ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs...

27
Dec 24, 2017 DOVETAIL GROUP LLC DESIGN•BUILD•RENOVATE•RESTORE 990 W STRASBURG RD WEST CHESTER PA 19382 PH: 484.639.2776 [email protected] PROJECT: TITLE: ISOMETRIC VIEW OF PROJECT ADDITION PRINTED: DWG #: CS SCALE: AS NOTED DRAWN BY: JBS PROJECT #:

Transcript of ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs...

Page 1: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

ISO

ME

TR

IC V

IEW

OF

PR

OJE

CT

AD

DIT

ION

PRIN

TED

:

DW

G #

: CS

SC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

Page 2: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

JOB

RE

LA

TE

D I

NF

OR

MA

TIO

N

PRIN

TED

:

DW

G #

: 00

SC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

DWG # TITLECS COVER SHEET1A PLAN VIEW & EAST ELEVATION

1B NORTH & SOUTH ELEVATIONS

1C VERT SECT @ BATH & BEDROOM1D VERT SECT @ BATH & LAUNDRY2A HELICAL PILES - PLAN2B HELICAL PILES - ORTHO3A SUPPORT BEAMS - ORTHO3B SUPPORT BEAMS - DETAILS4A I-JOISTS LAYOUT - ORTHO4B UNDERSIDE DECKING - ORTHO4C DECK ASSEMBLY - DETAILS5A 1ST FLR WALL FRAMING - PLAN5B 1ST FLR FRAMING - RH ORTHO5C 1ST FLR FRAMING - LH ORTHO5D 1ST FLR FRAMING - DETAILS5E LAUNDRY WALL FRAMING - PLAN5F LAUNDRY WALL FRAMING - ORTHO5G ROOF FRAMING - ORTHO5H ROOF FRAMING DETAILS5I ROOF FRAMING DETAILS5J ROOF FRAMING DETAILS6A 1ST FLR ELECTRICAL - PLAN6B KITCHEN ELECTRICAL - PLAN6C LAUNDRY ELECTRICAL - PLAN

S 1.0 HELICAL PILES - ENGINEERING SPECS

Page 3: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

RO

OF

PL

AN

& W

EST

EL

EV

AT

ION

O

F A

DD

ITIO

NPR

INTE

D:

DW

G #

: 1ASC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

A22

A21

1PLAN VIEW OF ROOFSScale: 3/16" = 1'-0"

2WEST ELEVATIONScale: 1/4" = 1'-0"

A12

N

12

5

1C1

9'-0

"

22'-0"

Page 4: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

NO

RT

H &

SO

UT

H E

LE

VA

TIO

NS

OF

AD

DIT

ION

PRIN

TED

:

DW

G #

: 1BSC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

0.0

1A2

2SOUTH ELEVATIONScale: 1/4" = 1'-0"

123

125

SLOPE OF METAL ROOFWILL BE DICTATED BY PROPERINTERSECTION WITH EXISTING

HOUSE ROOF

1NORTH ELEVATIONScale: 1/4" = 1'-0"

1D1

Page 5: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

EL

EV

AT

ION

& O

RT

HO

SE

CT

ION

SA

T B

AT

H &

BE

DR

OO

M &

LA

UN

DR

YPR

INTE

D:

DW

G #

: 1CSC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

2'-9

1/4

"

2ORTHO SEC @ BATH @ BEDScale: NTS

1VERT SECT @ BATH @ BEDScale: NTS

34"

AFF4'

-1"

FRA

ME

2'-4

1/2

"FR

AM

E

STEP DOWN FROMFLOOR TO STAIR

LANDING

Page 6: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

EL

EV

AT

ION

& O

RT

HO

SE

CT

ION

SA

T B

AT

H &

LA

UN

DR

YPR

INTE

D:

DW

G #

: 1DSC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

2'-9

1/4

"

9'-3

1/2

" V

IFFL

USH

OU

T W

ITH

EX

ISTI

NG

FLR

& C

EIL

ING

8'-1

-1/4

" R

OU

GH

8'-1

1/4

"

3'-0

"A

FF

IN-WALL BLK'G

2ORTHO SEC @ BATH @ BEDScale: NTS

1VERT SECT @ BATH & LAUNDRYScale: 1/4" = 1'-0"

Page 7: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

PL

AN

VIE

W O

F H

EL

ICA

L P

ILE

S

PRIN

TED

:

DW

G #

: 2ASC

ALE

: 3/

8" =

1'-0

"

