DSHT No. Rev. No.
1
1 Project RPP-WTP Bldg./Rm # EMF / E-0102
2 Project No. 24590
3 Site DOE Hanford
4 Safety Class Non-Safety
5 Seismic CategorySC-IV (Service Level B)
Note 132
6 System No. DVP
7 System Description 24590-BOF-3ZD-25-00001
8 Description
9
10
11 Code Stamp / NB Registration Yes
12
13
14 (lb/hr) 578 [1]
15 (lb/ft^3) 0.067 Note 6
16 (acfm) 140 Note 7
17 (°F) 109 / 143 [2.1, 2.2]
18 (%) 100% / 40% [2.3]
19 (psia) 14.14 [1]
20 (kW) * / * / 3* [2.4] Note 12
21 (%) 100%
22 Site Storage Conditions - Summer (°F DB) 113 [3.1]
23 Site Storage Conditions - Winter (°F DB) (-)23 [3.1]
24 (mrem/hr) 10 [3.2, 5]
25 (psig) 15 [6]
26 (°F) 195 [7]
27
28 Circulation Immersion Heater
29 (°F) 1468*
30 (°F) 500*
31 (°F) *
32 5 yrs at 8760 hr/yrs. of use Note 3
33 6 WSI*
34 Incoloy 800*
35 Number of Heating Elements 6*
36
37 (psia) 0.01-0.03*
38 (psia) *
39 (in.) 4 in. diameter, nominal Note 5
40 (in.) 4 in. diameter, nominal Note 5
41 CL150 RF Flange
42 (in.) 80" (L) x 72" (W) x 78" (H) * Note 10
43 (lb) 2400*
44 (lb) 2400*
45 (in) 3/4*
46
47 Note 9
48
49 (in.) 0.040 [8]
50 Note 9
51 Note 9
52 (in.) 1.5*
53 Note 9
Gasket Note 11
54
55 480 / 60 / 3 / 3 wires + ground
56 PARTLOW*
57 1*
58 UL liquid tight / NEMA 4X
Thermostat Type
Inlet Nozzle Dimensions
Power Supply (voltage / frequency / phase / wires)
Outlet Nozzle Dimensions
Operating Weight
Pneumatic Test Pressure
Heating Elements Watt Density
Max. Temperature at Normal Operating Conditions
Corrosion Allowance
Relative Humidity (In / Out)
Connection Type
Manufacturer Part No.
24590-BOF-3PS-MEE0-T0002 Rev. 1
24590-QL-MRA-MEE0-00004 Rev. 2
Associated
Drawings Quantity Required
*
Max. Dimensions
HEATING ELEMENT DATA
Radiological Dose Rate
Max. Rated Temperature
Quality Level - Note 8 CM
24590-BOF-MAC-DVP-00001
Manufacturer
24590-BOF-M6-DVP-00001001
24590-BOF-P1-25-00001
DVP HEPA Filter Preheater Datasheet
Reference
Documents
Supporting
Calculations*
Primary Design Codes
MECHANICAL ENCLOSURE DESIGN DATA
MATERIALS OF CONSTRUCTION
POWER AND CONTROL
Heating Elements Sheath Material
DEP Vessel Ventilation Gases / GV
Insulation Thickness
Drain SizeShipping Weight
Process Ventilation HEPA Filter Preheater
Fluid Name / Fluid Code
Duty
ASME AG-1-97 (R2000)
Density
REFERENCE DATA
ASME Section VIII, Division 1 (Housing)
Volumetric Flow Rate
Temperature (In / Out)
Number of Branch Circuits
Type
OPERATING PROCESS DATA
Maximum Design PressureMaximum Design Temperature
Operating Pressure
Max. Temperature at Maximum Power Output
Heater Output (Minimum / Normal Operating / Maximum)
Calcium Silicate*
approved equal to Stock Code #PGGC2W100607
Mean Time to Failure (MTTF)
Mass Flow Rate
Insulation
Heating Element Incoloy 800*
316 / 316L (max 0.030% C)
Enclosure Rating (Terminal housing/ Control panel)
Shell and Non-Heated Components
316 / 316L (max 0.030% C)Inlet/Outlet Nozzles
Maximum Pressure Drop
24590-BOF-MED-DVP-00001
Plant Item No.
24590-BOF-ME-DVP-HTR-00001A/B
Outer Jacket Aluminum*
Page 1 of 2
Issued byRPP-WTP PDC
1 2 3 4
5
6 7 8
~
10
...._
......1L 12
'"""T3""" .....Ji... .......1L ,__1L_ .......!L .......1!L.. .___1L. .._lQ_
21 .....__ ......_g_
23 .....__
24
~ 26 27
......1§_
._lL
......lQ_ -21-
32
~ c....M....
35
~ ___R._
38 39 40 41 42
--1L 44
45
46
47
• DSHT No. Rev. No .
DVP HEPA FIiter Preheater Datasheet 24590-BOF-MED-DVP-00001 1 Plant Item No.
