Integrated Water Project for the town of Sliven
1.Reconstruction of WWTP Sliven (FIDIC Yellow Book)
2.Construction/Reconstruction of Water Supply and Sewerage Network of Sliven (stage 1); LOT 1:Construction/Reconstruction of Sewerage
Network
ISPA Measure 2005 BG 16 P PE 001
![Page 2: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/2.jpg)
Works Contract 1Reconstruction of WWTP Sliven
(FIDIC Yellow Book)
• Commencement Date: March 24, 2009
• Taking Over Certificate: July 21, 2011
• DNP started on: July 21, 2011
• Performance Certificate: October 18, 2012
• Physical Execution: 100 %
• Financial Execution: 83 %
![Page 3: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/3.jpg)
WWTP Sliven
before reconstruction
![Page 4: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/4.jpg)
Reconstruction of WWTP Sliven
Inlet chamber
Entrance and control building
![Page 5: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/5.jpg)
Reconstruction of WWTP Sliven
Screening building
![Page 6: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/6.jpg)
Reconstruction of WWTP Sliven
Grid tank
Blowers
![Page 7: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/7.jpg)
Reconstruction of WWTP Sliven
![Page 8: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/8.jpg)
Reconstruction of WWTP Sliven
PS for primary sludge - reconstruction
Primary Settlement Tank
![Page 9: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/9.jpg)
Reconstruction of WWTP Sliven
Aeration Tank
![Page 10: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/10.jpg)
Distribution Chamber of SSTSecondary Settlement Tank
Reconstruction of WWTP Sliven
![Page 11: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/11.jpg)
Service Building at Heated Digesters
Reconstruction of WWTP Sliven
![Page 12: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/12.jpg)
Facilities for Sludge treatment and utilization of biogas
Reconstruction of WWTP Sliven
![Page 13: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/13.jpg)
Reconstruction of WWTP Sliven
SCADA MCC
![Page 14: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/14.jpg)
Gasholder Torch
Reconstruction of WWTP Sliven
![Page 15: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/15.jpg)
Reconstruction of WWTP Sliven
Commemorative table
![Page 16: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/16.jpg)
Supervision Contracts
Contract № 1
• Commencement Date: March 23, 2009
• Completion Date: April 23, 2012
• Financial Execution: 100 %
Contract № 2 – funded by national budget
• Completion Date: December, 2012
Reconstruction of WWTP Sliven
![Page 17: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/17.jpg)
Construction/Reconstruction of Sewerage Network – LOT1
• The final assessment for the result achieved in LOT 1 is about 23 % (excluding recovering of the roads).
• Sliven Municipality has submitted in MoEW documentation to apply for financing under the OP Environment. The new project includes the activities of LOT1 that were not completed by ISPA.
![Page 18: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/18.jpg)
Compliance with Article 8of the Financing Memorandum
All conditions under Article 8 of the FM related to payments are considered fulfilled.
![Page 19: ISPA Measure 200 5 BG 16 P PE 00 1](https://reader033.fdocuments.us/reader033/viewer/2022051623/56815acd550346895dc8a08a/html5/thumbnails/19.jpg)
ISPA Measure 2005 BG 16 P PE 001
Integrated Water Project for the town of
Sliven
• Final Report was presented to the European Commission