1. Number of changes in specific time period – number of changes per week, for example. This describes the degree of volatility of requirements.
2. Product, process or resource – The three important entities in an IT Organization
3. Which of the following is the internal attribute: Effort, Quality, Cost, and Stability?
4. The internal attributes are measures or metrics that we can control and measure directly
5. A measure is single quantitative attribute of an entity
6. Objective measures uses data that can be obtained by counting, stacking, weighing, timing, etc.
7. The subjective measurement is likely to change values across users
8. Objective measures are often referred to as quantitative data
9. Subjective data are referred to as qualitative data
10. Software metrics may be broadly classified as either product metrics, process metrics or service metrics.
11. Complexity Metrics is Product metrics
12. On Time Delivery is Service Metrics
13. The software metrics lifecycle consists of Identify, Define, Collect, Analyze and Evolve stages
14. Reusability is addressed in Product Transition of McCall model
15. Requirements are to say “What” a software solution should do rather than “How”, it is to be done
16. A requirement is complete if: Everything that the software is supposed to do is included in the requirement specification All pages numbered; all figures and tables numbered, name referenced; all terms defined; all units of measure
provided; and all referenced material present. No sections marked “To Be Determined”.
17. A requirement is traced if and only if the origin of each of its requirements is clear
18. Annotating requirement in a requirement specification provides guidance to the software developers. – True
19. Annotated by Relative Importance - This approach satisfies minimum needs of the customer
20. UML: Use case diagram, UML: activity diagram, Data flow diagrams – representation forms available for Functional design
21. The usage of global data, public attributes, and common areas within a module increases coupling
22. A high fan-in is desirable for procedures as it indicates a reused procedure – True
23. As a rule of thumb, the optimum fan-out is seven, ±2.
24. Change-prone model is developed to identify change prone classes using following parametersCoupling Between Objects (CBO)RFCNORMLOCOM1
TJS
25. Defect-prone model is developed to identify change prone classes using following parametersNumber Of Added Methods (NOAM) and Number of Operations (NOO)Coupling Between Objects (CBO)Depth Of Inheritance Hierarchy (DOIH)
26. Cyclomatic Complexity measures the structural / logic flow complexity in a method
27. One question using the formulae McClure Complexity = B + NB = the number of conditional branches in a programN = the number of unique operands used in conditional branches
28. McCabe provides complexity from structural perspective whereas Halstead provides complexity from computational perspective
29. The MOOD metrics, defined by Fernando Brito e Abreu, provide a summary of the overall quality of an object-oriented project
30. Performing smoke testing on the build and accepting / rejecting the build depending on smoke test result is part of test environment setup.
31. To achieve 100% decision coverage, each decision condition in the code has to be evaluated for both true and false while testing
32. Race Coverage: reports whether multiple threads execute the same code at the same time
33. State-based context coverage metrics are designed to improve the testing of classes with state dependent behavior.
34. Cause-Effect graph is a technique that aids in selecting combination of input conditions in a systematic way such that smaller set of high yield test cases can be generated
35. Utilities- Programs/Scripts etc. that help to automate routine tasks like initializing, comparing and similar other sundry housekeeping jobs
36. %EFFORT Savings= Actual reuse effort savings/ (Actual effort+ Actual tools savings+ Actual reuse savings)
37. Functionality is major factor in which phase of SDLCa) requirementb) Architecturec) Designd) Coding
38. Reliability is major factor in which phase of SDLCa)requirementb)architecturec)designd)coding
39. 39 high value of Count ‘01’ and redefines clause in COBOL __________ the complexitya)increasesb) decreases
40. Entities of Software MetricsProcess, Product and Resources
41. Quality is the attribute of which metricsProcess
42. UML activity diagram, DFD and structure diag are part of which design
TJS
Functional Design
43. Simplicity is calculated on basis of complexityTrue/False
44. Coupling and cohesion belong to which MetricProduct/Process (not sure abt answer)
45. Data from one module decides the action of second module. This is ----------Control Coupling
46. Modules are design so that user navigates from one screen to other. Which cohesion is applicable here Communicational
