Is a 80th Percent Design Point Logical?

7
 6  Metallurg ical Plant Desig n and Ope rating Strate gies (MetPla nt 2013) 15 - 17 July 2013, Perth WA Is an 80th Percentile Design Point Logical?  D David 1  1. FAusIMM, Technical Director – Process, AMEC, Level 7, 197 St Georges Terrace, Perth WA 6000. Email: [email protected] ABSTRACT Clearly a plant designed only to treat average ore at the nameplate rate will fail to achieve nameplate in any typical year. To insert the necessary capability to achieve nameplate it is common process engineering design practice that plant must be able to treat an ore with 80 th  percentile value (hardness or competence values for example) at the nameplate rate. In the author’s experience, apart from a couple of notable cases, this has been applied reasonably well as a principal, and with widespread success. However, in a number of recent instances it became clear that the use of the 80 th  percentile number would have resulted in significant under design of the plant. This paper makes the case that the 80 th  percentile, as a principal, has can have serious flaws and its use needs to be assessed on a case  by case basis. The discussion in this paper is the first step in developing a new design principal, and the associated methodology for selection of a design value, that will ensure plants are designed to achieve their nameplate capacities. INTRODUCTION Designing a process plant has many conventions that are often taken for granted. One of these is that the 80 th  percentile value of a key measure, like the Bond ball mill work index (BWI), will provide an unquestionable margin of design safety in the plant. The normal procedure is to take a set of test results, for example 20 individual BWI values from around the orebody, arrange them largest to smallest and take the 16 th  largest value. This is placed in the design criteria as the 80 th  percentile, usually alongside the average BWI value, and is subsequently used to design the ball mill. Many years later that number can assume almost legendary status as THE work index of the deposit or it may have assumed infamous status as being the main cause of the failure of the plant to achieve nameplate throughput or grind size. The purpose of this paper is to explore circumstances where the 80 th  percentile value will not provide a definitive design point. Guidelines for avoiding being fooled by a false design value are provided, together with the basis for alternative design methodologies. PROBLEMATIC DATA SETS The annual plan If the 20 values of a particular measurement are provided from a 20 year annual mine plan then failure to design for variability for that measure is virtually assured. One of the most common values that dangerously makes its way into design criteria from mine plans is head grade. A recent analysis of copper head grade for a project determined the variability of a number of related data sets ranging from the most inherently variable to the least. The most variable data sets are those that look at the orebody in individual parcels that may represent minutes or hours of plant feed. Two examples of such data (present in virtually all projects) are the drill database and the block model. At the other end of the variability scale is the annual mine plan. To arrive at the annual mine plan it is normal to use the individual ore blocks contained in the block model in an orderly and controlled fashion. The use of blocks (in an open pit example) is orderly because it commences at the surface and must progress downward in some logical mining sequence. The use of blocks is controlled  because it is typical to attempt to obtain a target head grade to the process plant when making HOME

description

80th Percentile.

Transcript of Is a 80th Percent Design Point Logical?

  • 6

    Metallurgical Plant Design and Operating Strategies (MetPlant 2013) 15 - 17 July 2013, Perth WA

    Is an 80th Percentile Design Point Logical?

    D David1

    1. FAusIMM, Technical Director Process, AMEC, Level 7, 197 St Georges Terrace, Perth WA 6000. Email: [email protected]

    ABSTRACT Clearly a plant designed only to treat average ore at the nameplate rate will fail to achieve nameplate in any typical year. To insert the necessary capability to achieve nameplate it is common process engineering design practice that plant must be able to treat an ore with 80th percentile value (hardness or competence values for example) at the nameplate rate. In the authors experience, apart from a couple of notable cases, this has been applied reasonably well as a principal, and with widespread success. However, in a number of recent instances it became clear that the use of the 80th percentile number would have resulted in significant under design of the plant. This paper makes the case that the 80th percentile, as a principal, has can have serious flaws and its use needs to be assessed on a case by case basis. The discussion in this paper is the first step in developing a new design principal, and the associated methodology for selection of a design value, that will ensure plants are designed to achieve their nameplate capacities.

    INTRODUCTION Designing a process plant has many conventions that are often taken for granted. One of these is that the 80th percentile value of a key measure, like the Bond ball mill work index (BWI), will provide an unquestionable margin of design safety in the plant. The normal procedure is to take a set of test results, for example 20 individual BWI values from around the orebody, arrange them largest to smallest and take the 16th largest value. This is placed in the design criteria as the 80th percentile, usually alongside the average BWI value, and is subsequently used to design the ball mill. Many years later that number can assume almost legendary status as THE work index of the deposit or it may have assumed infamous status as being the main cause of the failure of the plant to achieve nameplate throughput or grind size.

