Eastchester Pipeline ProjectEastchester Pipeline ProjectEastchester Pipeline Project
![Page 2: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/2.jpg)
Eastchester Pipeline Extension:Eastchester Pipeline Extension:
![Page 3: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/3.jpg)
SCOPE OF WORK ROUTE OVERVIEWSCOPE OF WORK ROUTE OVERVIEW
•35 miles of 24-inch pipeline
PIPELINE
GROUNDS
CABLE AREAKEYSPAN
AREA
DUMPINGGROUNDS
DUMPING
NORTHPORT
GROUNDS
TERMINAL
DUMPING
R=2200
FT
GROUNDS
DUMPING
NYPA CABLECROSSING Nos.
1, 2, 3 & 4
CON-ED CABLECROSSING
CABLEAREA
NORWALKTEE
PIPELINE
GROUNDS
CABLE AREAKEYSPAN
AREA
DUMPINGGROUNDS
DUMPING
NORTHPORT
GROUNDS
TERMINAL
DUMPING
R=2200
FT
GROUNDS
DUMPING
NYPA CABLECROSSING Nos.
1, 2, 3 & 4
CON-ED CABLECROSSING
CABLEAREA
NORWALKTEE
![Page 4: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/4.jpg)
Agencies involved inAgencies involved in PermittingPermitting
FERC FERC
NYSDECNYSDEC
U.S. Army Corps of EngineersU.S. Army Corps of Engineers
NMFSNMFS
SHPOSHPO
U.S Coast GuardU.S Coast Guard
NYSDOS NYSDOS –– Coastal Zone, EasementCoastal Zone, Easement
U.S. DOT, NYSPSCU.S. DOT, NYSPSC
TBTA TBTA –– BridgesBridges
Town of Huntington Town of Huntington –– Northport Shore approachNorthport Shore approach
NYSEDC NYSEDC –– Hunts Point Shore Approach Hunts Point Shore Approach
![Page 5: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/5.jpg)
Marine PipelineMarine Pipeline Design & Construction Design & Construction -- ConstrainstConstrainst
Plow must be utilized to maximum extent possible. Plow must be utilized to maximum extent possible.
U.S Customs laws (dredging act) place restrictions on the use ofU.S Customs laws (dredging act) place restrictions on the use ofplows. Plow was a purpose built designed for the conditions in plows. Plow was a purpose built designed for the conditions in LIS, LIS, utilizing North Sea experience.utilizing North Sea experience.
The shore approaches were required to be constructed utilizing The shore approaches were required to be constructed utilizing Horizontal Directional Control technology. Horizontal Directional Control technology.
Extensive modifications were required for the Gulf of Mexico Extensive modifications were required for the Gulf of Mexico laybargelaybarge to operate in a northern climate winter. to operate in a northern climate winter.
LiveLive--boating was required adjacent to the Northport cables as a boating was required adjacent to the Northport cables as a substitute for anchors.substitute for anchors.
Midline buoys utilized on breast anchors up to MP 24Midline buoys utilized on breast anchors up to MP 24
5 power cables were crossing by the pipeline5 power cables were crossing by the pipeline
Two suspension bridges were crossed by the pipelineTwo suspension bridges were crossed by the pipeline
Pipeline protection via crushed rock required for last 10 miles.Pipeline protection via crushed rock required for last 10 miles.
