• 2008– Build Will unveiled
• 60 projects on County Highway System• $300 million program
– Funded with • RTA sales tax• Federal, State, & other Local funding sources
• 2009-Present– Additional 12 projects– Total additional cost $57 million– $100 million in bonds approved
by County Board
BUILD WILL UPDATE
• Largest Overlay Program in History– Last 2 Years
• 84 Center-line Miles• 25 County Highways
– FY 2012• 36 Center-line Miles• 14 County Highways• Total estimated cost $10 million
– 3 Year Total• 120 Center-line Miles• 39 County Highways
BUILD WILL UPDATE (cont.)
Road Construction $40.7 million
Structure Rehab & Reconstruction $11.9 million
Engineering $14.0 million
ROW Acquisition $14.8 million
Build Will Total $81.4 million
Maintenance $10 million
Program Total $91.4 million
FY 2012 PROGRAM
• Weber Road @ Renwick Road
• 135th Street @ Il Route 171 (Archer Avenue)
• 95th Street Extension (Plainfield-Naperville Road to Boughton Road)
• Will-Peotone Road @ Old Chicago Road over Jordan Creek
• South Briggs over Metra & Hickory Creek
PROGRAM HIGHLIGHTS
WEBER ROAD @ RENWICK ROAD
• Scope – Weber Road
• Widen to 6 lanes • Barrier Median
– Renwick Road• Widen to 4 lanes• Barrier Medians
• Total Cost: $ 14 million• Approximately $ 4 million in
Federal Funds (STP & CMAQ)• Quick Take approved for ROW
acquistion
135TH STREET @ IL ROUTE 171(ARCHER AVENUE)
• Scope of Work– Realign
Intersection– New Structure over
Long Run Creek
• Total Cost: $ 7.1 million
95TH STREET EXTENSION:PLAINFIELD-NAPERVILLE ROAD TO BOUGHTON
ROAD• Scope
– Approximately 2 miles of new Roadway
– New Structure over DuPage River
– Intersection Improvements at termini
– Noise Walls• Total Cost: $ 25.9 million• Funding: Over $10 million
in Federal Funds (STP & STR)
WILL-PEOTONE ROAD @ OLD CHICAGO ROAD
• Scope– Turn Lanes on all legs– Reconstruction of
Structures over Jordan Creek on both roads
• Total Cost: $7.04 million
SOUTH BRIGGS STREET OVER METRA & HICKORY CREEK
• Scope: Structure Rehabilitation
• Total Cost: $2.5 million
• According to Labor Statistics – 42, 000 jobs are created – Per $1 billion in Construction
• Build Will FY 2012 Creates: 2210 jobs