Irrigation & CAD Department, Government of...

14
Office of the Engineer-in-Chief (Admn Wing) Irrigation & CAD Dept , Government of Telangana Jalasoudha Building, Errum Manzil , Hyderabad . Proc No. RC/ENC(AW)/ADA/AEE2/Kaleshwaram(Hyd)Reorg Dt.23-06-2020 Sub :- Irrigation & CAD Dept. - Kaleshwaram Project -Modified Reorganization Proposals of Kaleshwaram Project Construction Circle No .1, Siddipet of the Engineer-in-Chief, Kaleshwaram Project, Hyderabad unit - Orders- Issued-Regarding Ref: 1. G.O Ms No. 15, l&CAD(Ser-11) Dept, Dt.22.05.2020 2. G.O Rt No.90, l&CAD(Ser-11) Dept, Dt.01 .06.2020 ***** The Government vide reference 1 st cited have reorganized the Kaleshwaram Project Circle No.1, Siddipet of Engineer-in-Chief, Kaleshwaram Project, Hyderabad unit as per the Annexure I appended to the order along with the staffing pattern as per Annexure II & Ill to the order, subject to redeployment of staff within the sanctioned strength and effecting transfers as per his competency strictly in conformity with the presidential order and in terms of G.O Ms No . 12, l&CAD (P&B) Dept, Dt.20.02.2016. In accordance with the orders issued vide reference cited, the modified reorganization orders are hereby issued in respect of Kaleshwaram Project Circle No. 1, Siddipet of Engineer-in-Chief, Kaleshwaram Project, Hyderabad as detailed below. Kaleshwaram Project Construction Circle No.1 , Siddipet The existing Kaleshwaram Project Construction Circle No.1 , Siddipet is presently functioning with the followi ng two divisions. 1. Kaleshwaram Project Construction Division No- 1, Siddipet with 4 Sub Divisions. 2. Kaleshwaram Project Construction Division No-4, Kamareddy with 3 Sub Divisions. Hydrology & Investigation Division No.2 (Godavari Basin) Metpally is now detached from Hydrology & Investigation Circle (Godavari Basin) Karimnagar and converted as Kaleshwaram Project Construction Division No-8, Siddipet and ordered to work under the control of Kaleshwaram Project Construction Circle No . 1, Siddipet of Engineer-in-Chief, Kaleshwaram project, Hyderabad unit.

Transcript of Irrigation & CAD Department, Government of...

Page 1: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

Office of the Engineer-in-Chief (Admn Wing) Irrigation & CAD Dept, Government of Telangana

Jalasoudha Building, Errum Manzil, Hyderabad.

Proc No. RC/ENC(AW)/ADA/AEE2/Kaleshwaram(Hyd)Reorg Dt.23-06-2020

Sub :- Irrigation & CAD Dept. - Kaleshwaram Project -Modified Reorganization Proposals of Kaleshwaram Project Construction Circle No.1, Siddipet of the Engineer-in-Chief, Kaleshwaram Project, Hyderabad unit - Orders-

Issued-Regarding

Ref: 1. G.O Ms No.15, l&CAD(Ser-11) Dept, Dt.22.05.2020 2. G.O Rt No.90, l&CAD(Ser-11) Dept, Dt.01 .06.2020

*****

The Government vide reference 1st cited have reorganized the Kaleshwaram

Project Circle No.1, Siddipet of Engineer-in-Chief, Kaleshwaram Project, Hyderabad

unit as per the Annexure I appended to the order along with the staffing pattern as

per Annexure II & Ill to the order, subject to redeployment of staff within the

sanctioned strength and effecting transfers as per his competency strictly in

conformity with the presidential order and in terms of G.O Ms No.12, l&CAD (P&B)

Dept, Dt.20.02.2016.

In accordance with the orders issued vide reference cited, the modified

reorganization orders are hereby issued in respect of Kaleshwaram Project Circle

No.1, Siddipet of Engineer-in-Chief, Kaleshwaram Project, Hyderabad as detailed

below.

Kaleshwaram Pro ject Construction Circle No.1 , Siddipet

The existing Kaleshwaram Project Construction Circle No.1 , Siddipet is

presently functioning with the following two divisions.

