Establishing Protection Intro to IP – Prof. Merges 3.10.2010.
IP Wai Hung Andrew (Prof.)IP Wai Hung Andrew (Prof.) PhD, CEng, MHKIE, MIET, MIMechE, SMIEEE Prof....
Transcript of IP Wai Hung Andrew (Prof.)IP Wai Hung Andrew (Prof.) PhD, CEng, MHKIE, MIET, MIMechE, SMIEEE Prof....
IP Wai Hung Andrew (Prof.)
PhD, CEng, MHKIE, MIET, MIMechE, SMIEEE
Prof. Ip has published more than 270 journal papers with over 130 papers in SCI indexed journals, and also over 130
papers in conference proceedings, and has written books and invited book chapters. Prof. Ip’s h-index as indicated in Web
of Science® scores 26 with over 2,600 citations for all SCI indexed journal/conference papers while his h-index as
indicated in Google Scholar scores 43 with over 6,300 citations for all publications (up to 2020-Jan).
The following is his full publication list. His latest publication is also available at:
https://www.researchgate.net/profile/WH_Ip
Prof. Ip’s online bibliography can be found in:
(ORCID) http://orcid.org/0000-0001-6609-0713 or (ResearcherID) http://www.researcherid.com/rid/J-2941-2013
Last updated: 08-02-2020
Publications (in chronological order)
(including Journals, Conferences, Books and Book Chapters)
(a) Journal Papers ........................................................................................................................................................... 1
Year 2020 ................................................................................................................................................................................ 1
Year 2019 ................................................................................................................................................................................ 1
Year 2018 ................................................................................................................................................................................ 1
Year 2017 ................................................................................................................................................................................ 2
Year 2016 ................................................................................................................................................................................ 2
Year 2015 ................................................................................................................................................................................ 3
Year 2014 ................................................................................................................................................................................ 3
Year 2013 ................................................................................................................................................................................ 4
Year 2012 ................................................................................................................................................................................ 4
Year 2011 ................................................................................................................................................................................ 5
Year 2010 ................................................................................................................................................................................ 7
Year 2009 ................................................................................................................................................................................ 8
Year 2008 ................................................................................................................................................................................ 9
Year 2007 ................................................................................................................................................................................ 9
Year 2006 .............................................................................................................................................................................. 10
Year 2005 .............................................................................................................................................................................. 10
Year 2004 .............................................................................................................................................................................. 11
Year 2003 .............................................................................................................................................................................. 12
Year 2002 .............................................................................................................................................................................. 12
Year 2001 .............................................................................................................................................................................. 13
Year 2000 .............................................................................................................................................................................. 13
Year 1999 .............................................................................................................................................................................. 14
Year 1998 .............................................................................................................................................................................. 14
Year 1997 .............................................................................................................................................................................. 15
(b) Conference Papers ................................................................................................................................................... 16
Year 2019 .............................................................................................................................................................................. 16
Year 2017 .............................................................................................................................................................................. 16
Year 2016 .............................................................................................................................................................................. 16
Year 2015 .............................................................................................................................................................................. 16
Year 2014 .............................................................................................................................................................................. 16
Year 2013 .............................................................................................................................................................................. 17
Year 2012 .............................................................................................................................................................................. 17
Year 2011 .............................................................................................................................................................................. 17
Year 2010 .............................................................................................................................................................................. 18
Year 2009 .............................................................................................................................................................................. 18
Year 2008 .............................................................................................................................................................................. 19
Year 2007 .............................................................................................................................................................................. 19
Year 2006 .............................................................................................................................................................................. 20
Year 2005 .............................................................................................................................................................................. 20
Year 2004 .............................................................................................................................................................................. 20
Year 2003 .............................................................................................................................................................................. 21
Year 2002 .............................................................................................................................................................................. 21
Year 2001 .............................................................................................................................................................................. 21
Year 2000 .............................................................................................................................................................................. 21
Year 1999 .............................................................................................................................................................................. 22
Year 1998 .............................................................................................................................................................................. 22
Year 1997 .............................................................................................................................................................................. 22
Year 1996 .............................................................................................................................................................................. 23
Year 1995 .............................................................................................................................................................................. 23
Year 1994 .............................................................................................................................................................................. 24
Year 1993 .............................................................................................................................................................................. 25
Year 1992 .............................................................................................................................................................................. 25
(c) Books / Book Chapters / Thesis ............................................................................................................................... 26
1 2020-Feb
(a) Journal Papers
Year 2020
1. Zhang, Y., Ma, S.Y, Zhang, X., LI, L., Ip, W.H. &Yung, K. L., “EDGAN: motion deblurring algorithm
based on enhanced generative adversarial networks”, The Journal of Supercomputing,
DOI:10.1007/s11227-020-03189-y (2020).
2. Gao, M., Chen, M.X., Liu, A., Ip, W.H. & Yung, K. L., “Optimization of microservice composition based
on artificial immune algorithm considering fuzziness and user preference”, IEEE Access, DOI:
10.1109/ACCESS.2020.2971379 (2020).
Year 2019
3. Bach, M.P., Tustanovski, E., Ip, W.H., Yung, K. L. & Roblek, V., “System dynamics models for the
simulation of sustainable urban development: A review and analysis and the stakeholder perspective”
Kybernetes, Vol. 49, No. 2, pp.460-504 (2019).
4. Tseng, K.K., Sun, H.C., Liu, J.W., Li, J.Q., Yung, K.L. & Ip, W.H., “Image semantic segmentation with
an improved fully convolutional network”, Soft Computing, DOI: 10.1007/s00500-019-04537-8 (2019).
5. Fan, W., Wang, H. M., Xing, Y., Huang, R., Ip, W.H. & Yung, K.L., “A network representation method
based on edge information extraction”, Soft Computing, DOI: 10.1007/s00500-019-04451-z (2019).
6. Wang, K., Chen, C.M., Zhao, D.N., Ip, W.H. & Yung, K.L., “A dynamic trust model in internet of things”,
Soft Computing, DOI: 10.1007/s00500-019-04319-2 (2019).
7. Dong, N., Li, Y.J., Gao, Z.K., Ip, W.H. & Yung, K.L., “A WPCA-based method for detecting fatigue
driving from EEG-based Internet of Vehicles system”, IEEE Access, Vol. 7, pp.124702-124711 (2019).
8. Tseng, K.K., Liu, L.L., Chao, W., Yung, K.L., Ip, W.H. & Hsu C.Y., “Robust Multistage ECG
Identification for Astronaut Spacesuits with IOT Applications”, IEEE Access, Vol. 7, pp.111662-111677
(2019).
9. Liu, X.Y., Li, D.H., Dong, N., Ip, W.H. & Yung, K.L., “Noncooperative Target Detection of Spacecraft
Objects Based on Artificial Bee Colony Algorithm”, Intelligent Systems, IEEE, Vol. 34, Iss. 4, pp.3-15
(2019).
10. Xie, Y., He, W., Ching, W.K., Tai, A.H., Ip, W.H., Yung, K.L. & Song, N., “Optimal advertising
outsourcing strategy with different effort levels and uncertain demand”, International Journal of
Production Research, DOI: 10.1080/00207543.2019.1641235 (2019).
11. Chang, J.F., Dong, N., Ip, W.H. & Yung, K.L., “An ensemble learning model based on Bayesian model
combination for solar energy prediction”, Journal of Renewable and Sustainable Energy, DOI:
10.1063/1.5094534 (2019).
12. Xhafa, F. & Ip, W.H., “Optimisation problems and resolution methods in satellite scheduling and space-
craft operation: a survey”, Enterprise Information Systems, DOI:
https://doi.org/10.1080/17517575.2019.1593508 (2019).
13. Zhang, Y., Liu, H., Wang, S., Ip, W.H., Fan, W. & Xiao, C., “Automatic keyphrase extraction using word
embeddings”, DOI: 10.1007/s00500-019-03963-y (2019).
14. Lam, C.Y. & Ip, W.H., “An Integrated Logistics Routing and Scheduling Network Model with RFID-
GPS Data for Supply Chain Management”, Wireless Personal Communications, Vol. 105, No. 3, pp.803-
817 (2019).
15. Wu, C.H., Leung, P.L., Dong, N., Ho, G.T.S., Kwong, C.K. & Ip, W.H., “Optimization of Terminal
Serviceability Based on Chaotic GA-Based Method”, Malaysian Journal of Computer Science, Vol. 32,
No. 1, pp. 62-82 (2019).
16. Law, K.M.Y., Lau, A.K.W. & Ip, W.H., “What drives success in product innovation Empirical evidence
in high-tech and low-tech manufacturers in China”, International Journal of Technology Management,
Vol. 79, No. 2, pp. 165 (2019).
Year 2018
2 2020-Feb
17. Jiang, Z.Z., He, N., Qin, X.W., Ip, W.H., Wu, C.H. & Yung, K.L., “Evolutionary game analysis and
regulatory strategies for online group-buying based on system dynamics”, Enterprise Information Systems,
Vol. 12, No. 6, pp. 695-713 (2018).
18. Tseng K.K., Zhang, Y., Yung, K.L., Ip, W.H., Ou, Z. & Qi, N., “A Robust Multilevel Speech Verification
with Wavelet Decomposition for Inadequate Training Data Sets of Mobile Device Systems”, IEEE Access,
Vol. 7, pp. 2418-2428 (2018).
19. Sun, H., He, R., Zhang, Y., Wang, R., Ip, W.H. & Yung, K.L., “eTPM: A trusted cloud platform enclave
TPM scheme based on intel SGX technology”, Sensors, Vol. 18, No. 11, pp. 3807 (2018).