47. Best type of cohesionFunctional
48. Structural fan in and fan out is measured in procedures as well as filesTRUE/FALSE (not sure)
49. High NOAM indicates functionality of child class is different that parent classTRUE/FALSE
50. DOIH and NOCC are attributes of interaction couplingTRUE/FALSE
51. Some question on LCOM don’t remember exactly
52. DesignR is not applicable in structured programsTRUE/FALSE
53. Design factors of Defect prone classesNOAM, NOO, CBO and DOIH.
54. LOCOM1 can be used to identify change prone characteristicTRUE/FALSE
55. Informational Metrics depends on…………..
56. Question on CRUD Metrics
57. Use of 01Level Variables and REDIFINES ……. The complexity in COBOLIncrease/decrease
58. True comment ratio is higher than comment ratioTRUE/FALSE
59. Overall code metrics for OODMood Metrics
60. You are able to express the functionality of a function in one line using 2 verbs separated by a and condition, what is it exhibiting- temporal cohesion - Communicational-functional cohesion
61. You are unable to express functionality of a method in one line what is it exhibiting 62. You need to write a design doc from SRS what is the best keywords to look for
TJS
-listed, given below -Timeliness,-Should, MayShall, will and must
63. If you need to look for non explanatory requirements (basically not doc properly) you should look for which keywords
--Timeliness,OptionsMay, can either or
64. What are the keywords that tell that the req is v long
---follows, listed
65. What estimation technique to use before start of coding phaseAns: Function points
66. McCabe Cyclomatic complexity calculates the minimum no of test cases requiredTrue
67. Which measure to use for database software?Ans: CRUD
68. Which metrics to use for OOPsAns: MOOD
69. If comments ratio in the program is as per the standards there is no need to evaluate itAnd False (i think)
70. Which of the following is not a level of measure?a. Nominalb. Ordinalc. Intervald. Ratioe. Cardinal
71. Complexity Metrics is a type of Product Metrics
72. The focus in unit testing is code coverage
73. Performing smoke testing on the build and accepting / rejecting the build depending on smoke test result is part of test environment setup.
74. Code coverage is the focus in structural testing
75. Which of the following is not a black box/functional testinga. Equivalence Partitioningb. Boundary Value Analysisc. Cause - Effect Graphingd. Error Guessinge. None of the above
76. For optimal modular design low coupling and high cohesion is desirable.
77. Data flow diagrams are used for process modeling
78. Number of test cases required to achieve path coverage increases exponentially with the number of branches. For 10 If else braches, what is the
TJS
a. 100b. 1024c. 2048d. None of the above
79. The Cyclomatic complexity indicates minimum number of test cases required to ensure reasonable coverage of the program.
80. Cause-Effect graph is a technique that aids in selecting combination of input conditions in a systematic way such that smaller set of high yield test cases can be generated.
81. Utilities - Programs/Scripts etc. that help to automate routine tasks like initialising,comparing and similar other sundry housekeeping jobs
82. %EFFORT Savings= Actual reuse effort savings/(Actual effort+ Actual tools savings+ Actual reuse savings)
83. Security – systems ability to protect from unauthorized access to data or system functionality at the same time permitting legitimate use
84. Efficiency – how well the system utilizes the resources
85. Performance is Observable QoS requirements
86. A requirement is unambiguous if, and only if, every requirement stated therein has only one interpretation and complete if:_ Everything that the software is supposed to do is included in the requirement specification
87. Number every paragraph hierarchically – Traceable
88. Use case diagram, UML: activity diagram, Data flow diagrams Functional Design
89. Coupling can be measured througha. # of parameters passedb. Number of components calledc. # of Shared variables accessed in the moduled. All of the above
90. If the sentence is a compound sentence, contains a comma, or contains more than one verb, the module is probably performing more than one function. Then it does not have functional cohesion.
a. If the sentence has more than one verb and if they are connected by OR’s then the module has logical strength.b. If the verbs are connected by AND’s then the module may have classical, procedural, or communication strength.
91. In structured design, Fan-In and Fan-Out metrics is available at files as well between procedures
92. A high fan-in is desirable for procedures as it indicates a reused procedurea. True b. False
93. The optimum fan-out is seven, ±2.
94. Which of the following is falsea. only about 10 – 15% of the classes/programs account more than 60% of defects
95. Defect proneness model is developed to identify defect prone classes using the design factors NOAM, NOO, CBO and DOIH
96. Change-prone model is developed to identify change prone classes using following parameters CBO, RFC, NORM, LOCOM1
97. McCabe Cyclomatic Complexity counts the number of possible linearly independent paths, meaning the number of if, Perform and Evaluate statements in the operation’s body
TJS
98. McClure tried to remove this discrepancy while estimating the program complexity.a. McClure Control Variable Complexity indicates the complexity involved in testing a programb. This is concerned on how complex the tests are that control their selectionc. It is based on the number of conditions and the number of unique data items used in comparison expressions.