1. Kaleshwaram Project Construction Division No- 1, Siddipet with 4 Sub

Divisions. 2. Kaleshwaram Project Construction Division No-4, Kamareddy with 3 Sub

Divisions.

Hydrology & Investigation Division No.2 (Godavari Basin) Metpally is now

detached from Hydrology & Investigation Circle (Godavari Basin) Karimnagar and

converted as Kaleshwaram Project Construction Division No-8, Siddipet and ordered

to work under the control of Kaleshwaram Project Construction Circle No.1, Siddipet

of Engineer-in-Chief, Kaleshwaram project, Hyderabad unit.

Page 2: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

2

Thus on modified reo · · . rganizat1on, the Kaleshwaram ProJ·ect Construct·1on Circle No 1 S'dd' · . , ' ipet will function with the following three Divisions.

1. Kaleshwaram Project Construction Div·1s·1on No- 1, Siddipet with 4 Sub Divisions.

2. Kaleshwaram Project c t . . . . . . . ons ruction D1v1s1on No-4, Kamareddy with 3 Sub D1v1s1ons.

3. Kaleshwaram Project Construction Division No-8, Siddipet with 3 Sub Divisions.

1 · Kaleshwaram Project Construction Division No.1 Siddipet with 4 Sub Divisions

The Kaleshwaram Project Construction Division No.1 Siddipet is presently

functioning with 4 Sub Divisions. There is no change in the existing setup of the division and its 4 Sub Divisions.

2. Kaleshwaram Project Construction Division No-4, Kamareddy with 3 Sub

Divisions

The Kaleshwaram Project Construction Division No-4, Kamareddy is

presently functioning with 3 Sub Divisions. There is no change in the existing

setup of the division and its 3 Sub Divisions.

3. Kaleshwaram Project Construction Division No-8 1 Siddipet with 3 Sub

Divisions

The existing Hydrology & Investigation Division No.2 (Godavari Basin)

Metpally of Hydrology & Investigation Circle (Godavari Basin) Karimnagar is

converted as Kaleshwaram Project Construction Division No-8 duly shifting

the headquarters from Metpally to Siddipet and ordered to work under the

control of Kaleshwaram Project Construction Circle No.1, Siddipet with the

following three Sub Divisions.

Sri B.Gopala Krishna Rao, Executive Engineer, KP Construction Division

No.1, Siddipet, who is placed on Full Additional Charge to the post of

erstwhile Executive Engineer, Hydrology & Investigation Division No.2

(Godavari Basin) Metpally vide reference 2nd

cited is directed to form now

Page 3: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

3

converted Kaleshwaram Project Construction Division No-8, Siddipet and

hold full additional charge to the post until further orders.

The works and records of H&I Division No.2(GB), Metpally are attached to

H&I Division No.4(GB), Karimnagar.

Sub Division No.1, Siddipet: The existing H & I Sub Division No.3, Armoor.

of Hydrology & Investigation Division No.2 (Godavari Basin) Metpally is now

converted as Sub Division No.1, Siddipet duly shifting the headquarters from

Armoor to Siddpet and ordered to work under the control of Kaleshwaram

Project Construction Division No-8, Siddipet of Kaleshwaram Project

Construction Circle No.1, Siddipet.

Sri N.Devender, Deputy Executive Engineer.Sub Division No.1,

Ellathakunta of Kaleshwaram Project Construction Division No.1 Siddipet is

directed to form Sub Division No.1, Siddipet and hold full additional charge to

the post until further orders.

Smt P.Shailaja, Deputy Executive Engineer, H & I Sub Division No.3,

Armoor is hereby transferred and posted to O/o Chief Engineer, Hydrology &

Investigation, Hyderabad.

The existing H & I Sub Division No.2, Nizambad of Hydrology &

Investigation Division No.2 (Godavari Basin) Metpally is now detached and

converted as H & I Sub Division No.1, Nizambad with same headquarters

and ordered to work under the control of Hydrology & Investigation Division

No.4 (Godavari Basin), LMD Colony, Karimnagar of Hydrology & Investigation

Circle (GB), LMD Colony, Karimnagar.

