Page 1: ISC40G(S) - Insatech · ISC40G(S) with external temperature sensor To get a more stable and faster reacting temperature reading, Insatech have designed a small solution with a termowell

ISC40G(S)with external

temperature sensortemperature sensor

Page 2: ISC40G(S) - Insatech · ISC40G(S) with external temperature sensor To get a more stable and faster reacting temperature reading, Insatech have designed a small solution with a termowell

ISC40G(S) with external temperature sensorTo get a more stable and faster reacting temperature reading, Insatech have designed a small solution with a termowell welded to the clamp. This ensures that temperature sensor is placed close to the conductivity measurement without inf luencing the measurement.

Solutions for existing installations delivered with –STC1

CLAMPISCEXTEMP-2

Consist of:– New 2” clamp connection with termowell

surface roughness Ra<0,8, Incl. 3.1 material certif icate and statement on the surface roughness.

– New coupling nut with smaller height– EPDM o-ring with FDA approval– Temperature sensor; PT1000 class. A

Page 3: ISC40G(S) - Insatech · ISC40G(S) with external temperature sensor To get a more stable and faster reacting temperature reading, Insatech have designed a small solution with a termowell

Solution for new installations ISC40G(S)-GS without -STC1 Price Delivery time

CLAMP2ICSEXTEMP 846 EUR 4 Weeks

New 2” clamp connection with termowell surface roughness Ra<0,8, Incl. 3.1 material certificate and statement on the surface roughness.

Metal pipe

Coupling nut with smaller height

EPDM o-ring with FDA approval

Temperature sensor; PT1000 class. A

Solutions for existing installation ISC40G-GG Price Delivery time

CLAMP3ISCEXTEMP 1100 EUR 4 weeks

New 3” clamp connection with termowell surface roughness Ra<0,8, Incl. 3.1 material certificate and statement on the surface roughness.

EPDM o-ring with FDA approval

Temperature sensor; PT1000 class. A

Solution for new installations ISC40G(S)-GS without -STC1 CLAMPICSEXTEMP-2N

– New 3” clamp connection with

termowell surface roughness Ra<0,8, Incl. 3.1 material certif icate and statement on the surface roughness.

– EPDM o-ring with FDA approval– Temperature sensor; PT1000 class. A

– New 2” clamp connection with termowell surface roughness Ra<0,8, Incl. 3.1 material certif icate and statement on the surface roughness.

– Metal pipe – Coupling nut with smaller height– EPDM o-ring with FDA approval– Temperature sensor; PT1000 class. A

Solutions for existing installation ISC40G-GG CLAMPISCEXTEMP-3

Page 4: ISC40G(S) - Insatech · ISC40G(S) with external temperature sensor To get a more stable and faster reacting temperature reading, Insatech have designed a small solution with a termowell

Thermowell in a ISC-fitting Page 1 of 1Temperature behavior

Test of the temperature measurement.

Equipment used to measure the conductivity.Transmitter Sensor Fitting:

Manufacturer YokogawaModel: ISC402G-E-2-E PT1000 2"-tri-flange. Option STC1Serial no.: P6220126 with Insatech thermowell

SW: Rel 2.0

Reference:Thermometer: Isotech TTI7 . Insatech ID 54A1. Bath Isotech parallel tube model 915.

Calibration set up.

First the PT1000 was placed in the thermowell of the fitting and calibrated. The fitting was immersed in to the bath until the underside of the tri-flange had contact with the water in the bath.

After the test where the temperature element was placed in the thermowell of the fitting, the element was calibrated directly in the bath. To prevent damage,of the sensor the top was 1-2 mm above the water level during the calibration.

[°C] [°C] [°C] [°C] [°C] [°C]0,20 0,2 0,00 0,20 0,3 0,10

20,00 20 0,00 20,00 20 0,0025,00 25 0,00 25,00 25 0,0050,00 49,9 -0,10 50,00 49,6 -0,4075,00 74,8 -0,20 75,00 74,5 -0,5090,00 89,9 -0,10 90,00 89,2 -0,80

Conclusion:The temperatur measurement is ok when the element is calibrated in the thermowell; but if calibrated directly in a bath with some of its metal exposed to ambient temperature the measurement is suffering under stam loss.So the element has to be calibrated in a well.

Deviation

PT1000 placed in the thermowell of fitting.