99. Following are the three major factors of the CRUD Matrixa. Total number of input / output operationsb. Total number of different Types of IO operationsc. Different types of databases used.d. All of the Above
100.Higher the Count of ‘01’ Variables and ‘REDEFINES’ clause, higher is the complexity.
101.Greater the value of MI the more maintainable the program is and lesser effort it requires for maintenance
102.At Infosys, the minimum value of MI should be 5.Recommended value for MI – between 2 and 7;
103.The MOOD metrics, defined by Fernando Brito e Abreu, provide a summary of the overall quality of an object-oriented projecta. Trueb. False
104.benefits of using metrics for Organizationa. Industry Benchmarkingb. Comparing Units Performancec. Meaningful Goal Settingd. All of the above
105.Effort Metrics is aa. Process Metricsb. Product Metricsc. Service Metricsd. None of the above
106._______ refers to the continued suitability of the measurement system to return valid measurements.a. Calibrationb. Consistencyc. Validityd. Timeliness
107.Ordinal measure points can be placed in an order or ranking
108.Software metrics may be broadly classified as either product metrics , process metrics or service metrics
109.PDB helps in : a. To aid estimation of effort and defectsb. To get productivity and quality data on different types of projectsc. To aid in creating process-capability baselinesd. To aid as a tool for process improvementa, b,cb,c,dAll of the above
110.Quality is defined as “The totality of features and characteristics of an entity that bear on its ability to meet stated and implied needs” by
a. Phil Crosbyb. Joseph Juran
TJS
c. Kanod. ISOe. None of the above
111.1 question on Figure 3: ISO 9126: Quality Factors
112.Functionality is in focus in _____ stage of SDLCa. Architectureb. Design and buildc. Testingd. None of the above
113.Benefits of metrics to organization – Ans is all of above i.e. benchmarking, comparing unit performance, goal setting
114.Quality is External attribute.
115.Scenario, a project team decided to use certain metric. Down the line it was found that the metric is not being used correctly, Why ?options were
a. DM not awareb. Lack of motivation to use metricc. Objective setting not done for metric (I marked this, n its correct )d. Lack of training
116.3 questions on table of point 5- The Right Metric framework.
117.Quality of Code is Process Metric
118.Metric and measures can be used interchangeably- False
119.Measure is single quantitative attribute of an entity –True
120.Metric bring Normalization.
121.One scenario was given which was focusing on Calibration attributes of Metric. Please read these attributes in details, it is very confusing. Especially in Exam hall
122.Which is not the level of measure – Nominal , Interval , Temporal, Ratio
123.PCB –is Process capability Baseline
124.3 questions were on Appendix in chapter 2 . i.e. on PDB and PCB
125.What is the sequence u will follow while extending the current project – There were 4 options given , I marked- Look project history, look similar projects, refer to PDB , refer to PCB. Other options were combination of these
126.2 scenarios were give and was asked to identify the type of requirement. One was Functional and another was QoS
127.systems ability to protect from unauthorized access to data or systemFunctionality at the same time permitting legitimate use is Security
128. 3 questions were on Essential Attributes of Requirements. These were the scenarios corresponding to Correct, complete and modifiable attributes
TJS
129.The purpose of creating the POC is requirements are Achievable ( I marked this)
130.Requirement Organization is Essential attribute – False (desirable attribute)
131.A question on Annotated requirement
132.Given two requirement for the same system, each exhibiting identical levels of all the previously mentioned qualities, the requirement specification that is shorter is better. -True
133.Which of the following does not indicate imperative requirementsAs applicableMustShouldFigure
134.Directive indicates how precisely req are specified.
