2 2
AGENDA Methodology to identify the
Significant Impact
Significant Aspect Calculation
Grade/Rating Methodology for
Significant Impacts
Format of the Environmental Aspect
& Impact Summery with Defination
Examples
3
Methodology to identify the Significant Impact
Methods: To identify the Significant Impact
Following is an overview of how this process takes place
Start
International Issues
Local issues/Interested parties
Legal and Other requirements
Environmental consequences
Non-Significant Aspects
Sig
nific
ant
impa
ct
No
No
No
No
Yes
Yes
Yes
Yes
4
Significant Aspect Calculation
Multiplication: B x C x D x E x F
Where: B – Legal Requirement
C – Severity/ Effects on Environment
D – Frequency of Occurrence
E – Present Control
F – Detection Time
5
Evaluation method:
Grade /Rating methodology for Significant Impact.
Grade (A)
Legal Requirement (B)
Severity/Effects on Environment ( C )
Frequency of occurrence (D)
Present Control (E)
Detection/Time (F)
1 Comply Negligible RarelyAutomatic/ON line
Within 1Hr- 8 Hrs
2
--------
Low (Nuisances) Yearly-Once
High Control/Alarming/by Resetting
Alarming Within one Day
3
--------Moderate/Medium Damages to Tree Monthly-once
Moderate Control by manual Control
Medium Within One Week
4--------
High Damages to human/plant /Tree/Flora-Fauna Weekly-Once
Required to modify
Within One Month
5Violence of Requirement
Severe/Damages to Permanent Damage/Death Daily/Hourly
--------More than One Month
6
Format of Environmental Aspect & Impact Summary
Department Process Activity Aspect Impact Condition
Critical Score
Legal Requirement
Severity/Effects On
EnvironmentalFrequency of occurrence present control Detection/Time Total
Control
Significant EMP No. WI(OCP)
7
Aspect :
1.Usage : Power ,Water,Air,Raw Material,paper,gas,Oil etc…..
2.Leakage : Air ,water,Oil,Gas etc….
3.Disposal : Solid Waste, Solvent Containers, test samples
Paint Containers
8
Impact :RU-Resource Usage
RW-Resource Wastage
AP-Air Pollution
LC-Land Contamination
Condition Normal / Abnormal
9
Legal Requirement
1974 - Water Act
1981 - Air Act
1989 - Hazardous waste Management Act
2000 - Batteries Act
10
Control
1. Significant : S/NS
2. EMP No: Energy: EMP-01 Water : EMP-02 Paper : EMP-03
3.OCP – Operation Control Procedure Room A/C –NIIPL-EOP-01,02,03,04,05,06 etc PrinterFax Xerox Fork Lift DGSoftener