DRAW

N B

Y: J

BS

PRO

JECT

#:

2'-4

3/4

"

8'-3

3/1

6"

19'-9

"

12-5/16"

7 11/16"

11'-9 5/16"

22'-4 5/16"

8'-7 3/16"

15'-7 1/4"

22'-8 13/16"

11'-8 5/16"7 11/16"

22'-8 13/16"

EXIS

TIN

G S

EWER

LIN

E

1'-8

1/2

"

NEW

SEC

TIO

N O

F SC

HED

40

PVC

PIP

ING

NEW 3" LINE FOR TOILET

NEW 1-1/2" LINE FOR SINKSAND WASHER

LAYOUT FOR HELICAL PILES

SEE ENGINEERING DRAWING S1.0 FOR STRUCTURAL

SPECIFICATIONS

- (20-1/2")

0 LEVEL

EXISTING FINISHED FLOOR

DROP LVL BEAM PIERS

MAIN LVL BEAM PIERS

MAIN LVL BEAM

- (11")

INSIDETOP OFBRACKET

INSIDETOP OFBRACKET

CR

OSS

LV

L B

EAM

MA

IN L

VL

BEA

M

MA

IN L

VL

BEA

M

FAC

E O

F H

OU

SE W

ALL

FACE OF HOUSE WALL

REF HGT

REF HGT

REF HGT

Page 8: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

OR

TH

O V

IEW

OF

HE

LIC

AL

PIL

ES

PRIN

TED

:

DW

G #

: 2BSC

ALE

: N

TS

DRAW

N B

Y: J

BS

PRO

JECT

#:

THIS IS AN ORTHOGRAPHIC VIEW OF THE HELICAL PILES WITH THE EARTH

REMOVEDSEE DWG 2A FOR LAYOUT DIMS

THE

DE

PTH

OF

EA

CH

PILE

ISD

ETE

RM

INE

DB

YTH

ESO

ILC

ON

DIT

ION

SA

ND

TH

ETO

RQ

UE

THA

TIS

AC

HIE

VE

DA

SIT

ISSC

RE

WE

DIN

TOTH

EG

RO

UN

DSE

EE

NG

INE

ER

ING

DW

GS1

.0FO

RA

DD

ITIO

NA

LD

ETA

ILS

Page 9: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

OR

TH

O V

IEW

OF

LV

L B

EA

MS

AT

TA

CH

ED

TO

HE

LIC

AL

PIL

ES

PRIN

TED

:

DW

G #

: 3ASC

ALE

: N

TS

DRAW

N B

Y: J

BS

PRO

JECT

#:

THIS IS AN ORTHOGRAPHIC VIEW OF THE MAIN SUPPORT BEAMSINSTALLED ON TOP OF THE

HELICAL PILES

3-1/2" x 9-1/2" x 1.8ELVL SUPPORT BEAMS

TYPICAL UON

DROP BEAM

CROSS BEAM

1-3/4" x 9-1/2" x 1.8E LVLWALL LEDGER

3B1

3B2

3B3

3B4

Page 10: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

DE

TA

ILS

OF

SU

PP

OR

T B

EA

MC

ON

NE

CT

ION

SPR

INTE

D:

DW

G #

: 3BSC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

2DETAIL AT CROSS BEAM CONNECTION

Scale: NOT TO SCALE1DETAIL AT JOIST HANGERS

Scale: NOT TO SCALE

3DETAIL AT LEDGER AROUND CHIMNEY

Scale: NOT TO SCALE4

DETAIL AT BEAM END CONNECTIONS

Scale: NOT TO SCALE

Label text(3) 5" FastenMasterTrussLOK Wood Screws

(2) 5" FastenMasterTrussLOK Wood Screws

Toe Screwed

HILTI HY70 EPOXYwith 1/2" x 9" galvanized

threaded rodwith washer and lock nut

6-3/4" embedment(2 ea) 24" OC Max

SIMPSONITS2.56x9.5

TOP MOUNT JOISTHANGERS TYP.

