Iran Pakistan Vs Trans Afghanistan Gas Pipelines- Muddaththir Abdul Qadeer
-
Upload
muddaththir-qadeer -
Category
Data & Analytics
-
view
776 -
download
1
Transcript of Iran Pakistan Vs Trans Afghanistan Gas Pipelines- Muddaththir Abdul Qadeer
TAPI VS IPI
1TAPI VS IPI – Muddaththir Abdul Qadeer
PART - I
2TAPI VS IPI – Muddaththir Abdul Qadeer
GEN
3TAPI VS IPI – Muddaththir Abdul Qadeer
AIM
To present an overview of TAPI and IPI
gas pipe lines incl brief hist of the projs, tech
specs, route of the pipelines, comparison
b/w two and the latest devs
4TAPI VS IPI – Muddaththir Abdul Qadeer
SEQ
Part – I. IPI Gas Pipeline
Part – II. TAPI Gas Pipeline
Part – III. Comparison
TAPI VS IPI – Muddaththir Abdul Qadeer 5
PART – I
IPI GAS PIPELINE
6TAPI VS IPI – Muddaththir Abdul Qadeer
IPI GAS PIPELINE
Brief Hist
The Idea
Conceptualization
Pachauri's Proposal
Formal Discussions and Agreement
Proposed Route
Prelim Agreement b/w Iran and India
7TAPI VS IPI – Muddaththir Abdul Qadeer
IPI GAS PIPE LINE
8TAPI VS IPI – Muddaththir Abdul Qadeer
Pak-Iran Discussions
Proposal forExtn
Prelim Agreement
Indo-Pak Payment
Agreement
Invitation to Bangladesh, Indian Call
China’s Interest /
Indian Wdr
Iran Completes Her Side of
Pipeline
Dead Line by Iran
Inauguration of Pak Sec of Pipeline
Announcement for Commencement
Conceptualization
Idea was Conceived
US-Iran Nuc Deal, Iran FM Visit to Pak, Vouch
to Cont the Proj
1950s 1989 1994 1995 1999 2007 2009 2010 2011 2012 2013 2014 2015
Time Line
IPI GAS PIPELINE
Length
Total Length : 2775 Km
Inside Iran : 1172 Km
Inside Pakistan : 785 Km
Inside India : 818 Km
The Route. Asaluyeh-Bandar Abbas-
Khuzdar-Sui / Karachi-Multan-New Dehli
9TAPI VS IPI – Muddaththir Abdul Qadeer
Tech Specs
IPI GAS PIPELINE
Tech Specs
Initial Capacity : 22 Bn CuM
Expected Raise : 55 Bn CuM
Carriage
• Per yr Carriage : 8.7 Bn CuM
• Max Capacity : 40 Bn CuM
Dia of Pipeline : 56”
Expected Cost : US$ 7.5 Bn
10TAPI VS IPI – Muddaththir Abdul Qadeer
IPI GAS PIPELINE
Tech Specs
Est Date of Commissioning
• Initial Est : Yr 2013
• Latest Est : Yr 2020
Price of Gas
• US$11 per Mn MMBTU
11TAPI VS IPI – Muddaththir Abdul Qadeer
Controversies
US Pressure
Ankara Agreement
Diminished Interest of Investors
Russian Investment (Gazprom)
Saudi Package
Proposed Pipeline - “The Death Sentence”
IPI GAS PIPELINE
12TAPI VS IPI – Muddaththir Abdul Qadeer
PART – II
TAPI GAS PIPELINE
13TAPI VS IPI – Muddaththir Abdul Qadeer
TAPI GAS PIPELINE
Brief Hist
Feasibility Study by Asian Dev Bank
Instability in Afghanistan – Maj Delay
Framework of Pipeline Signed on 24 Apr 08
Inter Governmental Agreement on 11 Dec 10
Transit Fee – One Maj Cause for Delay
Afghan – India Agreement in May 2012
14TAPI VS IPI – Muddaththir Abdul Qadeer
TAPI GAS PIPELINE
15TAPI VS IPI – Muddaththir Abdul Qadeer
Formal Signing of Coys
9/11
Bombing of US Embassies
New Deal Signed
Taliban Threat
En-Route
Feasibility study
Framework Agreement
India-Afghan Failed
Negotiations
Inter-Govt Agreement
Cen Asia Gas Pipeline Consortium
InaugralMemo
1995 1996 1997 1998 2001 2002 2005 2006 2008 2010 2012 2013 2015
Time Line
TAPI GAS PIPELINE
Length
Total Length : 1680 /1735 Km
Route inside Afghanistan is not cfm due to
instability in the Cty
Proposed Route. Daulatabad / Lolotan-Hearat-
Kandahar-Chaman-Zhob-DGKhan-Multan-Fazlika
16TAPI VS IPI – Muddaththir Abdul Qadeer
TAPI GAS PIPELINE
Altn Route. Taskepri-Faryab-Balkh-
Samangan-Kabul-Nanghar-Peshawar-
Nowshehra-Attock-Islamabad-Lahore-India
17TAPI VS IPI – Muddaththir Abdul Qadeer
TAPI PROJ
Tech Specs
Initial Capacity : 27 Bn CuM
Proposed Share
• Afghanistan : 2 Bn CuM
• Pakistan : 12.5Bn CuM
• India : 12.5Bn CuM
Expected Raise : 33 Bn CuM
Compressor Stas : 6 Along the Pipeline
18TAPI VS IPI – Muddaththir Abdul Qadeer
TAPI GAS PIPELINE
Tech Specs
Est Date of Commissioning
• Initial Est : Yr 2014
• Latest Est : Yr 2020
Dia of Pipeline : 56”
Price of Gas
• US$13 per Mn MMBTU
• Expected Cost :US$ 7.6 – 10 Bn
19TAPI VS IPI – Muddaththir Abdul Qadeer
TAPI GAS PIPELINE
Controversies
Security Sit in Afghanistan
Russian Involvement
American Str Recom
Transit Fee
Trilateral Relations b/w Pak, Afghan and India
20TAPI VS IPI – Muddaththir Abdul Qadeer
PART – III
COMPARISON
21TAPI VS IPI – Muddaththir Abdul Qadeer
COMPARISON
TECH ASPECT IPI TAPI
Gas Sup Iran Turkmenistan
Est Time For Completion Initially Yr 2013 Yr 2020 Proposed
Capital Cost US$ 7.5 Bn US$ 7.6 Bn
Length of Route 2775 Km 1680 / 1735 Km
Pipe Dia 56” 56”
Price of Gas US$ 11/Mn MMBTU US$ 13/Mn MMBTU
Gas Vol 8.7 Bn CuM -
Gen Dir of Pipelines W to E / S to N N to S
Max Disch/ Initial Capacity 22 Bn CuM 27 Bn CuM
TAPI VS IPI – Muddaththir Abdul Qadeer 22
COMPARISON
TECH ASPECTS IPI TAPI
Maj Powers Involved Iran, USA, KSA,
China, Pak, India
Sp by US and Allies,
China, CARs, India,
Pak, Afghanistan
Route Troubles No Yes
Compressor Stas - 6
Time Factor for
Completion
Const of Iran’s side is
Completed
Proj is still Under
Const
TAPI VS IPI – Muddaththir Abdul Qadeer 23
THANKS
TAPI VS IPI – Muddaththir Abdul Qadeer 24