Page 1: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC1

TSX – NYSE MKT: RIC ww

w.r

ich

mo

nt-

min

es.

com

Island Gold MineSite Visit September 30, 2015

Page 2: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC22

Safe harbor statement & cautionary note to U.S. investors concerning mineral resource estimates

This presentation contains forward-looking statements that include risks and uncertainties. The factors thatcould cause actual results to differ materially from those indicated in such forward-looking statementsinclude changes in the prevailing price of gold, the Canadian-U.S. exchange rate, grade of ore mined andunforeseen difficulties in mining operations that could affect revenue and production costs. Other factorssuch as uncertainties regarding government regulations could also affect the results. Other risks may bedetailed from time to time in Richmont Mines Inc.’s periodic reports and annual notice.

The mineral resource estimates in this presentation were prepared in accordance with Regulation 43-101adopted by the Canadian Securities Administrators. The requirements of Regulation 43-101 differsignificantly from the requirements of the United States Securities and Exchange Commission (the “SEC”). Inthis presentation, we use the terms “Measured”, “Indicated” and “Inferred” Resources. Although these termsare recognized and required in Canada, the SEC does not recognize them. The SEC permits U.S. miningcompanies, in their filings with the SEC, to disclose only those mineral deposits that constitute “Reserves”.Under United States standards, mineralization may not be classified as a Reserve unless the determinationhas been made that the mineralization could be economically and legally extracted at the time thedetermination is made. United States investors should not assume that all or any portion of a Measured orIndicated Resource will ever be converted into “Reserves”. Further, “Inferred Resources” have a greatamount of uncertainty as to their existence and whether they can be mined economically or legally, andUnited States investors should not assume that “Inferred Resources” exist or can be legally or economicallymined, or that they will ever be upgraded to a higher category.

U.S. Investors are urged to consider the disclosure in our annual report on Form 20-F, File No. 001-14598,which may be obtained from us or from the SEC’s web site: http://sec.gov/edgar.shtml.

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Page 3: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC3

Island Gold MineSeptember 30 Site Visit - Agenda

TSX - NYSE MKT: RIC 3Copyright 2015 by Richmont Mines

1. Welcome & Safety Induction

2. Mill & Surface tour

3. Lunch & Presentation,Q&A

A. Introduction Work force, Health & SafetySustainabilityJean Bastien, General Manager

B. GeologyDoug Mac Millan, Senior GeologistRaynald Vincent, Chief Geologist

C. OperationsDevelopment PlansMining StudiesJean Bastien, General Manager

4. Underground visit

5. Core Display Core Shack

6. Presentation 2015 Planned Exploration Drilling ProgramsRaynald Vincent, Chief Geologist

7. Departure

Page 4: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC4

Copyright 2015 by Richmont Mines

TSX - NYSE MKT: RIC4

Safety induction

At all times:

No horseplay is tolerated

Each refuge station has a first aid kit.

Tell your tour guide of any injury

immediately.

Have a safe and

pleasant visit

In case of emergency, stay calm, follow instructions from your tour guide and regroup in the gathering area beside the parking lot. Each area is equipped with a fire extinguisher

When your outside of the building, PPE should be worn at all times1. Hard hat2. Safety glasses3. Reflecting vest4. Safety boots

Stay with your guide at all times. If for any reason you lose contact STAY WHERE YOU ARE and your tour guide will find you.

In case of emergency, stay calm and follow your tour guide’s instructions.

No horseplay is tolerated at any time.

Island Gold MineSafety Induction – Main Buildings & Surface

Page 5: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC5

Island Gold MineSafety Induction - Underground

TSX - NYSE MKT: RIC 5Copyright 2015 by Richmont Mines

Underground and surface safety requirements:

1. Tag in prior to going underground2. Do not exit from vehicles in motion3. Use 3 points of contact rule when entering/exiting

a vehicle4. Stay with the group at all times5. Follow the instructions of your guide in an

emergency situation6. Watch for uneven ground and report any unsafe

conditions7. Tag out when leaving underground

Medical clinic and help available at all times.

Page 6: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC6

IntroductionPresented by:

Jean BastienGeneral Manager

Page 7: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC7

Island Gold MineMineralized zones

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines 7

RICHMONT MINES203 Mining Titles

7,168 hectares

Emily Bay

ShowingArgonaut

1,968 he

Dubreuilville

2 km

Island Gold MineManagement Team

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC

Jean Bastien, P. Eng., MBA Sylvain DroletGENERAL MANAGER HEALTH AND SAFETY SUPERINTENDENT

Jacques Proulx, Tech. Michael Pahkala, P. Eng.ASSISTANT GENERAL MANAGER TECHNICAL SERVICES SUPERINTENDENT

Marc Leclair Donald LachapelleUNDERGROUND SUPERINTENDENT MAINTENANCE SUPERINTENDENT

Peter Massi Daniel Vachon, P. Eng.MILL SUPERINTENDENT PROJECTS & PLANNING SUPERINTENDENT