Primarily colder weather constructionPrimarily colder weather construction
![Page 6: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/6.jpg)
Marine PipelineMarine Pipeline Construction Construction –– Timing WindowsTiming Windows
![Page 7: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/7.jpg)
East River East River -- Design ConsiderationsDesign Considerations
Pipelines are not typically designed longitudinally within riverPipelines are not typically designed longitudinally within rivers.s.Rivers are a much more dynamic and uncontrolled environment.Rivers are a much more dynamic and uncontrolled environment.Regular vessel transit within a narrow corridor and the everRegular vessel transit within a narrow corridor and the ever--present present potential for anchoring whether planned or during an emergency.potential for anchoring whether planned or during an emergency.24,000 vessels per year transited this area, approximately one h24,000 vessels per year transited this area, approximately one half alf or 12,000 of which were tugboats with oil bargesor 12,000 of which were tugboats with oil barges2 anchorage areas are located on the North shore of the river.2 anchorage areas are located on the North shore of the river.The highly variable bathymetry, ranging from less than 35 feet oThe highly variable bathymetry, ranging from less than 35 feet of f water depth to greater than 110 feet, is indicative of the dynamwater depth to greater than 110 feet, is indicative of the dynamic ic river condition.river condition.Magnetometer surveys indicate a large number of magnetic Magnetometer surveys indicate a large number of magnetic anomalies.anomalies.Many areas of the river have elevated concentrations of Many areas of the river have elevated concentrations of contaminants, posing environmental concernscontaminants, posing environmental concernsBurial of the pipeline in or around the federal channel would haBurial of the pipeline in or around the federal channel would have to ve to be conducted such that the top of the pipeline is located a minibe conducted such that the top of the pipeline is located a minimum mum of seven feet below the channel depth of 35 feet.of seven feet below the channel depth of 35 feet.The anchor spread and handling process would create a potential The anchor spread and handling process would create a potential impediment to shipping during the time the impediment to shipping during the time the laybargelaybarge is approaching is approaching and within the East River.and within the East River.
![Page 8: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/8.jpg)
Mitigation Measures in East RiverMitigation Measures in East River
4,552 ft HDD of the Hunts Point Shore approach, HDD traverses t4,552 ft HDD of the Hunts Point Shore approach, HDD traverses till and low ill and low shear strength shear strength mudsmuds, complicated by a 30 degree horizontal side bend to , complicated by a 30 degree horizontal side bend to accommodate alignment in river.accommodate alignment in river.
Exit pit minimized by utilizing sheet pile cofferdam.Exit pit minimized by utilizing sheet pile cofferdam.
Environmental bucket utilized in controlled manner to minimize Environmental bucket utilized in controlled manner to minimize sedimentation.sedimentation.
All materials excavated placed on hopper barges, for later use iAll materials excavated placed on hopper barges, for later use in backfilling.n backfilling.
Post trench plow utilized to lower pipeline below seabed.Post trench plow utilized to lower pipeline below seabed.
Backfill plow utilized to push windrows back into trench.Backfill plow utilized to push windrows back into trench.
Geotextile fabric and crushed rock placed over back plowed trencGeotextile fabric and crushed rock placed over back plowed trench to h to provide capping of materials and protection of the pipeline.provide capping of materials and protection of the pipeline.
Additional armor rock protection provided at bridgesAdditional armor rock protection provided at bridges
![Page 9: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/9.jpg)
Water Quality MonitoringWater Quality Monitoring
Iroquois is performing water monitoring sampling of a variety ofIroquois is performing water monitoring sampling of a variety ofmarine operations in a variety of different sedimentary and marine operations in a variety of different sedimentary and hydrologic environments. hydrologic environments.
Representative sampling is being taken for the following operatiRepresentative sampling is being taken for the following operations:ons:1) dredging in the East River and Long Island Sound LIS),1) dredging in the East River and Long Island Sound LIS),2) plowing in the East River , 2) plowing in the East River , 3) plowing in coarse3) plowing in coarse--grained sediments in LIS,grained sediments in LIS,4) plowing in fine4) plowing in fine--grained sediments in LIS, andgrained sediments in LIS, and5) stone backfilling in the East River and LIS.5) stone backfilling in the East River and LIS.