20. Qin, X., Jiang, Z.Z., Ip, W.H., Sheng, Y. & Wu, C.H., “Analyzing manufacturer and the insurance-based
risk mitigation policy with equipment service contracting”, Enterprise Information Systems, Vol. 12,
No.10, pp. 1359-1381 (2018).
21. Leung, P.L., Wu, C.H., Ip, W.H. & Ho, G.T.S., “Enhancing online-to-offline specific customer loyalty in
beauty industry”, Enterprise Information Systems, Vol. 13, No. 3, pp. 352-375 (2018).
22. Lau, H.C., Ip, W.H., Lee, C.K.M. & Ho, G.T.S., “Development of a three-tier assessment model: a case
study”, Benchmarking An International Journal, Vol. 25, No. 4, pp. 2216-2229 (2018).
23. Ng, C.K., Wu, C.H., Ip, W.H. & Yung, K.L., “A Smart Bat Algorithm for Wireless Sensor Network
Deployment in 3-D Environment”, IEEE Communications Letters, Vol. 22, No. 10, pp. 2120-2123 (2018).
24. Wu, C.H., Ho, G.T.S., Yung, K.L., Tam, W.W.Y. & Ip, W.H., “An RFID-based Fallen Object Detection
System: A Case Study of Hong Kong’s Light Rail System”, IEEE Journal of Radio Frequency
Identification, Vol. 2, No. 2, pp. 55-67 (2018).
25. Ng, C.K., Wu, C.H., Yung, K.L., Ip, W.H. & Cheung, T., “A semantic similarity analysis of Internet of
Things”, Enterprise Information Systems, Vol. 12, No. 7, pp. 820-855 (2018).
Year 2017
26. Lee, C.K.M., Mitrea, C., Ip, W.H., Choy, K.L. & Ho, G.T.S., “Design and development of inventory
knowledge discovery system”, Enterprise Information Systems, Vol. 11, No. 8, pp. 1262-1282 (2017).
27. Leung, P.P.L., Wu, C.H., Tseng, K.K., Ho, G.T.S., Ip, W.H. & Kwong, C.K., “Designing and modeling of
a fully automated car park system with colored petri nets”, Journal of Advanced Transportation (Under
Review).
28. Wu, H.P., Huang, M., Ip, W.H. & Fan, Q.L., “Algorithms for single-machine scheduling problem with
deterioration depending on a novel model”, Journal of Industrial and Management Optimization, Vol. 13,
No. 2, pp. 681 - 695 (2017).
29. Mak, M.K.Y. & Ip, W.H., “An exploratory study of investment behaviour of investors”, International
Journal of Engineering Business Management, Vol. 9, DOI: 10.1177/1847979017711520 (Accepted).
30. Chiu, A.B.S. & Ip, W.H., “Improving merger and acquisition decision-making using fuzzy logic and
simulation”, International Journal of Engineering Business Management, Vol. 9, DOI:
10.1177/1847979017711521 (Accepted).
31. Cho, V. & Ip, W.H., “A Study of BYOD adoption from the lens of threat and coping appraisal of its
security policy”, Enterprise Information Systems, Vol. 12, No. 6, pp. 659-673 (2017).
Year 2016
32. Jiang, Z.Z., Fan, Z.P., Ip, W.H. & Chen, X., “Fuzzy multi-objective modeling and optimization for one-
shot multi-attribute exchanges with indivisible demand”, IEEE Transactions on Fuzzy Systems, Vol. 24,
Iss. 3, pp. 708-723 (2016).
33. Gong, Y.J., Ge, Y.F., Li, J.J., Zhang, J. & Ip, W.H., “A splicing-driven memetic algorithm for
reconstructing cross-cut shredded text documents”, Applied Soft Computing, Vol. 45 (2016), pp. 163-172
(2016).
34. Wang, J.W., Wang, H.F., Ding, J.L., Furuta, K., Kanno, T., Ip, W.H. & Zhang, W.J., “On domain
modelling of the service system with its application to enterprise information systems”, Enterprise
Information Systems, Vol. 10, Iss. 1, pp. 1-16 (2016).
3 2020-Feb
35. Wu, C.H., Ho, G.T.S., Lam, C.H.Y., Ip, W.H., Choy, K.L. & Tse, Y.K., “An online niche-market tour
identification system for the travel and tourism industry”, Internet Research, Vol. 26, Iss. 1, pp. 167-185
(2016).
36. Dong, N., Wu, C.H., Gao, Z.K., Chen, Z.Q. & Ip, W.H., “Data-driven control based on simultaneous
perturbation stochastic approximation with adaptive weighted gradient estimation”, IET Control Theory &
Applications, Vol. 10, Iss. 2, pp. 201-209 (2016).
37. Tseng, K.K., Zeng, F.F., Ip, W.H. & Wu, C.H., “ECG sensor verification system with mean-interval
algorithm for handling sport issue”, Journal of Sensors, DOI: 10.1155/2016/1814264 (2016).
Year 2015
38. Tan, C.Q., Jiang, Z.Z., Chen, X.H. & Ip, W.H., “Atanassov’s intuitionistic fuzzy Quasi-Choquet
geometric operators and their applications to multicriteria decision making”, Fuzzy Optimization and
Decision Making, Vol. 14, No. 2, pp. 139-172 (2015).
39. Ting, S.L. & Ip, W.H., “Combating the counterfeits with web portal technology”, Enterprise Information
Systems, Vol. 9, Iss. 7, pp. 661-680 (2015).
40. Lee, C.K.M., Chan, C.Y., Choy, K.L. & Ip, W.H., “Explore the feasibility of adopting crowdsourcing for
innovative problem solving”, Industrial Management & Data Systems, Vol. 115, Iss. 5, pp. 803-832
(2015).
41. Wu, C.H., Ho, G.T.S., Lam, C.H.Y. & Ip, W.H., “Franchising decision support system for formulating a
center positioning strategy”, Industrial Management & Data Systems, Vol. 115, Iss. 5, pp. 853-882 (2015).
42. Jiang, H.M., Kwong, C.K., Liu, Y. & Ip, W.H., “A methodology of integrating affective design with
defining engineering specifications for product design”, International Journal of Production Research,
Vol. 53, No. 8, pp. 2472-2488 (2015).
43. Lee, C.K.M., Ru, C.T.Y., Yeung, C.L., Choy, K.L. & Ip, W.H., “Analyze the healthcare service
requirement using fuzzy QFD”, Computers in Industry, Vol. 74 (2015), pp. 1-15 (2015).
44. Wu, C.H., Ng, C.K., Wang, L.X., Ho, G.T.S., Ip, W.H. & Zhang, J., “Design of a wireless sensor network
monitoring system for biological and pharmaceutical products”, International Journal of Distributed
Sensor Networks, DOI: 10.1155/2015/760242 (2015).
45. Tsang, P.Y.P., Wu, C.H., Ip, W.H., Ho, G.T.S. & Tse, Y.K., “A Bluetooth-based indoor positioning
system: a simple and rapid approach”, Annual Journal of IIE (HK), Vol. 35 (2014/2015), pp. 11-26 (2015).
46. Wu, C.H., Tseng, K.K., Ng, C.K. & Ip, W.H., “An effective motion-blurred image restoration approach
for automated optical inspection”, HKIE Transactions, Vol. 22, No. 4, pp. 252-262 (2015).
47. Wu, H.P., Huang, M., Cho, V., Ip, W.H. & Fan, Q.L., “Scheduling problem with human energy recovery
function under nonlinear time-dependent deterioration”, International Journal of Applied Mathematics,
Vol. 45, Iss. 4, pp. 31-37 (2015).
Year 2014
48. Tan, C.Q., Jiang, Z.Z., Chen, X.H. & Ip, W.H., “A banzhaf function for a fuzzy game”, IEEE Transaction
on Fuzzy Systems, Vol. 22, No. 6, pp. 1489-2502 (2014).
49. Wang, J.W., Liu, D., Ip, W.H., Zhang, W.J. & Deters R., “Integration of system-dynamics, aspect-
programming, and object-orientation in system information modeling”, IEEE Transactions on Industrial
Informatics, Vol. 10, No. 2, pp. 847-853 (2014).
50. Wang, J.W., Wang, H.F., Zhang, W.J., Ip, W.H. & Furuta, K., “On a unified definition of the service
system: what is its identity?”, IEEE Systems Journal, Vol. 8, No. 3, pp. 821-826 (2014).
51. Tan, C.Q., Ip, W.H. & Chen, X.H., “Stochastic multiple criteria decision making with aspiration level
based on prospect stochastic dominance”, Knowledge-Based Systems, Vol. 70 (2014), pp. 231-241 (2014).
52. Zhang, S.Z., Lee, C.K.M., Choy, K.L., Ho, W. & Ip, W.H., “Design and development of a hybrid
artificial bee colony algorithm for the environmental vehicle routing problem”, Transportation Research
Part D: Transport and Environment, Vol. 31 (2014), pp. 85-99 (2014).
53. Zou, K.S., Ip, W.H., Wu, C.H., Chen, Z.Q., Yung, K.L. & Chan, C.Y., “A novel 3D model retrieval
approach using combined shape distribution”, Multimedia Tools and Applications, Vol. 69, Iss. 3, pp.
799-818 (2014).
4 2020-Feb
54. Dong, N., Wu, C.H., Ip, W.H., Chen, Z.Q. & Wu, A.G., “Species-based chaotic hybrid optimizing
algorithm and its application in image detection”, Applied Artificial Intelligence, Vol. 28, Iss. 7, pp. 647-
674 (2014).
