 1 d
Maintenance at plant in Fort
Saskatchewan, Alberta between
March 29 and 30.
April‐June Pemex HDPE 100 Mexico Shutdown 60 d
Scheduled maintenance at Asahi
plant will start on April 6. The
plant produces injection grade.
April‐June Pemex HDPE 80 Mexico Shutdown 60 d
Scheduled maintenance at
Mitsui plant may take place in
line with Asahi plant. The plant
produces b/m grade.
Monomer
March‐April Chevron Phillips Cracker 300 USA Shutdown
Company shut one of its
crackers (ethylene unit 22) in
Sweeny, TX on March 30 due to
a propylene compressor outage.
The cracker restarted on April 5
before shutting down again on
April 8 due to an automatic
shutdown of propylene
compressor.
April‐May Dow Chemical Cracker 600 USA Shutdown 40‐60 d
Company shut its LHC#7 cracker
in Freeport, TX for maintenance
on April 1.
April Flint Hills Resources Cracker 635 USA Shutdown
An area‐wide power outage that
occurred in Jefferson County on
April 17 caused operational
issues at Port Arthur, TX. The
unit was previously restarted on
April 12 after a short power
outage on April 11.
April Hunstman Cracker 218 USA Shutdown
An area‐wide power outage that
occurred in Jefferson County on
April 17 caused operational
issues at Port Neches, TX.
May‐June Nova Chemical Cracker 816 Canada Shutdown 45 d
Company will shut its No.2
ethylene facility in Joffre,
Alberta in mid‐May.
NEW CAPACITIES
Date Company Product
Capacity
ktons/yr Location Column1 Column2 Notes
ASIA
Q1 2013 Qilu Petrochemical HDPE 250 China Test runs
Start up date was planned to be
around the first quarter of 2013.
Test runs started on January 10.
July 2013
Brahmaputra Cracker
and Polymer Ltd
(BCPL) PE 220 India Start up
New PE plant as a part of Assam
Gas Cracker Project is expected
to start up in July 2013. Cracker
and PE plant will have a capacity
of 220,000 tons/year.
Mid‐2013
Wuhan
Petrochemical PE 600 China Start up
Units (300,000 t/y HDPE;
300,000 t/y LLDPE) will be fed
by new ethylene plant. Cracker
and downstream units could
start up in May or June, or even
as early as mid‐April. They will
start up in mid‐2013, acc. to
reports on Feb 20.
June 2013 SK Group‐Sinopec PE 400 China Start up
New JV plant in Wuhan City,
Hubei will start up in June.
October 2013‐Q1
2014
ONGC‐Petro
Additions PE 1.06 mil India Start up delayed
Plants were to begin
commercial operations in Oct
2013. The company has two
HDPE/LLDPE swing lines with
360,000 t/y capacity each and
one HDPE line with 340,000 t/y
capacity. They will start up in Q1
2014.
End 2013 Gail
HDPE/
LLDPE 450 India
The company’s new
HDPE/LLDPE swing plant is
expected to come online by end
of 2013 and it will double
company's existing PE capacity.
December 2013‐
March 2014
Bharat Petroleum
Corporation Limited
(BPCL)
HDPE/
LLDPE 220 India
The unit will come online
between December 2013 and
March 2014.
Monomer
December 2012‐
Mid‐2013
Wuhan
Petrochemical Ethylene 800 China Test runs
Test runs at brand new cracker
at Hubei started on Dec 28,
2012. Earlier reports had
suggested that the plant would
come online in Q3 of 2013. The
cracker and downstream units
could start up in May or June, or
even as early as mid‐April. They
will start up in mid‐2013, acc. to
reports on Feb 20.
June 2013 SK Group‐Sinopec Cracker 800 China Start up
New JV plant in Wuhan City,
Hubei will start up in June.
Q3 2013 CPC Ethylene 600 Taiwan Start‐up delayed
Company planned to start up its
brand new No. 6 cracker in
Linyuan in June or July. The date
was delayed sometime in Q3,
2013, acc. to reports on April 16.
2012‐Q1 2014
ONGC‐Petro
Additions Ethylene 1.1 mil India Start up
Construction was underway as
of June 2012. Plant is expected
to start up in Q1 2014.
2014 Mitsubishi Chemical Ethylene 476 Japan Expansion
The company plans to increase
their No. 2 cracker’s ethylene
capacity by 50,000 t/y .
2014
p
and Polymer Ltd
(BCPL) Ethylene 220 India Engineering is underway
2014 GAIL (India) Ethylene 900 India Planned unit.
2014 Jiutai Energy Ethylene 600 China Start up
The start up of a methanol to
olefins plant in Inner Mongolia is
planned for 2014
2015 Indian Oil Corp Ethylene 850 India Study is underway.
2015
Reliance Industries
Ltd. Ethylene 1.365 mil India
Engineering was underway. The
new cracker may start up in H1
2015, as early as May 2015.
