Issue-65

3
Design Department Weekly Technical Quiz Issue Number 65 (23 rd to 27 th May 2011) Questions for This Week Answer of the Last Week’s Questions Q.129) A twisted bar has about ……….. more yield stress than ordinary mild steel bar a) 10% b) 20% c) 35% d) 50% Q.130) Which Indian wicketkeeper has taken the most catches at the world cups? a) MS Dhoni b) Nayan Mongia c) S Kirmani d) Kiran More Thought of the Week You are not responsible for what people think about you. But you are responsible for what you give them to think about you. By - Stanley Ferrard - Q.127) Any loading condition for a beam can be represented in form of a ANS: Fourier’s series a) Laplace transform b) McLaurin's series c) Fourier's series d) Fourier transform Q.128) Who invented Internet (World Wide Web)? ANS: Tim Berners-Lee a) Bill Gates b) Tim Berners-Lee c) Charley Kline d) Ray Tomlinson

description

Technical Newsletter 65

Transcript of Issue-65

  • Design Department Weekly Technical Quiz

    Issue Number 65 (23rd to 27th May 2011)

    Questions for This Week

    Answer of the Last Weeks Questions

    Q.129) A twisted bar has about .. more yield stress than ordinary mild steel bar

    a) 10% b) 20% c) 35% d) 50%

    Q.130) Which Indian wicketkeeper has taken the most catches at the

    world cups?

    a) MS Dhoni b) Nayan Mongia c) S Kirmani d) Kiran More

    Thought of the Week

    You are not responsible for what people think about you.

    But you are responsible for what you give them to think about you.

    By - Stanley Ferrard -

    Q.127) Any loading condition for a beam can be represented in form of a ANS: Fouriers series

    a) Laplace transform b) McLaurin's series c) Fourier's series d) Fourier transform

    Q.128) Who invented Internet (World Wide Web)? ANS: Tim Berners-Lee

    a) Bill Gates b) Tim Berners-Lee c) Charley Kline d) Ray Tomlinson

  • KOLKATTA METRO PROJECT (EAST WEST METRO PROJECT \CONTRACT UG1)

    Client Name: Kolkatta Metro Rail Corporation Ltd

    This is Indias first underwater metro tunnel project and approximately 520m of the tunnel will go 20m below Hooghly river

    bed. The Kolkata Metro currently operates using one line from Garia Bazar in the south to Dum Dum in the north

    (Line 1). Two new lines are proposed to complement the existing Line 1. Line 3 will run from Thakurpukur in the south to

    Dakshineshwar in the north and is in the planning stage. The East-West Metro (Line 2) will run from Howrah Maidan in

    the west to Bidhannagar in the east. Line 2 will connect with Line 1 at Central Station and will connect with the proposed Line 3

    at Sealdah Station

    JV with Transtonnelstory Ltd of Russia

    EPC contract (design and construction)

    Cost of Project 938 Crore

    Underground section from Howrah Maidan Station to the western end of Central Station

    The Contract UG1 comprises approximately 3.7km of railway tunnels and 3 stations with the following major elements:

    Howrah Maiden Station TBM tunnel between Howrah Maiden Station and Howrah Station

    (East bound and west bound) Howrah Station TBM tunnel between Howrah Station and Mahakaran Station

    (east bound and west bound) under passing the Hooghly River Vent shaft and connecting adits at midway between Howrah and Mahakaran Station Mahakaran Station TBM tunnel between Mahakaran Station and Central Station (by others) This is a very challenging landmark Tunnelling Project of AFCONS in the history of 50years using TBM which passing under water for a few portions (approx. 520m), the water table is at higher level along its entire alignment and heavily congested city where we will be constructing stations.

    The TBM tunnels will be constructed between proposed cut and cover stations where no additional temporary shafts are required. The station will be constructed using 30m deep diaphragm wall which will act as the side walls and flat slabs at floor, concourse and roof levels. Top down method is adopted for the construction of stations except at Howrah maidan cross over portion, where it is bottom up technique since it will act as the key portion for TBM operation. The TBM will be lowered at this area and the segment feeding and the muck removal will

    also carry out here. The tunneling will be done using tunnel boring machines (TBM

    6.25m outer dia). The tunnel lining is made of RCC precast segments. Twin tunnels of

    2.775m

    internal radius and shell thickness of 275mm will be constructed through the soft soil (clayee) strata throughout the alignment.

    The centre to centre distance and the depth below ground level varies along the alignment. The tunnel will cross the Hooghly

    River between Howrah station and Mahakaran station.

    The project director of this project is Mr. Branko Mischkulnig and the project manager is Mr. Bimal Kumar. The clients consultant

    is a consortium formed by the consultants MAUNSELL|AECOM-YEC-CES-EGISRAIL-LHPA and the contractors consultant is W.S.

    ATKINS AND PARTNERS OVERSEAS.

    (Compiled by- Aravind Ashok)