55. Fan, W., Su, Q.B. & Ip, W.H., “Research on multi-leg inventory control based on passenger choice”,
International Journal of Engineering Business Management, Vol. 6, No. 2, pp. 3-8 (2014).
56. Fan, W., Wang, J.W. & Ip, W.H., “Multi-leg seat inventory control based on EMSU and virtual bucket”,
International Journal of Engineering Business Management, Vol. 6, No. 3, pp. 9-14 (2014).
57. Choy, K.L., Lam, H.Y., Lee, C.K.M., Chin, K.S., Ip, W.H. & Poon, T.C., “A food monitoring system for
preventing product deterioration”, International Journal of Food Safety, Nutrition and Public Health, Vol.
5, No. 1, pp. 54-79 (2014).
58. Ip, W.H., “Editorial”, International Journal of Engineering Business Management, Vol. 6, Iss. 1, pp. 1-2
(2014).
Year 2013
59. Jiang, H.M., Kwong, C.K., Ip, W.H. & Chen, Z.Q., “Chaos-based fuzzy regression approach to modeling
customer satisfaction for product design”, IEEE Transactions on Fuzzy Systems, Vol. 21, No. 5, pp. 926-
936 (2013).
60. Wang, J.W., Wang, H.F., Zhang, W.J., Ip, W.H. & Furuta, K., “Evacuation planning based on the
contraflow technique with consideration of evacuation priorities and traffic setup time”, IEEE
Transactions on Intelligent Transportation Systems, Vol. 14, No. 1, pp. 480-485 (2013).
61. Lv, Y.Q., Lee, C.K.M., Wu, Z., Chan, H.K. & Ip, W.H., “Priority-based distributed manufacturing
process modeling via Hierarchical timed color Petri net”, IEEE Transactions on Industrial Informatics,
Vol. 9, No. 4, pp. 1836-1846 (2013).
62. Ip, W.H., Wang, D.W. & Cho, V., “Aircraft ground service scheduling problems and their genetic
algorithm with hybrid assignment and sequence encoding scheme”, IEEE Systems Journal, Vol. 7, No. 4,
pp. 649-657 (2013).
63. Wang, L.X., Ting, J.S.L. & Ip, W.H., “Design of Supply-chain Pedigree Interactive Dynamic Explore
(SPIDER) for food safety and implementation of Hazard Analysis and Critical Control Points (HACCPs)”,
Computer and Electronics in Agriculture, Vol. 90 (2013), pp. 14-23 (2013).
64. Wang, J.W., Ip, W.H., Muddada, R.R., Huang, J.L. & Zhang, W.J., “On Petri net implementation of
proactive resilient holistic supply chain networks”, The International Journal of Advanced Manufacturing
Technology, Vol. 69, Iss. 1, pp. 437-437 (2013).
65. Wang, J.W., Wang, H.F., Ip, W.H., Kanno, T. & Zhang, W.J., “Predatory search strategy based on swarm
intelligence for continuous optimization problems”, Mathematical Problems in Engineering, DOI:
10.1155/2013/749256 (2013).
66. Huang, M., Wu, H.P., Cho, V., Ip, W.H., Wang, X.W. & Ng, C.K., “Single machine problem with multi-
rate-modifying activities under a time-dependent deterioration”, Journal of Applied Mathematics, DOI:
10.1155/2013/135610 (2013).
67. Tseng, K.K., Zeng, F.F., Huang, H.N., Liu, Y., Pan, J.S., Ip, W.H. & Wu, C.H., “A new non-exact aho-
corasick framework for ECG classification”, ACM SIGARCH Computer Architecture News, Vol. 41, No.
2, pp. 41-46 (2013).
68. Wang, D.W. & Ip, W.H., “Survey on modeling and optimization within RFID technology and
applications”, Control Engineering of China, Vol. 20, No. 1, pp. 9-12, 17 (2013).
69. Wu, H.P., Huang, M., Cho, V., Ip, W.H. & Wang, X.W., “Due-date assignment on a single machine
scheduling problem with nonlinear deterioration function”, Advanced Materials Research, Vol. 645, pp.
280-284 (2013).
Year 2012
70. Lin, Y., Zhang, J., Chung, H.S.H., Ip, W.H. & Shi, Y.H., “An ant colony optimization approach for
maximizing the lifetime of heterogeneous wireless sensor networks”, IEEE Transactions on Systems, Man,
and Cybernetics - Part C: Applications and Reviews, Vol. 42, No. 3, pp. 408-420 (2012).
5 2020-Feb
71. Jiang, H.M., Kwong, C.K., Ip, W.H. & Wong, T.C., “Modeling customer satisfaction for new product
development using a PSO-based ANFIS approach”, Applied Soft Computing, Vol. 12, No. 2, pp. 726-734
(2012).
72. Dong, N., Wu, C.H., Ip, W.H., Chen, Z.Q. & Yung, K.L., “Chaotic species based particle swarm
optimization algorithms and its application in PCB components detection”, Expert Systems with
Applications, Vol. 39, No. 16, pp. 12501-12511 (2012).
73. Ho, G.T.S., Ip, W.H., Lee, C.K.M. & Mou, W.L., “Customer grouping for better resources allocation
using GA based clustering technique”, Expert Systems with Applications, Vol. 39, No. 2, pp. 1979-1987
(2012).
74. Ho, G.T.S., Ip, W.H., Wu, C.H. & Tse, Y.K., “Using a fuzzy association rule mining approach to identify
the financial data association”, Expert Systems with Applications, Vol. 39, Iss. 10, pp. 9054-9063 (2012).
75. Wang, H.F., Yang, S.X., Ip, W.H. & Wang, D.W., “A memetic particle swarm optimisation algorithm for
dynamic multi-modal optimisation problems”, International Journal of Systems Science, Vol. 43, No. 7,
pp. 1268-1283 (2012).
76. Ip, W.H., Yung, K.L. & Wang, D.W., “A chaotic model for advertising diffusion problem with
competition”, International Journal of Systems Science, Vol. 43, No. 8, pp. 1545-1554 (2012).
77. Dong, N., Wu, C.H., Ip, W.H., Chen, Z.Q., Chan, C.Y. & Yung, K.L., “An opposition-based chaotic
GA/PSO hybrid algorithm and its application in circle detection”, Computers & Mathematics with
Applications, Vol. 64, No. 6, pp. 1886-1902 (2012).
78. Lam, C.Y. & Ip, W.H., “An improved spanning tree approach for the reliability analysis of supply chain
collaborative network”, Enterprise Information Systems, Vol. 6, Iss. 4, pp. 405-418 (2012).
79. Chan, S.L., Ip, W.H. & Zhang, W.J., “Integrating failure analysis and risk analysis with quality assurance
in the design phase of medical product development”, International Journal of Production Research, Vol.
50, No. 8, pp. 2190-2203 (2012).
80. Dong, H.Y., Huang, M., Ip, W.H. & Wang, X.W., “Improved variable neighbourhood search for
integrated tundish planning in primary steelmaking processes”, International Journal of Production
Research, Vol. 50, No. 20, pp. 5747-5761 (2012).
81. Lv, Y.Q., Lee, C.K.M., Chan, H.K. & Ip, W.H., “RFID-based colored Petri net applied for quality
monitoring in manufacturing system”, International Journal of Advanced Manufacturing Technology, Vol.
60, No. 1-4, pp. 225-236 (2012).
82. Wang, L.X., Kwok, S.K. & Ip, W.H., “Design of an improved quantum-inspired evolutionary algorithm
for a transportation problem in logistics systems”, Journal of Intelligent Manufacturing, Vol. 23, No. 6,
pp. 2227-2236 (2012).
83. Zou, K.S., Chan, C.K., Peng, S.X., Luximon, A., Chen, Z.Q. & Ip, W.H., “Shape-based retrieval and
analysis of 3D models using fuzzy weighted symmetrical depth images”, Neurocomputing, Vol. 89 (2012),
pp. 114-121 (2012).
84. Chen, Z.N., Lee, C.K.M., Ip, W.H. & Ho, G.T.S., “Design and evaluation of an integrated inventory and
transportation system”, Transportation Planning and Technology, Vol. 35, No. 4, pp. 491-507 (2012).
85. Chen, Z.Q., Ip, W.H., Wei, Y.F. & Wu, C.H., “Chaos particle swarm algorithm for energy consumption
optimization in wireless sensor networks”, Sensor Letters, Vol. 10, No. 8, pp. 1830-1835 (2012).
86. Wang, L.X., Kwok, S.K. & Ip, W.H., “A radio frequency identification-based quality evaluation system
design for the wine industry”, International Journal of Computer Integrated Manufacturing, Vol. 25, No.
1, pp. 11-19 (2012).
87. Ting, S.L., Ip, W.H., Tsang, A.H.C. & Ho, G.T.S., “An integrated electronic medical record system
(iEMRS) with decision support capability in medical prescription”, Journal of Systems and Information
Technology, Vol. 14, Iss. 3, pp. 236-245 (2012).
88. Peng, S.X., Chan, C.K., Luximon, A. & Ip, W.H., “Parametric body model development”, Computer
Technology and Application, Vol. 3, No. 3, pp. 206-210 (2012).
89. Ting, S.L., Wang, L.X. & Ip, W.H., “A study of RFID adoption for vehicle tracking in a container
terminal”, Journal of Industrial Engineering and Management, Vol. 5, No. 1, pp. 22-52 (2012).
