Revision 1 to Calculation ANO-34Q-326, 'Pressurizer Level ...
ISSU W PACIFIC ELECTRIC SCL-11-11 REVISION POWER ... · 9 DIABLO CANYON POWER PLANT TITLE:...
Transcript of ISSU W PACIFIC ELECTRIC SCL-11-11 REVISION POWER ... · 9 DIABLO CANYON POWER PLANT TITLE:...
8
*~~ ISSU W
PACIFIC GAS AND ELECTRIC COMPANY
DEPARTMENT OF NUCLEAR POWER GENERATION
DIABLO CANYON POWER PLANT
INSTRUMENT SCALING CALCULATIONTITLE: PRESSURIZER LIQUID SAMPLE ISOLATION
VALVE 9355A INSIDE CONTAINMENT
0
NUMBER SC"L-11-11
REVISION 0
PAGE 1 OF 4
UNIT
PREPARED BY DOZIER VICKERS
REVIEWED BY
APPROVED BY
DATE 25 SEP 1990
DATE
DATE
1.0
** l}UALITYRELATED *+
1.1 Provide formal scaling calculation for existing plantinstrumentation.
1.2 Affected Test:. 11-11
1.2.1 Affected Loop: 11-11
1.2.2
2.0 DISCUSSION
Affected Instruments: Valve 9355A, POS-303, POS"1044,SV-370, AIR-I-1-670A, and
ERFDS MUX 01/22/02
2.1 The devices included in Loop Test 11-11 collectively function toprovide a method of obtaining a liquid sample from the pressurizer.Valve 9355A will close on a Containment Isolation Phase "A" signal.
2.2 Calibration is achieved by bench setting the valve and setting theposition switches to specified position.
2.3 POS-303, POS-1044, and SV-370 are environmentally qualified.
2.4 Valve 9355A is time tested in the closed direction per STP V-3S1.
3.0 REFERENCES
3.1 102032-33, Instrument Schematic
3.2 663219-63, Westinghouse Valve Specification Sheet Control ValvesSystem SS, Sheet 1 of 2
3.3 6632)9-63, Attachment 1 and 2, (Accepting reduced strokemeasurement)
~sis~aoe~o esosmPDR ADQCK 05000275P PDR
0
9
DIABLO CANYON POWER PLANT
TITLE: PRESSURIZER LIQUID SAMPLE ISOLATIONVALVE 9355A INSIDE CONTAINMENT
NUMBERREVISIONPAGE
e
UNIT
SC"L"11-1102 OF 4
3.4 663219-539, Hasoneilan Valve Instruction Manual
3.5 RLOC 1951/4579-4581, Correspondence with Hasoneilan to correct portdiameter
3.6 RLOC 2082/1155, Worthington Controls Spec Sheet
3.7 BLOC 4250/2501, Previous Calibration ll/07/89
3.8 DCH H-46, Piping Pressure, Temperature and Operating Modes
3.9 Hasoneilan Valve Manual, Specification Data CR 3000E, Rev B 12/83
4.0 ~EF4.1 Per Technical Specification 3/4 3.6, Table 3.6-1, Valve 9355A
requires an isolation Closing Time of ~ 10 seconds.
4.2 Valve 9355A requirements:
4.2.1 Valve fully opened ~ air supply
4.2.2 Valve fully closed against maximum dp of 2504 PSI
~
~ ~
5.0 GIVEN
5.1 Current plant settings indicate that valve will close againstmaximum dp of 2504 PSIG.
5".2 Device Information
5.2.1
5.2.2
5.2.3
5.2.4
5.2.5
Valve 9355A, ATO/FC, bench set 9-15 PSIG, stroke 7/16"(Ref 3.3 and 3.6).
POS-303, set at 10 +0, -5% of travel from the full closedposition per standard practice for valves with closing timerequirements.
POS-1044, set at 90 a 5~ of travel from the full closedposition per standard practice.
Air-I-1-670A setting is 30 PSIG (Ref 3.1). Standardpractice is utilized (+2, -0 PSIG).
ERFDS HUX 01/22/02 (TP2) measurement of > 6 VDC correspondsto a Logic 1 and a measurement of < 6 corresponds to a Logicof 0 per standard practice.
DIABLO CANYON POWER PLANT
TITLE: PRESSURIZER LIQUID SAMPLE ISOLATIONVALVE 9355A INSIDE CONTAINMENT
NUMBER SC-L"1 l-l1REVISION 0PAGE 3 OF 4
UNIT 1
6.0 CALCULATIONS
6.1 Valve 9355A Calibration Summary
6. 1. I Port Diameter: 1/4" (Ref 3.3 and 3.5)
6.1.2 Actuator Area: 45 in2 (Ref 3.2)
6.1.3 Full Stroke: 7/16" (Ref 3.3)
6.1.4
6.1.5
6.1.6
6.1.7
Based on full stroke of 7/16", POS-303 is set at 10 +0, -5'.of travel from the full closed position. This is equivalentto 1/16 +0, -1/32".
Based on full stroke of 7/16", POS-1044 is set at 90 ~ 5~ oftravel from the full closed position. This is equivalent to3/8 k 1/32".
Maximum valve dp: 2504 PSI (Upset, Emergency Node)(Ref 3.8).