    The purpose of this paper is to explore circumstances where the 80th percentile value will not provide a definitive design point. Guidelines for avoiding being fooled by a false design value are provided, together with the basis for alternative design methodologies.

    PROBLEMATIC DATA SETS

    The annual plan If the 20 values of a particular measurement are provided from a 20 year annual mine plan then failure to design for variability for that measure is virtually assured. One of the most common values that dangerously makes its way into design criteria from mine plans is head grade.

    A recent analysis of copper head grade for a project determined the variability of a number of related data sets ranging from the most inherently variable to the least. The most variable data sets are those that look at the orebody in individual parcels that may represent minutes or hours of plant feed. Two examples of such data (present in virtually all projects) are the drill database and the block model. At the other end of the variability scale is the annual mine plan. To arrive at the annual mine plan it is normal to use the individual ore blocks contained in the block model in an orderly and controlled fashion. The use of blocks (in an open pit example) is orderly because it commences at the surface and must progress downward in some logical mining sequence. The use of blocks is controlled because it is typical to attempt to obtain a target head grade to the process plant when making

  • 7

    Metallurgical Plant Design and Operating Strategies (MetPlant 2013) 15 - 17 July 2013, Perth WA

    selections from the blocks that are immediately available to be mined. In many cases there is also a stockpiling system in place (usually incorporated into the block sequencing procedures) between the mine and process plant to allow grade control to be achieved when the mine cannot directly provide it. Usually the measure being controlled is the head grade of the most valuable component, and this also the measure for which believable variability information is required for design.

    On arrival at a site for commissioning at a copper mine the author was greeted with the bunded flotation area of the plant freshly filled with copper concentrate, mostly from the cleaners and recleaners. The launders and pumps were continuing to overflow. On asking what had caused the problem, the response was that the plant had been processing 8% Cu in feed for the last day and they couldnt do much about the problem immediately as the stockpile was full of 8% copper ore!

    The design criteria for this project were, in theory, prepared on an even more conservative basis than the 80th percentile because the maximum grade had been used (100th percentile). This value was 1.6% Cu and, obviously, nowhere near what was being dealt with by the plant. Although this value was in the design criteria, the maximum case mass balance assumed a head grade of only 1.39% Cu, the 80th percentile value. Both the 100th percentile and the 80th percentile values were from the annual mine plan.

    The variability levels for the various data sets described at the commencement of this section are shown in Figure 1. The upper and lower limit 95% lines represent the range that contains 95% of the data within that particular set. Note that this is not the same project that had the 8% Cu in flotation feed problem.

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    Core MetTestData Block Shift Day Week Month Year

    %Cu

    inFe

    ed UpperLimit95%80thPercentileAverageLowerLimit95%

    Figure 1: Variability Bands for Grade Data Sets from a Single Orebody

    The 80th percentile value for the shift data set is 0.91% Cu and this would be a reasonable value to use for design purposes. The shift data set also predicts that the plant can expect to treat 1% Cu (or greater) in feed for 2.5% of the time (the Upper Limit 95 is actually the 97.5th percentile value) which is 27 x 8 hour shifts per year, or more than two per month. Clearly choosing to use the 80th percentile annual, monthly or weekly mine plan copper grades for design purposes would dangerously underestimate the real copper grade variability that the plant must be able to process.

    Interestingly, the core database 80th percentile would also underestimate the shift 80th percentile value, while both the metallurgical test data set and the block data 80th percentile values would be acceptable

  • 8

    Metallurgical Plant Design and Operating Strategies (MetPlant 2013) 15 - 17 July 2013, Perth WA

    estimates. However, all three small-sample data sets overestimate the Upper Limit 95 value by at least 100% compared to the shift data.

    When put in the context of real operational requirements, it becomes clear that the annual plan is not a valid source of process design information.

    The composited sample To save money, a recent client had only conducted five sets of metallurgical tests at laboratory scale for a definitive feasibility study (DFS) level design. Minimal background information, apart from the data itself, was provided for a review. The five BWI values provided all lay between 11.1 kWh/t and 11.8 kWh/t. The SD between the six tests was 0.3 kWh/t, approximately what is normally considered to be the inherent repeatability of the test itself. The SD (standard deviation) of the DWI results was only 0.4 kWh/m3, again similar to the level of repeatability expected of that test.

    The 80th percentile of the five BWI values was only 2% greater than the average value and the maximum value was only 3.5% above the average. For the DWI result set, the 80th percentile value was only 10% higher than average and the maximum value was not much higher at 13% above average. There were two possibilities to explain these results, either the orebody was the first one in the authors experience where the material was all the same or, something very strange had happened in the constitution of the samples.

