ISDP(CW2) Individual Report

9
COMP1632 – Information System Development Project(ISDP) Coursework 2 - Individual Report

Transcript of ISDP(CW2) Individual Report

Page 1: ISDP(CW2) Individual Report

COMP1632 – Information System Development Project(ISDP)

Coursework 2 - Individual Report

Name: Chew Yi Xuan

Student ID: 000809579

Page 2: ISDP(CW2) Individual Report

In the 2nd phase of Information System Development Project(ISDP), we have

continue using the meeting to discuss the work. Nowadays, we are more closely and

understanding each other almost like family member than just a partner. In the 1st class

of 2nd phase of ISDP, we have start and learn the analysis and design about to draw the

UML diagram such as UML Design Class Diagram, Use Case Diagram, Activity

Diagram, Sequence Diagram, State Chart Diagram and Entity Relationship

Diagram(ERD). We are decide open meeting for this.

In the 1st meeting(CW2)/ 6th meeting (CW1) at Grand View Department, we are

discuss about the UML conceptual class diagram, use case diagram and activity diagram.

We have do a research and find some resource and tutorial to learn the concept to draw

the diagram. Moreover, we have write a assumption and draw the diagram follow the

requirement and match it so that the diagram are match with system requirement and

business need. Besides, I have learn to draw the diagram through online by using

Lucichart so that can improve skill and help group member facing problem for drawing

diagram.

Following the 7th meeting, our team have finished the conceptual class diagram,

use case diagram and activity diagram. We have show diagram to our lecturer during the

consultation time to make sure the diagram is in correct way. Moreover, we have

continue to draw the sequence diagram, state chart diagram and design class diagram. In

this section, we have do a lot of paperwork to improve the diagram because of the

sequence diagram, state chart diagram and design class diagram is more complicated so

that we use more time on it. Finally, we have complete our diagram for entire project and

we decide to start the system development and implementation phase there are start

coding for the system.

In addition, we plan to use CSS to make our system more user friendly and easily

to understand so that before starting coding the system in the 8th meeting, we gather go

learn about some concept of CSS, PHP, HTML, JavaScript, Jquery through

"www.w3school" this website. After that, the two lead programmer and I try start to write

Page 3: ISDP(CW2) Individual Report

code for the system. We have try do a web template for our system through Adobe

Dreamweaver CS6 and using some example online through "youtube.com". And the

other two group member are going to draw Entity Relationship Diagram(ERD) and built

the database by using phpMyAdmin.

Furthermore, we try to combine the system that we code with the database.

Finally we have done to coding our system so that now our team have start to doing

testing phase for the system. In the 9th meeting, we have make a documentation for our

system. We have do the program listing by using the use case diagram to match with the

system so that can know the result of fulfill of requirement. We have use some design

pattern for our system so that make it look nicely and better code as well as use the test

case/test plan for our system. I have doing some checking for the documentation of the

system to make sure our work are following the requirement of project case study. Lastly,

we have do some GUI and HCI for the system so that make user more easily to

understand our system and also can show out the strength of our system.

In conclusion, I will proud and wonderful can have group with my team member

because they are nice and awesome. I have learn a lot from them about discipline and

morale as well as best experience from the sharing of them. Lastly, we have do the best to

complete the project.

Page 4: ISDP(CW2) Individual Report

Pro-forma

Team Name: Y & Z Group member name

NotesDevelopmen

t Phase Task description

Che

w Y

i Xua

n

Leon

g K

ah C

hun

Koa

y Ph

aik

Chi

n

Lim

Wei

Hun

g

Fong

wei

Lun

g

Contribution%

Coursework 1

System Planning

Project Plan 5 3 4 3 2

System Planning

Individual Roles & Responsibility

5 5 5 5 5

System Planning

Business Case & Rationale

3 4 4 10

System Planning

Gantt Chart 7 2

System Planning

Activity Diagram for project

7 2

System Planning

Resource Utilization & Allocation Plan

7

System Planning

Costings & Use considerations & Other resource requirements

7

System Planning

5ps 5

System Planning

Rich Picture 2 7

System Planning

Root Definition & CATWOE

10

Page 5: ISDP(CW2) Individual Report

System Planning

List functional and non-functional requirement

10

Coursework 2

System Analysis and Design

UML Conceptual Class Diagram

10 4 6 4 3

System Analysis and Design

UML Use Case Diagram

10 4 6 4 3

System Analysis and Design

UML Activity Diagram for system

10 4 6 4 3

System Analysis and Design

UML Sequence Diagram

10 4 6 4 3

System Analysis and Design

UML State Chart Diagram

10 4 6 4 3

System Analysis and Design

UML Design Diagram 10 4 6 4

System Analysis and Design

Entity Relationship Diagram(ERD)

5 6 4

System Analysis and Design

Input/Output Design (Draft)

3 6

System Development and Implementation

Web design (CSS, HTML)

20 13 10 15 10

Page 6: ISDP(CW2) Individual Report

System Development and Implementation

System Coding (PHP, Javascript, Jquery, MySQL)

8 6 13 15 30

System Testing and Maintenance

Design Pattern 2 5 7

System Testing and Maintenance

HCI 2 5 7

System Testing and Maintenance

Test Case/Test Plan 3 7

System Testing and Maintenance

ReadMe 3 7

Total

Initials

100 100 100 100 100

CY

X

LKC

KPC

LWH

FWL