The PT1000- element directly in the cal. Bath

Reference Deviation Reference

Thermowell in a ISC-f itting Temperature behavior

Page 5: ISC40G(S) - Insatech · ISC40G(S) with external temperature sensor To get a more stable and faster reacting temperature reading, Insatech have designed a small solution with a termowell

Thermowell in a ISC-fitting Page 1 of 3Influence of ext. temp. sensor

Test of how the temperature thermowell welded on the tri-flange of an inductive sensor is influencing the conductivity measurement.

Equipment used for the test.

Equipment used to measure the conductivity.Transmitter Sensor

Manufacturer Yokogawa YokogawaModel: ISC402G-E-2-E ISC40S-GS-T3-05Serial no.: P6220126 X80196

SW: Rel 2.0 IF: label 1,90

Reference equipment:0,01-1000 µS/cm: SC450 & SC42-SP34. Insatech's ID 72 & 741 -240 mS/cm: SC450 & SC42-EP08. Insatech's ID 72 & 81Measuring ability: ±0,5% of actual value.

Fitting:2"-tri-flange. Option STC1

Calibration set up:

The tri-flange with the ISC40 is placed in a pipe. Calibration media is then pumpedthrough the pipe and the reference. When stable both values are noted.

Pipe data:Material: SS 316LInner diameter: 76,3 mmOuter diameter: 72,0 mmThe neck of the tri-flange is 14 mm

The sensor is facing the same way during all tests.

The measurements are done with-out temperature compensation.

Thermowell in a ISC-f itting Inf luence of ext. temp. sensor

Page 6: ISC40G(S) - Insatech · ISC40G(S) with external temperature sensor To get a more stable and faster reacting temperature reading, Insatech have designed a small solution with a termowell

Thermowell in a ISC-fitting Page 2 of 3Influence of ext. temp. sensor

Calibration data

Thermowell placed Thermowell placed at theat the Pick-up side of the ISC40 sensor driver side of the ISC40 sensor

Reference SC402G Deviation Reference SC402G Deviation mS/cm mS/cm mS/cm mS/cm

IF=1,856 % IF=1,856 %0,2838 0,2818 -0,73 0,2340 0,2327 -0,530,6113 0,6097 -0,26 0,6837 0,6828 -0,131,143 1,144 0,10 1,207 1,207 0,023,926 3,924 -0,05 4,633 4,635 0,045,34 5,35 0,07 5,93 5,92 -0,067,82 7,83 0,06 8,49 8,48 -0,089,29 9,28 -0,16 10,68 10,65 -0,33

19,49 19,43 -0,34 15,88 15,83 -0,3536,9 36,7 -0,43 18,7 18,7 -0,3149,4 49,2 -0,37 37,6 37,5 -0,3194,1 93,9 -0,23 57,5 57,2 -0,48

116,1 115,8 -0,27 95,1 94,7 -0,38116 115,7 -0,18

Thermowell placed at the side No thermowellof the ISC40 sensor (turned 90°)

Reference SC402G Deviation Reference SC402G Deviation mS/cm mS/cm mS/cm mS/cm

IF=1,856 % IF=1,856 %0,0768 0,0749 -2,40 0,2857 0,2837 -0,720,2178 0,2164 -0,64 0,7108 0,7107 -0,020,782 0,781 -0,15 1,240 1,242 0,121,295 1,295 0,00 5,008 5,020 0,235,31 5,32 0,10 9,78 9,77 -0,088,89 8,89 -0,06 15,44 15,40 -0,28

11,31 11,27 -0,32 21,37 21,35 -0,1115,27 15,22 -0,30 37,83 37,70 -0,3618,4 18,3 -0,22 55,7 55,5 -0,3437,2 37,1 -0,20 108,6 108,5 -0,1453,9 53,8 -0,1993,0 92,8 -0,18

109,5 109,4 -0,09

Thermowell in a ISC-f itting Inf luence of ext. temp. sensor

Page 7: ISC40G(S) - Insatech · ISC40G(S) with external temperature sensor To get a more stable and faster reacting temperature reading, Insatech have designed a small solution with a termowell

Thermowell in a ISC-fitting Page 3 of 3Influence of ext. temp. sensor

Conclusion

Now what does the numbers and graph shows?

First- in the low region the IF factor seems to be diffrent compaired to the higher conductivity range.

Secondly- The thermowell seems not to influence the conductivity measurement. The difference in calibration curves are probably due to uncertainties in the determination

-1,00

-0,80

-0,60

-0,40

-0,20

0,00

0,20

0,40

0,60

0,80

1,00

0,0 20,0 40,0 60,0 80,0 100,0 120,0 140,0

Dev

iati

on in

%

Reference mS/cm

Deviation

At pick-up side

At drive side

At the side of the sensor (90°)

No termowell

Uncertainty of calibration

The difference in calibration curves are probably due to uncertainties in the determination of the curves.