Specific Start to Open Pressure: 9 PSIG (Ref 3.6)
6.1.8 Maximum Case Pressure: 80 PSIG (Ref 3.9)
6.1.9 Process Stem Force (PSF)
PSF = max dp ~ port area
PSF = 2504 PSI t,(0.25/2)2 nj
PSF = 122.85 lbs
6.1.10 Process Equivalent Loading Air '(PELA)
PELA = PSF + actuator area
PELA = 122.85 + 45
PELA = 2. 73 PS I
DIABLO CANYON POWER PLANT
TITLE: PRESSURIZER LIQUID SAMPLE ISOLATIONVALVE 9355A INSIDE CONTAINMENT
NUMBER SC-L-11"llREVISION 0PAGE 4 OF 4
UNIT 1
6.1.11 Total Equivalent Loading Air (TELA)
TELA = PELA + seati ng cri teri a
TELA = 2.73 + 3 PSIG (Hard Seat)
TELA = 5.73 = 6.0 PSIG
VALVE 9355A BENCH SET SUMMARY
VALVEPOSITION
STOFO
STCFC
PSIG
91515
9
LIMITS
N/A~ AIR SUPPLY
N/A '
6 PSIG
AIR SUPPLYPSIG
30 +2, -0
7.0 ~hE IEC
For valve and regulator calibration a 0.5~ test gauge of appropriate rangemay be used. Therefore, a 0-60 a 0.3 PSIG test gauge is appropriate.
8.0 CHANNEL ACCURACY
N/A
9. 0 CONCLUSION
A valve full closed functional limit of ~ 6.0 PSIG will ensure therequirement in Section 4.2.2 is met. Setting POS-303 at ~ 1/16" fromvalve full closed will ensure consistent results for the valve timingtest. This will satisfy the requirement specified in Section 4.1. Thevalve is verified to fully open s air supply. 'This satisfies therequirement of Section 4.2.1.
Current plant scaling was corrected. The previous seating criteria(1 PSIG) was based on a soft seat, however, seating criteria was correctedto 3 PSIG due to Valve 9355 having a stellite seat (Ref 3.6). This willincrease the seating force of the valve in a conservative direction.
10.0 ATTACHMENTS
None
MMWO HBR/ACT:PRZ/CTD/WMZ
ERF ORG
RZHT DATEPAGE HO.
M0009810 014 XM1~PMMMM6
01MAY980001
DIABLO CANYON POWER PLANTMINOR MAZHTENAHCE WORK ORDER
0* 4***** **4*0* ****4t** 0* **
**
** **+*** +***** **4* **0* ** *0
W/0 DESC TEST VALVE POR GL 96-06.
A/R NUMBER:A/R DESCA/R TEXT
A0414348TRACK ACTIONS FOR GL 96-06 E UXP OPER. CONTAINMTHIS AR IS IN1TIATED TO TRACK ACTIONS RELATED TO GL 96-06"ASSURANCE OF E UZPMENT OPERABILITY AHD CONTAINMENTINTEGRITY DURING DESIGN-BASIS ACCIDENT CONDITIONS " DATEDSEPTEMBER 30 1996.
THIS ISSUE EVENT DESCRIBED IN THIS AR HAS BEEN REVIEWEDBY THE DAILY AR REVIEW TEM DART AND DETERMINED NOT TO
BE A UALITY PROBLEM PER OM7.ID1. SET P FIELD PM N.
CLARIFICATIONIN E3 UNDER THE CCW SYSTEM HEADING IT IS STATED THATTHE CCW NITROGEN PRESSURIZATION SYSTEM DCPS M-49284AND M-50284 ARE "AT VARIOUS STAGE OF IMPLEMENTATION".THESE DCPS WERE IMPLEMENTED IN UNIT 1 AT POWER ANDiN UNIT 2 DURING 2R7 IN THE APRIL-MAY 1996 TIME FRAME.THE CHANGES ARE IMPLEMENTED AND THE PRESSURIZATIONSYSTEMS HAVE BEEN FULLY OPERATIONAL SINCE THOSE DATES.
CLARIFICATIONE8 DEALS WITH CONTAINMENT PENETRATIONS 82 AHD 83CHILLED WATER SUPPLY AND RETURN. THE EVALUATIONCONCLUDES THAT IT IS NOT CLEAR THAT THE PENETRATIONPXPXNG XS FULL OF WATER. IN OUR EVALUATION OF THECONTAINMENT PENETRATIONS WITH TRAPPED FLUID BETWEENCLOSED ISOLATION VALVES THE PIPING FOR PENETRATIONS82 AND 83 WAS ASSUMED TO BE FULL OF WATER AND TREATEDACCORDINGLY. SEE A0421202 FOR THE POA AND OE 97-01.
POTENTIAL CAVITATION AT THE ASW RETURN LINE VALVE FROMTHE CCW HEAT EXCHANGER WAS EVALUATED VIA CALCULATIONM988 REV. 1 ISSUED 1.28. 97. CAVITATZON WAS FOUND TONOT BE A PROBLEM. THE ANSWER IS DOCUMENTED IN AE 2 TOAR A0418240.
DCL-97-046 DATED 3 17 97 UPDATED THE NRC REGARDING PG&EACTXONS RELATIVE TO GL 96-06 SEE AE 15 FOR INFORMATION.