Sri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub

Division No.2, Nizambad now converted as H & I Sub Division No.1 ,

Nizambad is directed to work under the control of Hydrology & Investigation

Division No.4 (Godavari Basin), LMD Colony, Karimnagar of Hydrology &

Investigation Division No.4 (Godavari Basin), LMD Colony, Karimnagar of

Hydrology & Investigation Circle (GB), LMD Colony, Karimnagar.

Page 4: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

4

The works and records of H & I Sub Division No.3, Armoor are attached to now converted H & I Sub Division No.1, Nizambad of Hydrology &

Investigation Division No.4 (Godavari Basin) , LMD Colony, Karimnagar.

Sub Division No.2, Siddipet : The existing H & I Sub Division No.1, Metpally of Hydrology & Investigation Division No.4 (Godavari Basin) LMD Colony, Karimnagar is converted as Sub Division No.2, Siddipet duly shifting the headquarters from Metpally to Siddipet and ordered to work under the control of Kaleshwaram Project Construction Division No-8, Siddipet.

Sri D.Ravinder, Deputy Executive Engineer, Sub Division No.4, Siddipet of Kaleshwaram Project Construction Division No.1 Siddipet is directed to form Sub Division No.2, Siddipet and hold full additional charge to

the post until further orders.

The Circle scale establishment working in the H & I Sub Division No.1,

Metpally are attached to Hydrology & Investigation Division No.4 (Godavari

Basin) LMD Colony, Karimnagar.

The works and records of H & I Sub Division No.1, Metpally are

attached to H & I Sub Division No.2, LMD Colony, Karimnagar of Hydrology &

Investigation Division No.4 (Godavari Basin) LMD Colony, Karimnagar.

Sub Division No.3, Siddipet: The existing H & I Sub Division No.2, Asifabad

of Hydrology & Investigation Division No.3 (Godavari Basin) Adilabad is

converted as Sub Division No.3, Siddipet duly shifting the headquarters from

Asifabad to Siddipet.

Sri V.Ch.Srinivas Rao, Deputy Executive Engineer, Sub Division No.3,

Siddipet of Kaleshwaram Project Construction Division No.1 Siddipet

is directed to form Sub Division No.3, Siddipet and hold full additional charge

to the post until further orders.

Sri M.Venkat Ratnam, Deputy Executive Engineer, H & I Sub Division

No.2, Asifabad, of Hydrology & Investigation Division No.3 (Godavari Basin)

Page 5: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

5

Adilabad is transferred and posted to H&I Sub Division No 2, Khammam of

Hydrology & Investigation Division No.S(Godavari Basin), Bhadrachalam.

The Circle scale establishment working in the H & I Sub Division No.2,

Asifabad are attached to Hydrology & Investigation Division No.3 (Godavari

Basin) Adilabad.

The works and records of H & I Sub Division No.2, Asifabad are

attached to H & I Sub Division No.3, Bellampally.

The Circle scale staff working in Hydrology & Investigation Division

No.2 (Godavari Basin) Metpally are transferred and posted to the offices

shown against their names as Annexure appended to this proceedings.

The lien and Seniority of Circle scale establishment of Kaleshwaram

Project Construction Division No.8, Siddipet will be continued to be

maintained in their parent circle only i.e H&I Circle (GB), LMD Colony,

Karimnagar.

The Statement showing the details of Modified reorganization structure

of Kaleshwaram Project Circle No.1, Siddipet is appended as Annexure-I to

the G.O 1st cited and H&I Circle (GB), LMD Colony, Karimnagar is appended

as Statement to this proceeding.

The staffing pattern of Kaleshwaram Project Circle No.1, Siddipet after

modified reorganization is shown as Annexure-11 and staffing pattern of

H&I Circle (GB), LMD Colony, Karimnagar is shown as Annexure-11I

respectively to the G.O 1st cited .

These orders are placed in the department official Web Site

www.irrigation.telangana.qov.in . All the Unit /Circle officers in the address

entry are r~quested to download the orders from the Website and take

necessary action accordingly.