SOUTHEAST ASIA
January 2012‐April
2013 JG Summit HD/LLDPE 200 Philippines Expansion 4 m
Company will shut the swing
plant in Batangas on Jan 17 for
debottlenecking. The capacity
will be lifted to 320,000 t/y.
April 2013 ExxonMobil LLDPE 650 Singapore Start up
New plant will start up on April
1.
April 2013 ExxonMobil
LLDPE/
HDPE 650 Singapore Start up
New plant will start up on April
1.
Monomer
June‐July 2013‐
September2013 JG Summit Ethylene 320 Philippines Start up
The cracker was expected to
start up in June‐July 2013 while
commercial operations were
expected by early 2014.
Company delayed the start‐up
to September 2013.
Indefinite Shell Ethylene 800 Singapore Expansion
The company will expand the
capacity of its cracker at Pulau
Bukom by 20%. After the start‐
up in March 2010, it will add an
extra c3 capacity of 90,000 t/y.
It is unclear when the expansion
willl begin and how long it will
take
EUROPE
Q2 2013 SABIC HDPE 250 Germany
Commercial
operations
Company to start producing
bimodal HDPE instead of HDPE
pipe at their Gelsenkirchen
plant. Commercial production is
expected by Q2 2013.
2016‐2017 Rosneft PE 350 Russia
Company to build an
HDPE/LLDPE swing plant with a
capacity of 350,000 tons/year.
Around 20% of the total
capacity will be used for LLDPE
production while the remainder
will be slated for HDPE.
Monomer
2015 Ineos Cracker 700 Norway Expansion
The Rafnes cracker's production
capacity is planned to be
boosted to more than 700,000
tons from 560,000 tons to
accommodate ethane supply
from the US
2016‐2017 Rosneft Ethylene 450 Russia Expansion
Company to increase ethylene
capacity from 200,000 t/y to
450.000 t/y in Angarsk.
Q1 2017 Rosneft Ethylene 1.4 mil Russia Groundbreaking
Construction of a petrochemical
complex, requiring 3.4 million
mt/year of feedstocks including
ethylene, PP, PE, MEG and other
products started in 2012
2018 Polimir Ethylene 200 Belarus Debottleneck
Company to add a new ethylene‐
propylene unit to its facility to
increase its cracker capacity.
MIDDLE EAST
October 2012‐April
2013 Saudi Kayan LDPE 300 S. Arabia
Commercial
operations
Trial operations started at the
Jubail complex in October 2012.
Commercial production started
on April 1, 2013.
Q3 2013
Saudi International
Petrochemical
Company (Sipchem) LDPE 200 S. Arabia Start up
Company initially planned to
start up a brand new plant in
Jubail in Q1 2013. Construction
is expected to be completed by
Q2 2013 while test runs are
scheduled for Q3 2013.
March 2013
Ilam Petrochemical
Company HDPE 300 Iran Start up
Construction started in 2005
while production is expected to
start on March 2013
March 2014
Kurdistan
Petrochemical Co HDPE 312 Iran
Construction
underway
Construction at Sanandaj was
54% complete as of Aug 2012
Mid‐2014 Borouge LDPE 350 UAE
Phase 3 complex is expected to
be completed by mid 2014
Mid‐2014 Borouge PE 1.08 mil UAE
Phase 3 complex is expected to
be completed by mid 2014
Late 2015‐Q1 2016 Petro Rabigh LDPE 300 Saudi Arabia Expansion
Rabigh 2 Expansion Project will
be completed by late 2015.
Plant is expected to start up by
Q1 2016.
2018 Qapco HDPE 850 Qatar
Ras Laffan complex is expected
to be completed by 2018.
2018 Qapco LDPE 430 Qatar
Ras Laffan complex is expected
to be completed by 2018.
Monomer
Q4 2013 Borouge Cracker 1.5 mil UAE
Phase 3 complex was expected
to be completed by mid 2014.
Market sources said on Feb 26
that the process is ahead of
schedule and the cracker may
start coming online in Q4 2013.
AMERICAS
June 2015 Braskem Idesa PE 1 mil Mexico Start up
Contract awarded for the
Ethylene XXI petchem complex
including 2 HDPE plants, 1 LDPE
plant
2016 Formosa Plastics LDPE 300 USA Start up
New complex planned in Point
Comfort, TX
2016 ExxonMobil PE 1.3 mil USA Start up
Two new PE plants to be built in
Mont Belvieu with 650,000 t/y
capacity each. The possible start
up date pronounced as 2016.
Q1 2017
Chevron Phillips
Chemical PE 1 mil USA Start up
New complex planned at Cedar
Bayou, TX
2017 Nova Chemicals
HDPE/
LLDPE Canada Startup
Company will build 1
HDPE/LLDPE plant and 1 LLDPE
plant
Monomer
2015 Westlake Cracker 565 USA Delayed Expansion
Expansion at Petro‐1 carcker in
Lake Charles, LA. Expansion
delayed from 2013 to 2015.