CTD WMI CHANGED TO U M3 FOR THIS AR TO APPEAR ON UNIT 2FORCED OUTAGE WORK LIST. THIS IS TO SUPPORT COMMITMENTSTATED XN EVAL 21
DZABLO CANYON POWER PLANTMXNOR MAINTENANCE WORK ORDER
MMWO NBR/ACT: M0009810 01PRZ/CTD/WMZ s 4 X M1PERP 'ORG: ~PSMNM6
RZNT DATE: 01MAY98AGE NO. : 0002
4*** 0****4 *****1l* *0 **
*l** **I0l* **If1**4 4t **
W/0 DESC : TEST VALVE FOR GL 96-06.
PER FORCED OUTAGE LIST REVIEW MEETING TODAY EVAL 21 ISNOT APPROVED FOR THE LIST BUT IS APPROVED FOR 2R8.
SEE ALSO NRC RE UEST FOR ADDITIONAL INFORMATION ASTRACKED BY A0458140. THE RE VEST FOR ADDITIONAL INFOWAS SENT TO PG&E BY THE NRC IN A TETTER DATED 3 16 98AND ASKS UESTIONS RELATED TO GL 96-06 AND PGRE'S ACTIONSFOR CONTAINMENT PENETRATIONS.
ON THE BASIS OF THE EXISTENCE OF A0458140 AND COMPLETIONOF ALL ACTIVITIES ASSOCIATED WITH THIS AR THIS AR ISTAKEN TO COMPLETE THIS DATE.
PEaaaaaaaaaaasssaaaaaaaaa NOTIFICATION / APPROVAL / REFERENCES aaaaaaaaaEEasaaaaaaaaassa
NOTIFY SFM? YES ( ) NO ( )
(RQRD IF WORKING INSTALLEDPLANT EQPT WITH NO CLR.)
CLEARANCE REQD/NBRCLEARANCE REQUESTORCNTL ROOM IMPACTRWP REQD/RWP NUMBER
N
SFM AUTHSFM COMMENTS:
USERXD: DATE:
FOREMAN APPROVAL TO COMMENCE WORK: W 0 HAS BEEN COMPLETED DATE : 22MAY97
SAP COST CENTER: 10 569 INTERNAL ORDER 2004667
aaaaaaaaasaaassaasaaaaaaaaaasass SPECIAL INSTRUCTIONS aaaaaaaaaaaaaaaaPEaaaaasPEaEEaaEPasa
1. ASSEMBLE THE VALVE AND ACTUATOR INCLUDING SETTING
PACKING TOR UE TO 5 FT-LB.
2. CONTACT T M TO DO LOOP TEST 11-11. SEE AE19
3. MOUNT THE VALVE IN A SUITABLE TEST FIXTURE SEE MIKE
DAVIDO FOR DETAILS AND PRESSURIZE WITH WATER TO THE
POINT OF LEAKAGE OR 6000 PSIG WHICHEVER COMES FIRST.
4. CONTACT MIKE DAVIDO TO WITNESS TEST.
aaaaaa- = aaaaaaaaaaEEa a aasa WORK ORDER COMPONENTS aEEaaaEEaaaEEaEEaaEPssaaEPa66assassaaaSELECT ITEMS FOR HISTORY UPDATE: FEG: 0 99 XNA
DIABLO CANYON POWER PLANTMINOR MAINTENANCE WORK ORDER
MMWO NBR/ACT: M0009810 01PRI/CTD/WMZ: 4 X M1
RRP ORG: ~PGMMM6
I RINT DATE ! 01MAY98PAGE NO. : 0003
**** *4**** *****i** ** **
*4k* %**%** ******** ** **
****
W/0 DESC : TEST VALVE POR QL 96-06.
aaaaaaaaRaaaaaaaaaaaa =-= aaaaaa COMPLETZON INFORMATION a aaaaaaaaaaaaaaaaaaaaa aaaaa-
A/R TAG LOC:
DOCS TO BE SENT TO RMS'P: YES ( ) NO ( X )
TOTAL MHRS: 20
aaaaaaaaaaaaaaaaaaaaaaaaaRsaaaaaaaa COMPLETZON REMARKS aaaaaaaaaaaaaaaaRRRRaaacRaaa aaaaaa
ASSIST ENG M. DAVZDO IS SETTING AND TESTING THE VLV. 22MAY97
PG AND E ***ACTION REQUESTA/R TYPE : AT NRCREQUEST ORG : NRAMREQUEST DATE : 020CT96REQUESTED BY : NICHOLSON ADATE REQUIRED: 30JUN98THE CONTACT FOR THIS A/R IS
A/R NUMBERA/R STATUSSTATUS DATE:LAST UPDATE:
'RINT DATE
PAGE: 32A0414348ASS GND26REB9726MAR9827MAR98
AT