Sylvie Belisle, CHRL Jay Henry, CHRLH.R. SUPERINTENDENT H.R. SUPERINTENDENT

Maxime Morin Ghislain CyrENVIRONMENT SUPERINTENDENT LOGISTIC & PURCHASING SUPERINTENDENT

Raynald Vincent, P. Eng., M.G.P. Justin Roy, CHIEF GEOLOGIST CHIEF ENGINEERING

7

Page 8: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC8

TSX - NYSE MKT: RIC 8

Island Gold MineLocation Map

Copyright 2015 by Richmont Mines

Page 9: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC9

Crown pillar

W E

- 1,000 m

- 500 m

GOUDREAULOCHALSH ISLAND EXT1 EXT2

2015 Planned Ramp and Drift Development

Conceptual Development

2015 Planned Ore Development

9TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Island Gold MineExtending Mine Life at Depth....

2015 Stoping

Mined out

Reserves – Resources 31/12/14

Actual Ramp and Drifts

190 Level

Page 10: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC1010

Island Gold MineSolid Q2 and 6 Month 2015

2015 – a year of repositioning :

Extensive development work and investment being completed in 2015 to reposition the mine for significant long-term growth

2015 forecasted gold sales: 45,000 – 50,000 ozs

6 month 2015 results on track:

Record quarterly gold sales: 14,997 ounces

Record quarterly milled tonnage: 71,584 tonnes Mill demonstrated that it can efficiently

operate at current capacity limit of 800 tpd

H1 2015 Gold production: 25,761 ounces Gold sales: 24,626 ounces Cash cost/oz: CAN$1,120 (US$906) AISC/oz: CAN$1,501 (US$1,214)

Q1 CAN$1,643 (US$1,485)Q2 CAN$1,307 (US$1,063)

TSX - NYSE MKT: RIC © 2015 by Richmont Mines

Page 11: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC1111TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Island Gold Mine2015 – Beginning a transformational year

SHAREHOLDER SCORECARD:

1. Ramp development: complete planned accelerated development of ramps, and related electrical, water management work

2. 620 metre level drift: complete definition/delineation drilling to upgrade to M&I and then to Reserves

3. Mining & milling studies: complete studies and internal review by year-end 2015 to determine long-term growth scenario.

4. Fixed assets & equipment: make targeted and strategic investments to position the mine for game-changing growth.

Main ramp at -700 m East ramp at -480 m

Drift extended to 478 m 24,803 m of drilling (def. & del.)

Studies initiated Preliminary results: H2 2015

Power to u/g increased by 700 hpMore upgrades in Q3 & Q4

YTD 2015 PROGRESS

OBJECTIVE

Main ramp to -750 metres, East ramp to -570 metres

Extend drift to 600 metres; complete 59,000 m of drilling

Evaluating base case and alternative mine/mill options

Repositioning & asset upgrade investments

Page 12: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC12

WorkforceHealth & Safety

Presented by:

Jean BastienGeneral Manager

Page 13: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC13

Island Gold MineWorkforce Statistics (as of July 31st , 2015)

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines 13

74%

26%

% Local % Non-Local

Total mine site workforce of 384:

241 employees 137 contractors

Workforce – local vs. non-local breakdown: Successfully increasing local workforce Low turnover rate

53%47%

% Local % Non-Local

2008 2014

Page 14: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC14

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC14

Island Gold MineHealth & Safety

• 4.5 years without a lost time accident

• Mine rescue competition:

Mine District Champion in 2014

First Aid Champion 3 years in a row (2013-2015)

Page 15: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC15

Island Gold MineHealth & Safety

SAFETY PERFORMANCE

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC 15

To be modified

Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015

frequency 12 month 8.7 9.7 5.7 6 5.5 3.5

lost time accident 0 0 0 0 0 0

0

2

4

6

8

10

12

Freq

uen

cy

Page 16: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC16

SustainabilityPresented by:

Jean BastienGeneral Manager

Page 17: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC17

• No major non-compliance registered in 2014

• Working on lifting tailing storage facilities by approximately 6 meters,

which would provide an additional minimum 8 years of storage at

current mill capacity of 800 tpd.

• Obtain continuous discharge permit.

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC 17

Island Gold MineEnvironment

Page 18: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC18

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC 18

Island Gold MineCommunity

First Nations relationships:

• Michipicoten

• Missanabie Cree

Local community of Dubreuilville:

• 17 km away from mine site

• Total population of 900

• Actual Bunkhouse: 80 rooms + kitchen facility

• Plan to add 98 rooms in 2015

Page 19: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC19

GeologyPresented by:

Doug Mac MillanSenior Geologist

Raynald VincentChief Geologist

Page 20: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC20

Lake Superior

Marathon

White River

17

25 km

Island Gold MineWawa Geological Sub-province

Wawa

HEMLO

RENABIE

MISHI EDWARDS

ISLAND GOLD MINE

Proterozoic Plutonic and Volcanic RocksArchean Granitoid PlutonsArchean Metasedimentary TerranesArchean Greenstone TerranesFaultGold Past Producer