These orders shall come into force with immediate effect from

30.06.2020 AN.

Page 6: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

To

6

The Engineer-in-Chief, Kaleshwaram Project, Hyderabad and the Chief

Engineer, Hydrology & Investigation, Hyderabad are requested to take

necessary action accordingly.

Encl: 1. G.O Ms No.15 Irrigation & CAD (Ser-II) Dept Dated: 22.05.2020 along with Annexure-I ,II and Ill

2. Statement, 3. Annexure.

Sd/- B.Nagendra Rao, Dt.23.06.2020 Eng ineer-in-Chief(AW)

The Engineer-in-Chief, Kaleshwaram Project, Hyderabad The Chief Engineer, Hydrology & Investigation, Hyderabad The individuals through concerned Circle/ unit officers

1. Copy submitted to the Principal Secretary to Government, Irrigation &CAD Department, Telangana Secretariat, Hyderabad for favour of information.

2. Copy to the Engineer-in-Chief (Irrigation) for information and necessary action. 3. Copy to the Superintending Engineer, Hydrology & Investigation Circle

(Godavari Basin), Karimnagar for information and necessary action. 4. Copy to the Superintending Engineer, Kaleshwaram Project Circle No.1,

Siddipet for information and necessary action. 5. Copy to the Director of Works Accounts, Manoranjan Buildings, M.J.Road,

Hyderabad. 6. Copy to the PAO Concerned. 7. Copy to the Deputy Executive Engineer (Computers) to place in irrigation

website. 8. Copy to 'B'Section, 'D' Section, 'E' Section of this office for information.

Leµ) . .

for Engineer-in-Chief (AW)

Page 7: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

STA

TEM

EN

T R

E-O

RG

AN

ISA

TION

STR

UC

TUR

E O

F HY

DR

OLO

GY

& INV

ES

TIGA

TION

CIR

CLE (G

OD

AVA

RI B

ASIN

), KA

RIM

NA

GA

R

Division

Sub-Division

S.N

o Existing

Now

converted after Existing

Now

converted after reorganisation reorganisation

Hydrology &

H & I S

ub Division N

o.1, Kadam

H

& I Sub D

ivision No.1, K

adam

Investigation Division

Hydrology & Investigation

1 N

o.3 (Godavari B

asin) D

ivision No.3 (G

odavari H

& I Sub D

ivision No.3, B

ellampally

H & I S

ub Division N

o.3, Bellam

pally A

dilabad B

asin) Adilabad

H & I S

ub Division N

o.2, Nizam

abad of H

ydrology & Investigation Division N

o.2 (GB

) H

& I Sub D

ivision No.1, N

izamabad

Hydrology &

Hydrology & Investigation

Metpally

Investigation Division

H & I S

ub Division N

o.2, LMD

Colony,

H & I S

ub Division N

o.2, LMD

Colony,

2 N

o.4 (Godavari B

asin) D

ivision No.4 (G

odavari K

arimnagar

Karim

nagar LM

D C

olony, B

asin) LMD

Colony,

Karim

nagar K

arimnagar

H & I S

ub Division N

o.3, Manthani

H & I S

ub Division N

o.3, Manthani

H & I S

ub Division N

o.4, Medak

H & I S

ub Division N

o.4, Medak

H & I S

ub Division N

o. 1, Warangal

H & I S

ub Division N

o.1, Warangal

Hydrology &

Hydrology & Investigation

3 Investigation D

ivision D

ivision No.5 (G

odavari H

& I Sub D

ivision No.2, B

hadrachalam

H & I S

ub Division N

o.2, Bhadrachalam

N

o.5 (Godavari B

asin) B

asin) Bhadrachalam

B

hadrachalam

H & I S

ub Division N

o.2, Kham

mam

H

& I Sub D

ivision No.3, K

hamm

am

Sd/-

B.N

agendra Rao, D

t.23.06.2020 E

ngineer-in-Chief(A

W)

_\o: '\Engineer-in-C

hief(AW

)

