Irish, GB and EU policy towards wind and other renewables
David Newbery
University of Cambridge
Windfarms-2017 International Conference Comillas, Madrid
31 May 2017
![Page 2: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/2.jpg)
www.eprg.group.cam.ac.uk
Outline
• Wind and Solar PV penetration
• Why support renewables?
• Challenges of high RES penetration
⇒high capital cost low variable cost
⇒ intermittent RES, lowers wholesale prices
• What implications for market design?
⇒Capacity payments, long-term contracts, auctions
⇒new flexibility services required
• How to support RES
⇒support installation, rectify carbon price short-fall
![Page 3: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/3.jpg)
www.eprg.group.cam.ac.uk
Wind resource up to 50m depth, hub ht 80m onshore, 120m offshore
Green is good, red poor
EEA Technical report
No 6/2009 at https://www.energy.eu/pu
blications/a07.pdf
![Page 4: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/4.jpg)
focussolar.de
≈Full hrs/yr
Green is bad, red good
![Page 5: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/5.jpg)
www.eprg.group.cam.ac.uk
UK wind growing, Spain stalls, Germany accelerates
![Page 6: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/6.jpg)
www.eprg.group.cam.ac.uk
UK wind capacity factor higher, outputs in DE, ES variable
![Page 7: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/7.jpg)
www.eprg.group.cam.ac.uk
PV in UK now overtakes France and Spain!!
![Page 8: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/8.jpg)
www.eprg.group.cam.ac.uk
Spain produces more PV than UK with less GW
![Page 9: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/9.jpg)
www.eprg.group.cam.ac.uk
UK, DK good for windSpain good for PV
![Page 10: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/10.jpg)
www.eprg.group.cam.ac.uk
Why support renewables?
• Learning-by-doing creates unrewarded spill-
overs that reduce later costs
– Justifies quite large subsidy for solar PV
– Rather less for wind (larger base, lower LbD rate)
=> subsidize installation, not output
• Low carbon price => second best subsidize low-C for CO2 abated
⇒ subsidy per MWh at marginal CO2 displaced
⇒ Shortfall @ €20/t CO2 => CCGT displaced €9/MWh
![Page 11: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/11.jpg)
www.eprg.group.cam.ac.uk
On-shore wind: taller towers give higher capacity factors
Source: IRENA (2016
Cum investment $647 billion
Learning rate 7%
Log scale
Log scale
![Page 12: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/12.jpg)
www.eprg.group.cam.ac.uk
Solar PV cost fall 20% as capacity x2 German wholesale prices fall 50% in
5 yrs, 40% of which due to RES
0
10
20
30
40
50
60
70
ene-11 ene-12 ene-13 ene-14 ene-15 ene-16
Day Ahead Auction Power price (Euro/MWh)
![Page 13: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/13.jpg)
www.eprg.group.cam.ac.uk
PV learning rates are highecons of scale important
Module learning rate
18-22%
BOS cost excl inverter
now 60% of total
![Page 14: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/14.jpg)
On-shore
wind
support
policies,
Spring 2014
Source: May and
Neuhoff, 2017
![Page 15: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/15.jpg)
www.eprg.group.cam.ac.uk
Support policies
• RES is capital-intensive, cost depends on WACC
• Feed-in tariffs provide stable revenue &
guaranteed access => low WACC, rapid growth
• Green certificates increase risk => high WACC
• Premium FiT (CfD) reduces risk in GB
• Auctions deliver lower costs
But all support output, not capacity
=> Distort location decisions
![Page 16: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/16.jpg)
UK ROC, EUA, and electricity prices
£0
£20
£40
£60
£80
£100
£120
2002
Q3
2003
Q1
2004
Q1
2005
Q1
2006
Q1
2007
Q1
2008
Q1
2009
Q1
2010
Q1
£/u
nit
ROC+RPD 1 yr centred MA
RPD
ROCwindfall profits
ROC price stable
![Page 17: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/17.jpg)
www.eprg.group.cam.ac.uk
Dramatic rise in UK solar PV from overgenerous FiTs
![Page 18: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/18.jpg)
www.eprg.group.cam.ac.uk
RES CfD 2015 auction results
Foolish bid - withdrew
![Page 19: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/19.jpg)
www.eprg.group.cam.ac.uk
Post 2020 RES-E support
• Learning spill-overs need remuneration– Almost entirely from making and installing equipment