Gold Producer

TSX - NYSE MKT: RIC 20Copyright 2014 by Richmont Mines

SUGAR ZONESCHREIBER

EAGLE RIVER

Page 21: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC21

Wawa

Lake Superior

17

10 km

Dubreuilville

519

RENABIE

MISHI

EAGLE RIVER

EDWARDS

ISLAND GOLD MINE

Archean Granitoid PlutonsArchean Greenstone TerranesFaultGold ShowingGold Past ProducerGold Producer

MINE

Island GoldMaginoKremzarEdwardsClineRenabieWawa AreaEagle River

1,675,000803,000306,000390,000300,000

5,584,000478,000

3,300,000

5.64.44.8

11.26.57.27.89.3

307,000114,000

47,000140,000

63,0001,100,000

119,000962,000

MINE TONNAGE AU g/t OUNCES

MAGINO

21

Past Production 2,800,000 ozs Au

TSX - NYSE MKT: RIC Copyright 2014 by Richmont Mines

Island Gold MineWawa Gold Camp

Page 22: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC22

Mill

EDWARDSProduction : 0,5 MT @ 11.0 g/t Au144 000 oz Au 1938,1997-2002

CLINEProduction : 0,3 MT @ 6.5 g/t Au63 000 oz Au 1938-40, 1947-48

1 km

Lochalsh

Gold Showing

KREMZARProduction : 0,6 MT @ 4.8 g/t Au47 000 oz Au 1988-1990

ISLAND GOLD MINE (31/12/2014) Proven & Probable Reserves : 895,000 T @ 6.39 g/t Au183,750 oz Au Measured & Indicated Resources: 733,500 T @ 9.29 g/t Au219,050 oz AuInferred Resources: 3,547,500 T @ 8.79 g/t Au1,002,750 oz Au

Goudreau

Closed Gold Mine

Producing Gold Mine

Richmont Properties

MAGINOProduction : 0,8 MT @ 4.4 g/t Au114 000 oz Au 1930-40, 1988-92

DEEP C ZONE

Island Gold MineHoldings in Area

22

Page 23: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC23

Ego Deposit

Emily Bay

Showing

Argonaut 1,968 hc.

Dubreuilville

2 km

RICHMONT MINES PROPERTIES

OTHER

OWNERS

Portal Main

Ramp

ISLAND GOLD MINE

ClineEdwards

Magino

Richmont Mines Inc.Land Tenure

TSX - NYSE MKT: RIC 23Copyright 2015 by Richmont Mines

RICHMONT MINES

216 Mining Titles

7,696 hectares

Page 24: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC24

Island Gold MineGoudreau Lake Deformation Zone

TSX - NYSE MKT: RIC 24Copyright 2014 by Richmont Mines

5 km

N

Page 25: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC25

Island Gold MineShowings and Deposits

TSX - NYSE MKT: RIC 25Copyright 2014 by Richmont Mines

Page 26: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC26

TSX - NYSE MKT: RIC 26Copyright 2015 by Richmont Mines

Island Gold Mine2014 Mineral Reserves and Resources

ISLAND GOLD MINE (31/12/2014)

TOTAL RESERVES AND RESOURCES

Proven & Probable reserves : 895,000 T @ 6.39 g/t Au

183,750 oz Au

Measured & Indicated resources: 733,500 T @ 9.29 g/t Au

219,050 oz Au

Inferred resources: 3,547,500 T @ 8.79 g/t Au

1,002,750 oz Au

-500m

Crown pillar

W E

-1000m

250m

Proven Reserves

Probable Reserves

Indicated Resources

C Zone Indicated &

Inferred Resources

Actual Ramp and Drifts

Mined Out

Au g/t / true thickness (metres)

Page 27: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC27

Island Gold MineIsometric View

27TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

515L to 700L

NE

Lochalsh Island ZoneExtension1

Extn 2Goudreau Zone

Page 28: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC28

Island Gold MineIsometric View

28TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

N

620 Exploration drift

E

Goudreau Extn 2 Extension 1 Island ZoneLochalsh

Page 29: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC29

2000 100

meters

4900m

Island Gold MineC Zone - Metal factor (grade x width)

Crown pillar

W E

- 1,000 m

- 500 m

LOCHALSH ISLAND EXT1 EXT2

Interpreted plunge of deposit axis

29

Cut off (3.75 g/t Au / 2.0 m)

327

30

20

10

5

0

Metal FactorGrade (g Au/t) x true width (metres)

Average mining grade (5.84 g/t Au / 2.4 m)

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

11.25g/t Au / 6.56m

13.3g/t Au / 3.6m

19.8g/t Au / 3.93m

2.04g/t Au / 6.33m

5.06g/t Au / 2.47m

Page 30: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC30

2000 100

meters

4900m

Island Gold MineC Zone – Grade (g/t Au)

30TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Cut Grade(95g/t Au)

Crown pillar

W E

- 1,000 m

- 500 m

LOCHALSH ISLAND EXT1 EXT2

Page 31: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC31

Island Gold MineC Zone – True width (metres)

31TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

2000 100

meters

4900m

Crown pillar

W E

- 1,000 m

- 500 m

LOCHALSH ISLAND EXT1 EXT2

True width (metres)

Page 32: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC32

Island Gold MineSchematic Section of Main Mineralized Zones

32TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Overburden

535 Level

620 Level

Island Mainmineralized zones

Inflection

Island Lowermineralized zones

Actual rampand drifts

Crown pillar

-500m

-750m

-250m

50m

100m

Page 33: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC33

TSX - NYSE MKT: RIC 33Copyright 2015 by Richmont Mines

Island Gold MineSection 14940E

S N

-500m

-900m

100 m

510 Level

535 Level

Zone

Island Gold Lower Resources

Section 14940E

560 Level

585 Level

Composite Longitudinal Section

620 Explo. Level

635 Level

Page 34: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC34

Planned Dev.

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Island Gold MinePlan View – 675 Level

Composite Longitudinal Section

Level 675

675 Level Plan

Zone

W E

10

0 m

620 Exploration Level

ISLAND EXT 1 EXT 2

Island Gold Lower Resources

Page 35: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC35

Island Gold MineTypical Section – Looking West

Crown pillar

-500m

-750m

-250m

Crown pillar

-1,000m

Island Lowermineralized zones

Mafic dykes

14960ESection

14740ESection

Mafic dykes

Island Lowermineralized zones

Page 36: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC36

TSX - NYSE MKT: RIC 36

Island Gold Mine

Copyright 2014 by Richmont Mines

Page 37: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC37

Island Gold MineShear and Extensional Veining

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines 37

Page 38: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC38

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines 38

Island Gold MineGoudreau Zone Gold Vein

Page 39: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC39

Island Gold MineIsland 560 Sill

39TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

ISLAND 560C

Approx. 13 cm

Page 40: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC40

TSX - NYSE MKT: RIC 40Copyright 2015 by Richmont Mines

Island Gold MineComposite Longitudinal Section, Lower Zones

400-514-1830.0 g/t Au / 9.55 m

ISLAND GOLD MINE (31/12/2014)TOTAL RESERVES AND RESOURCES

Proven & Probable Reserves : 895,000 T @ 6.39 g/t Au, 183,750 oz Au Measured & Indicated Resources: 733,500 T @ 9.29 g/t Au, 219,050 oz AuInferred Resources: 3,547,500 T @ 8.79 g/t Au m 1,002,750 oz Au

400-528-104.79 / 2.87

400-528-097.44 / 8.49

400-528-104.44 / 6.07

GD-14-022.43/1.5

GD-14-01C19.87 g/t Au / 3.93 m

Page 41: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC41

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

DH 400-514-18: 30.06G/9.55M; @ -950M ELEV.

Smokey quartz vein 4.5 metres wide, weak development of accompanying

stringers, vertical zonation of veining style from sheeted veinlets +/- decimeter

scale veins in upper levels to up to 2.0 metres veins at depth.

Island Gold MineDisplay Core C Zone

41

Page 42: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC4242TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Still open at depth... GD14-01C : 19.9 g/t Au over a true width of 3.9 m

1,200 metres below

Page 43: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC43

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

DH 425-487-12: NICE DEEP C VEIN - SMOKEY COLOR + VG, NQ SIZE.

Island Gold MineDisplay Core C Zone

43

Page 44: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC44

Island Gold MineDisplay Core C Zone

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines 44

DH 425-487-18 : 1 CM AU STRINGER AT 9,240 G/T AU

SAMPLE LENGTH OF 30 CM.

Page 45: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC45

TSX - NYSE MKT: RIC 45Copyright 2014 by Richmont Mines

Island Gold MineDescription of Gold Particles

Page 46: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC46

TSX - NYSE MKT: RIC 46Copyright 2015 by Richmont Mines

Island Gold MinePrevious QA/QC Pulp Metallic Method Review

2004 RPA Technical Report on the Island GoldDeposit concludes that gold in the Island Deposit isfine grained enough to respond well to normal fireassay procedures.

2015: RPA completed a full review of estimatedMineral Resources as at December 31, 2014.