~~bfv,

Page 8: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

Annexure

S.No Name of the officer holding the post Employee Designation

1 Azeem Khan Assistant Technical Officer

2 Shailaja Palle Junior Technical Officer

3 Venkateshwar Rao Damera Technical Assistant

4 Venkata Swamy Kothakonda Superintendent

5 Padmakar Gajanaveni Senior Assistant

6 M.Rajeshwar Rao Marepally Senior Assistant

7 Satya Narayana Goud Bollapally Senior Assistant

8 Santhosh Kumar Santapuri Senior Assistant

9 Saleem Pasha - Junior Assistant

10 Srinivas Raju Namarapu Raju Junior Assistant

11 Ramesh Dasari Record Assistant

12 Anwer Baig Md. Driver(Regular)

13 Satyanarayana Sunkari Driver(Regular)

14 Ramakrishna Sonnaila Office Subordinate

15 Kiran Kumar Nakka Office Subordinate

16 Prasad Bingi Office Subordinate

1/I C F S+ei a ¥ WW:c-=-

, __

Now Transferred to

KP Construction Division No.8 , Siddipet

KP Construction Division No.1, Siddipet

KP Construction Division No.8, Siddipet

KP Construction Division No.8, Siddipet

KP Construction Division No.1, Siddipet

KP Construction Division No.1, Siddipet

KP Construction Division No.8, Siddipet

KP Construction Division No.8, Siddipet

KP Construction Division No.8, Siddipet

KP Construction Division No.8, Siddipet

KP Construction Division No.8, Siddipet

KP Construction Division No.4, Kama reddy

KP Construction Division No.8, Siddipet

KP Construction Division No.1 , Siddipet

KP Construction Division No.1, Siddipet

KP Construction Division No.8, · Siddipet

Sd/- B.Nagendra Rao, Dt.23.06 .2020 Engineer-in-Chief(AW)

for Engineer-in-Chief(AW)

~-r--

Page 9: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

Y-(A)

J/,_?)r

q GOVERNMENT OF TELANGANA

ABSTRACT

Es1ablishf!1ent . - l&CAD Department - Reorganization of Kaleshwaram Project Construction ~1rcle No.1 Siddipet of the Engineer-in-Chief, Kaleshwaram Project, Hyoerabad unit - Orders - Issued. ----------------=============--==============

IRRIGATION & CAD (Ser.II} DEPARTMENT

G.O.Ms.No.15 Dated:22.05.2020.

ORDER:

Read:

From the Engineer-in-Chief (AW), I &CAD Department, Hyderabad Lr. No. RC/ ENC(AW)/ADA/AEE2/ Keleshwaram (Hyd) / Reorg, Dated: 04.05.2020

-x-x-x-x-x-x-

After careful examination of the proposal of the Engineer-in-Chief (Admn.Wing), I & CAD Department, Hyderabad in the reference read above, Government hereby reorganize the Kaleshwaram Project Construction circle No.1 Siddipet of the Engineer-in-Chief, Kaleshwaram Project, Hyderabad unit as per Annexure-1 and staffing pattern as per Annexure-11 & Ill appended to this order, subject to re-deployment of staff within the sanctioned strength and effect transfers as per his competency strictly in conformity

· t< with the Presidential Order, in terms of G.O.Ms.No.12, l&CAD (P&B) Department, dated

20.02.2016.

~__;:: 2. The Engineer-in-Chief (AW), l&CAD Department, Hyderabad/ Engineer-in-Chief ~cl iP.s ·•waram Project) Hyderabad shall take further necessary action in the matter

~0

{ -~ i-oaccordingly. ?--1·

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF TELANGANA)

Dr. RAJAT KUMAR PRINCIPAL SECRETARY TO GOVERNMENT

To The Engineer-in-Chief (AW), l&CAD Department, Hyderabad.

Copy to: . The Engineer-in-Chief (Kaleshwaram ProJect) , Hyderabad

I &CAD Department, Hyderabad. The Engineer-in-Chief (Irrigation) l&CAD Department, Hyderabad. The Accountant General, Hyderabad through the E-n-C (AW). The Pay & Accounts Officer, Hyderabad through the E-n-C (AW) The PS to Principal Secretary to Govt., l&CAD Department. The I ti. CAD(Proj.lV} Dept. Sf/ Sc.