EVALUATION NBREVALUATING ORGEVAL ASIGND TOEVAL REQUEST ORG:EVAL REQUESTOREVAL RETURNED BY:NRC COMMIT CODEPREMIS
18PGMWMP6PGMAPULLEY L.B.POULSEN PA
EVAL DUE DATE: 19APR97DATE ASSIGNED: 14MAR97
EVAL STATUS
OUTAGE CODEPOA STATUS
EVAL DESC: PERFORM TEST ON SPARE GLOBE VALVEAS PART OF THE EVALUATION FOR GENERIC LETTER
FOR GL 96-0696-06 A LBP1 14MAR97
TEST OF THE SPARE VALVE SIMILAR TO THAT USED FOR SAMPLING LBPlVALVES 9355A B IS RE UIRED. THIS TEST IF SUCCESSFUL LBP1WILL PRECLUDE THE NEED FOR PHYSICAL MODIFICATIONS IN 2R8 LBP1
14MAR9714MAR9714MAR97
1R9.THE TEST WILL PRESSURIZE THE VALVE IN THE NORMAL FLOW
LBP1LBP1
14MAR9714MAR97
DIRECTION AND NOTE WHAT PRESSURE THAT THE VALVE LEAKS A LBP1NOTICIBLE AMOUNT. THE TEST VALVE IS PRESENTLY NOT FULLY LBP1ASEMBLED AS DELIVERED TO THE U2 COLD SHOP THE VALVE IS LBPlSEPARATE FROM THE ACTUATOR VALVE S C 94-2589 ACTUATOR LBP1
C 75-1838 LBP1EASE PREPARE A WORK ORDER TO: LBP1
ASSEMBLE THE VALVE AND ACTUATOR INCLUDING SETTING LBP1PACKING TOR UE TO 5 FT-LB. . LBP1
14MAR9714MAR9714MAR9714MAR9714MAR9714MAR9714MAR9714MAR97
2. SETUP THE VALVE ASSEMBLY TO LOOP TEST 11-11 WITHSPECIAL CONSIDERATION TO HAVING THE VALVE FULL CLOSED
LBP1LBP1
14MAR9714MAR97
PRESSURE AS CLOSE TO 6.8 PSI AS POSSIBLE THIS WILL MOST LBP1 14MAR97CLOSELY MATCH THE EXISTING PLANT VALVE SETUP LBP1 14MAR973. MOUNT THE VALVE IN A SUITABLE TEST FIXTURE SEE MIKE LBPlDAVIDO FOR DETAILS AND PRESSURIZE WITH WATER TO THE LBP1POINT OF LEAKAGE OR 6000 PSIG WHICHEVER COMES FIRST. LBP1
14MAR9714MAR9714MAR97
4. CONTACT MIKE DAVIDO TO WITNESS TEST. LBP1ALN1
14MAR9722MAR97
NOTE: PER DCL-97-046 DATED 3 17 97 THIS ACTION IS A ALN1 22MAR97COMMITMENT TO THE NRC.SEE WO M0009810.
ALN1PAP1
22MAR9726MAR97
PG AND E **+ ACTION REQUEST ***A/R TYPE : AT NRCREQUEST ORG : NRAMREQUEST DATE : 02OCT96REQUESTED BY : NICHOLSON ADATE REQUIRED: 30JUN98THE CONTACT FOR THIS A/R IS
A/R NUMBERA/R STATUS s
STATUS DATE:LAST UPDATE:PRINT DATE
PAGE: 40A0414348ASIGND26FEB9726MAR9827MAR98
AT
EVALUATION NBREVALUATING ORGEVAL ASIGND TOEVAL REQUEST ORG:EVAL REQUESTOREVAL RETURNED BY:NRC COMMIT CODEPREMIS
25PQMADAVIDO M.NCEIPULLEY L.B.DAVIDO M.P.
EVAL DUE DATE: 31MAY97DATE ASSIGNED: 16MAY97
EVAL STATUS : COMPLT
OUTAGE CODEPOA STATUS
EVAL DESC: WITNESS EVALUATE LEAKTHE VALVE SETUP CRITERIA OF EVAL
TEST OF EVAL 1818 IS MODIFIED SLIGHTLY: LBP1 16MAY97
THE MAIN RE UIREMENT IS THAT THE FULL CLOSED PRESSURE BE LBP1 16MAY97AT LEAST 6.8 PSI. THE PACKING TOR UE IS A DESIRED VALUE LBP1 16MAY97NOT RE UIRED. THE FULL CLOSED LOOP TEST PRESSURE WILL ASS LBP1 16MAY97URE THAT THE SIMILAR SEATING LOAD TO THE INSTALLED VALVES LBP1 16MAY97IS OBTAINED REGARDLESS OF PACKING TOR UE.