Mid‐ 2014 Westlake Ethylene 285 US Expansion
The company will add more
than 90,000 tons/year of
ethylene production capacity to
reach around 300,000 tons/year
in line with the conversion of its
Calvert City, Kentucky steam
cracker to ethane feedstock
from propane
Q3 2013 Williams Cracker 272 USA Expansion Debottleneck at Geismar, LA
End 2013 Ineos Cracker 115 USA Expansion
Debottleneck at Chocolate
Bayou, TX
2014 Westlake Cracker 113 USA Expansion Expansion at Lake Charles, LA
2013‐2015 LyondellBasell Cracker 1.8 mil USA Expansion
Expansion planned at
Channelview, TX. Capacity will
be increased by 113,000 t/y by
2015.
Late March 2013‐
2014 LyondellBasell Cracker 1.1 mil USA Expansion
Construction for the expansion
project at La Porte, TX will start
in late March 2013. Ethylene
capacity will be increased from
the current 770,000 t/y to 1.1
mil t/y.
2014‐2015 LyondellBasell Cracker 770 USA Expansion
Construction for the expansion
project at Corpus Christi, TX will
start in 2014 and is expected to
be completed by 2015. Ethylene
capacity will be increased by
362,000 t/y.
Q1 2013 ‐ Q2 2015 Williams Cracker Canada Start up
The company will build olefin
processing facilities with 11,000‐
12,000 b/d ethane, ethylene,
propane and propylene
capacities by Q2 2015
June 2015
Braskem/ Grupo
Idesa Cracker 1 mil Mexico Start up
Contract awarded in Oct 2012
for the Ethylene XXI petchem
complex
2016 ExxonMobil Cracker 1.5 mil USA Start up
Ethylene cracker in Baytown is
expected to start up in 2016.
2016 Formosa Plastics Cracker 800 USA Start up
New cracker at Point Comfort,
TX
2016 OxyChem Ethylene 544 USA Start up
Contract awarded in Oct 2012
for a new ethane cracker
2016‐2017 Dow Cracker
World
scale USA Start up
Company plans expansions and
1 new cracker to increase
capacity by 2.3 mil tons/yr by
2017
2016‐2017 Shell Chemical Cracker
World
scale USA Start up
Company is assessing where to
locate a new complex using
Marcellus Shale
2017 Dow Chemical Cracker
World
scale USA Start up
World scale ethylene cracker
will be built in Texas.
Q1 2017
Chevron Phillips
Chemical Cracker 1.5 million USA Start up
New ethane cracker at its Cedar
Bayou complex in Texas.
After 2017 Sasol Cracker 1‐1.4 mil USA Start up
Ethane cracker planned for Lake
Charles, LA. Feasibility study will
be completed by 2H 2013
PLANT CLOSURES
Date Company
Plant ‐
Product
Capacity
ktons/yr Location Column1 Column2 Notes
ASIA
March 2013 Prime Polymer HDPE 130 Japan Closure
Chiba plant will be mothballed
due to falling domestic demand
April 2014 Mitsubishi Chemical HDPE 52 Japan Closure
Kawasaki plant will be closed
permanently.
Monomer
2014 Mitsubishi Chemical Ethylene 375 Japan Closure
The company pointed to the
surge in ethylene production
capacity anticipated in China
and North America for the
closure of No. 1 cracker.
2015 Sumitomo Chemical Cracker 415 Japan Closure
Company will shut its sole
cracker at Chiba during or
before 2015 due to lower
competitiveness in terms of
energy efficiency, maintenance
costs.
EUROPE
2016‐2017 Rosneft LDPE 76 Russia Closure
Company may shut the plant
permanently.
Monomer
Notes:
(i) Under duration "d" denotes day, "w" denotes week, "m" denotes month.
(ii) Updates made during the current week are marked in red.
(iii) Where the plant is listed as Cracker, the capacity refers to Ethylene.
PRODUCTION NEWS
Date Company
Plant ‐
Product
Capacity
ktons/yr Location Status Duration Notes
ASIA
March‐April Dalian Petrochemical PP 200 China Shutdown 10 d
Plant in Dalian, Shangdong will
be shut on March 26 for
maintenance.
March‐April Jinan Refinery PP 120 China Restart 40 d
Shandong plant will restart on
April 19 after being shut on
March 10 for scheduled
maintenance.
April‐May
Sinopec Qilu
Petrochemical PP 120 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong. (No.1 cracker)
April
Fujian Refining &
Petrochemical PP 180 China Shutdown Maintenance started on April 1.
April
Daqing Refining &
Chemicals PP 300 China Shutdown
Company shut the plant in
Heilongjiang on April 10 due to a
technical issue. The restart date
was undisclosed.
Monomer
December 2012‐
April 2013
Daqing
Petrochemicals Cracker 600 China Shutdown 4 m
The new ethylene unit started
production on Oct 9 to reach a
total ethylene capacity of 1.2 mil
t/y. Company shut the cracker
on Dec 3 after a fire, plans to
restart it in early April.