// FORWARDED :: BY ORDER II fl · {,,,Ji.A Iii~ SECTION OFFICER

Page 10: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

... --.

... --

ANNEXURE-1 -

-1 G

.O.M

s.No.15, I &

CAD(SER.11) DEPARTMENT, DT: 22.05.2020

RE-ORG

ANISATION STRUCTURE O

F KALESHWARAM

PROJECT coN

STRU

CTIO

N C

IRC

LE N0.1 SIDDIPET

Division sub-D

ivision

Existing I

Now converted after

Existing

' Now

converted after reorganisation reorganisation

Proposed work load

KALESHWARAM

PROJECT CO

NSTRUCTION CIRCLE NO

.1 KALESHW

ARAM PRO

JECT CO

NSTR

UC

TION

CIR

CLE NO.1 SIDDIPET

SIDD

IPET

Sub Division No.1, Ellanthakunta

Sub Division No.1, Ellanthakunta

Kaleshwaram Project

Kaleshwaram Project

Sub Division No.2,C

hinna Kodur, Sub D

ivision No.2,Chinna Kodur C

onstruction Division No-1, C

onstruction Division No-1,

Sub Division No.3, Siddipet,

Package-10, 11 and 12 Siddipet,

Siddipet, Sub Division No.3, Siddipet,

Sub Division No.4, Siddipet, Sub D

ivision No.4, Siddipet,

Kaleshwaram Project

Kaleshwaram Project

Sub-Divisin No.1 Kam

areddy Sub-D

ivisin No.1 Kamareddy

Construction Division No-4,

Construction D

ivision No-4, Sub-Division No.2, G

handhari Sub-D

ivision No.2, Ghandhari

Package-22 Kam

a reddy Kam

a reddy Sub-D

ivision No.3, Bikanoor Sub-D

ivision No.3, Bikanoor

H & I Sub Division No.3, Arm

oor of Sub D

ivision No.1, Siddipet, H

ydrology & Investigation Division No.2

Hydrology & Investigation

(GB) M

etpally W

orks of additional One

Division No.2 (G

odavari Basin) Kaleshwaram

Project H

& I Sub Division No.1, M

etpally of Sub D

ivision No.2, Siddipet, TM

C parallel conveyor M

etpally of Hydrology & C

onstruction Division No-8,

Hydrology & Investigation Division No.4

system from

MM

R to Sri Investigation C

ircle (Godavari

Siddipet (G

B) LMD Colony, Karim

nagar Kom

aravelli Mallanasagar

Basin) Karimnagar

Reservoir.

H & I Sub D

ivision No.2, Asifabad of Sub D

ivision No.3, Siddipet, H

ydrology & Investigation Division No.3 (G

B) Adilabad DR. RAJAT KUM

AR PRINCIPAL SECRETARY TO

GO

VERNMENT

//FOR

WAR

DED

: BY ORDER//

til_-~Olt}i~~

SECTION O

FFICER

Page 11: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

--------

------

--.. ,.,,,a.1re.11 I

G.O

.Ms.N

o.15, I &

CA

D~

o2

0

' '