135.------Lead to ambiguityWeak phraseOptions
136.Following indicates size of SRSLines of textSubject/title of SRSParagraphsAll of the above
137.Complexity is the attribute of design and code – True
138.Lot of questions on Cohesion and couplinga. What define level of coupling between two classesb. Coupling can be avoided through ---- (Ans – appropriate checks, checklists and review methodologies )c. High data coupling is expected( other options were No, Moderate, low)d. High coupling means function do not implement all the functionalities
139.one module controls the logic of another, by passing it information on what to do is called Usage of Controlled flags
140.2 questions on kind of cohesion specifically Communicational cohesion and Sequential cohesion (these were the scenarios)
141.What is the correct sequence of cohesion ( in order of acceptability)a. Functional – Sequential – Temporal – coincidentalb. Other were the combination of above mentioned kinds
142.High Fan-out is High Coupling (not sure)
143.High fan- in is High Cohesion (not sure)
144.2 questions were on OO Parameters and interpretation table
145.CBO, MIC, VOD, RFC indicates Interaction coupling.
146.LOCOM1 focuses ona. Service cohesion
TJS
b. Class cohesionc. Generalization n specialization cohesiond. All of the above
147.What is design Robustness (DesignR)? – I dint get the answer w.r.t. option
148.Design factors NOAM, NOO, CBO, DOIH shows Defect proneness model
149.LOCOM, RFC shows Change proneness model
150.Which tool is used for design metric in online applicationa. QA4Jb. FxCOPc. Both (online means - .net and java )d. None
151.In Requirement analysis, we should focus ona. What’s need to be developedb. How we should develop it
152.IF you are going in Requirement review meeting with client, where will be your primary focusa. Conformance to requirement ( I mared this)b. Fitness for usec. Attractive qualityd. none
153.Finding the origin of requirements means the requirement is Traced, other options were traceable, both none
154.LOC does not affects
a. Maintainabilityb. Modularityc. Reusabilityd. None of the above
155.What is the FP weight assigned to inputsa. 5b. 4c. 10
156.If you are implementing the application which involves lot of mathematical computation then ideally you should followa. McCabe’s Cyclomatic complexity metricb. McClure complexity metricc. Halstead metric ( I marked this one, not sure)
157.If the program has 4 conditional branches and 6 unique operands then McClure complexity isd. 12e. 8f. 10 (B+N=6+4)g. 6
158.2 questions on CRUD metric, almost similar. Which metric is used if you are referring to Database operations – CRUD
159.If there are too many operations performed in Procedure, then it should me refactored – True
160.2 questions were on information flow metric
TJS
161.MI is the indicator of maintainability of a class – True
162.TCR is always less than comment ratio – True (not sure, I could not find any clue for this)
163.The rule of thumb for maximum Fan out is Seven ±2
164.Each executable coverage is part of Unit testing
165.In Integration test all interfaces are tested – True
166.Test strategy is designed in which phase of Testinga. Test executionb. Test planningc. Test designd. None
167.What is correct order of test metric improvementa. Statement coverage – decision coverage- condition coverage – Decision/condition coverageb. Other were the combination of above mentioned attributes
168.Which metric reports multiple thread execution on same code a. Raceb. Weak mutation coveragec. Call coverage
169.CC is helps to reduce the number of test cases – True
170.One question was designed on formula of state based context coverage—it was very confusion, just look after the formula
171.Error guessing isa. Not useful in unit testingb. Is not useful in reliability testc. Is just type of test which helps the traditional ways of testing ( I marked this)
172.In equivalence partitioning testing if test cases are satisfied for group of test data, then is valid for all the data – True
173.The ability of different system to work under different system environment is called as Portability
174.The ability of system to interact with application in future release is called as Interoperability
175.Definition of Quality was given and asked the reference? – ISO
176.In ISO 9126 model , Functionality constitutes Suitability, Accuracy, Security, Interoperability, Compliance
177.One application was developed to maintain the user requests. The process was, the user has to insert the queries in multiple pages and numerous validations were applied. Over the period of time is was observed that application is not being used by users, the reason was lack of
a. Maintainabilityb. Usabilityc. Understandabilityd. Complexity
178.One data entry system was developed in which the data was flown from one page to another and to the last page. This system can be called as ---Communication cohesion
179.2 questions were applicable for SRS completeness and correctness
TJS
180.What do not account for reusea. Code librariesb. Checklistsc. Material with IP rights reservedd. All of the above
181.Who can modify the code with which Infosys IP is associateda. Infosys Project teamb. Any onec. ENCORE team ( I marked this)
182.Infosys reserves the IP, even if the application is developed using Client infrastructure –True (not sure)
183.ENCORE manages the reusable assets unit wise.- True (not sure because of word unit wise)
184. The definition "Quality is the totality of…." was given by:
Juran Crosby ISO Deming
185. Three entities of s/w Product, Process and Resource
Product, Process, Service
186. is an Objective Measure No of Defects, Hours Worked, LoC
187. Which of these is not an external attribute
Effort Quality Cost
188. Ordinal Measure can be placed in an order or ranking
189. Which is the only model that supports all quality features
ISO McCabe FUPS
190. Features of good design High Coupling ,Low Cohesion Simple, Low Coupling, High Cohesion
Low Coupling ,High Cohesion
191. physical line of code excluding comments and blank lines
logical loc assuming physical loc will be merged
logical lines - comments and blank spaces
192. CRUD is taking more time .What should be done to improve performance
Reduce DB calls If there are too many operations performed in a single procedure, refractor that procedure.
