Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water...
-
Upload
kristian-collins -
Category
Documents
-
view
221 -
download
0
Transcript of Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water...
![Page 1: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/1.jpg)
Is Desalination Our Future?
April, 2010
Paul HellikerGeneral Manager
Marin Municipal Water District
![Page 2: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/2.jpg)
“If we could produce fresh water from salt water at a low cost, that would indeed be a great service to humanity and would dwarf any other scientific accomplishment.”
JFK - 1962
![Page 3: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/3.jpg)
Water Stress Globally
IPCC, 2008
![Page 4: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/4.jpg)
15 Model Runs: 2080-99 compared to 1980-99
Climate Model Predictions
![Page 5: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/5.jpg)
Climate Skeptic Theories
![Page 6: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/6.jpg)
Trends in Runoff TimingD
WR
, 200
7
![Page 7: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/7.jpg)
Precipitation Variability
DWR, 2007
![Page 8: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/8.jpg)
CA Snowpack Predictions
DWR, 2010
![Page 9: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/9.jpg)
L. F
lint,
20
09Projected Runoff Changes
![Page 10: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/10.jpg)
L. Flint, 2009
Projected Runoff Changes
![Page 11: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/11.jpg)
DW
R, 2
010
![Page 12: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/12.jpg)
DW
R, 2
010
![Page 13: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/13.jpg)
“All I’m saying is now is the time to develop a technology to deflect an asteroid”
Lessons from the Past
![Page 14: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/14.jpg)
DWR, 2010
Strategies for Water Resources
![Page 15: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/15.jpg)
Desalination: Israel
FACILITIES:
Hadera (92)
Palmachim (33)
Soreq (108)
Ashdod (72)
Ashkelon (83)
![Page 16: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/16.jpg)
Plant Location Capacity (MGD)
% of Supply
Startup Cost
Gold Coast
Brisbane 33/44 27 2009 $1.30 B
Perth Perth 38/66 17 2006 $420 M
Kurnell Sydney 66/132 15 2010 $2.06 B
Southern Perth/
Bunbury
13/26 20 2011 $1.04 B
Wonthaggi Melbourne 108/145 33 2012 $3.80 B
Port Stanvac
Adelaide 71 50 2012 $1.98 B
Desalination in Australia
![Page 17: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/17.jpg)
Gold Coast
Kurnell
WonthaggiPort Stanvac
SouthernPerth
Desalination in Australia
![Page 18: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/18.jpg)
Desalination in Spain
20 new plants planned for the SE
Will double the capacity in Spain
Will provide about 50% of the area’s water need
![Page 19: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/19.jpg)
Current Desalination Facilities
![Page 20: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/20.jpg)
Proposed Plants in CA
20+ new plants planned
425 MGD of capacity proposed (= to 20% of MWD daily)
Largest in Southern California
![Page 21: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/21.jpg)
Zone 7
SCVWD
ACWD
SFPUC
MMWD
EBMUD
CCWD
SCWA Solano CWA
Water Supply in SF Bay Area
Mix of Wholesale and Retail Agencies
MMWD Supplies from Local Reservoirs (75%) and Russian River (22%)
![Page 22: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/22.jpg)
Sources of Water
![Page 23: Is Desalination Our Future? April, 2010 Paul Helliker General Manager Marin Municipal Water District.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649ebf5503460f94bc95fc/html5/thumbnails/23.jpg)
NHOME DEPOT
SHORELINE P
ARKWAY
HWY 580
TO SAN RAFAEL
NORTHSAN FRANCISCO
BAY
HWY 580
TO RICHMOND
24” DESALINATEDWATER PIPELINE TO
MMWD DISTRIBUTION
36” SOURCE WATER PIPELINE
MMWD
DESALINATIO
N
FACILIT
Y
EXISTING MMWD PELICAN WAY STORAGE SITE
36” INTAKE PIPELINE
UNDER PIER
FULL SCALE FACILITY INTAKE SCREENS AND
PUMP STATION
24” BRINE PIPELINE
BRINE PIPELINE CONNECTS TO EXISTING CMSA VALVE BOX
CENTRAL MARINSANITATION
AGENCY (CMSA)EXISTING CMSA EFFLUENT PIPELINE
EXISTING CMSA OUTFALL (8,600 FT. +/-)
TO SIR
FRANCIS
DRAKE
N
PACIFIC OCEAN
SAN FRANCISCO
BAY
PROJECTLOCATION
MMWD Full Scale Desalination Project