Year 2011
6 2020-Feb
90. Chung, S.H., Chan, F.T.S. & Ip, W.H., “Minimization of order tardiness through collaboration strategy in
multifactory production system”, IEEE Systems Journal, Vol. 5, No. 1, pp. 40-49 (2011).
91. Ip, W.H. & Wang, D.W., “Resilience and friability of transportation networks: evaluation, analysis and
optimization”, IEEE Systems Journal, Vol. 5, No. 2, pp. 189-198 (2011).
92. Chan, S.L. & Ip, W.H., “A dynamic decision support system to predict the value of customer for new
product development”, Decision Support Systems, Vol. 52, No. 1, pp. 178-188 (2011).
93. Chan, S.L., Ip, W.H. & Kwong, C.K., “Closing the loop between design and market for new product idea
screening decisions”, Expert Systems with Applications, Vol. 38, No. 6, pp. 7729-7737 (2011).
94. Dong, N., Wu, C.H., Ip, W.H., Chen, Z.Q., Chan, C.Y. & Yung, K.L., “An improved species based
genetic algorithm and its application in multiple template matching for embroidered pattern inspection”,
Expert Systems with Applications, Vol. 38, No. 12, pp. 15172-15182 (2011).
95. Jiang, Z.Z., Ip, W.H., Lau, H.C.W. & Fan, Z.P., “Multi-objective optimization matching for one-shot
multi-attribute exchanges with quantity discounts in E-brokerage”, Expert Systems with Applications, Vol.
38, No. 4, pp. 4169-4180 (2011).
96. Lam, C.Y. & Ip, W.H., “A customer satisfaction inventory model for supply chain integration”, Expert
Systems with Applications, Vol. 38, No. 1, pp. 875-883 (2011).
97. Ip, W.H., Chan, S.L. & Lam, C.Y., “Modeling supply chain performance and stability”, Industrial
Management & Data Systems, Vol. 111, No. 8, pp. 1332-1354 (2011).
98. Lam, C.Y. & Ip, W.H., “Constraint priority scheduling using an agent-based approach”, Industrial
Management & Data Systems, Vol. 111, No. 1-2, pp. 246-263 (2011).
99. Ting, S.L., Wang, W.M., Tse, Y.K. & Ip, W.H., “Knowledge elicitation approach in enhancing tacit
knowledge sharing”, Industrial Management & Data Systems, Vol. 111, No. 7, pp. 1039-1064 (2011).
100. Ting, J.S.L., Tsang, A.H.C., Ip, A.W.H. & Ho, G.T.S., “RF-MediSys: a radio frequency identification-
based electronic medical record system for improving medical information accessibility and services at
point of care”, Health Information Management Journal, Vol. 40, No. 1, pp. 25-32 (2011).
101. Wu, C.H., Zheng, Y., Ip, W.H., Chan, C.Y., Yung, K.L. & Lu, Z.M., “A flexible H.264/AVC compressed
video watermarking scheme using particle swarm optimization based dither modulation”, AEU -
International Journal of Electronics and Communications, Vol. 65, No. 1, pp. 27-36 (2011).
102. Zou, K.S., Chen, Z.Q. & Ip, W.H., “3D model retrieval method by using fractal D2 distribution”,
Electronics Letters, Vol. 47, No. 14, pp. 796-797 (2011).
103. Chen, Z.Q., Zou, K.S., Ip, W.H. & Chan, C.Y., “3D model retrieval based on fuzzy weighted shape
distributions”, Advanced Materials Research, Vol. 201-203, pp. 1678-1681 (2011).
104. Ting, S.L., Ip, W.H., & Tsang, A.H.C., “Is Naïve bayes a good classifier for document classification?”,
International Journal of Software Engineering and its Applications, Vol. 5, Iss. 3, pp. 37-46 (2011).
105. Chan, S.L., Ip, W.H. & Chung, R.C.P., “Impacts of project team and innovation process on new product
development”, International Journal of Product Lifecycle Management, Vol. 5, Nos. 2/3/4, pp. 224-241
(2011).
106. Huang, M., Ip, W.H., Jiang, G., Xu, C. & Wang, X., “A two-level framework for the dynamic risk
evaluation of virtual enterprise”, ICIC Express Letters, Vol. 5, Iss. 5, pp. 1717-1723 (2011).
107. Xue, F., Chan, C.Y., Ip, W.H. & Cheung, C.F., “A learning-based variable assignment weighting scheme
for heuristic and exact searching in Euclidean traveling salesman problems”, NETNOMICS: Economic
Research and Electronic Networking, Vol. 12, Iss. 3, pp. 183-207 (2011).
108. Ng, C.K., Wu, C.H., Ip, W.H., Chan, C.Y. & Ho, G.T.S., “A real time quality monitoring system for the
lighting industry: a practical and rapid approach using computer vision and image processing (CVIP)
tools”, International Journal of Engineering Business Management, Vol. 3, No. 4, pp. 14-21 (2011).
109. Ting, S.L., Ip, W.H., Lam, W.H.K. & Ngai, E.W.T., “A PKI-based track and trace network for cross-
boundary container security”, International Journal of Computer Science Issues, Vol. 8, Iss. 5, No. 1, pp.
20-27 (2011).
110. Wu, C.H., Ip, W.H., Kwok, S.K., Ho, G.T.S. & Chan, C.Y., “Design and development of an RFID-based
HIS - a case study”, International Journal of Engineering Business Management, Vol. 3, No. 1, pp. 1-8
(2011).
7 2020-Feb
111. Wu, C.H., Zheng, Y., Ip, W.H., Lu, Z.M., Chan, C.Y. & Yung, K.L., “Effective hill climbing algorithm
for optimality of Robust watermarking in digital images”, Information Technology Journal, Vol. 10, No. 2,
pp. 246-256 (2011).
112. Zou, K.S., Chan, C.K., Peng, S.X., Ip, W.H. & Chen, Z.Q., “Efficient 3D model retrieval by using
symmetrical depth images”, ICIC Express Letters, Part B: Applications: An International Journal of
Research and Surveys, Vol. 5, No. 8, pp. 2889-2894 (2011).
113. Zou, K.S., Ip, W.H., Wu, C.H., Chan, C.Y., Yung, K.L. & Chen, Z.Q.,“3D model retrieval approach by
using fuzzy shape distributions”, Scientific Research and Essays, Vol. 6, No. 20, pp. 4330-4340 (2011).
114. Zou, K.S., Wu, C.H., Ip, W.H., Chan, C.Y., Yung, K.L. & Chen, Z.Q., “A novel 3D model retrieval
approach based on model-partitioning and fuzzy relevance feedback”, Advanced Materials Research, Vol.
143-144, pp. 186-190 (2011).
115. Peng, S.X., Chan, C.K., Peng, S.X., Ip, W.H. & Chen, Z.Q., “Waist-hip section surface profile data
automatic analysing system: WHS”, International Journal of Human Factors Modelling and Simulation,
Vol. 2, No. 4, pp. 267-275 (2011).
Year 2010
116. Zhan, Z.H., Zhang, J., Li, Y., Liu, O., Kwok, S.K., Ip, W.H. & Kaynak, O., “An efficient ant colony
system based on receding horizon control for the aircraft arrival sequencing and scheduling problem”,
IEEE Transactions on Intelligent Transportation Systems, Vol. 11, Iss. 2, pp. 399-412 (2010).
117. Wang, J.W., Ip, W.H. & Zhang, W.J., “An integrated road construction and resource planning approach to
the evacuation of victims from single source to multiple destinations”, IEEE Transactions on Intelligent
Transportation Systems, Vol. 11, No. 2, pp. 277-289 (2010).
118. Chen, Z.Q., Ip, W.H., Chan, C.Y. & Yung, K.L., “Two-level chaos-based video cryptosystem on H.263
codec”, Nonlinear Dynamics, Vol. 62, No. 3, pp. 647-664 (2010).
119. Wang, L.X., Kwok, S.K. & Ip, W.H., “A radio frequency identification and sensor-based system for the
transportation of food”, Journal of Food Engineering, Vol. 101, No. 1, pp. 120-129 (2010).
120. Wu, W.J., Chen, Z.Q. & Ip, W.H., “Complex nonlinear dynamics and controlling chaos in a Cournot
duopoly economic model”, Nonlinear Analysis: Real World Applications, Vol. 11, No. 5, pp. 4363-4377
(2010).
121. Chan, S.L., Ip, W.H. & Cho, V., “A model for predicting customer value from perspectives of product
attractiveness and marketing strategy”, Expert Systems with Applications, Vol. 37, No. 2, pp. 1207-1215
(2010).
122. Wang, J.W., Gao, F. & Ip, W.H., “Measurement of resilience and its application to enterprise information
systems”, Enterprise Information Systems, Vol. 4, Iss. 2, pp. 215-223 (2010).
123. Chan, S.L. & Ip, W.H., “A Scorecard-Markov model for new product screening decisions”, Industrial
Management & Data Systems, Vol. 110, No. 7, pp. 971-992 (2010).
124. Dong, H.Y., Huang, M., Ip, W.H. & Wang, X.W., “On the integrated charge planning with flexible jobs
in primary steelmaking processes”, International Journal of Production Research, Vol. 48, No. 21, pp.
6499-6535 (2010).
125. Lau, H.C.W., Jiang, Z.Z., Ip, W.H. & Wang, D.W., “A credibility-based fuzzy location model with
Hurwicz criteria for the design of distribution systems in B2C e-commerce”, Computers & Industrial
Engineering, Vol. 59, No. 4, pp. 873-886 (2010).