193. What deals with analyzing &choosing the best strategy for test plans execution
Test Planning Test Execution Test Strategy
194. What is the Reuse Tool used in Infy Encore 195. For an asset to be termed as
reusable, it has to be used without any change otherwise it does not remain reusable
TRUE FALSE
196. One projects assets can be used in another project
With permission of the owner of the asset
TJS
197. A general thumb rule for Fan-Out 5 plus minus 2 6 plus minus 1 8 plus minus 2
7 plus minus2
198. physical and logical LoC 199. Graph Testing is what kind of
testingBlack Box White Box Glass Box
200. Arrange degree of cohesion from lowest to Strongest Binding
Logical Temporal Functional Procedural
201. Shared global variable increases or decreases Cohesion/Coupling
increases coupling
202. Depth of inheritance counts the no of classes that are inherited…
DOI
203. Question not available PF CF MIV and MFI
204. A Requirement is said to be ----if it gives only one interpretation and --- if for every function in the requirement there is a corresponding ---
Unambiguous, Complete
205. You have tested the application and the client complaints that it is taking more time to Analyze the place which has problem in enhancement.
Maintainability
206. There is a class with 3 functions with Cyclomatic Complexity as 4,7,9.Which function has 9
Highest Level CC Highest LoC McCabe CC
207. You want to test a procedure for its access complexity What is the metric
Fan IN Fan Out LoC COB
208. LoC is the basic practice in Infy to calculate Size Of Code
TRUE FALSE
209. Encore- Cohesive TRUE FALSE 210. 6 4- Calculate 10 24 2 6211. Review Effectiveness is addresses
by which s/w metricProcess Product Service
212. Objective is used for ------Subjective is used for decision making
TRUE FALSE
213. Requirements doc is 50 pages .Can you say that it is a good SRS
TRUE FALSE can't say
214. There is a class which calls many classes and is called by many classes
Cyclomatic Complexity High Coupling Low Cohesion
215. How do you measure ---- Complexity
No of shared var’s Local /global var's Both None
216. Purpose of Maintainability index 217. If CR>30% the DirectR is good bad can’t say 218. You have to measure the
Performance metric on DB Module .What method will you choose
CRUD Matrix CC
TJS
219. A _______ is single quantitative attribute of an entity.
Measure Metric
220. Measure and Metrics is the same and used interchangeably
TRUE FALSE
221. Which of the following in not a valid measure
Cardinal Ordinal Ratio Interval
222. You have prepared Use Test Cases and they are not enough. What does it map to
Verifiable Maintainable Portable Scalable
223. During your requirement analysis if you are able to identify the history/source of that req then that is
Traceable Traced Complete Correct
224. Adhering to ..requirements is a part if which testing
Functional Unit System
225. if the person developing reads the design docs and finds out that the error messages could be better This is
Usability Conformance to design
226. There is a website and the no. of hits dropped. Survey shows that there were 9 hits before submitting the page.
Usability Performance
227. You have gone to client location, the client is asking when will you analyse the quality metric
Build Design Both None
228. You want to analyses the ---- metric. You describe the procedure in one sentence. You realize a lot AND, OR.
Imperative Conjunctional definitive All
229. What is a good/precise SRS Shall, will figures, tables as follow, listed below
maybe
230. You want to get a rough idea of the number of functionalities in the SRS. You should calculate the number of -
definitive words conjunctional words imperative words
All of above
Question option1 option2 option3 option4 AnswerCoding metrics231.The amount of computing, resources
and code required by a program toperform its function is captured under
performance Maintainability
Extendibility Reusability performance
232.which of the following is use for estimation of software before development
Function Point LOC Both None FP
TJS
233.which of the following is inconsistent with the actual effort
Function Point LOC Both None LOC
234.What is the weight for inquiries in Function point( question could be based on the weight value of other attributes as well)
2 5 4 10 4
235.Which of the following indicates the control flow at run-time?
