ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline Sanders-Telfer - PM High Risk Individuals Localities Project (SPMO) Improvement Science Professional Development Program Caring For Our Complex Patients in the Community

Transcript of ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality...

Page 1: ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline.

ISIA TeamMonique Davies - PM 20,000 Days Campaign

Tim Hou - GP & Clinical Lead for Mangere LocalityAlison Howitt - PM 20,000 Days Campaign and

Pauline Sanders-Telfer - PM High Risk Individuals Localities Project (SPMO)

Improvement Science Professional Development Program

Caring For Our Complex Patients in the Community

Page 2: ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline.

Caring for our Complex Patients in the Community

(As identified on PARR Risk Reports)

By 01 Dec 2014:

We aim to provide coordinated planned community management for our PARR identified high risk patients reducing unplanned hospital admissions from 50% (813 bed days)

Page 3: ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline.
Page 4: ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline.
Page 5: ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline.

High Risk Individuals Monitoring & Evaluation Framework

Page 6: ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline.

Name of Measure Is this an Outcome, Process or Balancing Measure?

Operational Definition (e.g., numerator & denominator)

Number of Patients identified on the Risk Score Tool. (PARR ≥ 30%)

Process measure Number of patients for triage

Number of high risk patients

Number of HR patients appropriate for intervention (Triaged including amenable to intervention by GP)

Process measure Number of HR patients for interventions

Number of patients for triage

Number of patients start interventions

Process measure Number high risk patients start interventions

Number of HR patients for interventions

Number of patients who complete their prescribed interventions

Process measure Number of patients who have completed ‘year of care’

Number enrolled into intervention programme

Positive patient experience questionnaires

Outcome measure Number of positive questionnaires

Total number of questionnaires completed

Reduction in risk score and predicted day usage compared with actual usual (after 12months)

Outcome measure (Long Term) Ratio : Actual measure of readmission for 12 months

Predicted chance of hospital admission

Measures

Page 7: ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline.

Change Concepts & PDSAsIdea for Testing in a

PDSATheory and prediction about what will happen

when ideas are testedList of interventions drafted and tested with GPs

Interventions list drafted by one of our GPs and approved by the Counties Manukau Clinical Reference Group, to be tested further with eight GP Practices in four localities (test to be completed by December 2013). Testing continues

GP Practice Readiness That GP practices have the processes and systems in place to allow them to take part in providing community based care for this complex patient group. Testing continues

That 50% of patients on the monthly High Risk list would be suitable for intervention

Nursing staff in Otara GP practice gauged patient amenability for intervention during a consultation using the December Risk report and the result was 50% were amenable to taking part in the suite of interventions. Testing continues

Triage time for GP to assess monthly high risk list

Completed with one GP, most patients took less than a minute to evaluate (for GP’s own patients) and 2-3 minutes to assess colleagues’ patients using the monthly risk report. Testing continues

Home Visit Assessment Transfer and adaptation of skills and tools from VHIU home visit assessment to Primary Healthcare Team. Testing continues

Page 8: ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline.

8

Appreciation for a System Optimizing the care of the patient in their medical

home (the community), by understanding the interactions between primary and secondary care providers

Incorporating primary and secondary data into the risk tool to ensure we appropriately identify our high risk group, by increasing the tools predictive power

Psychology Understanding primary and secondary care

perspectives and standardising the approachs to high risk patients

Understanding beliefs and assumptions and the will to change: i.e. the patient’s home is with the GP and the care should be driven from there

Do what’s best for the patient!

Theory of Knowledge Our subject matter experts are:

GPs, Primary Healthcare CentrePredictive Risk Model (PRM) collaborative Very High Intensity User (VHIU) collaborative

Learning from our experiences we are incorporating the PRM tool and the VHIU model and further developing a primary care intervention model to deliver care differently for our patients with complex needs

Understanding Variation Every patient’s needs are different and the

system needs to cater for the majority of those needs

The interventions allow flexibility for treating the patients but standardizing each process to reduce variation in the standard of care delivered

Profound Knowledge Worksheet

Page 9: ISIA Team Monique Davies - PM 20,000 Days Campaign Tim Hou - GP & Clinical Lead for Mangere Locality Alison Howitt - PM 20,000 Days Campaign and Pauline.

Shared Learning’s• Very valuable having Tim Hou, a GP and the Clinical Lead for

Mangere Locality, attend the ISIA course with us and having both Tim and Harley Aish (GP& Clinical Lead PRM collaborative) work on this project

• Working as an Inter-collaborative (PRM and VHIU), we have shared learnings to inform this project

• Having team members with knowledge and expertise in both Improvement Methodology and Prince2-lite, has benefited our understanding and approach to the project