126. Tang, J.F., Kong, Y., Lau, H., & Ip, W.H., “A note on ‘efficient feasibility testing for dial-a-ride
problems’”, Operation Research Letter, Vol. 38, Iss. 5, pp. 405-407 (2010).
127. Wang, H.F., Yang, S.X., Ip, W.H. & Wang, D.W., “A particle swarm optimization based memetic
algorithm for dynamic optimization problems”, Natural Computing, Vol. 9, No. 3, pp. 703-725 (2010).
128. Wang, D.W. & Ip, W.H., “Evaluation and analysis of resilience and frangibility for transportation
networks”, Control Theory and Applications, Vol. 27, Iss. 7, pp. 849-854 (2010). (in Chinese)
129. Ip, W.H., Cho, V., Chung, N. & Ho, G., “A multi agent based model for airport service planning”,
International Journal of Engineering Business Management, Vol. 2, No. 2, pp. 93-100 (2010).
130. Ip, W.H., Chung, N. & Ho, G., “Using integer programming for airport service planning in staff
scheduling”, International Journal of Engineering Business Management, Vol. 2, No. 2, pp. 85-92 (2010).
8 2020-Feb
131. Lei, Y.Q., Chau, K.Y., Lu, Z.M. & Ip, W.H., “DCT-domain global feature and DWT-domain least-
squares line fitting based local feature for robust image hashing”, International Journal of Innovative
Computing, Information and Control, Vol. 6, No. 6, pp. 2513-2521 (2010).
132. Wu, C.H., Ip, W.H., Chan, C.Y., Zheng, Y. & Lu, Z.M., “A case study on multimedia e-tailing services:
can watermarks help build customer relationships?”, International Journal of Services, Technology and
Management, Vol. 14, No. 1, pp. 58-76 (2010).
Year 2009
133. Wang, H.F., Yang, S.X., Ip, W.H. & Wang, D.W., “Adaptive primal-dual genetic algorithms in dynamic
environments”, IEEE Transactions on Systems, Man, and Cybernetics - Part B: Cybernetics, Vol. 39, No.
6, pp. 1348-1361 (2009).
134. Wang, D.W. & Ip, W.H., “Evaluation and analysis of logistic network resilience with application to
aircraft servicing”, IEEE Systems Journal, Vol. 3, No. 2, pp. 166-173 (2009).
135. Chung, S.H., Lau, H.C.W., Ho, G.T.S. & Ip, W.H., “Optimization of system reliability in multi-factory
production networks by maintenance approach”, Expert Systems with Applications, Vol. 36, No. 6, pp.
10188-10196 (2009).
136. Lam, C.Y., Ip, W.H. & Lau, C.W., “A business process activity model and performance measurement
using a time series ARIMA intervention analysis”, Expert Systems with Applications, Vol. 36, No. 3, Part
2, pp. 6986-6994 (2009).
137. Chung, R.C.P., Ip, W.H. & Chan, S.L., “Impacts of the overheating economy on China's manufacturing
industry”, International Journal of Advanced Manufacturing Technology, Vol. 43, No. 11/12, pp. 1133-
1143 (2009).
138. Wu, C.H., Wang, D.Z., Ip, A., Wang, D.W., Chan, C.Y. & Wang, H.F., “A particle swarm optimization
approach for components placement inspection on printed circuit boards”, Journal of Intelligent
Manufacturing, Vol. 20, No. 5, pp. 535-549 (2009).
139. Wu, C.H., Wang, D.Z., Ip, A., Wang, D.W., Chan, C.Y. & Wang, H.F., “Erratum: A particle swarm
optimization approach for components placement inspection on printed circuit boards”, Journal of
Intelligent Manufacturing, Vol. 20, No. 5, pp. 551 (2009).
140. Wu, C.H., Wong, Y.S., Ip, W.H., Lau, H.C.W., Lee, C.K.M. & Ho, G.T.S., “Modeling the cleanliness
level of an ultrasonic cleaning system by using design of experiments and artificial neural networks”,
International Journal of Advanced Manufacturing Technology, Vol. 41, No. 3-4, pp. 287-300 (2009).
141. Wang, D.W., Fung, R.Y.K. & Ip, W.H., “An immune-genetic algorithm for introduction planning of new
products”, Computers & Industrial Engineering, Vol. 56, No. 3, pp. 902-917 (2009).
142. Liu, L.L., Wang, D.W. & Ip, W.H., “A permutation-based dual genetic algorithm for dynamic
optimization problems”, Soft Computing, Vol. 13, No. 7, pp. 725-738 (2009).
143. Chan, C.K., Chan, Y.Y. & Ip, W.H., “Authentic knowledge management: the integration of an
organisation’s environment and the autopoietic characteristics of knowledge agents”, International
Journal of Knowledge and Learning, Vol. 5, No. 1, pp. 14-25 (2009).
144. Chau, K.Y., Liu, S.B. & Ip, W.H., “Enhancing enterprise information integration using Six Sigma”, Total
Quality Management & Business Excellence, Vol. 20, No. 5, pp. 537-546 (2009). (Formerly known as:
Total Quality Management before 2003)
145. Cho, V., Wu, G.P.K. & Ip, W.H., “An aircraft service staff rostering using a hybrid GRASP algorithm”,
International Journal of Engineering Business Management, Vol. 1, No. 2, pp. 13-18 (2009).
146. Chung, R.C.P., Ip, W.H. & Chan, S.L., “An ARIMA-Intervention analysis model for the financial crisis in
China's manufacturing industry”, International Journal of Engineering Business Management, Vol. 1, No.
1, pp. 15-18 (2009).
147. Tan, Y., Wang, D.Z., Wang, D.W., Ip, W.H. & Wang, H.F., “Single machine group scheduling problems
with the effects of deterioration and learning”, Acta Automatica Sinica, Vol. 35, Iss. 10, pp. 1290-1295
(2009).
9 2020-Feb
148. Lin, F.Q., Chen, B.C., Chan, C.Y., Wu, C.H., Ip, W.H., Mai, A., Wang, H.Y. & Liu, W.H., “The design
of a lightweight RFID middleware”, International Journal of Engineering Business Management, Vol. 1,
No. 2, pp. 73-78 (2009).
149. Ting, S.L., Wu, C.H., Ng, C.K., Ip, W.H. & Kwok, S.K., “Integration of RFID and video watermarking
techniques for enhancing trace-and-track measures for physical assets”, International Journal of
Information Analysis and Processing, Vol. 2, No. 2, pp. 47-53 (2009).
150. Wang, L.X., Kwok, S.K., Ip, W.H. & Ng, P.H., “Transportation visualization of perishable products with
an RFID and sensor network”, International Journal of Information Analysis and Processing, Vol. 2, No.
2, pp. 35-42 (2009).
151. Wu, C.H., Ip, W.H. & Chan, C.Y., “Real-time distributed vision-based network system for logistics
applications”, International Journal of Intelligent Systems Technologies and Applications, Vol. 6, No. 3-4,
pp. 309-322 (2009).
Year 2008
152. Huang, M., Ip, W.H., Yang, H.M., Wang, X.W. & Lau, H.C.W., “A fuzzy synthetic evaluation embedded
tabu search for risk programming of virtual enterprises”, International Journal of Production Economics,
Vol. 116, No. 1, pp. 104-114 (2008).
153. Lam, C.Y., Chan, S.L., Ip, W.H. & Lau, C.W., “Collaborative supply chain network using embedded
genetic algorithms”, Industrial Management & Data Systems, Vol. 108, No. 8, pp. 1101-1110 (2008).
154. Tam, K.F.D., Chan, C.Y., Ip, W.H. & Tang, C.S.J., “In-house development of low cost automatic IC
workcell for BGA solder ball attachment”, Assembly Automation, Vol. 28, No. 3, pp. 255-261 (2008).
155. Zheng, Y., Wu, C.H., Lu, Z.M. & Ip, W.H., “Optimal robust image watermarking based on PSO and HVS
in integer DCT domain”, International Journal of Computer Sciences and Engineering Systems, Vol. 2,
No. 4, pp. 281-287 (2008).
156. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M. & Ip, A.W.H., “Real-time process mining system for supply chain
network: OLAP-based fuzzy approach”, International Journal of Enterprise Network Management, Vol. 2,
No. 1, pp. 84-103 (2008).
157. Ip, W.H., Chen, B.C., Lau, H.C.W., Choy, K.L. & Chan, S.L., “Modelling a CRM Markov chain process
using system dynamics”, International Journal of Value Chain Management, Vol. 2, No. 4, pp. 420-435
(2008).
158. Wu, C.H., Ip, W.H., Yung, K.L., Lu, Z.M. & Wang, D.Z., “Image compression using SPSO Vector
Quantization”, International Journal of Information Analysis and Processing, Vol. 1, No. 1, pp. 33-37
(2008).
Year 2007
159. Huang, M., Ip, W.H., Yung, K.L., Wang, X.W. & Wang, D.W., “Simulation study using system dynamics
for a CONWIP-controlled lamp supply chain”, International Journal of Advanced Manufacturing
Technology, Vol. 32, No. 1-2, pp. 184-193 (2007).
160. Ip, W.H., Huang, M., Yung, K.L., Wang, D.W. & Wang, X.W., “CONWIP based control of a lamp
assembly production line”, Journal of Intelligent Manufacturing, Vol. 18, No. 2, pp. 261-271 (2007).