Page 47: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC47

Copyright 2015by Richmont Mines 47TSX - NYSE MKT: RIC

Island Gold MineQuality Assurance / Quality Control

Standard Reference Material inserted at rate of 1:25in core sample stream for exploration and 1:50 forproduction

Standard Reference Material inserted into everyoutgoing chip sample batch (10-25 samples/batch)

Coarse field blanks inserted after all visible gold coresamples

Pulp and Reject laboratory cross checking routine

Duplicate chip sampling on faces and core ongoing

Core shack on gated mine site with limited access

Page 48: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC48

Island Gold MineLab Expert vs. Actlabs pulp cross checks

TSX - NYSE MKT: RIC Copyright 2014 by Richmont Mines 48

y = 0.9796x + 0.1558R² = 0.9941

0

10

20

30

40

50

60

70

80

0 10 20 30 40 50 60 70

Act

Lab

s C

ross

Ch

eck

Au

g/t

Lab Expert Original Au g/t

Page 49: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC49

TSX - NYSE MKT: RIC 49

Island Gold MineC Ore Zone - Deep Level vs. Upper Level

Copyright 2015 by Richmont Mines

Higher grades in Island Deep averaging over 8.79 g/t in the currentinferred resource vs. the 5.92 g/t average mined between 2007-2014 inupper mine or a 35% grade increase.

Veining more robust with increasing depth - a change from cm todecimeter stringers and veins progressing into decimeter and metre scaleveins with increasing depth.

Average zone width of deep resource 4.5 metres width vs. upper zonesaveraging 2.7 metres or ~40% width increase (Press release 02/05/13).

Vg hit ratio is typically 50% or better at depth, compared to 30% in theupper levels as calculated in the first Deep C resource estimate.

Structural-alteration corridor enveloping all zones appears to bewidening at depth from about 50 meters to 100 meters.

Page 50: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC50

Island Gold MineMineral Reserves and Resources

50TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Goudreau 215 G2

Goudreau

Island 560 C

Approx. 13 cm

Upper Island D

Page 51: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC51

49,196 oz

(1) Resources are exclusive of Reserves, and do not have demonstrated economic viability at this time. (2) Established on December 31/14, using a gold price of US$1,200/oz and an exchange rate of CAN$1.0833=US$1.00. In 2013, a price of US$1,225/oz and an exchange rate of CAN$1.06=US$1.00 were used. (3) Underground Resources established for the C Zone and six other lateral zones below a vertical depth of -400 metres.

Mineral resources were estimated by 3D block modeling with blocks of 5m x 5m x 2 m for the Upper part and blocks of 10m x 10m x 5m for the lower part of the mine. Grade estimation was done by ordinary Kriging or ID2

51

MINERAL RESERVES + RESOURCES

1

AS OF DEC. 31, 2014 AS OF DEC. 31, 2013

Tonnes(metric)

Grade(g/t Au)

Au ozs contained

Tonnes(metric)

Grade(g/t Au)

Au ozs contained

Island Gold Mine

P & P Reserves 2 (above -400 m) 463,000 6.04 90,000 644,500 6.01 124,450

P & P Reserves 2,3 (below -400 m) 431,500 6.76 93,750 88,500 6.70 19,050

Total P & P Reserves 2 895,000 6.39 183,750 733,000 6.09 143,500

M & I Resources (above -400 m) 295,500 6.83 64,850 283,500 7.07 64,450

Indicated Resources3 (below -400 m) 438,000 10.95 154,200 456,000 11.52 168,900

Total M & I Resources 733,500 9.29 219,050 739,500 9.81 233,350

Inferred Resources (above -400 m) 369,500 6.97 82,800 363,000 7.09 82,750

Inferred Resources 3 (below -400 m) 3,178,000 9.00 919,950 3,196,000 9.29 954,600

Total Inferred Resources 3,547,500 8.79 1,002,750 3,559,000 9.07 1,037,350

Copyright 2015 by Richmont Mines

Island Gold MineMineral Estimated Reserves & Resources

TSX - NYSE MKT: RIC

Page 52: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC52

Copyright 2015 by Richmont Mines 52TSX - NYSE MKT: RIC

Island Gold MineResource Drilling Parameters

Measured Resources:

DDH Spacing: 20 metres and less

within 8 metres of an U/G opening (raise, sill, stope)

Indicated Resources:

DDH Spacing: 20-25 metres

no U/G openings, good continuity of mineralization

Inferred Resources:DDH Spacing: more than 25 metres, wider spacing

Limit of resources block defined on longitudinal section with amaximum of 30 metres from a DDH

Page 53: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC53

190 Level

Crown pillar

W E

- 1,000 m

- 500 m

GOUDREAULOCHALSH ISLAND EXT1 EXT2

2015 Planned Ramp and Drift Development

Conceptual Development

2015 Planned Ore Development 2015 Mining Area

Mined out

Resources 31/12/2014 Actual Ramp and Drifts

Extend ramp systems

Exploration/definition drift on the -620 m level

Reserves 31/12/2014

Dyke

Dyke

Drill hole intersections+

Page 54: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC54

Island Gold MineHighlights Results of Face Sampling – C Zone

54TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

LEVEL

CHANNEL FACE SAMPLING

Length(m)

Au (g/t)Cut 47 g/t Au

True Thickness(m)