24590-BOF-ME-DVP-HTR-00001AJB
Proiect RPP-WTP Blda./Rm# EMF / E-0102 Manufacturer Proiect No. 24590 Supporting
24590-BOF-MAC-DVP-00001 Site DOE Hanford Calculations
Manufacturer Part No. Safetv Class Non-Safety
Associated 24590-BOF-MS-DVP-00001001 Seismic Category SC-JV (Service Level B) Drawings 24590-B0F-P1 -25-00001 Quantity Required 2
Note 13 Svstem No. DVP Reference 24590-BOF-3PS-MEEO-T0002 Rev. 1 Quality Level - Note 8 CM Svstem Descriotion 24590-B0F-3ZD-25-00001 Documents 24590-QL-MRA-MEE0-00004 Rev. 2 Descriotion Process Ventilation HEPA Filter Preheater
NOTES:
1. Vendor to fill in data cell with (•) asterisk. Fields containing data from Vendor's proposal are followed by •. Vendor to confirm or update this data. Blank data fields are not required to be completed. Source references for inputs are identified in brackets [) and are for BNI internal use only. Supporting calculations, associated drawings. and reference documents are for BNI internal use only . 2. Deleted . 3 Equipment shall be designed for a minimum useful life of 40 years, inclusive of maintenance. with the exception of the heating element, that shall have a design life of at least 5 years at 8760 hrs./yr. 4. There is no notable additional margin added to values on this data sheet. Values are taken directly from their source documents. 5. lnleVOutlet nozzles are to be the smallest available size to connect to 4 inch nominal diameter type 316L SS pipe . 6. Density= 144 • Pressure/ (R • Temperature) (4.2) Pressure= 14.14 psia (1), R = 53.35 ft*lb/lbm*"R (4.1), T = 109"F = 569'R (2.1) 7. Volumetric Flow= Mass Flow/ (60 • Density) 8. The quality level Is CM, but remains air permit affecting (9). The design will meet ASME AG-1 . 9. All materials will need to be fully identified by ASME/ASTM standard and type/grade or UNS . 10. Max. dimensions increased as two (2) Heaters and two (2) Control Panels to be mounted on a single structural skid (24590-BOF-DVP-SKID-00001). 11 . Gasket Stock Code #PGGC2W100607: Gasket 316L Stainless Steel, Flexible Graphite Filled, ASME Class 150, Spiral Wound, with 1/8 inch (3mm) Thick Stainless Steel Centering Ring & SS Inner ring per ASME 816.20 for ASME 816.5 Flanges
12 Maximum heater rating is based on the Sellers proposal and exceeds the require value . 13, Service level as defined in ASME AG-1 . Seismic loads (QBE) is the seismic load required by the building code.
14. Contents of this document are Dangerous Waste Permit (DWP) affecting,
REFERENCES (BNI Internal Use Only): [1] 24590-BOF-M6C-DVP-00001 Rev. B Attachment D [2) 24590-BOF-MAC-DVP-00001 Rev. B
(2.1) Assumption 6.2.10, Pg. 6 (2.2) Section 7.1, Pg. 6 (2.3) Assumption 6.1.1, 6.1.3, Pg. 5 (2.4) Section 7.1, Pg. 1 O
(3] 24590-WTP-DB-ENG-01-001 Rev. 5 (3.1] Table 4-7, Pg. 4-5- Max and Min Ambient Air Temperatures [3.2] Table 5-1 , Pg. 5-4 - R3 Area Max Dose
[4] Crane Co. Technical Pa12er 410 Flow of Fluids through Valves Fittings and Pi12e 2011 Crane Co. Stamford Connecticut (4.1) Pg. A-9 (4.2) Pg. 1-3
[5] 24590-BOF-P1-25-00001 Rev. 1 [6] 24590-BOF-M6-DVP-00001001 Rev. 1 PSV Set@ 1512sig (60) [7] 24590-BOF-M6C-DEP-00009 Rev. B Pg. A-19 [8] 24590-WTP-DC-M-06-001 Rev. 1 Pg. 9 [9) 24590-BOF-QDF-MS-17-0001 Rev. O
APPROVAL
Revised to reflect Q to CM changes. Incorporated EIE 24590-BOF-EIE-MS-17-0018, Originator ,2 Rev.a (EIE: Flow rate used 578 lb/hr with
1 operating pressure at14.14 psia. The new flow By- Thang E Thawn - tethawn
Org Name, Bechbol · rate is 577 lb/hr and the new operating pressure
Placed Aug 23, 2017 is 14.13 psia. These changes are minor, have no impact, and not reflected on the data sheet). Also incorporated EIE 24590-BOF-EIE-MS-17-0060, Rev.a. Thana Thawn Issued for Purchase Conformed to Seller's Bid
0 Impacts against this document have been evaluated and there are no EIE against this datasheet. Margins have not been reduced. R. Preston
Revision Description Originator
Notice: Please note that source, special nuclear, and byproduct materials, as defined in the Atomic Energy Act of 1954 (AEA), are regulated at the US Department of Energy (DOE) facilities exclusively by DOE acting pursuant to its AEA authority. DOE asserts that, pursuant to the AEA, it has sole and exclusive responsibility and authority to regulate source, special nuclear, and byproduct materials at DOE-owned nuclear facilities. Information contained herein on radionuclides is provided for process description purposes only.
Checked ByTo,yFogle - tjlogle
OroNam<o ~ Auo 2, .,,m
Torv Fonle
J . Shin Checker
~~uV~ ~ {o<
V Y. Mohammad-Zadeh
Y. Mohammad-Zadeh Aoorover
~ ·1 (, \)11\~
316/2017 Date
Page 2 of2