161. Tang, J.F., Yung, K.L., Ip, A.W.H. & Liu, S.X., “Synchronized production and transportation planning
using subcontracted vehicles in a production-distribution network”, Transportation Planning and
Technology, Vol. 30, No. 2-3, pp. 113-146 (2007).
162. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M. & Ip, A.W.H., “A flexible information management system for
supporting manufacturing activities”, International Journal of Computer Applications in Technology, Vol.
28, No. 2/3, pp. 190-194 (2007).
163. Ho, G.T.S., Lee, C.K.M., Lau, H.C.W. & Ip, A.W.H., “An online decision support system for inventory
management”, International Journal of Product Development, Vol. 4, No. 3/4, pp. 351-365 (2007).
164. Liu, S., Yung, K.L. & Ip, W.H., “Genetic local search for resource-constrained project scheduling under
uncertainty”, International Journal of Information and Management Sciences, Vol. 18, Iss. 4, pp. 347-363
(2007).
10 2020-Feb
165. Yung, K.L., Ip, W.H. & Wang, D.W., “Soft computing based procurement planning of time-variable
demand in manufacturing systems”, International Journal of Automation & Computing, Vol. 4, No. 1, pp.
80-87 (2007).
Year 2006
166. Wang, Y.W., Wang, D.W. & Ip, W.H., “Optimal design of link structure for e-supermarket website”,
IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans, Vol. 36, No. 2, pp.
338-355 (2006).
167. Yung, K.L., Tang, J.F., Ip, A.W.H. & Wang, D.W., “Heuristics for joint decisions in production,
transportation, and order quantity”, Transportation Science, Vol. 40, No. 1, pp. 99-116 (2006).
168. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M., Ip, A.W.H. & Pun, K.F., “An intelligent production workflow
mining system for continual quality enhancement”, International Journal of Advanced Manufacturing
Technology, Vol. 28, No. 7-8, pp. 792-809 (2006).
169. Wong, W.K., Kwong, C.K., Mok, P.Y. & Ip, W.H., “Genetic optimization of JIT operation schedules for
fabric-cutting process in apparel manufacture”, Journal of Intelligent Manufacturing, Vol. 17, No. 3, pp.
341-354 (2006).
170. Ho, G.T.S., Lee, C.K.M., Lau, H.C.W. & Ip, A.W.H., “A hybrid intelligent system to enhance logistics
workflow: an OLAP-based GA approach”, International Journal of Computer Integrated Manufacturing,
Vol. 19, No. 1, pp. 69-78 (2006).
171. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M., Ip, A.W.H. & Ho, W., “Design and development of an agent-
based information system for process improvement”, International Journal of Information Technology
and Management, Vol. 5, No. 2-3, pp. 134-150 (2006).
172. Chan, Y.Y., Chan, C.K. & Ip, W.H., “The employers' perspective on the professional knowledge to
enhance employees' productivity in Hong Kong apparel industry”, Taiwan Textile Research Journal, Vol.
16, Iss. 4, pp. 18-28 (2006).
173. Ip, W.H., Chen, B.C., Lau, H.C.W. & Liang, B., “Functional framework for integrating eCRM with
workflow management based on customer value”, Tsinghua Science and Technology, Vol. 11, No. 1, pp.
65-73 (2006).
174. Lau, H.C.W., Ho, G.T.S., Ip, A.W.H., Lee, C.K.M. & Ning, A., “Development of a responsive logistics
workflow system: an OLAP-based hybrid approach”, International Journal of Services, Technology and
Management, Vol. 7, No. 5-6, pp. 568-581 (2006).
175. Lau, H.C.W., Lee, C.K.M., Ho, G.T.S., Ip, W.H., Chan, F.T.S. & Ip, R.W.L., “M-commerce to support
the implementation of a responsive supply chain network”, Supply Chain Management: An International
Journal, Vol. 11, No. 2, pp. 169-178 (2006).
Year 2005
176. Wang, D.W. & Ip, W.H., “Ant search based control optimisation strategy for a class of chaotic system”,
International Journal of Systems Science, Vol. 36, No. 15, pp. 951-959 (2005).
177. Ho, G.T.S., Lau, H.C.W., Lee, C.K.M. & Ip, A.W.H., “An intelligent forward quality enhancement
system to achieve product customization”, Industrial Management & Data Systems, Vol. 105, No. 3, pp.
384-406 (2005).
178. Lee, C.K.M., Lau, H.C.W., Yu, K.M. & Ip, W.H., “Enhancement of product development through
product information mark-up language”, Journal of Engineering Design, Vol. 16, No. 1, pp. 91-110
(2005).
179. Wong, W.K., Kwong, C.K., Mok, P.Y., Ip, W.H. & Chan, C.K., “Optimization of manual fabric-cutting
process in apparel manufacture using genetic algorithms”, International Journal of Advanced
Manufacturing Technology, Vol. 27, No. 1-2, pp. 152-158 (2005).
180. Lau, H.C.W., Lee, C.K.M., Ip, W.H., Chan, F.T.S. & Leung, R.W.K., “Design and implementation of a
process optimizer: a case study on monitoring molding operations”, Expert Systems, Vol. 22, No. 1, pp.
12-21 (2005).
11 2020-Feb
181. Wang, Q., Yung, K.L. & Ip, W.H., “An order dispatcher for dispersed manufacturers solved by a mixed-
variable hybrid genetic algorithm”, International Journal of Computer Integrated Manufacturing, Vol. 18,
No. 1, pp. 41-52 (2005).
182. Chen, B.C., Ip, W.H., Li, Y.J. & Sheng, P., “Analyzing and modeling to the customer relationship chain
management”, Systems Engineering - Theory & Practice, Vol. 25, No. 4, pp. 42-54 (2005). (in Chinese)
183. Chen, B.C. & Ip, W.H., “Markov chain customer relationship management model based on the Hopfield
neural network”, Journal of Tsinghua University (Science and Technology), Vol. 45, No. 12, pp. 1696-
1699 (2005). (in Chinese)
184. 陳伯成、葉偉雄與繩鵬,『應用 Markov鏈方法分析銷售策略』,運籌與管理,第 14 卷,第 2 期,
19-25頁 (2005)。// Chen, B.C., Yie, W.X. & Sheng, P., “Applying Markov chain method to analyzing
sales strategies”, Operations Research and Management Science, Vol. 14, No. 2, pp. 19-25 (2005). (in
Chinese)
185. Cheung, A., Ip, W.H. & Lu, D.W., “Expert system for aircraft maintenance services industry”, Journal of
Quality in Maintenance Engineering, Vol. 11, No. 4, pp. 348-358 (2005).
186. Cheung, A., Ip, W.H., Lu, D.W. & Lai, C.L., “An aircraft service scheduling model using genetic
algorithms”, Journal of Manufacturing Technology Management, Vol. 16, No. 1, pp. 109-119 (2005).
(Formerly known as: Integrated Manufacturing Systems before 2004)
187. Ip, W.H., Huang, M., Yung, K.L., Kwong, C.K. & Wang, D., “A model of production line flexible
combination for one of a kind product”, Annual Journal of IIE (HK), Vol. 25, pp. 26-34 (2005).
188. Lau, H.C.W., Ning, A., Pun, K.F., Chin, K.S. & Ip, W.H., “A knowledge-based system to support
procurement decision”, Journal of Knowledge Management, Vol. 9, No. 1, pp. 87-100 (2005).
189. Lee, C.K.M., Lau, H.C.W., Yu, K.M. & Ip, W.H., “A generic model to support rapid product
development: an XML schema approach”, International Journal of Product Development, Vol. 1, No. 3/4,
pp. 323-340 (2005).
Year 2004
190. Ip, W.H., Yung, K.L. & Wang, D.W., “A branch and bound algorithm for sub-contractor selection in agile
manufacturing environment”, International Journal of Production Economics, Vol. 87, No. 2, pp. 195-
205 (2004).
191. Tang, J.F., Yung, K.L. & Ip, A.W.H., “Heuristics-based integrated decisions for logistics network
systems”, Journal of Manufacturing Systems, Vol. 23, No. 1, pp. 1-13 (2004).
192. Ho, G.T.S., Lau, H.C.W., Ip, W.H. & Ning, A., “An intelligent information infrastructure to support the
streamlining of integrated logistics workflow”, Expert Systems, Vol. 21, No. 3, pp. 123-137 (2004).
193. Ip, W.H., Lai, C.L. & Lau, C.W., “A web-based training model of enterprise resources planning for the
manufacturing industry”, International Journal of Engineering Education, Vol. 20, No. 5, pp. 733-741
(2004).
194. Wang, Q., Yung, K.L. & Ip, W.H., “A hierarchical multi-view modeling for Networked Joint
Manufacturing System”, Computers in Industry, Vol. 53, No. 1, pp. 59-73 (2004).
195. Chen, B.C., Ip, W.H., Zhou, Y.B. & Liang, B., “The integrated process model analysis on an extended
ERP software for MSE”, Systems Engineering - Theory & Practice, Vol. 24, No. 7, pp. 38-45, 110 (2004).
(in Chinese)
196. Liu, Y.Q., Zhang, Y., Wang, D.W., & Ip, W.H., “Model and algorithm of reliability evaluation for
complex device networks”, Journal of Northeastern University (Natural Science), Vol. 25, Iss. 6, pp. 539-
542 (2004).
197. Ip, W.H. & Chen, B., “An enterprise model and the organisation of ERP”, International Journal of
Computer Applications in Technology, Vol. 21, No. 3, pp. 79-86 (2004).