515W 37 10.53 2.2

535W 83 9.82 2.5

560W 120 9.69 2.8

585W 95 6.96 3.1

610W 99 7.34 2.6

635W 167 12.52 2.5

655W 77 10.67 2.7

535E 34 12.05 2.4

560E 109 6.59 3.0

585E 152 8.73 3.8

610E 162 7.64 3.1

635E 142 8.65 2.9

655E 83 8.15 2.9

Results of development (up to September 28, 2015)

Page 55: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC55

Island Gold Mine2015 Planned Development & Drilling Activities

190 Level

Crown pillar

W E

- 1,000 m

- 500 m

GOUDREAULOCHALSH ISLAND EXT1 EXT2

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Definition drilling 14,500 m

2015 Planned Ramp and Drift Development

Conceptual Development

2015 Planned Ore Development

2015 Stoping

Mined out

Reserves – Resources 31/12/2014

Actual Ramp and Drifts

55

2015 PLANNED DRILLING

Drilling will define & delineate between -500 metres and – 860 metres

Delineation drilling 44,500 m

2015 OBJECTIVES

1. Extend main access ramp to -750 m2. Extend East Ramp to -570 m3. Extend 620 level drift to ~600 m length

Page 56: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC56

OperationsPresented by:

Jean BastienGeneral Manager

Page 57: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC57

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines 57

Island Gold MineMining Methods

Production Drilling

1.5mx1.5m spacing

Φ2½”

Slot Raise 1.8mx1.8m

Mining is done using long-hole stoping

100% long-hole stoping anticipated for below 400 metres

Page 58: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC5858

Island Gold MineMine Sequencing

Pull void is used to create void for the next blast Cables are used in the walls between rings for ground support

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC

Page 59: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC59

Island Gold MineMill Details

TSX - NYSE MKT: RIC 59Copyright 2015 by Richmont Mines

0.8 km from the ramp portal

CIP gold milling process

CRUSHING GRINDING LEACHING CIP CIRCUIT STRIPPING ELECTROWINNING & REFINING

All incurred costs are in Canadian dollars

Current capacity of 850 tpd, average capacity around 800 tpd

Permitted capacity of 900 tpd

2014 scoping study determined that the mill can be expanded to

1,200 tpd, at a cost of $20 million

Jaw crusher and cone crusher replaced in 2014

Screening capacity will be increased in 2015

Page 60: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC60

Page 61: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC61

TSX - NYSE MKT: RIC 61Copyright 2015 by Richmont Mines

Island Gold MineMill Flowsheet – 1 of 2

Page 62: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC62

TSX - NYSE MKT: RIC 62Copyright 2015 by Richmont Mines

Island Gold MineMill Flowsheet – 2 of 2

Page 63: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC6363Copyright 2015 by Richmont Mines

Island Gold MineMine Cost/Tonne Breakdown – FY 2014

All of Island Gold Mine operating costs are in Canadian dollars 2014 average exchange rate CAN $0.9054 = US $1.00

$97

$36

$36

$8

Mining Surface & administration

Milling Royalties

2014 Cash Cost/Tonne (CAN$)Total 2014 cost/tonne = CAN$177

2014 Cash Cost/Tonne (CAN$, in %)

0%

5%

10%

15%

20%

25%

30%

35%

TSX - NYSE MKT: RIC

Page 64: Island Gold Mine Site Visit Presentation

Copyright 2014 by Richmont MinesTSX - NYSE MKT: RIC6464

Island Gold MineMining Unit Cost Opportunity

TSX - NYSE MKT: RIC

Near-term opportunity: lower the mining cost by returning to historical development ratio

Un

it M

inin

g C

ost

% of Development Ore of Total Ore Mined

Long-term planned ratio

© 2015 by Richmont Mines

0

50

100

150

200

250

0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0%

Long-term planned ratio

Q1 2015

Q2 2015

Page 65: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC65

2015 Development

Plans Presented by:

Jean BastienGeneral Manager

Page 66: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC66

TSX - NYSE MKT: RIC 66

Island Gold MineWell Positioned for Growth

Copyright 2015 by Richmont Mines

RICHMONT’S OBJECTIVE

To transform Island Gold Mine into alonger life, higher production and lowercost operation, with the ability todeliver years of high-quality growthand increased net free cash flowstreams.

Page 67: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC67

ISLAND GOLD MINEOCTOBER SHUTDOWN…. (MILL)

• Service the NGR (Neutral Ground Resistor) at the portal and mill substation

• The main mill transformer will be replaced

• Increase screening capacity in the crushing plant

• Gear (Pinion and Bull gear) - Non Destructive Testing

• Replace pinion on re-grind mill

• Installation and commissioning of new Dust Collector

Page 68: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC68

ISLAND GOLD MINEOCTOBER SHUTDOWN…. (UNDERGROUND)

• Service main fan on original vent raise

• Replace main portal transformer

• Replace substations at 125, 190 G1, and 390.