    In response to requesting more information, the core intervals making up each of the samples were provided. The source of the problem was composite preparation, and all semblance of variability had been eliminated from the samples. Each test sample was a composite of a minimum of 60 core intervals from a minimum of 4 different drill holes. The stated aim of this particular piece of work had been to define the properties of five different areas in the orebody. Obviously, it was confirmed that the five areas can be considered virtually identical, on average, with respect to ball milling. However, the test data set contains compositing equivalent to, at least, the level of an annual mine plan (and maybe even up to a 5 year mine plan basis). As demonstrated in the last section, annual plan data is unsuitable because it contains a level of variability far below what is needed for safe design.

    Applying the relationship between annual variability and shift variability from Figure 1, it is possible to provide an estimate of what the true variability of BWI values might have been, had multiple contiguous samples been tested individually. From figure 1 the 80th percentile value from annual data is only 10% above the average value, while the 80th percentile on a shift basis is 74% above the average value. Therefore, if the difference between the annual BWI 80th percentile and the average BWI value is multiplied by 7.4 the variability will more closely represent a valid design 80th percentile. The outcome of this calculation is a more believable 80th percentile BWI value of 13.2 kWh/t 16% above the average value of 11.4 kWh/t. Given the uncertainty in what the original data set actually represents, the real 80th percentile value for a production shift could be even higher.

    This example clearly shows the danger of relying on composited samples for design purposes. The circumstances behind these composites are extreme, but it must be recognised that any compositing reduces the inherent variability that will exist in the test results. Knowing how samples have been selected and prepared is essential to understanding the design implications of test data.

    As a variation on the compositing theme, in many projects tests have been carried out on annual composites (eg Year 1 composite, Year 2 composite, etc). Taking an 80th or 100th percentile value from the set of annual composite results will, again, dangerously underestimate the variability the process design needs to cope with.

    Multi-modal ore properties Few orebodies consist of a single lithology or a single geological classification of material. In many instances (but not all) the comminution and separation properties of the different geological units can be distinctly different and need to be understood separately. If the geological differences also correspond to metallurgical differences then the geological ore types are valid geometallurgical ore

  • 9

    Metallurgical Plant Design and Operating Strategies (MetPlant 2013) 15 - 17 July 2013, Perth WA

    types. In addition, each geometallurgical ore type will display a range of properties, and the proportions of each ore type in plant feed will vary from shift to shift and year to year.

    A classic example would be where the orebody has an oxidised cap, a transition zone and fresh rock at depth. The approach often seen by the author is for the fresh rock to be represented by 20 or more samples, the transition by five samples and the oxide by two, neatly matching their proportion in the orebody.

    Provided the samples have been selected correctly, it is certainly possible to derive a reasonable 80th percentile value for the fresh ore. Conversely, it is not even possible to estimate the degree of variability in key properties (let alone the 80th percentile values) that characterise the oxide cap using only two samples.

    If the oxide cap represents 100% of plant feed for the first 6 months, then understanding the properties of that material is of reasonably high importance. The plant will be commissioned on that ore and it may play a significant role when bankers tests and warranty tests are being conducted. In this situation, a minimum of 10 spatially distributed samples of oxide ore need to be tested before the variability can be estimated. There is usually one guarantee with oxide ore, it will be more variable than the fresh rock from which it is derived.

    The transition ore presents similar problems, not least of which is definition. An ore is called transition because it is part way between the original rock (in this case fresh ore) and the geological layer above it (in this case the oxide cap). Invariably, the transition ore will contain examples of the end members (fresh and oxide) together with everything in between. The high degree of variability in typical transition ore demands that a reasonable number of samples be tested, provided of course that the transition ore type represents a substantial plant feed component for a long enough time period to be considered separately in the design process.

    The more components in the ore the more important it is to have detailed mine plans guiding the design process. The most common misconception for the inexperienced (or those in a hurry) is that the proportions of each ore type in plant feed can be taken directly from the monthly or annual mine plan. The only way a realistic appreciation of the variability in ore type proportions can be gained is to understand how such ore gets from the mine to the plant.

    For example: An orebody has two ore types with distinctly different comminution properties and these ore types are planned to be, on an annual basis, delivered to the plant in a 50:50 ratio. Simplistically the ore type properties can be averaged and then used for design. However, discussions with the geologists reveal that the first ore type is on one side of the orebody and the other ore type is on the other side of the open pit. Discussions with the miners reveal that they are only intending to have one shovel in ore at any one time and that there is no intention to set up blending stockpiles, as it is too expensive to double-handle all the ore. The 50:50 ratio is not a 50:50 blend and has now become sequential processing of one ore type, followed by the other. The resulting design requirements are totally different to the requirements for processing a 50:50 blend.