Mathematical Complexity
Structural complexity
Informational complexity
Computational Complexity
Structural complexity
236.Which of the following used for deciding complexity:
No of lines in the code
complexity metrics
both none both
237.Complexity(options may vary) decreases the defect-proneness
decreases code reliability
decreasesmaintenance effort
All decreases code reliability
238.which is not true about McCabe Cyclomatic complexity:
counts the number of possible linearly independent paths
indicates minimum number of test cases required
Branches in the program to call a subroutine or a paragraph are to be considered acontributor to McCabe
none Branches in the program to call a subroutine or a paragraph are to be considered acontributor to McCabe
239.which is not true about McClure Control Variable Complexity
McClure Control Variable Complexity indicates the complexity involved in testing aprogram
It is based on the number of conditions and the number of unique data items used incomparison expressions.
counts the number of possible linearly independent paths
none counts the number of possible linearly independent paths
240.which are the parameter for calculating McClure
number of conditional branches in a program
number of unique operands used in conditional branches
number of process blocks in the flowchart
number of connecting lines in a flowchart
option a and b
241.which of the following take the parameter passing and variableaccess to calculate complexity
McClure Control Variable Complexity
Information flow Metrics
Halstead Actual Program Length
McCabe Cyclomatic complexity
Information flow Metrics
242.If there are too many operations beingperformed by a single procedure
Don't remember the options. that procedure can be a target for refactoring
243.Recommended value for depth of nesting metrics
option were different integer values 1)Depth of Conditional Nesting= 5 2) Depth of Looping=2
244.Impact of "01" , redefines and Clause on complexity.
245.metrics for evaluating understandability Comments density/ratio
Variable names
Procedure names All All
246.Recommended value for MI 2 to 7247.As per PCB the value for MI should be 5
TJS
248.which of the following is Metrics in Object Oriented programminglanguages
Don't remember the options. Mood metrics
249.which of the following is used for encapsulation
MHV, AHV, PF AIV, MIV CF MHV,AHV
250.High MHV, low AIV and High PF indicates
poor usage of MHV and AIV, Proper usage of PF
Poor usage of MHV, proper usage of AIV,PF
Poor usage of MHV, proper usage of AIV and Poor usage of PF
Proper usage of All
Option c
251.if there are 3 methods in a class and they have CC values as 5, 10, 15, then the higher method cc value is
5 10 3 15 15
252.if there are 3 methods in a class and they have CC values as 5, 10, 15, then metric value will be 15 according to
MNOL Highest method CC
WMPC1 none b
253.If a person is using parameter CBO, CC, DOIH, RFC, he is intended to calculate the MI for
java COBOL .net java and COBOL
COBOL
Software Product Quality254.“the totality of features and
characteristics" state to which definition
ISO Kano, Joseph Juran, Phil Crosby ISO
255.The ease with which the system can be modified states to
Portability Maintainability
Performance Functionality Maintainability
256.which of the following model attempts to bridge the gap between users and developers by focusingon a number of software quality factors
Bohem Model ISO Dromey Model McCall’s Quality d
257.adaptability to new environments undergoes in
Product transition
Product revision
Product operations
none Product transition
258.Reliability and efficiency are part of which higher level characteristics:
Maintainability As-is utility characteristics
General utility Modifiability) As-is utility characteristics
259.which of the following is not an attribute of FURPS( same question could be for other models as well)
Functionality Flexibility Reliability usability Flexibility
260.Which of the following is true for Functionality
Supportability, Recoverability, Security, Interoperability
Suitability, Accuracy, Security, Interoperability
Stability, Accuracy, Security, Interoperability
Suitability, understandability, Security, Interoperability
b
Requirement Metrics261.Question on Observable and non
observable QOS262.the ease with which system can handle
increase in demandManageability- Scalability Maintainability Portability Scalabilit
y263.Question on Example given to find the
requirement type.264.which of the following is not an
essential attributeUnambiguous Complete Understandable Organized d
265.question on definition of trace and traceable attributes
TJS
266.Which of the following is not the type of annotation
Annotated by Relative Importance
Annotated by performance
Annotated by Relative Stability
Annotated by Version
b
267.Given two requirement for the same system, each exhibiting identical levels of all the previouslymentioned qualities, the requirement specification that is shorter is better.