• Remove obsolete ducting and cables

• Leaky feeder installation

Page 69: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC69

TSX - NYSE MKT: RIC 69Copyright 2015 by Richmont Mines

Island Gold MineOctober Shutdown (Underground)

• Drill and blast bumps and corners in the main ramp

• Drill and install rabbit ears on pipe

• Repair and install new sprinkler system

• Install 8 inch discharge pipe from 125 to portal

Page 70: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC70

Mining Studies

Page 71: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC7171

Island Gold MineMilling and Mining Studies

SVP vérifier,

clarifier ou

ajouter de l’info

Island Gold Mine - Studies

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines 71

East

Update on mining studies will consist of:

- Optimization of Base Case scenario (800 tpd) with respective 2017-2022production & costs estimates

- Expanded scenario based on increased capacity with a third mininghorizon open in 2017

Page 72: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC72

TSX - NYSE MKT: RIC 72Copyright 2015 by Richmont Mines

Ontario Quebec

Island Gold MineMining Studies

Mining - Phase 1 Analysis:

Mining of reserves, indicated and inferred resources from level -450 to level -860considered for the studies

Over 2M tonnes of ore considered part of Phase 1, excluding isolated inferredresource blocks.

3 mining horizons created: (from 635 up, between 635 and 740 and between 740 and 860)

Long-hole mining method considered for Phase 1

Optimization of Base Case scenario (800 tpd by ramp):

Mining by ramp down to level -860

Optimization of mine plan (mining & development sequence)

5 year forecast (2017-2022) for production, opex and capex

Base case extended scenario to 900 tpd (average permitted level)

Expanded Scenario Analysis:

Analysis of the new mining capacity reached once third mining horizon (abovelevel -860) is open in 2017.

Optimization of mine plan and respective 5 year forecast (2017-2022)

Two scenarios contemplated:

(1) Full shaft and (2) New haulage ramp direct to mill from level -450

Expanded scenario to be brought to PEA level H1 2016

Page 73: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC73

TSX – NYSE MKT: RIC ww

w.r

ich

mo

nt-

min

es.

com

Island Gold Mine2015 Planned Exploration Drilling programs

Page 74: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC74

Island Gold Mine2015 Planned Development & Drilling Activities

190 Level

Crown pillar

W E

- 1,000 m

- 500 m

GOUDREAULOCHALSH ISLAND EXT1 EXT2

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Definition drilling 14,500 m

2015 Planned Ramp and Drift Development

Conceptual Development

2015 Planned Ore Development

2015 Stoping

Mined out

Reserves – Resources 31/12/2014

Actual Ramp and Drifts

74

2015 PLANNED DRILLING

Drilling will define & delineate between -500 metres and – 860 metres

Delineation drilling 44,500 m

2015 OBJECTIVES

1. Extend main access ramp to -750 m2. Extend East Ramp to -570 m3. Extend 620 level drift to ~600 m length

Page 75: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC75

Island Gold Mine2015 Planned U/G Exploration Drilling (41,000 m)

190 Level

Crown pillar

W E

- 1,000 m

- 500 m

GOUDREAULOCHALSH ISLAND EXT1 EXT2

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Mined out

Reserves – Resources 31/12/2014

Actual Ramp and Drifts

C Zone Intersections (Au cut 95 g/t)

Au g/t / true thickness (metres)

400-528-10

4.44 / 6.07

400-528-10

4.79 / 2.87

GD-14-01C

19.87 / 3.93Previous holes

GDE-10-14

1.96 / 1.67

GDE-10-15

3.99 / 2.15

GDE-10-16

9.93 / 1.07

GDE-10-12

4.94 / 2.77

5,000 m drilling

from 450 level 5,000 m drilling

from 340 level

400-528-09

7.44 / 8.49

GDE-10-12

4.89 / 4.16

GDE-10-12

6.28 / 1.97

Assays pending

31,000 m drilling

from 620 level

400-514-52

13.30 / 3.60

Page 76: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC76

Island Gold Mine2015 Planned Surface Exploration Drilling

190 Level

Crown pillar

W E

- 1,000 m

- 500 m

GOUDREAULOCHALSH ISLAND EXT1 EXT2

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Mined out

Reserves – Resources 31/12/2014

Actual Ramp and Drifts

C Zone Intersections (Au cut 95 g/t)

Au g/t / true thickness (metres)

400-528-10

4.44 / 6.07

400-528-10

4.79 / 2.87

GD-14-01C

19.87 / 3.93Previous holes

GDE-10-14

1.96 / 1.67

GDE-10-15

3.99 / 2.15

GDE-10-16

9.93 / 1.07

GDE-10-12

4.94 / 2.77

400-528-09

7.44 / 8.49

GDE-10-12

4.89 / 4.16

GDE-10-12

6.28 / 1.97

Assays pending

8,500 metres of drilling2,500 m from surface +

6,000 m from Level 190

7,000 m drilling

from surface

23,000 m

drilling

from surface

190-419-12

21.12 (17.33 cut) / 4.78 c.l.

LC-388-01

5.73 / 2.70 c.l.