March‐April SK Innovations Propylene 140 South Korea Restart 1 m
Maintenance at No.1 Ulsan
cracker started on March 7 as
scheduled. The cracker restarted
on April 3, op rates were
gradually raised to reach 100%
on April 6‐7.
March‐Mid‐June
Formosa
Petrochemicals Propylene 375 Taiwan Shutdown 3.5 m Maintenance an No.2 RFCC.
April Samsung Total Cracker 1 mil South Korea Full rates
Company will keep running their
Daesan cracker at 100% capacity
in April, similar to March.
April
Formosa
Petrochemicals Propylene Taiwan Op rates lower
Company will cut op rates of its
3 Mailiao crackers from 100% in
March to 90% from April 1 on
poor margins. No.1, 2 and 3
crackers produce 600,000 t/y,
515,000 t/y and 350,000 t/y
propylene, respectively.
April CPC Corp. Propylene 193 Taiwan Op rates lower
Company will maintain lower op
rates of 95% at their No.4
cracker in Linyuan indefinitely
due to poor margins and tight
availability of tank space, acc.to
market sources. Rates were
reduced on March 15.
April CPC Corp. Propylene 250 Taiwan Shutdown
Company would maintain lower
op rates of 95% at their No.5
cracker in Kaohsiung indefinitely
due to poor margins and tight
availability of tank space, acc.to
market sources. Rates were
reduced on March 15. The
cracker was down on April 5
following an explosion.
April‐May
Sinopec Qilu
Petrochemical Cracker 510 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong (No.1 cracker) started
on April 1.
April‐May
Sinopec Qilu
Petrochemical Cracker 350 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong (No. 2 cracker)
started on April 1.
End March ‐ Early
May
JX Nippon Oil &
Energy Propylene 140 Japan Shutdown 40 d
OCU unit in Kawasaki will be
shut for maintenance
May‐July Mitsubishi Chemical Propylene 320 Japan Shutdown 50 d
The cracker at Mizushima will be
shut for scheduled maintenance
on May 17.
June‐August Mitsui Chemical Ethylene 330 Japan Shutdown 1.5 m
Scheduled maintenance at Chiba
cracker between June 27‐August
7.
July
Chiba Chemicals
Manufacturing Propylene 555 Japan Shutdown 1 m
Company will reform its 2 steam
crackers with respective
capacities of 331,000 t/y and
224,000 t/y to make them run
efficently at lower op rates
August ‐
September Mitsubishi Chemical Propylene 260 Japan Shutdown 50 d
The No 2 cracker at Kashima is
planned to be shut for
maintenance
September‐End
October
Formosa
Petrochemicals Propylene 515 Taiwan Shutdown 45 d
No 2 steam cracker at Mailiao is
planned to be shut for
maintenance from mid Sept
2013 to end October 2013
October
JX Nippon Oil &
Energy Propylene 140 Japan Shutdown 20 d Maintenance
October‐December CPC Cracker 380 Taiwan Shutdown 2 m
Maintenance shutdown at No.4
Linyuan cracker for more than 2
months.
SOUTHEAST ASIA
Monomer
February‐March PTT Global Chemical Propylene 127 Thailand Shutdown 40 d
Scheduled maintenance at Map
Ta Phut cracker
February‐March HMC Polymers Propylene 300 Thailand Shutdown 30 d
PDH plant was shut
unexpectedly in the week Feb
11‐17 given technical issues.
April Pertamina Propylene 250‐260 Indonesia Shutdown
Company was running their
RFCC at Balongan, West Java at
50% capacity as of April 2 due to
technical issues.
June‐July PCS Propylene 270 Singapore Shutdown 1 m
Scheduled maintenance at No 1
cracker between June 6‐July 12,
2013.
July PTT Global Chemical Cracker 550 Thailand Shutdown 40 d
Maintenance at I‐4 No. 1 cracker
in Map Ta Phut. Company will
keep their op rates at 85% prior
to shutdown, acc.to market
reports on March 22.
September Optimal Olefins Propylene 95 Malaysia Shutdown 1.5 m
Cracker in Kertih to be shut in
early September for safety
inspections.
October Quenos Cracker 300 Australia Shutdown
Company to shut the cracker in
Botany, NSW in Q4 2013 for
maintenance.
Q4 2013
Map Ta Phut Olefins
Co. Propylene 400 Thailand Shutdown 40 d Scheduled maintenance.
2013 Shell Cracker 800 Singapore Shutdown
Maintenance shutdown in
Bukom.
EUROPE
March‐April Borealis PP 230 Belgium Shutdown
Maintenance will start in the
second half of March.
April Borealis PP 155 Belgium Shutdown
Maintenance will start in the
second half of April.