198. Ip, W.H., Chen, B.C., Lau, H. & Sunjing, W.Q., “An object-based relational data base system using re-
configurable finance and material objects”, Journal of Manufacturing Technology Management, Vol. 15,
No. 8, pp. 779-786 (2004). (Formerly known as: Integrated Manufacturing Systems before 2004)
199. Lau, H.C.W., Ning, A., Ip, W.H. & Choy, K.L., “A decision support system to facilitate resources
allocation: an OLAP-based neural network approach”, Journal of Manufacturing Technology
Management, Vol. 15, No. 8, pp. 771-778 (2004). (Formerly known as: Integrated Manufacturing
Systems before 2004)
12 2020-Feb
200. Lau, H.C.W., Lee, C.K.M., Choy, K.L., Ip, W.H., Chan, F.T.S. & Ip, R.W.L., “Implementation of
logistics information system to support reverse logistics: a case study”, International Journal of Logistics
Systems and Management, Vol. 1, No. 1, pp. 1742-7967 (2004).
Year 2003
201. Fung, R.Y.K., Au, A.Y.M. & Ip, A.W.H., “Petri Net-based workflow management systems for in-process
control in a plastic processing plant”, Journal of Materials Processing Technology, Vol. 139, No. 1-3, pp.
302-309 (2003).
202. Keung, K.W., Ip, W.H. & Yuen, D., “An intelligent hierarchical workstation control model for FMS”,
Journal of Materials Processing Technology, Vol. 139, No. 1-3, pp. 134-139 (2003).
203. Lai, C.L., Lee, W.B. & Ip, W.H., “A study of system dynamics in just-in-time logistics”, Journal of
Materials Processing Technology, Vol. 138, No. 1-3, pp. 265-269 (2003).
204. Ng, J.K.C. & Ip, W.H., “Web-ERP: the new generation of enterprise resources planning”, Journal of
Materials Processing Technology, Vol. 138, No. 1-3, pp. 590-593 (2003).
205. Chan, W.M., Chan, C.Y. & Ip, W.H., “A heuristic algorithm for machine assignment in cellular layout”,
Computers & Industrial Engineering, Vol. 44, No. 1, pp. 49-73 (2003).
206. Ip, W.H., Huang, M., Yung, K.L. & Wang, D.W., “Genetic algorithm solution for a risk-based partner
selection problem in a virtual enterprise”, Computers & Operations Research, Vol. 30, No. 2, pp. 213-231
(2003).
207. Ip, W.H., Chan, J.S.F. & Choi, A.C.K., “An integrated problem-based learning model for engineering
education”, International Journal of Engineering Education, Vol. 19, No. 5, pp. 734-737 (2003).
208. Wang, D.W., Ip, W.H. & Yung, K.L., “Advertising strategy analysis for enterprise in duopoly”, Control
Engineering of China, Vol. 10, No. 1, pp. 29-32 (2003). (in Chinese)
209. Chen, B.C., Ip, W.H., Sun, J. & Wang, Q., “Analysis and modeling on ERP software process model”,
Computer Integrated Manufacturing Systems-Beijing, Vol. 9, No. 3, pp. 224-230 (2003).
210. Cheung, A.H.W., Lu, D.W. & Ip, W.H., “Integrated management decision support system for aircraft
maintenance services industry”, Annual Journal of IIE (HK), Vol. 24, pp. 11-15 (2003).
211. Chen, B.C., Ip, W.H., Sun, J. & Wang, Q., “ERP software for simplified process integration model”,
Journal of Tsinghua University (Science and Technology), Vol. 43, No. 6, pp. 721-724, 728 (2003).
Year 2002
212. Wang, C.Y., Wang, D.W., Ip, W.H. & Yuen, D.W., “The single machine ready time scheduling problem
with fuzzy processing times”, Fuzzy Sets and Systems, Vol. 127, No. 2, pp. 117-129 (2002).
213. Ip, W.H., Yung, K.L., Huang, M. & Wang, D.W., “A CONWIP model for FMS control”, Journal of
Intelligent Manufacturing, Vol. 13, No. 2, pp. 109-117 (2002).
214. Chen, B.C. & Ip, W.H., “Organization Structure in ERP and Analysis of BPR Realization”, Computer
Integrated Manufacturing Systems-Beijing, Vol. 8, No. 5, pp. 404-408 (2002).
215. Chan, D.C.K., Yung, K.L. & Ip, A.W.H., “An application of fuzzy sets to process performance
evaluation”, Integrated Manufacturing Systems, Vol. 13, No. 4, pp. 237-246 (2002). (Currently known as:
Journal of Manufacturing Technology Management since 2004)
216. Chan, Y.K., Gaffney, P., Neailey, K. & Ip, W.H., “Achieving breakthrough performance improvement:
results of implementing a fit-for-purpose total management system”, The TQM Magazine, Vol. 14, No. 5,
pp. 293-296 (2002). (Currently known as: The TQM Journal since 2008)
217. Chan, Y.K., Kam, J., Neailey, K. & Ip, W.H., “How IMS can achieve ISO 9001:2000 certification”, The
TQM Magazine, Vol. 14, No. 6, pp. 345-349 (2002). (Currently known as: The TQM Journal since 2008)
218. Fung, R.Y.K., Tam, W.T., Ip, A.W.H. & Lau, H.C.W., “Software process improvement strategy for
enterprise information systems development”, International Journal of Information Technology and
Management, Vol. 1, Iss. 2-3, pp. 225-241 (2002).
219. Ip, W.H. & Chen, B.C., “Organisation structure and enterprise modelling in ERP realisation”,
International Journal of Networking and Virtual Organisations, Vol. 1, No. 2, pp. 170-183 (2002).
220. Ip, W.H., Chau, K.Y. & Chan, S.F., “Implementing ERP through continuous improvement”, International
Journal of Manufacturing Technology and Management, Vol. 4, No. 6, pp. 465-478 (2002).
13 2020-Feb
221. Kwong, C.K., Ip, W.H. & Chan, J.W.K., “Combining scoring method and fuzzy expert systems approach
to supplier assessment: a case study”, Integrated Manufacturing Systems, Vol. 13, No. 7, pp. 512-519
(2002). (Currently known as: Journal of Manufacturing Technology Management since 2004)
222. Wang, D.W., Yung, K.L. & Ip, W.H., “Partner selection model and soft computing approach for dynamic
alliance of enterprises”, Science in China Series F: Information Sciences, Vol. 45, No. 1, pp. 68-80 (2002).
(Currently known as: Science China - Information Sciences)
223. Cheung, A., Ip, W.H., Lai, A. & Cheung, E., “An optimization model for aircraft service logistics”,
Journal of Xiamen University (Natural Science), Vol. 41, No. S1, pp. 252 (2002).
Year 2001
224. Keung, K.W., Ip, W.H. & Lee, T.C., “A genetic algorithm approach to the multiple machine tool selection
problem”, Journal of Intelligent Manufacturing, Vol. 12, No. 4, pp. 331-342 (2001).
225. Keung, K.W., Ip, W.H. & Lee, T.C., “The solution of a multi-objective tool selection model using the GA
approach”, International Journal of Advanced Manufacturing Technology, Vol. 18, No. 11, pp. 771-777
(2001).
226. Wang, D.W., Yung, K.L. & Ip, W.H., “A heuristic genetic algorithm for subcontractor selection in a
global manufacturing environment”, IEEE Transactions on Systems, Man, and Cybernetics - Part C:
Applications and Reviews, Vol. 31, No. 2, pp. 189-198 (2001).
227. Wong, W.K., Chan, C.K., Ip, W.H. & Huang, M., “Evaluation of optimum combinations of spreading and
cutting machines in a garment factory”, International Journal of Advanced Manufacturing Technology,
Vol. 18, No. 1, pp. 62-66 (2001).
228. Wong, W.K., Chan, C.K. & Ip, W.H., “A hybrid flowshop scheduling model for apparel manufacture”,
International Journal of Clothing Science and Technology, Vol. 13, No. 2, pp. 115-131 (2001).
229. 陳伯成與葉偉雄,『對實施 ERP 項目人員的思考』,軟科學,第 15 卷,第 6 期,82-85、90 頁
(2001)。// Chen, B.C. & Yie, W.X., “Thoughts on who should implement ERP projects”, Soft Science,
Vol. 15, No. 6, pp. 82-85, 90 (2001). (in Chinese)
230. Keung, K.W., Ip, W.H. & Chan, C.Y., “An enhanced MPS solution for FMS using GAs”, Integrated
Manufacturing Systems, Vol. 12, No. 5, pp. 351-359 (2001). (Currently known as: Journal of
Manufacturing Technology Management since 2004)
231. Lai, C.L., Ip, W.H. & Lee, W.B., “The system dynamics model for engineering services”, Managing
Service Quality, Vol. 11, No. 3, pp. 191-199 (2001).
232. Ng, K.C. & Ip, W.H., “A model for global manufacturing excellence”, Work Study, Vol. 50, No. 2, pp.
63-68 (2001). (Currently known as: International Journal of Productivity and Performance Management
since 2004).
Year 2000
233. Lee, A.K.C., Ip, W.H. & Yung, K.L., “Inheritance and polymorphism in real-time monitoring and control
systems”, Journal of Intelligent Manufacturing, Vol.11, No.3, pp. 285-294 (2000).
234. Li, Y., Man, K.F., Tang, K.S., Kwong, S. & Ip, W.H., “Genetic algorithm to production planning and
scheduling problems for manufacturing systems”, Production Planning & Control, Vol. 11, No. 5, pp.
443-458 (2000).