400-514-52

13.30 / 3.60

Page 77: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC77

2000 100

meters

4900m

Island Gold MineC Zone - Metal factor (grade x width)

Crown pillar

W E

- 1,000 m

- 500 m

LOCHALSH ISLAND EXT1 EXT2

Interpreted plunge of deposit axis

77

Cut off (3.75 g/t Au / 2.0 m)

327

30

20

10

5

0

Metal FactorGrade (g Au/t) x true width (metres)

Average mining grade (5.84 g/t Au / 2.4 m)

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

11.25g/t Au / 6.56m

13.3g/t Au / 3.6m

19.8g/t Au / 3.93m

2.04g/t Au / 6.33m

5.06g/t Au / 2.47m

Page 78: Island Gold Mine Site Visit Presentation

Copyright 2014 by Richmont Mines Inc. TSX – NYSE MKT : RIC www.richmont-mines.com

Island Gold Mine2015 -2016 Deep Directional Drilling Program

190 Level

Crown pillar

W EGOUDREAULOCHALSH ISLAND EXT1 EXT2

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

400-528-10

4.44 / 6.07

400-528-10

4.79 / 2.87

GD-14-01C

19.87 / 3.93

400-514-52

11.25 / 6.56

- 500 m

- 1,000 m

- 1,500 m

Actual Ramp and Drifts

Gold Zone Intersections (Au cut 95 g/t)

Au g/t / true thickness (metres)

Previous holes

Target

Reserves – Resources 31/12/2014

Mined out

Deep directional exploration from surface (23,000 metres)

400-514-52

13.30 / 3.60

Page 79: Island Gold Mine Site Visit Presentation

Copyright 2015 by Richmont MinesTSX - NYSE MKT: RIC79

Island Gold Mine2015 Planned Exploration Drilling

190 Level

Crown pillar

W E

- 1,000 m

- 500 m

GOUDREAULOCHALSH ISLAND EXT1 EXT2

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Mined out

Reserves – Resources 31/12/2014

Actual Ramp and Drifts

C Zone Intersections (Au cut 95 g/t)

Au g/t / true thickness (metres)

400-528-10

4.44 / 6.07

400-528-10

4.79 / 2.87

GD-14-01C

19.87 / 3.93

Underground exploration 41,000 m

Lateral extension exploration 15,000 m

2015 Exploration DrillingPrevious holes

GDE-10-14

1.96 / 1.67

GDE-10-15

3.99 / 2.15

GDE-10-16

9.93 / 1.07

GDE-10-12

4.94 / 2.77

5,000 m drilling

from 450 level 5,000 m drilling

from 340 level

400-528-09

7.44 / 8.49

GDE-10-12

4.89 / 4.16

GDE-10-12

6.28 / 1.97

Assays pending

31,000 m drilling

from 620 level

7,000 m drilling

from surface

23,000 m

drilling

from surfaceSurface deep directional exploration 23,000 m

8,500 metres of drilling2,500 m from surface +

6,000 m from Level 190

190-419-12

21.12 (17.33 cut) / 4.78 c.l.

LC-388-01

5.73 / 2.70 c.l.

Page 80: Island Gold Mine Site Visit Presentation

Copyright 2014 by Richmont Mines Inc. TSX – NYSE MKT : RIC www.richmont-mines.com

Island Gold MinePlanned Regional Surface Exploration Drilling

TSX - NYSE MKT: RIC Copyright 2015 by Richmont Mines

Mill

Maskinongelake

MAGINO MINE(1988-1992 & 1933-1939)114,000 oz Au0.8 MT @ 4.4 g/t Au

MAGINO OPEN PIT (Resources)158 MT @ 1.03 g/t Au 5.2 million oz Au

CLINE MINE (1938-1942)63,000 oz Au0.3 MT @ 6.5 g/t Au

EDWARDS MINE(1996-2002 & 1936-1937)144, 000 oz Au0.5 MT @ 11.0 g/t Au

KREMZAR MINE (1988-1990)47,000 oz Au0.6 MT @ 4.8 g/t Au

ISLAND GOLD MINE (31/12/2014) Proven & Probable Reserves : 895,000 T @ 6.39 g/t Au; 183,750 oz Au Measured & Indicated Resources: 733,500 T @ 9.29 g/t Au; 219,050 oz Au

East Extension

West Extension

- 1,000 m

- 500 m

- 1,500 m

MAGINO ISLAND GOLD EDWARDS CLINE

Ric

hm

on

t

Ric

hm

on

t

Arg

on

aut

Stri

ke M

iner

als

Drilling target

2015 Surface Exploration Program (7,500 m)

1 km

GDE-10-15

3.99 / 2.9

GDE-10-16

9.93 / 1.8

GD-11-06

10.90 / 1.2

Gold Zone Intersections (Au uncut g/t)

Au g/t / core length (metres)

LC-388-01

5.73 / 2.7

Clin

e M

inin

g C

orp

.

EastExtension

WestExtension

Page 81: Island Gold Mine Site Visit Presentation