Monomer
February‐April Versalis Cracker 380 France
Force Majeure/
Restart 4 w
Company shut Dundirk cracker
by the end of the week of Feb
18‐24 for a minor repair. FM
was declared on olefins output,
acc.to reports on Feb 26.
Restarted on March 13, but FM
remained in place.
Mid‐March‐April LyondellBasell Cracker 400 Germany Restart/FM 2 m
Company declared force
majeure on propylene output on
Feb 21 due to an unplanned
shutdown at its
Muenchsmuenster cracker on
technical problems. FM took
effect from mid‐March as
previously reported. Company
resumed normal operations and
reached on spec output on April
12. FM remained in place.
Early March‐April Shell Cracker 940
The
Netherlands Shutdown 6 w
Maintenance in Moerdijk to
start on March 10 instead of
earlier reports of May.
End March‐April Versalis Cracker 745 Italy Restart 2 w
Priolo cracker was restarted in
the week April 8‐14 after being
shut on March 31 due to a
technical problem.
April
BP Refining and
Petrochemicals Cracker 540 Germany Production Issues
Company faced small
production issues at
Gelsenkirchen facility in the
week April 8‐14. Problems were
resolved by the end of that
week.
April
BP Refining and
Petrochemicals Cracker 515 Germany Production Issues
Company faced small
production issues at
Gelsenkirchen facility in the
week April 8‐14. Problems were
resolved by the end of that
week.
April ‐ June BASF Cracker 1.08 mil Belgium Shutdown 2 m
Maintenance in Antwerp to start
in H2 April and last until H2
June.
April‐June Total Petrochemicals Cracker 330 France Shutdown 2 m
Maintenance shutdown at
Carling cracker started on April
5.
May‐June
BP Refining and
Petrochemicals Cracker 540 Germany Shutdown 6 w Maintenance in Gelsenkirchen.
August‐October Versalis Cracker 745 Italy Shutdown 2 m
Priolo cracker will be shut for
maintenance in August instead
of previously defined date of
October.
September Sabic Cracker 800
The
Netherlands Shutdown 5‐6 w
Turnaround and slight capacity
expansion.
September Ineos Cracker 600 Germany Shutdown 6 w
Scheduled maintenance at No.5
Cologne cracker.
October‐
November Repsol Cracker 700 Spain Shutdown 40 d
Tarragona cracker will be shut
for maintenance
MIDDLE EAST
February‐End April Orpic PP 350 Oman Restart 2 m
Company shut the plant, acc.to
reports on Feb 28. It will restart
on April 17.
Monomer
AMERICAS
Monomer
March‐April Chevron Phillips Cracker 300 USA Shutdown
Company shut one of its
crackers (ethylene unit 22) in
Sweeny, TX on March 30 due to
a propylene compressor outage.
The cracker restarted on April 5
before shutting down again on
April 8 due to an automatic
shutdown of propylene
compressor.
April‐May Dow Chemical Cracker 600 USA Shutdown 40‐60 d
Company shut its LHC#7 cracker
in Freeport, TX for maintenance
on April 1.
April Flint Hills Resources Propylene 317 USA Restart
An area‐wide power outage that
occurred in Jefferson County on
April 17 caused operational
issues at Port Arthur, TX. The
unit was previously restarted on
April 12 after a short power
outage on April 11.
April Hunstman Cracker 218 USA Shutdown
An area‐wide power outage that
occurred in Jefferson County on
April 17 caused operational
issues at Port Neches, TX.
NEW CAPACITIES
Date Company
Plant ‐
Product
Capacity
ktons/yr Location Column1 Column2 Notes
ASIA
2011‐2012
Essar Gujarat
Petrochemicals Ltd. PP 900 India The plant is under study
Q2 2013
Sichuan
Petrochemical PP 450 China Start up
Sichuan plant to start up in the
second quarter of 2013.
May‐June 2013 Sinochem Quanzhou PP 200 China Start up
Company to start up new plant
in Fujian in May‐June.
June 2013 SK Group‐Sinopec PP 400 China
New JV plant in Wuhan City,
Hubei will start up in June.
July 2013
Brahmaputra Cracker
and Polymer Ltd
(BCPL) PP 60 India Start up
New PP plant as a part of Assam
Gas Cracker Project is expected
to start up in July 2013.
July 2013
Guangzhou
Petrochemical PP 200 China Start up
Company plans to start up new
capacity in Guangdong by July.
October 2013‐Q1
2014
ONGC‐Petro
Additions PP 340 India Start up delayed
Was to begin commercial
operations in October 2013,
reports in May 2012 had said.
Plant is expected to start up in
Q1 2014.
End 2013 Sinopec Maoming PP 200 China Start up
Brand new plant in Maoming,
Guangdong to start up at end‐
2013.
Mid‐2013
Wuhan
Petrochemical PP 400 China Start up
The unit will be fed by the
Wuhan ethylene plant. The
cracker and downstream units
may start up in May or June, or
even as early as mid‐April. They
will start up in mid‐2013, acc. to
reports on Feb 20.
