ISLAIS CREEK MOTOR COACH MAINTENANCE & OPERATIONS …

9
1 ISLAIS CREEK MOTOR COACH MAINTENANCE & OPERATIONS FACILITY Phase II Lisa Chow Project Manager

Transcript of ISLAIS CREEK MOTOR COACH MAINTENANCE & OPERATIONS …

1

ISLAIS CREEK

MOTOR COACH

MAINTENANCE &

OPERATIONS FACILITY

Phase II Lisa Chow

Project Manager

2

Construction of a two-story, 66,000 square foot operations and

maintenance facility for the diesel-electric hybrid articulated buses.

3

Progress:

• Perform utility relocation

• Drive piles for the north and south buildings

• Began erecting steel for south building

• Continue with pile cap and grade beam, and electrical

pullbox installation and erection of steel structure.

Next Steps:

Pile Driving

4

General Excavation

5

Pile Installation

6

Pile Cap Excavation

7

Electrical Pullbox Installation

8

Steel Erection

9