r. I) brePt., ot: 22.0 . S

tatemen

t sho

win

g th

e S

anctio

ned

po

sts of K

aleshw

aran, P

. -

ct·on Circle N

o.1, S

idd

ipet A

fter Reorganisation

ro1rett constru •

0/o

SE, Kaleshw

aram P

roject K

aleshwaram

Project C

onstn. aram

Project

Kaleshw

aram P

roject Constn. D

ivn. D

ivn. No.1, S

iddipet C

l<aleshW

o•vision N

o-4, N

o.8, Siddipet

Kaleshw

aram P

roject C

onstruction Circle N

o.1, Siddipet

0nstruction I ddY

Construction C

ircle No.1 Sid,

Ka

m!r!.-

No of No of

SS including No of

No of

55 including N

o of

S.N

o N

ame of the Post

SS including R

edeployment

Redeploym

ent ss includin9

Redeploym

ent R

edeployment

Redeploym

ent SS including

Redeployn

Redeploym

ent Posts

Redeploym

ent Posts

Redeploym

ent P

osts Posts

Redeploym

ent Posts

-A

B C

D

F

E F

G=A

+C+E

H=B+D-1

E

-0

0 0

0 0

0 1

0 1

0 1

5uperintendinq Engineer

I 0

1 0

0 1

0 4

0 1

1 I

2 E

xecutive Engineer /D5E

I 4

0 0

3 0

12 0

2 0

3 3

Dy. E

xecutive Engineer

17 0

0 13

0 47

0 A

ssistant Executive

4 0

13 4

Engineer/ Assistant Enqineer

0 1

0 3

0 1

0 0

0 1

5 Technical O

ffice(DM G

r.I)

0 0

0 0

1 0

1 0

2 0

6 A

.T.O. (D

M G

r.II) 1

0 6

0 1

0 1

0 3

0 7

J.T.O. (DM

Gr.III)

8 Tech

. Asst. (Tracers)

0 0

0 0

0 0

2 0

2 0

0 0

0 0

0 0

1 0

1 0

9 P

rintinq Technician (BPO)

1 3

1 0

1 0

1 0

1 0

10 D

.A.O

. 0

1 0

0 0

0 0

0 0

1 1

1

N.T.P.A.

0 4

1 1

0 1

1 0

1 1

12 S

uoerintendent

4 0

6 3

3 0

4 0

17 3

13 S

enior Asst.

19 4

0 8

4 5

0 4

2 0

14

Junior A

sst. 1

0 0

0 0

0 0

0 1

0 15

Senior S

teno 6

2 2

0 0

0 2

0 2

2 Tvoist

-...... -

16

-

. . --

, . u ... ·-

-'I,

.. , II,

. -

-

Page 12: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

· ned P s s of I< ' . the sanct10 aleshwaram . Statement showing - hwara111 Pro1ect Construction Circle No.1, Siddipet After Reorganisation

. Kales Proj ect Co Kaleshwaram Project Kaleshwararh Projet;f:' 0/o SE, Kaleshwaram otvn. No.1, Siddipe;stn. Kaleshwaram Project Constn . Divn. ,.

Construction Circle No.l, _ ,-----~ Construction Division No-4, No.8, Siddipet Construction Circle No.i Side Kama reddy y ./

No of ss including No of No of Noof SS including Redeployment Redeployment Redeployment SS including No of SS including SS including S.No Name of the Post Redeployment Redeployment Redeploym Redeployment Posts - Posts Redeployment Redeployment Redeployment Posts i-- -i--- Posts Posts -

C A B D E F E F G=A+C+E H=B+D+ - r---.

1 0 17 Driver 0 0 r-- 1 0 1 0 3 0

0 0 0 0 1 0 1 0 2 0 18 Record Asst - -

0 10 6 0 28 8 5 7 2 6 19 O.S. l AttendersJ -0 0 0 0 1 0 20 Night Watchman 0 0 0 1

Total 26 0 52 16 43 2 42 1 163 19 I

Dr.RAJAT KUMAR PRINCIPAL SECRETARY TO GOVERNMENT

/ /FORWARDED: : BY ORDER// t91 . IJ [JP)~~~ SEC~ N OFFICER

Page 13: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

-[ G.O.Ms.No.15, I&c:~nexure.!ti

os.2020 -

. , Before Reorganisation Ser.11 De After Reorganisation --. 1)1::2:Z• I

0/o Hydrol og Hydrolo g Hydrolo gy Hydrolog y ---

Hydrology& Hydrology& .!! ti y y& & Investigatio Investigatio tl2.k: .. 0

SE,Hydrolog y& & 0.