December 2013‐
March 2014
Bharatmaputra
Petroleum
Corporation Limited
(BPCL) PP 60 India Start up
The unit will come online
between December 2013 and
March 2014.
2015 Jiutai Energy PP 350 China Start up
Methanol to olefins based PP
plant
2015‐2016 Indian Oil Corp PP 700 India Studies are underway.
Monomer
2012
Mangalore Refinery
& Petrochemical Ltd Propylene 300 India Engineering is underway.
2012‐Q1 2014
ONGC Petro‐
additions Ltd. Propylene 400 India
Construction was underway as
of June 2012. Plant is expected
to start up in Q1 2014.
March‐April 2013 GS Caltex Propylene 250 South Korea
Test runs/Delayed
restart
New vacuum gasoil FCC in Yeosu
expected to reach commercial
production by June. Company
shut FCC April 2 for a 9 day
maintenance. Restart was
delayed to April 14 due to
mechanical issues.
Q3 2013 CPC Propylene 300 Taiwan Start up delayed
Company planned to start up its
brand new No. 6 cracker in
Linyuan in June or July. The date
was delayed sometime in Q3,
2013, acc. to reports on April 16.
Early 2013‐
September 2013
Tianjin Bohua
Petrochemical Propylene 600 China Test runs
Company plans to start test runs
at its new PDH unit in
September. Construction work
was completed earlier in 2013.
2014
Shandong
Chambroad Propylene 133 China Start up New unit will start up.
2014 Jiutai Energy Propylene 600 China Start up
The start up of a methanol to
olefins plant in Inner Mongolia is
planned for 2014
2014
Brahmaputra Cracker
and Polymer Ltd
(BCPL) Propylene 60 India Engineering is underway.
2015
Reliance Industries
Ltd. Propylene 150 India
Engineering was underway. The
new cracker may start up in H1
2015, as early as May 2015.
SOUTHEAST ASIA
2013‐2015 Pertamina PP 250 Indonesia Start up delayed
Start up of new Balongan plant
delayed from 2011 to 2013.
Delayed again to 2014. Then
delayed again to 2015.
Monomer
June‐July 2013‐
September2013 JG Summit Propylene 190 Philippines Start up
The cracker was expected to
start up in June‐July 2013 while
commercial operations were
expected by early 2014.
Company delayed the start‐up
to September 2013.
2015 Pertamina Propylene 150 Indonesia Start up delayed
Start up date of RCC at Cilacap is
revealed as 2015
Indefinite Shell Propylene 450 Singapore Expansion
The company will expand the
capacity of its cracker at Pulau
Bukom by 20%. After the start‐
up in March 2010, it will add an
extra c3 capacity of 90,000 t/y.
It is unclear when the expansion
willl begin and how long it will
take
MIDDLE EAST
Mid‐2014 Borouge PP 960 UAE
Phase 3 complex is expected to
be completed by mid 2014
2015 APC/Bayegan PP 500 Turkey
Saudi Arabia’s Advanced
Petrochemical Company and
Turkish Bayegan to build new PP
plant. The construction of the
project is expected to start in 2Q
2013
2018 Qapco PP 760 Qatar
Ras Laffan complex is expected
to be completed by 2018.
Monomer
Q3 2013
Saudi Aramco Total
Refinery and
Petrochemical
(Satorp) Propylene 200 Saudi Arabia Start up
Brand new polymer grade
propylene capacity in Al‐Jubail
will start up in Q3 2013.
Q4 2013 Borouge Propylene 1 mil UAE
Phase 3 complex was expected
to be completed by mid 2014.
Market sources said on Feb 26
that the construction process is
ahead of schedule and the
cracker may start coming online
in Q4 2013.
EUROPE
Q3 2013 Polyom PP 180 Russia Start‐up
Commercial production was set
to begin in Nov‐Dec, 2012.
Commissioning work was
completed on February 11,
2013. Full rates are expected to
be reached by Q2 2013, acc.to
market reports on March 6.
April 2013 Sibur PP 500 Russia Commercial runs
The plant was to come online in
H2 2012 and the test production
was to start in H1 2013.
Commercial output was
expected around Q2 2013,
reports said on Feb 22.
Commercial runs will start on
April 23.
2015‐2016 Taneco OJSC PP 200 Russia
New plant to start up in
Tatarstan. Expected date is 2015‐
2016
2016‐2017 Rosneft PP 250 Russia
Company will build a PP plant
with two lines, one of which will
produce homo‐PP and the other
of which will produce PPBC. The
plant will have a total PP
capacity of 250,000 t/y.
Monomer
2015 Ineos Cracker 700 Norway Expansion
The Rafnes cracker's production
capacity is planned to be
boosted to more than 700,000
tons from 560,000 tons to
accommodate ethane supply
from the US
2018 Polimir Propylene 100 Belarus Debottleneck
Company to add a new ethylene‐
propylene unit to its facility to
increase its cracker capacity.