PLEASE EVALUATE THE VALVE LEAK TEST.LBP1 16MAY97LBPl 16MAY97
*THE TEST VALVE AND ACTUATOR WERE ASSEMBLED AND AN ATTEMP MPD1 16MAY97T WAS MADE TO ACHIEVE THE VALUES DEFINED IN LOOP TEST MPD1 16MAY97SC-L-11-11 INCLUDING THE PACKING TOR UE OF 5 FTLBS. THIS MPD1 16MAY97WAS NOT ABLE TO BE DONE IN THAT THE SEATINQ FORCE WAS 0. MPD1 16MAY97
IS WAS BECAUSE THE PACKING FRICTION TOOK ALL THE SPRING MPD1 16MAY97RCE TO OVERCOME. THE PACKING WAS RELAXED TO 0 AND THE MPDl 16MAY97
ULL CLOSED VALUE WAS 6.8 TO 7.0 PSIG. THE VALVE WAS THEN MPD1 16MAY97SUBJECTED TO INCREASING HYDROSTATIC PRESSURE. THE VALVE MPD1 16MAY97WAS FILLED WITH WATER AND REMAINED LEAK TIGHT UNTIL MPD1 16MAY97ABOUT 5000 PSI AT THAT PRESSURE THE VALVE BEGAN TO LEAK MPD1 16MAY97ABOUT A DROP IN EVERY 4 SECONDS PRESSURE WAS INCREASED MPD1 16MAY97TO 5500 PSI AND THE LEAKAGE MEASURED OVER A 6 MINUTE TIME MPD1 16MAY97
THE LEAKEGE IN 6 MINUTES WAS 57.5 CC. BY EXTRAPOLATION MPD1 16MAY97THE RATE IS 575 CC HR. AT 5500PSIG. THIS WORK WAS DONE MPD1 16MAY97USING CALIBRATED GAUGES AND IAW WO M0009810
THIS EVAL IS COMPLETE.MPD1 16MAY97LBP1 04JUN97
Attachment 6PG&E Letter DCL-98-078
VALVEDRAWINGS
DC696214-12, REVISION 3DC663219-78, REVISION 27DC663219-287, REVISION 5DC663219-311, REVISION 8DC663219-569, REVISION 1
I
C.IWlttDOWS'iTEMPi0000AF7AiEDOOXBI4.TIF
51 V P OR ARI
L FLING HYDRccK)os sttt »4ilasvlatKQ d5Z. DESIGN 0 OPERATIONAL CENSENTIONS
PRIMARY PRESSURE RATINGPRESSURE BOUNDARY,OESICNNORMAL OPERAI'IGNAt. DESIGN
ASS ISOZCsfsPSIG AT »44 FFv'45K»AI 11 fQI,IOGGs5aa»AT220 FQ
».fas s ' Ihv tsl4. HfDROST*TIC CONDITIONS
SHKLL LEAKAGE ZKZO At 4'tS PSIG AT TO'F»ss I»as ss~t»»a v»s r v assr»s
'S SOLENOID OPERATORcs a vass» CLASS Hs sar* s s asVOLTAG'E IZO< 10 /oVA Cllllsss»» s T a s S Isa-»ra»v I.s I Isa» as ss *a a s Fsrls cv»sssv ass va
C.FD)La)Rc. pobltx)ra ract5RD
5 CN) Vra CREANANGE ctD 0rcn Rtasovsa oo ttoussssaFOR ACCESS TO VAossaC
L. E
OSIER IS RE5IONSIBLK POR SEALINGTHE CONDINT CONNECTION ANOPREVENTING TNE'ENTRANCE OFMOISTURE TNRU TNE CONCUls TONAVITAIN THE VALIDITYOF YHEIEEK 525 OVALIFICATION.
IO
0
I
f4
-COTIOINT CONNECTIONSV4 laP Z
WINK MARNER
263I 5.00 SCI VAX
12
.'DLEADWIRKS, 54'ONG KIN IS AWG ITEFZKt.NfSULATED»IINCOATED COPPLR STRANDS COO VOLT .I)0»CI PROVIDED FOR BENCH TK5T 011LI. NOT TO SrUSED FOR FINAL INSTARLATION
A RELKPs5%.0 CGR PZC,VI)CtION4 sa 4 ~ oca\Ilo »sos a»acr» ao givs sass
CEID 8 vo$ 4$ ' c» I'l fcv los, sav oso foAc soot vo» a s ~ t 4 ~ ssr 4 \ . 4» \afro
Hfg c sfna so»soar'Star»vs',asÃc sao. »»Sosltrolrsrlsl~ stafasr wo»lvoafoo sr'sass»o,wossrsssc svroA4aM rs»5~4»a as
I VACCOTR KHfs CCZEIZBE Ps'I AT 344'fSlatVKAR BUILT 19Pg 14 IO»1700OY
814.54 CLASS ISO
IR75 P51 rz 1054K 'LC.3/I5 7191K
V.ALCOR
In/0 'X pe@pl
Q
s
Iyg@8pe
~gISI 9,geo ~ ~ Ca<p,yztuf'
I.WEIGHT'553 S»A5. INSTALLATION HEA'f TRA)SSFER OVE TO IN LINE WELDING SHALL
BE MINIMIZEDSVCIR THAT MAX. BODY TEMPERATUREWITIGN I OF WELD SHAI.L NOT EXCEED 400»F.
9. RADIATION KNVIRONVKNTGAMMARADIATION IllTEGRATED DOSAGE OFs.s» 107 RAGS
»4 CODE COME'LIANCKANNIE 'Dtsat. Qf 1977 s)fCLa)OI»st» VsSRM'Z 19)S r»CXara'JA CLAS52 PKSICsto
QThG ttt)1413FRSfCV-ZSS (2 KAC)4)FCV- Z.sts (ZKPCR0sFKV Z 37 g, E PKRZI
Z.38 (Z KPsCR»)
CCV-2,59 (ZKPADIIPCV-Z40 (Z,KA.
FCV 69tt »Z KACHr 4hCCV 69Y !tEACH'IGCV. 6 96 PEACH:1FCV T»49 »ZKACHIFCV 700 (ZKACNfa
SWITCHINS VCLTAGE 125 VDC ORTZSVACna. POSffN)N SIINCATION MAGNETICREED SWITCH SWITCHDIG CLWRENT &ANDS MAX.
SWITCHNG CAPABIUTY 60 WATTS MAX.