START JOIST LAYOUT

FROM THE OUTSIDE OF

THIS BEAM AND WORK

TO THE LEFT

(3) 5" FastenMasterTrussLOK Wood Screws

(3) 5" FastenMasterTrussLOK Wood Screws

(2) 5" FastenMasterTrussLOK Wood Screws

Toe Screwed

2-7/8" FastenMasterFlatLOK Wood Screws

at Steel HelicalPile Brackets TYP

1'-4" OC

TYPICAL

CROSS BEAM

CROSSBEA

M

DROP BEAM

TOP OF FINISHED FLR IN THE HOUSE

1 1/

2"

0'-0" A.F.F.EXISTING FLOOR

-11" A.F.F.BOTTOM OF BEAMS

-20-1/2" A.F.F.BOTTOM OF DROP BEAM

Page 11: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

OR

TH

O V

IEW

OF

I-J

OIS

TS

IN

ST

AL

LE

D

IN L

VL

BE

AM

SPR

INTE

D:

DW

G #

: 4A

SC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

2-1/2" X 9-1/2" x11' 2 1/2"I-JOISTS THIS SECTION

2-1/2"x 9-1/2" x 7' 11 3/4"I-JOISTS THIS SECTION

Page 12: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

OR

TH

O V

IEW

OF

UN

DE

RS

IDE

DE

CK

ING

PRIN

TED

:

DW

G #

: 4B

SC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

7/16" ZIP PANELS NAILEDTO UNDERSIDE OF BEAM &

I-JOISTS

ALL SEAMS AND PENETRATIONSTO BE SEALED WITH ZIP TAPE OR ZIP

LIQUID FLASH

LEAVE 12" GAP IN DECKINGAT THIS CROSS BEAM TO

ALLOW FOR THE INSTALLATIONOF DENSE PACK CELLULOSE

INSULATION IN THE JOIST BAYS ONCE FRAMING AND ROOF DECK ARE DRIED IN

FILL IN DECKING AND SEALONCE INSULATION HS BEEN INSTALLED

Page 13: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

DE

TA

ILS

OF

DE

CK

AS

SEM

BL

YPR

INTE

D:

DW

G #

: 4C

SC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

3/4" T&G - 50 YROSB DECKING

GLUED AND NAILED

INSTALL 2X4 BLK'GTO SUPPORT RECESSED

OSB DECKING TO ALLOWFOR WEDI FLUSH SHOWER PAN

INSTALL 2" PVC SHOWERDRAIN LINE CONNECTED TO

TOILET DRAIN

NOTE: PVC FITTINGS REQUIRED FOR PROPER INSTALLATION

MAY NOT BE AS SHOWN HERE

3'-11-3

/4"

OFF FACEOF LEDGER

DENSE PACK CELLULOSETO BE BLOWN INTO JOIST BAYS

AFTER COMPLETION OFSUB-FLR DECKING & FRAMING

INSTALLED AT 35 LBS/SQFTTO ACHIEVE R38

OSB SUB-FLR MATERIALSTO BE INSTALLED ON TOP OF 2X4'sAND FLUSH WITH TOP OF JOISTS

3'-0"

2'-3

/4"

1'-8

1/2

"

1'-6 1/2"

7'-5"

4'-0

"

DIMENSIONS OFF BRICK WALL

1SHOWER PAN BLOCKINGScale: NTS

2DECK ASSY INSULATIONScale: NTS

3OSB DECKINGScale: NTS

4PVC PIPING & SHWR PAN LAYOUTScale: NTS

EXTEND OSB INTODOOR OPENING

Page 14: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

1ST

FL

R F

RA

MIN

G P

LA

N

PRIN

TED

:

DW

G #

: 5ASC

ALE

: 3/

8" =

1'-0

"

DRAW

N B

Y: J

BS

PRO

JECT

#:

3 1/2"2'-2 1/8"

4'-11 1/2"

4'-1 3/4"

3'-2" RO

2'-4"3'-2" RO

3'-4 1/4"11

'-1/2

"

19'-1

1" O

A

22'-5 1/2" O.A.

1'-6 1/4"

3'-2" RO

8"

3'-2

" R

O

4'-1

1/2

"CHIMNEY

REMOVE EXISTING WINDOWAND IN-FILL WITH FRAMING

AND INSULATION11

'-1/2

"

5 1/

2"

5'-7 3/4" ROEGRESS

WINDOW

2'-1

0 1/

4"

2'-6

1/2

" R

OW

IND

OW

1'-8

"

EXTERIOR WALLS TO BEINSULATED WITH NETTED

AND BLOWN IN DENSE PACKCELLULOSE TO 3.5LBS/sqftCOMPLETED WALL = R22

4'-6

3/4

"

2'-6

1/2

" R

OW

IND

OW

7'-1

1 1/

2"

0 LEVEL

EXISTING FINISHED FLOOR

REF HGT

5 1/

2"

15'-10 9/16"

3 1/2"

5'-4 3/8"

3 1/2"8'-5 1/2"