Investi ga Investig a Investig at Investiga o/o Hydrolo9Y~ n Division n Division

0 l,J Ill .. & ti SE,1iydrolo9Y In"estigatiO

0. l a .e- C Ill

Inve~gation tion tion ion on Divisiq No.4 No.s GB Total 8~t:g l S.No Cadre Circle Divisio n Divisio n Division No.S

n GB Tota 1 s, n pilfision (Godavari (Godavari ; i 'iii In.,l!stigation No,3 .2

(Godavari No.2 No.3 No.4 (Godavar Basin) Basin) iii:it; 0. i arcJe . Adilabad

Ill .-t C Ill

Basin) (Godava r Adilaba d (Godavari Basin) LMDColony, Bhadrachala a "ti (GOda~11 Ill

- -- K=G+H+ A B C D E f=A+B + H I J L=F-K

C+D+E G l+l

Superintending 1 0 0 0 1 - ,__ - 0 0 0 1 0 1 0 - 0

Engineer 1

1 1 Executive 1 1 5 -- 1 1 1 4 1 0 2 Engineer/DSE 1 1

Dy. Executive 1 3 4 3 13 2 4 3 10 3 0 3 2 1

Engineer

3 10 7 15 44 6 12 10 31 13 0 4 AEEs/AEs 9 3

Technical Officer 1 1 0 1 4 1 0 1 3 1 0 5 (DM Gr.I) 1 1

2 1 1 1 6 1 1 1 5 1 0 6 A.T.O. (DM Gr.II) 1

2

2 4 2 1 12 2 4 2 1 9 3 0 7 J.T.O. (DM Gr.III) 3

Tech. Asst. 2 1 2 1 8 2 1 2 1 6 2 0 8 (Tracers) 2

Printing Technician 1 1 1 1 5 1 1 1 1 4 1 0

9 (BPO) 1

0 1 0 0 1 0 1 0 0 1 0 0

10 D.A.O. 0 I I

Page 14: Irrigation & CAD Department, Government of Telanganairrigation.telangana.gov.in/uploadedFiles/proc394.pdfSri S.Venkata Narasimha Rao, Deputy Executive Engineer, H & I Sub Division

E======:- ;;;;,,; .... -~ .__ - ''H;;ie ----- ··- ------...... - . -... -. - ., r-----___r-- G.O.Ms.No,1s Annexure-uz

=--===== Before Reorganisation I&.CAD(Ser,IIJ DeDt. Dt:22.os.2020 I -e I Hydrology liYdrology f O/o Hydrolo g Hydrolog After Reorganisation .S! 0

& u • g. SE,Hydrology y& y& &. O/o Hydrology& Hydrology & ti.so~ S.No & Investig a Investiga Investigat Investigati SE,Hydrology Hydrology& Investigatio Investigatio &.-o sf Investigation tion tion ion on Division & Investigatio n Division n Division cu cu ·- "O Cadre Division GB Total u t: tl ·-Circle Division Division No.s Investigation n Division No.4 No.S GB Total cCU:,11> _

(Godavari No.2 No,3 No,4 (Godavari Circle No.3 (Godavari (Godavari ~:au~ t (Godavari (Godavari ID C "O Basin) (Godavar Adilabad Basin) Adilabad Basin) Basin) 8 Basin) LMDColony, Bhadrachala

--

A B C D E f=A+B+ K=G+H+ r---

C+D+E G H I J L-F-K 11 1 0 0 I+l

N.T.P.A. 0 0 0 1 1 0 0 0 1 0 r---12

Superintendent ' 1 1 1 1 5 0 1 1 1 1 1 4 1

13 Senior Asst.

4 8 2 5 25 4 0 6 8 2 5 19 6

14 Junior Asst. 4 8 4 6 27 4 8 0 5 4 6 22 5

15 0 1 2 1 4 0 1 2 0 Typist 0 1 4 0

16 0 0 0 3 0 0 0 0 0 3 0 Driver 3 0

1 0 1 0 3 1 0 1 0 2 1 0 17 Record Asst 1

7 21 7 19 63 7 21 7 19 54 9 0 18 o.s. (Attenders) 9

1 1 0 0 3 1 1 0 0 2 1 0 19 Night Watchman 1

Total 33 46 63 35 56 233 33 58 40 51 182 51 0

Dr. RAlAT KUMAR

// FORWARDED:: BY ORDER// PRINCIPAL SECRETARY TO GOVERNMENT

/Y}.ila,P,~~ SE~~N OFFICER