NZ. CVSTOMKR OOCUIAKNTSlEECCFIC GAST KLKC721C ~'f
DIAT)LO Ctrsfora Urolt I$ 'xPKXFIC, GA»54 KLBCYZsC CCA D.O v4IK 47K4 ra 4~)HsSAaCOIZ 5/t) EI7078c F 17179
14.9i0 -.AK 7
SEAL WELD
3
LIC=4 '/.39OTF)
~SZSC04
I3
IS
(6I7
iaI9
SEE DETAIL A
2I
Z.SQR.OK
P4 410 2.ZS
~10nt Cat a tun)st Ct
IttRGTED RRI
ttt~sBCIR)KDscttvrc tctovrttt
RI5frtrr ORTE»sfVrf
31
20
ZC
Hfa5IEDLA',lK INFQZsvaztt)04
Ri.DUCKZCcv)IUT
»CZKVR ISEX HD5cnaw cAP.BUI cia NoRC YAIVKR
NKLT ONLDISCCUDSPACESMAGNETPLUG0 RINGLOCXPINcoupLTNGSPACESSCREW, DRIVENANKPLATE
A)rrl%. 5A 479 tfts 31400 SERIES . STL-
»CO SERIES t. 1L.»DOSKRIES SY 'ML
A5146 SA 419 TIPG 31 4PIC
300 SERIES St. STL.ASsot SA 4ID TYPE )16ASTIR 4560 IIPE 316ASTV ASCO tIPE 316RKVC0 I C
AStlt 4500 TTPK 31C
EPR305 5T. Stt-AS'fK A)40 I'IPK SICASTM AZTG TYPE SIC
300 SERIES 5t. Stl-502 CR)04 ST. SII-
O
ID
s s rs
POClfIOVINO1CATION
lgn
POIIER104UT
tttvwaLSO»AD a r v v o ro rr
TERMINALBOARD
TRICK AaREED Crit arts
ITORssO™ DESCRIPTION
~ 0 51'I t isa
I) Sisnl NO 5TCPI ~20
5010ca plN5PR I Iot
I SsO I
OIICINaL tlAT tN THE FIELD At.TERNATE PART RTPLACS)&CNATKRIRL HATERIAL = PARI NNBER
sate»st I 1 0 5s)a) 0 1sttaalaor V)2404 10 I
~ 20 )TAI»%655 51tta Ss)4) 4 1
11 it»Its»»5 541) I52404 »00420 slats465$ 5'I x 51)$ ) 0 stoep Iiocossta I 150 Si)4) 0 lost
I52415%)ll 2 LCiaCI V 1 s I1 rssf
Q.ECTIGIGAL SCHEMATIC
YNKfxosta p0$rt fcna
NUCLEA8 HARD~'Ilk-.,=
ItotocALOATA40caosas scots» sa nc tootcrlla raacoc tsscsct»ac, coot »sos $»aaa»ol DS4 tat»ava lotD. Rata sf»it0 Do Dccailt0 ls sscXSa os tMIrot oasasr Attics 40 Doocw»t»l~cssr Isst oostl ns tt»soarfssor lcforaro oltlnos0Colt Catt tr rirs SSSEOGOCI OSPASC 440VSDWSra»cosa acts nc slt» ic t»occ$ $ 4$»rcsoco so&Ionc R»cs 4tAiosaoar At»a»4$ 6 IO DsaN s Issscal~I tO»»sassct a nc»0»E; ~0 DNIsstassls14t, Dora»CA Tsoa Aso Doca75ia»K ail ss Dr Ds»AL Ds
» NfofOCI ID DC taSCODD a» rsnoa ntt aCCS»soDs»al lc ssAoatD cr Arrl attooouclsss scstsw ss$1444 cr N t»AI
C~T)IIVI)OCR.rfst atlta5 $ 1,CS
~s ssv»v vs ~ ~~ rovv» v vr« ~~sw Kvvo vvvs»sr 5 I iCAT2 7-8-80
P-/~I v. Tlslfs5~vs
~ i ': RIir
VALCOII ENGINEERING CORPORRTIONXENCWQRfH. NEW IERSEY
3/87VBE<06SZNIatt 150 Liss
VALVE, SOLENOID, POSITIONINDICATION, NUCLEAR SERVICEIL.C. MODEL V526-5295-36
ooa sass» less lca t»sr ca
D 96482 10317COO7~Ass I sspi
vv 15. RLTERMft ttttt)KRT MIIIRLIS Rtgattt5 ICC NIGH TDPERAt~ LIGIIDRtttICATICN).
GEE Rtt J fall EOC IACINEXTXTtRCT DESICRTIOI RCflztfttt TRLIIR SCTRUIS NEV
IRLYES VITN Rattnaatt MTKRIRL AS STANDARD 16 ttttON)t TG NIORCCEN QRRITIEDKNf' tRCCLENR. EXIRTINC NVERIAL CVsfIQNNTIOIINES ilttO IR AIR Rttt)CAIICNS 1$ Rttttf
AttE. NOIK IMT TIK 'IOCCR 1$ 10 ttTTRKR )INTRTINC TNE ORtCINRL tRRT CIREICNRTIGt
EOR NEV ~ RCNflATES NO 1QRACEXERT Cfts» ARE ICttLIES VIEN ftt RETERMTT MTERIRL
IRsatSS trtCIRIED CnthrIIK 11 IURCRRSK DRIER. )tt 'fAItt 'A ICR RlltCIED ITEXS.