Thermowell in a ISC-f itting Inf luence of ext. temp. sensor

Page 8: ISC40G(S) - Insatech · ISC40G(S) with external temperature sensor To get a more stable and faster reacting temperature reading, Insatech have designed a small solution with a termowell

In 2005 Insatech A/S became a part of the Addtech Group of companies – Addtech AB, Stockholm, and since the company was established in 1989, we have had a positive business development. Today we are nearly 50 employees.

Our mission is to be a trustworthy and competent partner, who supply technical solutions and engineering within process automation.

About us

Accredited Calibration:Conductivity (Master meter)Gas Flow

Analysis of gases:Ammonia - NH3 Moisture - H2O Oxygen - O2Carbon dioxide-CO2Carbon monoxide - CO Methane - CH4Hydrochloric acid - HCl Water - HO2

Analysis of liquids:Cell density Density Color Conductivity Concentration Carbon dioxide - CO2Live Cells Sound speed NIR Dissolved Oxygen pH Plato Protein Refractive index Turbidity Solids Viscosity

Analysis of solids:Moisture Fat Protein

Calibration:Flow Temperature Pressure Simulators

Control and Systems:DCS Systems Shut Down & security systems MES systems Blending Systems MID SolutionsSEEMP

Controllers:Auto-tuning Fuzzy-logic Single- and multi-loop

Flow Measurement:Bunker ControlBunker BlendingCustody transfer Coriolis massfl owDifferential - orifi ce/pitot tube Flowswitch Magnetic inductiveMechanical Rotameters V/A Thermal massfl ow Ultrasonic (Clamp-on and in-line)Vortex

Flow Measurement Solids:Microwaves

Level Measurement:ElectromechanicalDisplacement Hydrostatic pressure Capacitive Conductive Microwaves Radar Radiometric Ultrasonic Vibration

Pressure Measurement:Absolute Differential RelativeCalibrators Diaphragm sealLevel Pressureswitch

Registration & Data Collection:Data loggers Data Acquisition Systems GPRS - wireless transmission Recorders Paperless recorders

Single Use Technology:FlowPressureTemperatureUVConductivityLive CellsTurbidity

Services:Calibration: Flow - gases and liquids Conductivity pH Temperature PressureAccredited Calibration: Conductivity Gas Flow Temperature ElectricalService: Project Solutions Control / Periodic maintenance Services and inspections

Temperature:FlowPressureTemperatureUVConductivityLive Cell CountingTurbidity

Temperature:Calibrators Sensors Thermoelements Transmitters

Training:Customized seminars and trainingsessionwww.instrumenteringskursus.dk

Products and Services

© Insatech A/S

Reproduction of text or excerpts of this is authorized provided the source is acknowledged.

• Process instrumentation and calibration equipment• Automation, control and data aquisition• System design, engineering and validation

(DCS and Safety Systems)• Service/maintenance and

calibration (ISO 17025 accreditation)• Site surveys and evaluation

of process optimization based on better control practices

• Marine- and ship solutions, Cargo Management Systems

• Project Management• Flow rigs/calibration rigs• Special fi ttings• Product enhancements • Wireless solutions for monitoring

and control• Complete solutions including

panels and commissioning• Seminars and training

Our main business areas:

Conductivity calibrationTemperature calibration

Electrical calibration

As a result of our longstanding partnership with some of the world’s leading manufacturers within instrumentation and automation, we are able to provide a global service.

We work as a professional partner for our suppliers and for our customers – we believe in long relationships.Our main markets are in the Pharmaceutical, Food, Energy, Marine/Oil & Gas Industry, which means we have a strong knowledge of the special applications, as well as the requirements for documentation in these areas.

Prod

ucts

Documentation

Com

mis

sion

ing

EngineeringDesign

Trai

nin

g

Support

Com

mis

si

ring

ort

Logi

stics

Documentatio

n

CSR & Environment

Quality Assurance

Financial

ww

w.in

satech.com

Marine SolutionsService and M

aintenance - Process Optim

ization

On-site Calibratio

n

Instrumentation

Contro

l Sys

tem

s an

d Pr

ojec

tsAc

cred

ited

Calibration

Product Engineers

Service Eng

ineers

Key Account Manager

s

Project M

anagers

Eng

inee

rs M

etro

logy La

b