AMERICAS
Q4 2013
Advanced
Composites PP 226 USA Expansion
Company to bring online an
additional capacity of 14,000
t/y.
Monomer
2015 Westlake Cracker 545 USA Delayed Expansion
Expansion at Lake Charles, LA.
Expansion delayed from 2013 to
2015
3Q ‐2013 Enterprise Products PDH 750 USA Start up
Commercial production is
expected in the third quarter of
2015.
Q1 2013 ‐ Q2 2015 Williams Cracker Canada Start up
The company will build olefin
processing facilities with 11,000‐
12,000 b/d ethane, ethylene,
propane and propylene
capacities by Q2 2015
2016‐2017 Formosa Plastics Propylene 600 USA Start up
New propane dehydrogenation
plant at Point Comfort, TX
PLANT CLOSURES
Date Company
Plant ‐
Product
Capacity
ktons/yr Location Column1 Column2 Notes
Asia
April 2014 Mitsubishi Chemical PP 89 Japan Closure
Kawasaki plant will be closed
permanently.
Olefins
2014 Mitsubishi Chemical Cracker 375 Japan Closure
The company pointed to the
surge in ethylene production
capacity anticipated in China
and North America for the
closure of the No. 1 cracker.
2015 Sumitomo Chemical Propylene 288 Japan Closure
Company will shut its sole
cracker at Chiba during or
before 2015 due to lower
competitiveness in terms of
energy efficiency, maintenance
costs.
SOUTHEAST ASIA
Q1 2013 Petronas PP 80 Malaysia Closure
Company will permanently close
the plant in Kuantan due to poor
economics.
Notes:
(i) Under duration "d" denotes day, "w" denotes week, "m" denotes month.
(ii) Updates made during the current week are marked in red.
(iii) Where the plant is listed as Cracker, the capacity refers to Ethylene.
PRODUCTION NEWS
Date Company
Plant ‐
Product
Capacity
ktons/yr Location Status Duration Notes
ASIA
April Supreme PS 272 India Shutdown
Company was operating only 1 of
their 3 lines as of April 12.
October
Kumho
Petrochemical PS 227 South Korea Shutdown 7‐10 d
Scheduled maintenance in Ulsan
plant.
Monomer
Late April‐May
Tianjin Dagu
Chemical Styrene 500 China Shutdown delayed 2 w
Company initially planned to shut
the unit in Tianjin either in late
March or early April for
maintenance. Shutdown was
likely to be delayed to late April
or May. The reason was
undisclosed.
April ‐Mid‐July NS Styrene Monomer Styrene 190 Japan Shutdown 3.5 m
No.2 Oita plant was to be shut
for maintenance and refurbishing
from March 1 to mid‐June.
Company delayed the start of the
shutdown by one month to April
1. Plant was shut on April 1 as
scheduled until mid‐July.
Late March‐Mid‐
April LG Chem Styrene 200 South Korea Shutdown 2 w
Scheduled maintenance at No.1
plant in Yeosu started on March
24. It will restart on April 14.
Late March‐Mid‐
April LG Chem Styrene 300 South Korea Shutdown 2 w
Scheduled maintenance at No.2
plant in Yeosu will start on March
29. It will restart on April 19.
Late March‐Mid‐
April Samsung Total Styrene 280 South Korea Shutdown 2 w
Maintenance at No 1 plant in
Daesan started in late March.
Company plans to restart it by
mid‐April.
April‐May Yeochun NCC Styrene 290 South Korea Shutdown 1 m
The styrene plant in Yeosu is to
be shut for maintenance
between April 15‐May 10.
April‐May
Sinopec Qilu
Petrochemical Styrene 200 China Shutdown 40 d
Maintenance shutdown at
petrochemical complex in Zibo,
Shandong.
August
Formosa Chemical
and Fiber Corp. Styrene 600 Taiwan Shutdown 1 m
Company will shut No. 1
(250,000 t/y), No. 2 (350,000 t/y)
plants at Mailiao for
maintenance in August.
September‐
October Nihon Oxirane Styrene 420 Japan Shutdown 1 m
Sheduled turnaround at Chiba
plant
September‐
October Asahi Kasei Styrene 390 Japan Shutdown 30‐40 d
Scheduled turnaround at the No
3 plant in Mizushima
September Samsung Total Styrene 650 South Korea Shutdown 3 w
Maintenance shutdown at No 2
plant
September
Honam
Petrochemical Styrene 560 South Korea Shutdown 20 d
Maintenance shutdown at
Daesan
SOUTHEAST ASIA
April ‐ May Denka GPPS 220 Singapore Shutdown 6 w
Maintenance shutdown started
on April 10 as scheduled.
Monomer
June
Styrindo Mono
Indonesia Styrene 100 Indonesia Delayed shutdown
Company delayed the shutdown
at their No. 1 Merak plant from
the initial late March/early April
to June due to good margins and
demand for styrene.