CEXL
~ I
~I
I I
3
DETAI< t)a
tROnt Ca) RND RmCrVIRRIDRR CCTNNCN»
NCDIOED
arrl)N) TCC
FEB 6-SlaocRRY)LRC
FEB 75
cgaÃNEXI IS RGIIZNRSC
PAGE 2
8 0. WIGGSNl NCISItsCD QCISSIR 51CSA
RII lRIIKXEO REV ~ HlCROFlLH 3
1916
16
14
SODYSPRINGGUIDEWASHER
PINSONNETPLVNGERSPIROL. PRN
ASVE Sa s52$ )atttt ROTC al
A5TM AZTC TYPE )sCASTM 4226 T'fPE 316
ASTV A)CO TYPE 51C
ASRAKSA 420 IYPK Sits430/VALCGR STD 5121
)tt Slit I)1312
10
SPRING
ster'OD
GPIRGL PIN
~ ' ~ wrac R)
4)OI VALCNLSTta Sl2 IASTM A)t» TYPE 316
)Ls NRI I)9 SCREW, CAP, SOC. HD
LOCXWASHER0 RINCSPACERLOCXWTRKVALV'E TAG
WELD CAUTION TAGVALVKASST
I SOLENOID ASSY
30C SERIESSPRKs SYL NXXRLPINEK
EPR300 SERIES ST. Stl502CR504 ST. 57L300 SERIES Sf. STL.3005KRIES ST STI.
arse M$4 Sar Ist 4
assr 4r »A'1$»s»ao
I»GIKS9 PKassa)2% eETA»tsHC WaTS
~ »IsosAa
ppKO IIO/n/3g TA/ME A /pn nKIrsIO,/3 /4 Is'ZO. PZR DC/ M&7353DCZ 6'Z-48353 FCF ts 5
EIT Doss
r»0 4, E REVISIONSLAST cERI'IFIEDYKHDOR s tssvE NAs RKvtstcN~'962l4 !2
DE»VCR IP 1 ICNNG. GREE BT
060000 sasntn 50 Rtl
'lTEIkoo 'IE,O - ~ I
~t)
Oa)
~2)
~ ~
:Hj'/fi
llr.
ii IIlII
Ii' I ~ I~t
cC
I1e i l
f
a f fi)
«~
rr':.iver
06000000050II8
Ie8II
e ~)eI."I
e %gee
I Aj'p)Cl )
I y
~ ~ I ~
LlmKHW ~
EHESn~5
i, ~
BRRRRRIIERtL~HR " EEZMKR '
- E".RE~RE&MRRHElmRRR%
E%i%iihRilRH&RERWWHBR&RBRZHI~M2%
~ ~
KRraCl
i '
~ ~ P ~
~ i ~
~'
~ ~
I ~
~ ~
~ZE3VBRIKRCH%%8 I ~ ~
I
~ 0
J1
CDCTIFtCO
I~Ncvsv e@& eoo+evl eNNet oeove No
Tte I Dost tloaxxsz or runs
N'Iaterlal ALTCRIIA'N. t4ATI'-ILIAL
yaccI
,c~ e c~ N ~
slscas~ssrsc t.saacLSsd1shJQLQP-Dta'v
ySVI h XW
Steel
~ ~
vt ~
reeve tvccte
adsttteaal S etftesttcecs1N rochtae sosttas eat .
face aadex hats oabeaaet floss@a,
ZN Oheet scestcs ea ecaeh4tace oads of cco14 egvalses ash Tcesattte
hofeoo w141al ho4r1ato y4rolscaoN
lasherS~atsashaaa
R setam"
N ~ fggj
SccttthI .O~
~N
J)%teal, Zinc ateSte 1 2I r t
RR
~ N
+ccA.KMTQ Ihf Ctots'I
~ r 1N
I~
L «l ll al N«NNNN«%4N
lNNNll~sets~
as'etto LKbeans t.statstsl.
~ NCSN RLMI
aLaSIK
lotos 411 at~ islets ass Q4e XriAtr soqaito4 i $5 rSZ
~ IIec~a404 splro patteiotas Vo14 ol)I~ shall Ivs per v 4', fltqoscqg s~ g eo ccOC„421 eeh )
'rettaate4 Valse lsotght Is 155 Lbse
ICOTbs:'tc TIIE EYISITHtg Irlk'All6 ll|4IW II4gHET9 ( 4ARlt4Ill c~~ IILITg
$ eTUP& I)A'F 0$ !LSPLACBP PllTH 4-35( CI=8 84cIJH&j&IA-I944IIEH HLIT& 4 4 4 53.6R is&0 5TLJP& .
2, THE FNGERP ATCcAND FINGER PLATE. GASKET $OEF OF THE REPLAKHEHF XS.SOHIIET 15SEHBLT) ARE, NOT SHoldH-REPL. FIHGEl'- PLATE HAT L -'STFl A 240, TYPE 9&&.ILCPL PINCER PLATE. 6ASLET MAT'l.lEPDM.
ksstfl 1 tCCcNLAL ~ glCCq0 5 tl.stNC ~ NC«ClCNCOC «WCN 1 NNC CA ~ l~ NN 00 01 ~ C
II IIIIITIrl42cc ssc pl& 2csecc
tv sass pc@ rep, sea . Raa. res'41C+No oen oc seevs ICN
sees asracees
est~r CCNCe SCN" cve«vee
MICROFILMestaesvlscece sv acv
tass ttasNsts vteetat sssst'+as stesscss —DC66 32 I9 2B7
5
I
4 LIII'h 4 % f
g pj't 4 ~ p'II
i
C:iWINGGWS>TEMPIOOOOBOGAIC0681211. TIP
)~lsc smoo~e.~~ 8 i~l pact tco
l5trZ
CP5CRCPTIOII
CAAIIO IOAAOW R
«AT I
CRE5CAC5CA85
cl ATT.