⇒Contract €X/MWh for N MWh/MW, Auction determines X and RES receives market returns
=>Subsidy targeted on learning source => investment aid– Reduces cost of capital and risk via debt finance
– Addresses failure to set right CO2 price
=> Exposes RES to current locational spot price=> incentivizes efficient location, connection
=> Does not over-reward high wind/sun– Not over-reward favoured locations with same learning
• Auction better than bureaucrats at minimizing cost
![Page 20: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/20.jpg)
E: 2,000 hrs/yr
N: 2,500 hrs/yr
C: £50/MWh
£49/MWh
=>£98k/MW/yr
=>£198k + ROC
P1 £35/MWh
(after new T)
=>£87.5k/MW/yr
=>£212.5k + ROC
T cost
£15/
MWh
ROC = £50/MWh
With ROCs wind farm
inefficiently locates at N
Pay wind for availability
+ average spot price => efficient E
Location choices under LMP and spot pricing for wind
![Page 21: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/21.jpg)
www.eprg.group.cam.ac.uk
Challenges from intermittent generation
• Output can vary widely over few hours
• Hard to forecast day-ahead
=> need fast flexible back-up capacity
• High non-synchronous penetration threatens
stability
=> need new frequency and voltage services
• High penetration lowers price => flexible back-
up less profitable without support
Missing markets => more missing money
![Page 22: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/22.jpg)
www.eprg.group.cam.ac.uk
Wind on the island of Ireland and share of output
![Page 23: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/23.jpg)
www.eprg.group.cam.ac.uk
Island of Ireland –the cutting edge of penetration
Monthly mean wind output and variability in the SEM
0
100
200
300
400
500
600
700
800
900
1,000
1,100
Ja
n-0
9
Ma
r-0
9
Ma
y-0
9
Ju
l-0
9
Se
p-0
9
No
v-0
9
Ja
n-1
0
Ma
r-1
0
Ma
y-1
0
Ju
l-1
0
Se
p-1
0
No
v-1
0
Ja
n-1
1
Ma
r-1
1
Ma
y-1
1
Ju
l-1
1
Se
p-1
1
No
v-1
1
Ja
n-1
2
Ma
r-1
2
Ma
y-1
2
Ju
l-1
2
MW
28 D MA + 1 SD
28 day MA
28 D MA - 1 SD
![Page 24: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/24.jpg)
www.eprg.group.cam.ac.uk
Handling high wind in SEM
![Page 25: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/25.jpg)
www.eprg.group.cam.ac.uk
Averaging over 9 hrs in successive 42 day periods
1-6% average wind output
![Page 26: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/26.jpg)
www.eprg.group.cam.ac.uk
California PV is saturating summer days
![Page 27: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/27.jpg)
www.eprg.group.cam.ac.uk
California solar PV lowers day-time prices
![Page 28: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/28.jpg)
www.eprg.group.cam.ac.uk
Electricity characteristics
• Electricity characteristics and cost drivers:
– capacity (MW): max demand on links to Load
– energy (MWh) nodal for each time period: fuel + C
– quality (frequency, voltage etc.) nodal each second
• Pay for option to take capacity
–Drives investment in T & D
•Some depends on peak, some on local maximum demand
–Pay for energy at efficient price (SMC)
–Pay for capacity at LoLP(VoLL-SMC)
–QoS bundled with access, energy, capacity
• paid by final consumers to suppliers of service
![Page 29: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/29.jpg)
www.eprg.group.cam.ac.uk
I-SEM flexibility services
![Page 30: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/30.jpg)
www.eprg.group.cam.ac.uk
System services in the SEM
New Services Now Existing Services Now
SIR Synchronous Inertial Response 65% SRP Steady‐state reactive power 69%
FFR Fast Frequency Response 54% POR Primary Operating Reserve 87%
DRR Dynamic Reactive Response 82% SOR Secondary Operating Reserve 90%
RM1 Ramping Margin 1 hour 88% TOR1 Tertiary Operating Reserve 1 91%
RM3 Ramping Margin 3 hours 88% TOR2 Tertiary Operating Reserve 2 89%
RM8 Ramping Margin 8 hours 66% RRDReplacement Reserve (De-Synchronised) 83%
FPFAPR
Fast Post Fault Active Power Recovery 88% RRS
Replacement Reserve (Synchronised) 93%
Table 1 Proposed new and existing System ServicesSource: SEM-13-060
![Page 31: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/31.jpg)
www.eprg.group.cam.ac.uk
Revised RES Directive
Revised RES Directive
16. “When designing support schemes and when allocating support, Member States should seek to minimise the overall system cost of deployment, taking full account of grid and system development needs, the resulting energy mix, and the long term potential of technologies.”