TRUE FALSE TRUE
268.If a requirement/Code is of 50 lines , it is good
True FALSE Can't say c
269.___________________gives a rough estimate of degree of design functionality required in thesoftware
Imperative Options Directives Continuances a
270.Two three questions were based on the word/ Phrases of different Requirement Quality Metrics
271.To precisely define the requirement use:
Imperative Options Directives Continuances c
272._______________used to report the number of statements identifiers found at each hierarchicallevel of the requirements document
Text Structure
273.Which of the following is used to measure the completeness of requirement
TBD TBS Both none c
274.Which of the following need to find out in case of specifications statement
end, etc. shall, must, etc.)
as listed, Figure AND, OR b
275.Question based on example of if statement is verifiable/complete or not?
Introduction276.Effective management of any process
requiresmeasurement metrics quantification qualification a,c
277.Metrics are used to improve Productivity Quality Efficiency Performance a,b278.Identifying Process Improvements
comes underProject Team Process
Engineering Team
Both None both
279.The three important entities in an IT organization
Product, process, service
Product, process, resource
Product, resource service
none b
280.which of the following can be controlled and measure directly
internal attributes
External attributes
Both none a
281.question based on figuring out the internal and external attributes from the option given
Design Metrics282.data or procedural design can be
extended: is define asExtendibility Reusability Modularity Maintainability a
283.Which of the following is not the parameter for coding metrics
Extendibility Reusability Modularity Usability d
284.Class and Object diagrams, Structure Charts, UML: Class diagram is part of which Design
Constructional Design
Behavioral design
Functional design Data design a
285.Structure Charts is of the following form Black Box white box Both None a
TJS
286.What are the sign of good design Simplicity Modularity High Cohesion Low coupling All287.What are the parameters to define the
level of coupling betweentwo routines
# of parameters passed
# of Shared variables accessed in the module
Number of components called
Usage of control flags in parameter list
All
288.Usage of control flags in parameter list can be eliminated through the usage of
checks, check-lists
review methodologies
checks, check-lists andreview methodologies
none c
289.Which of the following is the highest ranking coupling?
Control coupling
data Coupling
Data-Structuredcoupling)
Control CouplingActivating
b
290.There were two question on cohesion conversion. A scenario was being provided and then the question was based on … the conversion from one type of cohesion to another type absed upon the changes made?
291.There were around 4 to 5 question only from the topic 3.2 in design metrics.( I got two question from logical cohesion itself, some example based)
292.Question to find out type of cohesion based on example . E.g: If the sentence has more than one verb and if they are connected by OR’s then themodule has logical strength.
293.Question to find out the parameters/keyword for a cohesion type
294.The optimum value for fan-out is seven +-2295.Question based on Designing Modules
That Consider Fan-In/Fan-Out296.Are the metrics for OOD and structured
programming is sameFALSE
297.which of the following is considered while identification of right class
Sufficiency Completeness
Primitive Simplicity a.b,c
298.which of the Following metrics will not help in deciding whether an identification of a class is a right class
NOA NOAM NORM MNOP c
299.If a person is looking for metrics: CBO. MIC, VOD, NORM, Then he is looking for which coupling
inheritance coupling
Interaction Coupling
encapsulation Polymorphism a
300.the number of acquaintance classes should be kept low, is considered in
MIC VOD RFC NORM b
301.If a class explicitly rejects many of theattributes of its generalization class or if class does not use many of attributes as well servicesof its generalization class , is calculated under
Interaction Coupling
inheritance coupling
Polymorphism none b
302.Lack of Cohesion of Methods 1 is of which cohesion
service logical class Generalization-specialization cohesion
c
303.Three question on Defect and change proneness parameters and statements. The point to remember is 1. Defect proneness model: NOAM, NOO, CBO and DOIH 2. Change Proneness Model: CBO, RFC, NORM, LOCOM1
TJS
304.3. 10 – 15% of the classes/programs account more than 60% of defects. These are defect prone classes 305.4. Highly change prone Design_ Metrics.doc For Internal Circulation Only Page 22 of 30 classes/programs are 8 to 10 times as
likely to be highly defect prone as well compared to not so- change-prone classes. These are change prone classes.Software Metrics306.the basic management objectives of
prediction, progress, andprocess improvement
Measurement Measurement System
Metrics Metrics and measurement
a
307.metrics and measurements are same and used interchangeably
TRUE FALSE FALSE
308.software metrics deals with Measurement Measurement System
both none a
309.which of the following is not a attribute for good measure
variability Consistency Validity simplicity a
310.Objective measures are often referred to as qualitative data while subjective data are referred toas quantitative data
TRUE FALSE FALSE
311.Which is not the level of measure Nominal ordinal cardinal interval c312.Question on option to find out software
metricsProduct, process, service
313.Complexity Metrics is part of Product process service resource a314.Effort Variance is part of Product process service resource process
metrics315.Question on Software metrics lifecycle
order316.Question on PCB and PDB about the
capabilities317._______ refers to the continued
suitability of the measurement system to return valid measurements.