    Where does the 80th percentile come into this discussion? The 80th percentile of the blend is obviously of little use. Each ore type now needs to be understood individually in terms of variability, and the number of test samples required has probably doubled. If the 80th percentile value is to be the basis of design then the properties of each ore type need to be measured to the degree where a reliable 80th percentile value can be extracted from the results for each ore type.

    However, before proceeding to design the plant to treat each ore type separately, a constructive discussion is needed across all three disciplines to explore the implications of alternative mining strategies. For example, introducing blending before the primary crusher or reducing the shovel size and having two (or more) ore faces supplying plant feed at all times. Beware of the argument that often comes up in such discussions that blending is happening in the coarse ore stockpile after primary crushing. Unless the coarse ore stockpile is a bed blending arrangement where ore is stacked in layers and reclaimed across the layers, then it can be safely assumed that no blending of any consequence occurs in the coarse ore stockpile.

  • 10

    Metallurgical Plant Design and Operating Strategies (MetPlant 2013) 15 - 17 July 2013, Perth WA

    VARIABILITY EXPECTATIONS Steve Morrell (Morrell 2011) published the distribution of variability levels that exists within the SMC (Sag Mill Competence) test database. Typically, SMC test samples are from contiguous core intervals and are done in numbers large enough (per orebody) to derive reasonable statistics. The variabilities of the DWI (drop weight index, in kWh/m3) results from the 650 orebodies represented in the database (at the time of his writing) were distributed as shown in Figure 2.

    Figure 2 Distribution of Orebody COV* values for Competence Measurement (after Morrell 2011)

    *The coefficient of variation (COV) is simply the standard deviation divided by the average value, expressed as a percentage.

    For an orebody with an average DWI value of 5 kWh/m3 and a COV value of 25%, the 80th percentile value must lie between 25% and 50% greater than the mean value (between one and two standard deviations greater than the mean). An 80th percentile value of 7 kWh/m3 would not be unreasonable for this example. However, the COV could range from 5% to 60%, so 80th percentile values of 10 kWh/m3 and 5.4 kWh/m3 are also not unreasonable for a 5 kWh/m3 ore.

    All critical measures used for design will have a similar (but usually less broadly spread) range of possible variability values. Without having enough actual measurements from tests performed in the correct manner on appropriate samples, it is not possible to achieve a reliable estimate of variability for a particular property in an orebody. This statement also excludes the 80th percentile estimation method applied in the compositing exercise discussed earlier in the paper. Although the final 80th percentile estimate was superior to the estimate from the original data, it was also far from definitive.

    AN ALTERNATIVE APPROACH As has been demonstrated in the examples above, the 80th percentile value can be totally misleading and dangerous as a design point if the data set from which it is derived is not suitable for design purposes. In any data set typically available as a foundation for design, the average value will be a much more reliable number than the 80th percentile or the SD. In the example given for the effect of compositing, an estimate was made of a believable 80th percentile value based on an assumption about

  • 11

    Metallurgical Plant Design and Operating Strategies (MetPlant 2013) 15 - 17 July 2013, Perth WA

    the variability differences known to exist between data sets calculated on varying time scales of production. Notably the adjustment to the 80th percentile value was made relative to this well-defined value, the average of the data set. The method employing scaling of variability (or 80th percentile) between datasets is one alternative approach to selecting the design point.

    However, although the concept of the 80th percentile is one that provides some comfort in design, it is also one that is arbitrary. Why not use the 90th percentile, the 75th percentile, or some other value? In a recent design project some criticism was provided in a review that the 80th percentile had not been used and reliance was placed on a riskier value, the 75th percentile. Regardless of the fact that the 75th percentile was the agreed design point with the client, the results database was revisited and the design outcome recalculated using the 80th percentile value. In this instance the difference was less than 0.5% in the mill power, insignificant in the accuracy of the design. For this particular deposit the SD of the value in question was very low but the variability in the data set was considered valid for design. The data set consisted of about 50 results, all from individual contiguous samples according to an AMEC sample selection plan. The insensitivity, in this instance, of the design outcome to the selected percentile value was of concern, mainly because the design point was not all that much greater than the data set average. This particular instance has led to a re-evaluation of the basis of design towards using the mean value, rather than any high-percentile derivative (80th or 75th) of the data set.