Page 15: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

1ST

FL

R F

RA

MIN

G

OR

TH

O V

IEW

FR

OM

RIG

HT

SID

E

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

5BSC

ALE

: N

TS

PRO

JECT

#:

DW

G #

:

5-1/4" x 9-1/4" 2.0E LVL

4 1/4"

5'-8 3/4"R

O

WIN

DO

W

3'-5

1/8"

RO

WIN

DO

W

6'- 101/2 "

RO

DO

OR

5D 2

2 x 4

2 x 6

2 x 8

2 x 10

2 x 12

LVL BEAM

LUMBER COLOR KEY

5D1

9'-2

"W

ALL

HE

IGH

T

ONE TOP PLATETO ALLOW FOR LAUNDRY

ROOM WALLS ABOVE

Page 16: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

1ST

FL

R F

RA

MIN

G

OR

TH

O V

IEW

FR

OM

LE

FT

SID

EPR

INTE

D:

DW

G #

: 5CSC

ALE

: N

TS

DRAW

N B

Y: J

BS

PRO

JECT

#:

2 x 4

2 x 6

2 x 8

2 x 10

2 x 12

LVL BEAM

LUMBER COLOR KEY

5D3

4'-6

9/1

6" R

OW

IND

OW

IN-WALL BLK'GFOR SLIDING DOOR

HARDWARE

IN-WALL BLK'GFOR WALL MOUNTEDSINK ON BATH SIDE

34" AFF TO TOP

Page 17: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

1ST

FL

R F

RA

MIN

G

DE

TA

ILS

PRIN

TED

:

DW

G #

: 5DSC

ALE

: A

S N

OT

ED

DRAW

N B

Y: J

BS

PRO

JECT

#:

REMOVE EXISTING WINDOWLEAVE HEADER IN PLACECUT BRICK DOWN TO BEFLUSH WITH LAUNDRY SUB-FLOOR

2" RIGID FOAM INSULATIONATTACHED WITH 3" CAP

NAILS

2x12

1/2" PLYWOOD2X12

ASSEMBLE HEADER WITH (3) 16d COMMON NAILS

BOTH SIDES EVERY 8 OCPLUS CONSTR ADHESIVE

2TYPICAL EXTERIOR WALL HEADERScale: NTS

1LAUNDRY FLOOR & DOOR OPENINGScale: NTS

3STEEL HEADER @ OPENING TO KITCHENScale: NTS

EXISTING CEILING JOIST IN KITCHEN

3-1/2 x 3-1/2 x 3/8 THKSTL ANGLE INSERTED

ON EACH SIDE OF BRICKWALL

2X FRAMED JAMB ASSYFLUSH WITH BOTTOM OFEXISTING CEILING JOISTS

1/2" DRYWALL FLUSH WITHCEILING & WALL SURFACES IN KITCHEN

5" EMBEDMENT MINIMUMGROUT IN PLACE

NOTE: FOR INTERIOR LOADBEARING HEADERS...REPLACE

RIGID FOAM WITH ANADDITIONAL LAYER OF 1/2"

PLYWOOD AND 2X12

2x8 JOIST HANGERS

HILTI HY70 EPOXYwith 1/2" x 9" galvanized

threaded rodwith washer and lock nut

6-3/4" embedment(2 ea) 32" OC Max

3/4"

4PENT CROWN & EAVE DETAILScale: NTS

Page 18: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

2ND

FL

R L

AU

ND

RY

WA

LL

S F

RA

MIN

G

OR

TH

O V

IEW

FR

OM

RIG

HT

SID

E

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

5ESC

ALE

: 3/

8" =

1'-0

"

PRO

JECT

#:

DW

G #

:

8'-5

"

4'-11 7/16"2'-2 3/8" RO

WINDOW

2'-3 3/16"2'-6 1/2" RO

HVAC ACCESS

13'-6 1/2"

1-1/2" PVC DRAIN & VENTFOR SINK & WASHER

EXTERIOR WALLS TO BEINSULATED WITH NETTED

AND BLOWN IN DENSE PACKCELLULOSE TO 3.5LBS/sqftCOMPLETED WALL = R22

Page 19: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

2ND

FL

R L

AU

ND

RY

WA

LL

S F

RA

MIN

G

OR

TH

O V

IEW

FR

OM

RIG

HT

SID

E

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

5FSC

ALE

: N

TS

PRO

JECT

#:

DW

G #

:

2 x 4

2 x 6

2 x 8

2 x 10

2 x 12

LVL BEAM

LUMBER COLOR KEY

2x6 HEADER

2'-1

1 1/

8" R

OW

IND

OW

2'-1

0 1/

2" R

OH

VA

C A

CC

ESS

2x6 LEDGER SECURED WITH(2 ea) 3/8" X 4" HEAVY DUTY

TAPCON+ HEX HDANCOHORS @ 16" OC

Page 20: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

RO

OF

FR

AM

ING

AN

D W

AL

L

SH

EA

TH

ING

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

5GSC

ALE

: N

TS

PRO

JECT

#:

DW

G #

:

5/8" ZIP SHEATHINGALL SEAMS TAPED

OR LIQUID FLASHED

1'-0" EAVEAT LAUNDRY

ROOF

2 x 4

2 x 6

2 x 8

2 x 10

2 x 12

LVL BEAM

LUMBER COLOR KEY

CEILING INSULATIONBLOWN IN CELLULOSE

10" THK = R40

Page 21: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

RO

OF

FR

AM

ING

DE

TA

ILS

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

5HSC

ALE

: N

TS

PRO

JECT

#:

DW

G #

:

2 x 4

2 x 6

2 x 8

2 x 10

2 x 12

LVL BEAM

LUMBER COLOR KEY

5/8" ZIP SHEATHINGALL SEAMS TAPED

TAPE THIS TRANSITION JOINTBEFORE BUILDING THE

2X EAVE ASSY

5-1/2"EAVE

3 3/4" SHEATHING OVERHANGTO ACCOMODATE FASCIA

AND CROWN

MITSUBISHI MINI-SPILTDUCTED HVAC UNIT

CLOSED CELL SPRAY FOAM INSULATION. INSTALLED TO

ACHIEVE R40

17" ROUGHFRAME SOFFIT

Page 22: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

RO

OF

FR

AM

ING

DE

TA

ILS

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

5ISC

ALE

: N

TS

PRO

JECT

#:

DW

G #

:

AZEK 5/4 x 6 x 6CORNER BOARDS

1x8 BORAL FASCIA

5/8" x 6 BORAL BEADBOARD

SOFFITH2.5 HURRICANE TIES

TYPICAL AT ALLROOF RAFTERS

BORAL 8" BEVELED SIDINGWITH 6" EXPOSURE

2 x 4

2 x 6

2 x 8

2 x 10

2 x 12

LVL BEAM

LUMBER COLOR KEY

Page 23: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

RO

OF

FIN

ISH

DE

TA

ILS

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

5JSC

ALE

: N

TS

PRO

JECT

#:

DW

G #

:

25YR ASPHALT SHINGLESWITH ICE& WATER SHEILD

AT EAVES

NO RIDGE VENTREQ'D

24ga STANDING METAL ROOFENTIRE SHEATHING SURFACE

TO BE COVERED WITH ICE & WATER SHEILD 1x6 BORAL FASCIA

BORAL SIDINGMITERED CORNERS

2"

Page 24: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

1ST

FL

R E

LE

CT

RIC

AL

PL

AN

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

6A

SC

ALE

: N

TS

PRO

JECT

#:

DW

G #

:

S

SSS

S

S 3

S 3

S4

S

GFI

S

S

WP

GFI

Page 25: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

KIT

CH

EN

EL

EC

TR

ICA

L P

LA

N

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

6B

SC

ALE

: 1/

2" =

1'-0

"

PRO

JECT

#:

DW

G #

:

GFI

GFI

GFI

GFI

GFI

HOOD

S3

S

S 3

Page 26: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

Dec

24,

201

7

990

W S

TRAS

BURG

RD

WES

T CHES

TER P

A 19

38

2PH

: 48

4.6

39

.277

6IN

FO@

DO

VET

AIL

GRO

UPL

LC.C

OM

PRO

JECT:

TITL

E:

LA

UN

DR

Y R

OO

M E

LE

CT

RIC

AL

PL

AN

DO

VE

TA

IL

GR

OU

PL

LC

DE

SIG

N•B

UIL

D•R

EN

OV

ATE

•RE

STO

RE

PRIN

TED

:

DRAW

N B

Y: J

BS

6C

SC

ALE

: 3/

4" =

1'-0

"

PRO

JECT

#:

DW

G #

:

S

GFI

GFI

Page 27: ISOMETRIC VIEW OF PROJECT - Dovetail Group · addition isometric view of project printed: dwg #: cs scale: as noted drawn by: jbs project #: dec 24, 2017 dovetail g roup llc design

12-11-17