26. …”(allow) Member States to count energy from renewable sources consumed in other Member States towards their own”
•Art 3 proposes Union funds (financial instruments) to reduce cost of capital for RES projects.
•Art 4: ensure RES responds to market price signals and support is granted in an open, transparent, competitive, non-discriminatory and cost-effective manner
![Page 32: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/32.jpg)
www.eprg.group.cam.ac.uk
Can liberalised markets deliver?
• Ambitious RES targets need flexible back-up
– Normally comes from old high-cost plant = coal
• EU Large Combustion Plant Directive 2016 limits coal
• Integrated Emissions Directive further threat to coal
• GB Carbon price floor + hostility to coal => close old coal
– high (pre-2015) EU gas prices and low load factors
• gas unprofitable, new coal prohibited by EPS
• Future prices now depend on uncertain policies
– on carbon price, renewables volumes, other supports
– on policy choices in UK, EU, COP21, …
Long-term contracts the solution?
=> Auctions for contracts
![Page 33: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/33.jpg)
www.eprg.group.cam.ac.uk
3333
GB Electricity Market Reform
• UK Energy Act 18 December 2013 to address:– Security of supply and carbon/RES targets– Address problems with EU ETS & Market/policy failures
• To deliver secure low-C in UK affordably=> capacity payments=> Carbon Price Floor
• de-risk RES investment => CfDs to lower WACC
• Energy-only markets: capped, balancing market distorted,
flexibility under-rewarded
=> Missing Markets => Missing Market problems
=> new ancillary services
=> Auctions for long-term contracts
![Page 34: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/34.jpg)
www.eprg.group.cam.ac.uk
Coal displaced by wind & gas
![Page 35: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/35.jpg)
www.eprg.group.cam.ac.uk
D Newbery Cranfield 2012 35
GB 2014 Capacity Auction auction result
Source: National Grid (2014)
Net CONE – predicted entry price
![Page 36: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/36.jpg)
www.eprg.group.cam.ac.uk
Post 2020 RES-E support
• Learning spill-overs need remuneration– Almost entirely from making and installing equipment
⇒Contract €X/MWh for N MWh/MW, Auction determines X
Reasons:
• Subsidy targeted on source of learning = investment aid– Reduces cost of capital and risk via debt finance
– Addresses failure to set right CO2 price
• Exposes RES to current locational spot price=> incentivizes efficient location, connection
• Does not amplify benefits of high wind/sun– Not over-reward favoured locations with same learning
• Auction better than bureaucrats at minimizing cost
![Page 37: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/37.jpg)
www.eprg.group.cam.ac.uk
Conclusions
• RES support is justified by spillovers
=> support for capacity installed
• But the carbon price is inadequate– subsidy for shortfall in value of displaced CO2 ≈€10/MWh?
• RES are capital intensive => reduce WACC– long-term contracts with fixed capacity subsidy => debt finance
– auctions reduce cost
• Reliability needs capacity auction for flexible plant
• Ensure adequate payment for flexibility services to reduce cost
• Interconnectors provide both, need proper reward
• T&D tariffs need careful design
1
![Page 38: Irish, GB and EU policy towards wind and other renewableswindfarms2017.iit.comillas.edu/wp-content/uploads/... · Electricity characteristics •lectricity characteristics and E cost](https://reader034.fdocuments.us/reader034/viewer/2022042921/5f6b4528658c6a6d16663df9/html5/thumbnails/38.jpg)
www.eprg.group.cam.ac.uk
3838
Acronyms
BOS Balance of system (cost)CCGT Combined cycle gas turbine CfD Contract for DifferenceCONE Cost of New EntryEMR Electricity Market ReformFiT Feed-in tariffLbD Learning-by-doingLoLP Loss of Load ProbabilityQoS Quality of ServiceRES Renewable energy/electricity supplyRES-E Renewable energy supply from electricityRO Reliability OptionROC Renewables Obligation CertificateSEM Single Electricity Market of island of IrelandSMC System Marginal Cost = variable cost of most expensive generator in meritSO System OperatorT&D Transmission and Distribution
VOLL Value of Lost LoadWACC weighted average cost of capital