    Once the focus is on the mean value then the concept of confidence can be introduced to design process. It is possible mathematically to derive the upper and lower confidence limits for a given mean value of a data population by knowing the number of samples in the population, the SD of the population and the degree of confidence that is required in the mean value. The higher is the required confidence level, the wider the range of possible mean values for any data set. A range of possible mean values exists because, if exactly the same sample selection process was conducted on the same orebody, but different core intervals were chosen, the mean result from testing this second sample set is almost certain to be different to the mean result from testing the first sample set. Therefore, it is possible to know what the highest likely mean value is (the upper confidence limit of the mean) and Microsoft Excel provides a function to simplify this estimation. As the SD is an integral part of the calculation it is still necessary to re-estimate the SD if compositing or annual planning has smoothed the available data set.

    Confidence is the inverse of risk. A confidence level of 90% means that the risk of the available result being wrong (outside of some accuracy target if you repeat the measurement exercise) is 10%. The 10% is actually made up of two components, being outside of accuracy limits on the high side and being outside the limits on the low side. If the low side is problematic but the high side is not, then there is only a 5% change of a problematic result. This represents 1 chance in 20 that the available measurement is lower than it should be and will lead to a design at risk of failure. Typically a 90% confidence limit or a 95% confidence limit is applied in these calculations and any remaining risk is mitigated by adding a design margin.

    A poor data set will provide a large confidence limit band for the mean. A good data set will provide a tight confidence limit band. For any data set the safest estimate of the mean for design purposes is either the upper or lower confidence limit (depending on how the value in question drives design). As these values are estimates of the mean (and not of the range of full population) then the resulting design value will be much less than the 80th percentile or the upper limit 95% for the population. The important thing about this value is its believability (the confidence it provides).

    Having such a value to work with, it is now possible to construct a design methodology based on estimation of SD coupled with a statistically-derived upper confidence limit of the mean value. It will be argued (in a follow-up paper) that such an approach is more robust than the tried, and sometimes wanting, 80th percentile based method.

    CONCLUSION The 80th percentile value can be a useful design number, provided all the correct pre-requisites are present in the population that it is derived from. Firstly, the samples that the individual test results

  • 12

    Metallurgical Plant Design and Operating Strategies (MetPlant 2013) 15 - 17 July 2013, Perth WA

    represent must consist of individual lengths of contiguous core, or something close to this ideal. Secondly, there must be some understanding of how the variability of the available data set is related to the variability that needs to be catered for in plant design. If a pathway to estimating shift by shift production variability (for any variable) is available then this can provide useful guidance and should be followed. Thirdly, there must be some relationship between the available data and the time sequence of presentation of ore to the plant. For example, if the ore that the plant is to be commissioned on is not clearly understood, then an adequate number of samples of commissioning ore need to be tested before commencing definitive design. Fourthly, the relationship between the mining practices to be employed and the distributions of the various ores in the deposit need to be understood at an operational level, and not a smoothed monthly or annual ideal.

    It is essential that the process design engineers have access to all raw test data, and that they understand the basis of sample selection, they understand any compositing that has been performed on the samples and why it was dome that way, and they have confidence in the testing that has been conducted. It is also essential to link the test results to the ore types and to the time sequence in which the ore is likely to be mined. Finally, the process engineers must understand the operational reality of ore access and delivery to the plant, including any assumptions regarding blending. A good start to gaining these necessary understandings is to ask the geologists for the drill database and to ask the mining engineers for a sequenced block list. The resulting conversations are usually very enlightening.

    If a valid 80th percentile design value is not obtainable from the available raw data, then a relatively simple pathway for estimating a useful 80th percentile value (based on the relative variabilities within available data sets) has been demonstrated.

    To increase the confidence that can be placed in a design outcome, the basis for a new and robust design methodology has been proposed that is linked to a worst case estimate of the mean value (at a desired accuracy level) and with a defined confidence level based on the clients appetite for risk. This will be elaborated in a follow-up paper.

    ACKNOWLEDGEMENTS Anonymous acknowledgement is given to those projects that supplied examples, good and bad, used in this paper. Special acknowledgement is given to the geologist who advised (in an operating pit) that there was no difference between the brown gooey ore and the crunchy blue rock, they are both the same geological classification. Acknowledgement is also given to Steve Morrell, who has followed (and sometimes built) the pathway to understanding variability.

    REFERENCE Morrell S, 2011, Mapping Orebody Hardness Variability for AG/SAG/Crushing and HPGR Circuits, in International

    Autogneous Grinding, Semiautogenous Grinding and High Pressure Grinding Roll Technology 2011, Paper # 154, (Editors Major K, Flintoff B C, Klein B, McLeod K).