xB 4IZA5TR
owC Ic RCTIARIA5
0 CtzasCO
I3C4It 'YC.I I«4'Y6
Ie CR8CPIICZte CRCC8
ALTERIIATE MATERIAL
5485 4&634
I elOC3136344
AC3CIIIR IccCA
GASkLFLAT tR 4
es05 58MS4 CR DCRAII< CCILI-a
VseosltcOO'5TCI
SO SILCets aac-IOSY? Loeece
e ctoiz eaox.lzsrllrTYPE
5'lNfSlt4UE.IQUQI46 MOTQ
5El.M
ig 84Il I ISIZ>7
I I I I I
'540thIs 'I I a
I 124
LOCX! l MIL
R
T Owstll ICUTsc'HC.T
IlcOKATCCC CARAT'C
LItalT 5ICC IT
asT
ROLL I lac
8CCulc5
CIVICS
5 ICCC4
ACC5 5643 "15IZtlA5TIICSIt 5151514COII'L
Sceak CI A5Z53T
5-scOI4ISI54Z
AI ~ CISO 5 IM5-18tetS
ASTH A551
ASTIY AZTS
tT 4PaGR.TP 50+OOA OIISTHtC
T'IPC .IT
HAT ASAIC..CR. CPV<PE ITP4PII
A5ees eac%%da CR $80 COACC IIOO
A5«E ca 564 CRC50 COHO.900 I
ISAIESAsc4GRcko couo II00
~WELD0
RRcc
+IOc
~IIIRCCV Ot Ig ~Tkt VX~ AT
a IcARIIIU51TnctRRATURR~+o<FCXAII~ICpRT~~ Sa,t at,+ m~a AIR FRESSURR Dl TRL tÃktRRACCR5
'L STR A14) 4R 8 0! 54 5 G4 TPG>o(IIIIOG)a STUD MAT'L iTRRL ASN Al
a R VIRALAtcEIIRLXDVAL IR ACCORUT lcAT'L STRRL AIRTQ e I
CLCARAICCR FOR RECCO VAL OF 0FCRATOR~L ttcDCD SFARR FARTS ARE IckRRKD VITTR AR
IR ADlSTTQIC TO TR R ITtlCS lCARRtD I')A CtktRXklDIRCCOIQCCtrttCTL Sit- 4C t.t5.K ~
a RfOIRRRD AIR tRRRCURC NFUT FOR RETIT OFF OF RACK r . ~
IL RtQUIRZD AIR FRZScURF IRFUT TO RCCDI LkJT OF FLIRI
ll. ROIOICT eIATERLAa,- CRtS Retie. Rttl OaCF'Cttc+sam ICATRmaX. - STRLAATR
A'cclcJ:PleSN I
kULR
~WKC et Cgtse s
a. at.~~ ~ ~ +kostt Warcse acacia csssss~ Olcsesscs 4 IMsssta ygg~a.~
+%tea ~aeaaaPar a
QOscm~~~~ r ca ww~~oo
ss'c
WT '. Rte $4LSS.
I' Q~r~Or'oo~~ecoC~~~OC S ~ofhce
~cere ~,Q~Q~~Q~~Q~~
~sss m me co ~.0~Q~cr~»~ os
ttaVIS CQaa etc~ ~asress5 1 ~ cere serac tsc ssIM cttts 0.IL
Rectrceo FLlce Rc aelccc %leal
C ~
EL<VISlolk
~caacca cess scca ass ~
eoa Pcs e
~ c pro ears~sse COOS
SLAVHCNOXCOHPAIETCat copes.vMLQAec cvcscccc
~are Off 14OCOSAOSSOa
re~i Did-rOO Q ~aOl- >SOa.ea. u~ >TO.VitVC A~~Z.mba V
~ggttIR ease~~OASC~ spc
~cask~ DWILROc le SCb R
Q~rra~0~~~0 ~ crcacrca ~~cccrar~
crcao r~e'a~~sorea~
ac C. CCIII a tr Ieace J
IULX8
~stet ss salas ~ ~ g
ecssss
0sac~.~rect «~~Q~~~weer sraas~Q~rrrcr a ascrasrrcscerr
~ ar» Ac
I 00
~esocaslo
ÃCRSI CIALAL~ e crees c ~ c~c
cttS690 S.SI~
MICRCFILM~
tea~ eoacsc ~ssc scoe caco ~ ttescIC j~ c terai, ecstasy
UN7 GEE 7'oI0 ccccssuc cc,j I 7 3
IOSi CS HaIet O PER PCT 44
CSCICCII PCC Catt «'PKI'Cyyt gt54gttt$CCS ff4 Petri
HAM~a oe asrcatrcccrvecsccccccsaceccanmoc ECG145 2 l9 3ll 8
4-8~C COCC ~e C~
CI
Gi3
Pe
~ ~i » ~
:.»' i»'
» '»
»» '
I '»»
a
I ~ ~ 0
~ ~
SEEQREQiihRgg-~Qe A ~ ~
0
M ~~
~l