The turbidity plumes from these operations are monitored using aThe turbidity plumes from these operations are monitored using an n Acoustic Doppler Current Profiler (ACDP) that uses changes in Acoustic Doppler Current Profiler (ACDP) that uses changes in acoustic backscatter in the water column to provide real time acoustic backscatter in the water column to provide real time measurement of suspended sediments. The ACDP is calibrated usingmeasurement of suspended sediments. The ACDP is calibrated usinglaboratory analysis of collected total suspended sediments sampllaboratory analysis of collected total suspended sediments samples. es.
The results will provide the NYSDEC with data to help evaluate tThe results will provide the NYSDEC with data to help evaluate the he potential impacts associated with suspended sediments and potential impacts associated with suspended sediments and turbidity for future marine construction projects.turbidity for future marine construction projects.
![Page 10: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/10.jpg)
Marine PipelineMarine Pipeline ConstructionConstruction
LaybargeLaybarge arrived on site, arrived on site, Nov 6Nov 6thth 20022002
Plow designed, fabrication Plow designed, fabrication and shipped from UK to and shipped from UK to Newark (March to October)Newark (March to October)
HDDsHDDs of Northport and of Northport and Hunts Point shores initiated Hunts Point shores initiated last week in October.last week in October.
HDD pipe string pulled in at HDD pipe string pulled in at Northport on Nov 26Northport on Nov 26thth
First HDD attempt at Hunts First HDD attempt at Hunts Point failed, pipe was stuck Point failed, pipe was stuck in hole for a month, second in hole for a month, second attempt successful on Feb attempt successful on Feb 1414thth
![Page 11: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/11.jpg)
GULF HORIZON PIPELAY BARGEGULF HORIZON PIPELAY BARGEGULF HORIZON PIPELAY BARGEGULF HORIZON PIPELAY BARGEGULF HORIZON PIPELAY BARGEGULF HORIZON PIPELAY BARGE
![Page 12: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/12.jpg)
LAYBARGE TOW ROUTELAYBARGE TOW ROUTELAYBARGE TOW ROUTE
![Page 13: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/13.jpg)
PROJECT PIPELINE DETAILS:PROJECT PIPELINE DETAILS:
Pipeline Length : 36.45 miles
Diameter/Joint Length : 24” OD x 40’
Mainline Pipe Material : API 5L X70 and X68
Wall Thickness : 0.532” and 0.618”
Number of Joints : 4,687 approx
![Page 14: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/14.jpg)
PIPE LAYING ACTIVITIES :PIPE LAYING ACTIVITIES :PIPE LAYING ACTIVITIES :
Loadout Pipe & Transfer to Laybarge
Load Pipe
Bevel Pipe
Preheat Joint
Align Pipes
Weld Joints
Inspect Welds
Coat Field Joint
![Page 15: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/15.jpg)
PIPE STORAGE, NEWARKPIPE STORAGE, NEWARK
![Page 16: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/16.jpg)
PIPE LOADOUT & TRANSFER TO LAYBARGEPIPE LOADOUT & TRANSFER TO LAYBARGE
![Page 17: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/17.jpg)
LAYBARGE (Gulf Horizon)LAYBARGE (Gulf Horizon)
![Page 18: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/18.jpg)
MATERIAL SUPPLY BARGE AT LAYBARGEMATERIAL SUPPLY BARGE AT LAYBARGE
![Page 19: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/19.jpg)
PIPE TRANSFERPIPE TRANSFER
![Page 20: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/20.jpg)
PIPE FACING MACHINE:PIPE FACING MACHINE:
![Page 21: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/21.jpg)
PIPE JOINT READY FOR ALIGNMENT:PIPE JOINT READY FOR ALIGNMENT:PIPE JOINT READY FOR ALIGNMENT:
![Page 22: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/22.jpg)
Pipeline Alignment Clamp:Pipeline Alignment Clamp:
![Page 23: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/23.jpg)
Preheat:Preheat:
![Page 24: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/24.jpg)
Welding Bug (cont.):Welding Bug (cont.):
![Page 25: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/25.jpg)
AUTOMATIC ULTRASONIC TESTS:AUTOMATIC ULTRASONIC TESTS:AUTOMATIC ULTRASONIC TESTS:
![Page 26: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/26.jpg)
PIPELINE FBE COATING:PIPELINE FBE COATING:PIPELINE FBE COATING:
Grit Blasting
Grit Grit BlastingBlasting
Heating (450 F)Heating (450 F)Heating (450 F)
Spray applicationSpray applicationSpray application
![Page 27: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/27.jpg)
Sea Sleeve FusionSea Sleeve FusionJOINT INFILL:JOINT INFILL:JOINT INFILL:
Infill MaterialInfill Material
Sea Sleeve WrapSea Sleeve Wrap Infill MaterialInfill Material
![Page 28: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/28.jpg)
SEA SLEEVE FINISHED:SEA SLEEVE FINISHED:SEA SLEEVE FINISHED:
![Page 29: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/29.jpg)
PIPE TENSIONER:PIPE TENSIONER:PIPE TENSIONER:
![Page 30: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/30.jpg)
PIPE SUPPORTED OFF BARGE:PIPE SUPPORTED OFF BARGE:PIPE SUPPORTED OFF BARGE:
![Page 31: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/31.jpg)
PIPE EXITING OFF OF BARGE TO SEABED:PIPE EXITING OFF OF BARGE TO SEABED:PIPE EXITING OFF OF BARGE TO SEABED:
![Page 32: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/32.jpg)
PIPE EXITING OFF OF BARGE TO SEABED:PIPE EXITING OFF OF BARGE TO SEABED:PIPE EXITING OFF OF BARGE TO SEABED:
![Page 33: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/33.jpg)
SURVEY CONTROL ROOM ON LAYBARGE:SURVEY CONTROL ROOM ON LAYBARGE:SURVEY CONTROL ROOM ON LAYBARGE:
![Page 34: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/34.jpg)
LAYBARGE MOVEMENT CONTROL ROOMLAYBARGE MOVEMENT CONTROL ROOMLAYBARGE MOVEMENT CONTROL ROOM
![Page 35: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/35.jpg)
LAYBARGE MOVEMENTLAYBARGE MOVEMENTLAYBARGE MOVEMENT
![Page 36: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/36.jpg)
SCOPE OF WORK ROUTE OVERVIEWSCOPE OF WORK ROUTE OVERVIEW
Glen CoveGlen Cove
NorthportNorthportHunts Hunts PointPoint
![Page 37: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/37.jpg)
STEP 1: LAY NORTHPORT HDD STRINGSTEP 1: LAY NORTHPORT HDD STRING
NorthportNorthport
![Page 38: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/38.jpg)
STEP 2: LAY HUNT’S POINT HDD STRING:STEP 2: LAY HUNT’S POINT HDD STRING:
Hunts PointHunts Point
ThrogsThrogs Neck Neck BridgeBridge
Whitestone Whitestone BridgeBridge
![Page 39: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/39.jpg)
STEP 3: INITIATE PIPELAY AT NORTHPORT:STEP 3: INITIATE PIPELAY AT NORTHPORT:
NorthportNorthport
![Page 40: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/40.jpg)
CONTINUE PIPELAY TO THROGS NECK:CONTINUE PIPELAY TO THROGS NECK:
NorthportNorthport
ThrogsThrogs Neck BridgeNeck Bridge
![Page 41: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/41.jpg)
STEP 4: LAYDOWN PIPELINE AT THROGS NECK:STEP 4: LAYDOWN PIPELINE AT THROGS NECK:
ThrogsThrogs Neck BridgeNeck Bridge
City IslandCity Island
Hart IslandHart Island
Whitestone BridgeWhitestone Bridge
![Page 42: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/42.jpg)
Step 5: INITIATE PIPELAY AT HUNT’S POINT:Step 5: INITIATE PIPELAY AT HUNT’S POINT:
ThrogsThrogs Neck BridgeNeck BridgeWhitestone BridgeWhitestone Bridge
TieTie--inin
Hunts PointHunts Point
![Page 43: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/43.jpg)
STEP 6: STEP 6: TieTie--in Prein Pre--Fabricated Fabricated
86 deg Hot Bend:86 deg Hot Bend:
![Page 44: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/44.jpg)
PLOWING: Utilizing North Sea Experience a purpose built plow wasPLOWING: Utilizing North Sea Experience a purpose built plow wasdesigned and fabrication in the U.K. to lower the pipeline belowdesigned and fabrication in the U.K. to lower the pipeline below the the
seabedseabed
Sonar from Plowed Trench
Sands and Tills
• 5-6 ft trench• pull loads up to 200 tons• tow speeds - 1inches/sec
Silty Clay7-8 ft trenchpull loads typically < 50 tonstow speeds – 2-4 inches/sec
Plow Results
![Page 45: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/45.jpg)
Plow and Backfill in East RiverPlow and Backfill in East River
ThrogsThrogs Neck BridgeNeck BridgeWhitestone BridgeWhitestone Bridge
TieTie--inin
Hunts PointHunts Point
Final TieFinal Tie--inin
![Page 46: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/46.jpg)
Eastchester Project Update: The Final TieEastchester Project Update: The Final Tie--InIn
![Page 47: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/47.jpg)
Backfill PlowBackfill Plow
![Page 48: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/48.jpg)
Crushed Rock PlacementCrushed Rock Placement
![Page 49: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/49.jpg)
MAT PLACEMENT AT CABLE CROSSINGSMAT PLACEMENT AT CABLE CROSSINGS
PIP E LIN EA R EA
N Y P A C A BLEC R O SS IN G N o s.
1 , 2 , 3 & 4
C O N -E D C A B LEC R O S S IN G
C AB LEA R EA
PIP E LIN EA R EA
N Y P A C A BLEC R O SS IN G N o s.
1 , 2 , 3 & 4
C O N -E D C A B LEC R O S S IN G
C AB LEA R EA
![Page 50: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/50.jpg)
Winter WeatherWinter Weather
![Page 51: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/51.jpg)
Horizontal Directional DrillingHorizontal Directional Drillingof Shore Approachesof Shore Approaches
••3,000 ft at Northport Shore Approach3,000 ft at Northport Shore Approach••4,552 ft at Hunts Point Shore Approach4,552 ft at Hunts Point Shore Approach
![Page 52: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/52.jpg)
HORIZONAL DIRECTIONAL DRILLINGHORIZONAL DIRECTIONAL DRILLING
![Page 53: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/53.jpg)
HORIZONAL DIRECTIONAL DRILLINGHORIZONAL DIRECTIONAL DRILLING
2424--inch pipe in HDD hole at Northport (Nov 26inch pipe in HDD hole at Northport (Nov 26thth, 02), 02)
![Page 54: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/54.jpg)
HORIZONAL DIRECTIONAL HORIZONAL DIRECTIONAL DRILLINGDRILLING
![Page 55: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/55.jpg)
Northport InterconnectNorthport Interconnect
Construction of 3,800 Construction of 3,800 feet of 24feet of 24--inch pipelineinch pipeline
Interconnect with Interconnect with existing mainlineexisting mainline
Pig launching facilitiesPig launching facilities
Construction initiated Construction initiated 22ndnd week of February.week of February.
![Page 56: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/56.jpg)
Hunts Point Hunts Point -- Onshore PipelineOnshore PipelineConstruction of 4,000 feet of 24Construction of 4,000 feet of 24--inch pipelineinch pipeline
![Page 57: Iroquois Eastchester Presentation for Task Force 3-25-03](https://reader030.fdocuments.us/reader030/viewer/2022020314/577cced01a28ab9e788e5801/html5/thumbnails/57.jpg)
Questions?