EUROPE
Monomers
Early March‐April Shell Styrene 450
The
Netherlands Shutdown 6 w
Maintenance shutdown may take
place at Moerdijk in line with the
company's cracker shutdown.
2013 LyondellBasell Styrene 640
The
Netherlands Shutdown 6 w
Maintenance shutdown in
Maasvlakte.
2013 Repsol Styrene 450 Spain Shutdown 40 d
Maintenance shutdown in
Tarragona.
MIDDLE EAST
Monomers
February‐April
Jubail Chevron
Phillips Styrene 777 Saudi Arabia Restart
Plant restarted on April 3 after a
maintenance that started on
February 18.
March‐April
Saudi Petrochemical
Company (Sadaf) Styrene 580 Saudi Arabia Shutdown 1 m
Unexpected shutdown occured
at No.2 plant at Al‐Jubail on
March 19. Company asked term
contract customers to delay
the shipment of April‐ and May‐
loading cargoes to July‐August,
acc.to market sources. Restart
date was undisclosed.
March‐Early April
Saudi Petrochemical
Company (Sadaf) Styrene 580 Saudi Arabia Shutdown 1 m
Maintenance at No.1 plant at Al‐
Jubail plant started in March.
Plant was expected to restart by
early April.
July‐August Pars Petrochemicals Styrene 600 Iran Shutdown 20 d
The company may shut their
plant in Assaluyeh for
maintenance in late summer.
AMERICAS
Monomers
March ‐ April LyondellBasell Styrene 1.2 mil USA Shutdown
Maintenance in POSM unit in
Channelview, Texas start by
second half of March through
April. Unit was shut on March 22.
March‐April Shell Canada Styrene 450 Canada
Company started a maintenance
at Scotford, Alberta on March 29.
Production will not be impacted.
NEW CAPACITIES
Date Company
Plant ‐
Product
Capacity
ktons/yr Location Column1 Column2 Notes
ASIA
Monomers
Q2 2013 SP Chemical Styrene 320 C hina Start up
Singapore's SP Chemicals plans to
start up its plant at Taixing in
China's Jiangsu province in Q2
2013
SOUTHEAST ASIA
August 2012‐May
2013
Vietnam Polystyrene
Co Ltd HIPS 50 Vietnam Delayed Start up
Start up delayed to May 2013
from March due to market
conditions and higher feedstock
costs.
EUROPE
MIDDLE EAST
PLANT CLOSURES
Date Company
Plant ‐
Product
Capacity
ktons/yr Location Column1 Column2 Notes Southeast Asia
1H 2013 Cheil Industries HIPS 85 S. Korea Closure
The company plans to phase out
HIPS production in Yeosu and
convert it to an ABS plant in 1H
2013
Europe
February 2013‐
March 2013 Total Petrochemicals PS 80 UK Closure
Company was in a consultation
process at its Stalybridge plant as
of Feb 6. Plant was to be closed
due to shrinking European
market and poor demand in the
UK. Company was still in
consultation as of March 13. The
plant was reportedly closed in
the week March 25‐31, the last
production took place on March
25.
Monomer
Notes:
(i) Under duration "d" denotes day, "w" denotes week, "m" denotes month.
(ii) Updates made during the current week are marked in red.
(iii) Where the plant is listed as Cracker, the capacity refers to Ethylene.
…Q & A
CHEMORBIS CHINA
No. 338, West Nanjing Road, Tian An Center, 7F, Unit 706 Shanghai, P.R. China, 200003 Phone: +86 (21) 6327 1212 Fax: +86 (21) 5375 1291 Email: [email protected]
CHEMORBIS MALAYSIA
Suite B-11-01, Plaza Mont Kiara No 2, Jalan Kiara, Mont Kiara Kuala Lumpur, Malaysia 50480
Phone: +60 (3) 6203 9717 Fax:+60 (3) 6203 9769 Email:[email protected]
CHEMORBIS TURKEY
Ataturk Caddesi, Seref Yazgan Is Merkezi, No:72, K: 6 Kozyatagi Istanbul, Turkey 34736
Phone: +90 (216) 468 10 25 (pbx) Fax: +90 (216) 360 57 88 Email:[email protected]
CHEMORBIS ITALY Via La Spezia 1 20142 Milano - Italy Phone: +39 (02) 8941 5593 Fax:+39 (02) 8941 5587 Email:[email protected]
CHEMORBIS EGYPT 21 Ebbad El Rahman St. Sheraton Area, Cairo, Egypt Phone:+20 (2) 226 81 485 Fax:+20 (2) 226 81 485 Email:[email protected]
CHEMORBIS USA 856 Sunflower Circle Weston Florida 33327 United States Phone: +1 (754) 581 8622 Fax: +1 (754) 581 8622 Email:[email protected]
CHEMORBIS RUSSIA 9 Universitetsky prospekt Moscow, 119296, Russia Phone: 8(495) 938 00 Email:[email protected]
THANK YOU...