a. Calibration a. Consistency
c. Validity d. Timeliness a
318.The process-capability baseline contains the process capability (mean and control limits), primarilyfor parameters
Schedule Effort and defect distributions
Review/test effectiveness
All All
Testing Metrics319.All the business scenario covered under
which moduleCoding Requirement Testing Design c
320.question from V model, at which level which test vases are required.
321.Which of the following is testing as per V model :
Unit Testing environment Testing
System Testing
Module Testing a,c
322.The focus in unit testing is Code Coverage
323.which of the following testing covers all the path, while testing:
Unit testing System testing
UAT Integration Testing
b
324.Test Strategy is created under Test Design Test Planning
Test case design
Test Execution b
325.Resource planning and determining roles and responsibilities is part of
Test Design Test Strategy Test case design
Test Report b
326.Document test results, and log defects for failed cases is part of
Test Report Rtset Design Test Execution
Test Planning c
327.which of the following is not Defect Number of Total Defect b
TJS
considerable in product metrics Distribution Totals by Severity per Period
Test Cases Passed or Failed
Number of Defects Raised and Closed per Period
Distribution Totals by Functional Areas/Requirements and Severity per Period
328.Question on metrics available for functional coverage.
329._________________reports whether each machine language conditional branch instruction both took the branch and fell through and_______________reports whether multiple threads execute the same code at the same time
Object Code Branch Coverage, Race Coverage
330.The Cyclomatic complexity indicates minimum number of test cases required to ensure reasonablecoverage of the program
TRUE FALSE TRUE
331.OO context coverage metrics are Inheritance context coverage
State-based context coverage
User-defined context coverage
interaction context coverage
a,b,c
332.The routine is wrongly considered “100%covered” when it has been exercised in the context of class Derived only.
Similar question was there on this statement, regarding when the coverage is considered 100%.
333.Question on State-Based Context Coverage, parameters and formula to calculate
334.Which of the following is not the functional Testing coverage metrics
Equivalence Partitioning
Boundary Value Analysis
Cause - Effect Graphing
none d
335.Purpose of Boundary value analysis is?336.Question on Statement" Cause-Effect
graph is a techniquethat aids in selecting combination of input conditions in a systematic way such that smallerset of high yield test cases can be generated. A cause is a distinct input condition and aneffect is a distinct output condition."
Reuse Metrics337.At which stage of SDLC, reuse can be
achieved?Requirement Design Coding Testing All
338.Reuse of software: Reduced development effort
Increased productivity and quality
Increased dependability
Option were: None, a & b, a&c, All, b &c
All
339.Reusable assets are to be used only on TRUE FALSE FALSE
TJS
As-IS basis340.Which of the following is considered in
reusing artifacts:Tools utilities Knowledge
ManagementChecklists, Guidelines & Templates
All
341.Programs/Scripts etc. that help to automate routine tasks like initializing,comparing and similar other sundry housekeeping jobs are
Knowledge Management artifacts
Checklists, utilities Tools Utilities
342.Which are the technical assets: libraries abstraction layers
service routines
use cases a,b,c
343.Which of the following is not a reusable artifact:
graphics libraries
Code Libraries
access libraries
All All
344.which of the following is not a Characteristics of Reusable Assets
Non Self-contained with clearly defined boundaries
Clear, unambiguous, and understandable specification
Functionality of the asset
Specification conformance
a
345.Question on %EFFORT Savings (didn’t remember the options.)
%EFFORT Savings= Actual reuse effort savings/(Actual effort+ Actual tools savings+ Actual reusesavings)