ISO New England Operations Significant Events December 2003 January 2004

21
1 ISO New England Operations Significant Events December 2003 January 2004 NEPOOL Reliability Committee February 3, 2004

description

ISO New England Operations Significant Events December 2003 January 2004. NEPOOL Reliability Committee February 3, 2004. Significant Events. 12/5 Declaration of OP4 Conditions 1/14 Declaration of OP4 Conditions 12/6 Loss of Salem Harbor Station. - PowerPoint PPT Presentation

Transcript of ISO New England Operations Significant Events December 2003 January 2004

Page 1: ISO New England Operations Significant Events December 2003 January 2004

1

ISO New England OperationsSignificant Events

December 2003January 2004

NEPOOL Reliability Committee

February 3, 2004

Page 2: ISO New England Operations Significant Events December 2003 January 2004

2

Significant Events

• 12/5 Declaration of OP4 Conditions

• 1/14 Declaration of OP4 Conditions

• 12/6 Loss of Salem Harbor Station

Page 3: ISO New England Operations Significant Events December 2003 January 2004

3

Declaration of OP4 ConditionsDecember 5, 2003

Page 4: ISO New England Operations Significant Events December 2003 January 2004

4

Dec. 5 OP4 Conditions

Initial Conditions (from morning report)

Installed generating capacity 33,024

Generation outages & reductions 5,362

External purchases 497

Operating reserve requirement 1,735

Peak load forecast for hour 18 19,375

Surplus 928

Page 5: ISO New England Operations Significant Events December 2003 January 2004

5

Dec. 5 OP4 Conditions

Events Contributing to OP4

• 16:13 – Millenium tripped due to low boiler level.

• 16:42 – Lake Road #1 tripped.

• 16:53 – Mystic 7 tripped due to an ID fan problem.

• System load 500MW over forecast.

Page 6: ISO New England Operations Significant Events December 2003 January 2004

6

Dec. 5 OP4 Conditions

OP4 Trigger

Maintenance crews at Yarmouth station were draining down the air system on breaker KG4/386 due to a compressor problem. At 17:25 low air pressure triggered a breaker failure lockout, transfer tripping the 391/386 and K386-4 breakers at Buxton, the KT1L breaker at South Gorham and the Yarmouth 4 generator.

Page 7: ISO New England Operations Significant Events December 2003 January 2004

7

Dec. 5 OP4 Conditions

• Instantaneous Capacity deficiency about 500MW

• 17:30 - M/S#2 declared

• 17:30 - OP#4 actions 1&6 implemented.

• Total available relief from actions 1&6: 575MW

Page 8: ISO New England Operations Significant Events December 2003 January 2004

8

Dec. 5 OP4 Conditions

Conditions improve

• 19:52 – The 386 line returned to service

• 20:00 – All actions of Op#4 are cancelled

• 21:00 – MS#2 cancelled

Page 9: ISO New England Operations Significant Events December 2003 January 2004

9

Dec. 5 OP4 Conditions

Peak hour capacity analysis

Installed generating capacity 33,024

Generation outages & reductions 6,368

External purchases 497

Operating reserve requirement 1,741

Peak load for hour 18 19,822

Surplus -363

Page 10: ISO New England Operations Significant Events December 2003 January 2004

10

Declaration of OP4 ConditionsJanuary 14, 2004

Page 11: ISO New England Operations Significant Events December 2003 January 2004

11

Jan. 14 OP4 Conditions

Initial Conditions (from morning report)

Installed generating capacity 32,637

Generation outages & reductions 8,439

External purchases -37

Operating reserve requirement 1,735

Peak load forecast for hour 18 21,975

Surplus 718

Page 12: ISO New England Operations Significant Events December 2003 January 2004

12

Jan. 14 OP4 Conditions

Morning. events

• Multiple units reduced or OOS due to gas restrictions or freezing problems.

• Evening peak load forecast raised 500 MW.

• ISO anticipating 30 minute reserve deficiencies over the evening peak cancels all economic outages & recalls 342 line (Canal, Pilgrim, Auburn St.)

Page 13: ISO New England Operations Significant Events December 2003 January 2004

13

Jan. 14 OP4 Conditions

Afternoon events

• 12:00 - M/S#2 declared for all Satellites

• 13:30 - New Brunswick, TransEnergie all forecast 30 minute reserve deficiencies over the evening peak.

• Restoration of 342 line delayed to difficulties reconnecting line leads. (550 Mw restriction on Canal generation)

Page 14: ISO New England Operations Significant Events December 2003 January 2004

14

Jan. 14 OP4 Conditions

Evening events

• 17:00 – OP#4 actions 1&6 implemented.

• 17:34 – Generator posturing initiated to maintain total 10 minute reserves.

• 18:17 – 342 line restored.

• 18:33 – Posturing cancelled.

Page 15: ISO New England Operations Significant Events December 2003 January 2004

15

Jan. 14 OP4 Conditions

Evening events

• 19:00 – All actions of OP#4 are cancelled.

• M/S#2 maintained until January 17th, 11:00.

Page 16: ISO New England Operations Significant Events December 2003 January 2004

16

Jan. 14 OP4 Conditions

Peak hour capacity analysis

Installed generating capacity 32,637

Generation outages & reductions 9,323

External purchases 401

Operating reserve requirement 1,740

Peak load for hour 18 22,450

Surplus -108

Page 17: ISO New England Operations Significant Events December 2003 January 2004

17

Loss of Salem Harbor StationDecember 6, 2003

Page 18: ISO New England Operations Significant Events December 2003 January 2004

18

Dec. 5 L/O Salem Harbor

Page 19: ISO New England Operations Significant Events December 2003 January 2004

19

Dec. 6 L/O Salem Harbor

20:27• Fault occurs on the 22-46 circuit breaker at Salem Harbor.

• T146 line & S145 terminal at Salem Harbor lock out.

• Close in fault caused #1&2 transformer & #1 bus

• differential relays to lock out all associated circuit breakers

• Salem Harbor 1&2 trip.

Page 20: ISO New England Operations Significant Events December 2003 January 2004

20

Dec. 6 L/O Salem Harbor

• 20:37 - Salem Harbor 3 tripped, 33-54 & 33T CBs open. B154 now open ended and C155 radial to #2 bus.

• 20:44 - #2 bus de-energized.

• 21:37 - 22-46 CB isolated, T146 line shot & closed in.

• 21:41 - #2 bus energized & some SS load picked up.

• 21:53 – S145, B154, C155 closed in. Salem units receive permission to restart.

Page 21: ISO New England Operations Significant Events December 2003 January 2004

21

Dec. 6 L/O Salem Harbor

Summary• 75 MW of area load lost.

• 313 MW of generation lost at Salem Harbor

• 23:44 - all area load restored