IPO Presentation November 2011. September 2011 2 VMS Districts Net Values Wabassi Image From HudBay...
-
Upload
adrien-ashmore -
Category
Documents
-
view
212 -
download
0
Transcript of IPO Presentation November 2011. September 2011 2 VMS Districts Net Values Wabassi Image From HudBay...
IPO PresentationNovember 2011
September 2011
2VMS Districts Net Values
Wabassi
Image From HudBay Corporate PresentationExploration Program Review, Dec. 15, 2010
Major Successes
Rising Corporations
September 2011
3Location
180 km south of Ring of Fire
170 km north of railhead at Nakina, Ontario
OntarioWabassi:
Proposed Rail link
Wabassi
September 2011
42011 VTEM – Preliminary Targets
A2
Anomaly ENew Exploration Camp Location
September 2011
5Assay Results
Anomaly E Long Run Price
Zn $
0.60 / lb
Ni $
5.00 / lb
Cu $
1.50 / lbAg $ 16.00 / OzAu $ 750.00 / Oz Drill Hole From (m) To (m) Interval (m) Ag (g/t) Cu% Ni% Zn% Au (g/t) $/ton Value
September 2011
62011 VTEM – EM - New Targets (Scales Equal)
Block 2 VTEMBlock 3 VTEM
Anomaly ‘E’ VMS Discovery-20112010 VTEM Survey
Size Comparison & Location, Referencing
New VTEM Targets – Blocks 2 & 3
**Note: Based on ground & downhole geophysics & drilling (4 holes) the
mineralization contained within Anomaly E is 650m in length,
averages 24m thick, and is open along strike in both directions and at
depth!!Anomaly “E” VMS Discovery
A-2 VMS Discovery
September 2011
7Capital Structure
Directors, 7.6 (6 are es-crowed)
F&F; 12.965
Zimtu; 2.02
WPX; 2.02
Investors; 12.76
NRN; 0.3
DHRC SHARES (in millions)
*as of July 31, 2011
Common Shares Issued 38,475,000
Fully Diluted 45,575,000
Investment Assets $1,525,200
Cash $803,149*
WPX Debenture $4,450,000
Converts at IPO Price
Shares and Assets