235. Wang, D.W., Tang, Z.W., Ip, W.H. & Fung, R.Y.K., “A human-computer interactive approach based on
activity-section analysis for BPR”, Production Planning & Control, Vol. 11, No. 8, pp. 789-796 (2000).
236. Ip, W.H., Li, Y., Man, K.F. & Tang, K.S., “Multi-product planning and scheduling using genetic
algorithm approach”, Computers & Industrial Engineering, Vol. 38, No. 2, pp. 283-296 (2000).
237. Wong, W.K., Chan, C.K. & Ip, W.H., “Optimization of spreading and cutting sequencing model in
garment manufacturing”, Computers in Industry, Vol. 43, No. 1, pp. 1-10 (2000).
238. Chan, Y.K., Brown, M., Neailey, K. & Ip, W.H., “One-stop-shop information mall – MTR’s experience”,
Managing Service Quality, Vol. 10, No. 2, pp. 92-97 (2000).
239. Ip, W.H., Kwong, C.K. & Fung, R., “Design of maintenance system in MRPII”, Journal of Quality in
Maintenance Engineering, Vol. 6, No. 3, pp. 177-191 (2000).
14 2020-Feb
240. Ip, W.H., Lee, K.C., Yung, K.L. & Yam, R., “SCADA in an integrated maintenance management system”,
Journal of Quality in Maintenance Engineering, Vol. 6, No. 1, pp. 6-19 (2000).
241. Tam, S.M., Kwong, C.K. & Ip, W.H., “A hybrid artificial intelligence system for optical lens design”,
International Journal of Computer Applications in Technology, Vol. 13, No. 3/4/5, pp. 229-236 (2000).
242. Wong, W.K., Chan, C.K. & Ip, W.H., “Effects of spreading-table quantities on the spreading-table
planning of computerized fabric-cutting system”, Research Journal of Textile and Apparel, Vol. 4, No. 1,
pp. 25-36 (2000).
243. Ng, J.K.C. & Ip, W.H., “The strategic design and development of ERP and RTMS”, International Journal
of Computer Applications in Technology, Vol. 13, Iss. 3-5, pp. 138-150 (2000).
Year 1999
244. Wang, W., Wang, D.W. & Ip, W.H., “JIT production planning approach with fuzzy due date for OKP
manufacturing systems”, International Journal of Production Economics, Vol. 58, No. 2, pp. 209-215
(1999).
245. Tseng, H.C., Ip, W.H. & Ng, K.C., “A model for an integrated manufacturing system implementation in
China: a case study”, Journal of Engineering and Technology Management, Vol. 16, No. 1, pp. 83-101
(1999).
246. Yip, W.M., Man, H.C. & Ip, W.H., “Optimisation of Nd-YAG laser welding of superduplex stainless
steel by parameter design”, Science and Technology of Welding and Joining, Vol. 4, No. 4, pp. 226-232
(1999).
247. Ip, W.H., Fung, R. & Keung, K.W., “An investigation of stochastic analysis of flexible manufacturing
systems simulation”, International Journal of Advanced Manufacturing Technology, Vol. 15, No. 4, pp.
244-250 (1999).
248. Ng, J.K.C., Ip, W.H. & Lee, T.C., “A paradigm for ERP and BPR integration”, International Journal of
Production Research, Vol. 37, No. 9, pp. 2093-2108 (1999).
249. Chan, D.C.K., Yung, K.L. & Ip, W.H., “The implementation of a model for integration of MRP II and
TQM”, Integrated Manufacturing Systems, Vol. 10, No. 5, pp. 298-305 (1999). (Currently known as:
Journal of Manufacturing Technology Management since 2004)
250. Choi, C.K. & Ip, W.H., “A comparison of MTM and RTM”, Work Study, Vol. 48, No. 2, pp. 57-61 (1999).
(Currently known as: International Journal of Productivity and Performance Management since 2004)
251. Fung, R.Y.K., Law, D.S.T. & Ip, W.H., “Design targets determination for inter-dependent product
attributes in QFD using fuzzy inference”, Integrated Manufacturing Systems, Vol. 10, No. 6, pp. 376-383
(1999). (Currently known as: Journal of Manufacturing Technology Management since 2004)
252. Ip, W.H., “ERP re-engineering”, Plastic Network, Vol. 6, pp. 36-40 (1999). (in Chinese)
253. Ip, W.H., Chau, K.Y. & Yam, R.C.M., “Enhancing manufacturing information management through
TQM”, Logistics Information Management, Vol. 12, No. 4, pp. 315-324 (1999). (Currently known as:
Journal of Enterprise Information Management since 2004)
254. Ip, W.H., Ng, K.C., Lee, T.C. & Tseng, C., “Manufacturing integration: a systems engineering
perspective”, International Journal of Business Performance Management, Vol. 1, No. 3, pp. 265-278
(1999).
255. Keung, K.W. & Ip, W.H., “The application of GA in FMS tool selection problem”, CIRP Journal of
Manufacturing Systems, Vol. 29, No. 3, pp. 225-227 (1999).
256. Wong, W.K., Chan, C.K. & Ip, W.H., “Optimisation of using computer cutting system in the garment
industry”, Textile Asia: the Asian Textile & Apparel Monthly, Vol. 30, No. 1, pp. 29-31 (1999).
Year 1998
257. Huang, M., Wang, D.W. & Ip, W.H., “Simulation study of CONWIP for a cold rolling plant”,
International Journal of Production Economics, Vol. 54, No. 3, pp. 257-266 (1998).
15 2020-Feb
258. Li, Y., Ip, W.H. & Wang, D.W., “Genetic algorithm approach to earliness and tardiness production
scheduling and planning problem”, International Journal of Production Economics, Vol. 54, No. 1, pp.
65-76 (1998).
259. Tang, J.F., Wang, D.W., Ip, A. & Fung, R.Y.K., “A hybrid genetic algorithm for a type of nonlinear
programming problem”, Computers & Mathematics with Applications, Vol. 36, Iss. 5, pp. 11-21 (1998).
260. Yung, K.L., Ip, A.W.H. & Chan, D.C.K., “A mechanism for the integration of TQM and MRPII”,
Computer Integrated Manufacturing Systems, Vol. 11, No. 4, pp. 291-296 (1998). (Incorporated into
Robotics and Computer-Integrated Manufacturing since 1999)
261. Huang, M., Wang, D.W. & Ip, W.H., “A simulation and comparative study of the CONWIP, Kanban and
MRP production control systems in a cold rolling plant”, Production Planning & Control, Vol. 9, No. 8,
pp. 803-812 (1998).
262. Li, Y., Wang, D.W. & Ip, W.H., “Earliness/Tardiness production scheduling and planning, and solutions”,
Production Planning & Control, Vol. 9, No. 3, pp. 275-285 (1998).
263. Ng, J.K.C. & Ip, W.H., “The strategic design and development of ERP and RTMS”, Computers &
Industrial Engineering, Vol. 34, No. 4, pp. 777-791 (1998).
264. Ng, J.K.C., Ip, W.H. & Lee, T.C., “The development of an enterprise resources planning system using a
hierarchical design pyramid”, Journal of Intelligent Manufacturing, Vol. 9, No. 5, pp. 385-399 (1998).
265. Ip, W.H. & Kam, K.W., “An education and training model for manufacturing resources planning”,
International Journal of Engineering Education, Vol. 14, No. 4, pp. 248-256 (1998).
266. Chan, Y.K. & Ip, W.H., “A methodology for integrated management system”, Transactions of Nanjing
University of Aeronautics & Astronautics, Vol. 5, No. 1, pp. 111-115 (1998).
267. Chan, Y.K., Gaffney, P., Neailey, K. & Ip, W.H., “The establishment of an integrated management
system - a paradigm for railway engineering management”, The TQM Magazine, Vol. 10, No. 6, pp. 420-
424 (1998). (Currently known as: The TQM Journal since 2008)
268. Chan, Y.K., Neailey, K. & Ip, W.H., “ISO9004-2 quality management system - the way to world-class
service”, Managing Service Quality, Vol. 8, No. 6, pp. 395-401 (1998).
269. Ip, W.H. & Yam, R.C.M., “The successful implementation of MRPII via a hierarchical modelling
approach”, Logistics Information Management, Vol. 11, No. 3, pp. 160-170 (1998). (Currently known as:
Journal of Enterprise Information Management since 2004)
270. Ip, W.H., “Manufacturing integration strategy using MRP II and RTMs: a case study in South China”,
Integrated Manufacturing Systems, Vol. 9, No. 1, pp. 41-49 (1998). (Currently known as: Journal of
Manufacturing Technology Management since 2004)
Year 1997
271. Ip, W.H., “Rule-based ARIMA models for FMS”, Journal of Materials Processing Technology, Vol. 66,
No. 1-3, pp. 240-243 (1997).
272. Ip, W.H., “An integrated curriculum for engineering management education in Hong Kong and China”,
AEESEAP Journal of Engineering Education, Vol. 26, No. 1-2, pp. 3-7 (1997).
273. Lo, Y.F., Ip, W.H. & Yung, K.L., “A structural approach to the development and implementation of
MRPII”, Journal of The Institution of Engineers, Singapore, Vol. 37, No. 4, pp. 56-67 (1997).
16 2020-Feb
(b) Conference Papers
Year 2019
1. Tseng, K.K., Lin, J.R., Sun, H.C., K. L. Yung & Ip, W. H., “Meteorite Detection and Tracing with Deep
Learning on FPGA Platform”, In: International Conference on Genetic and Evolutionary Computing,
Singapore, 12 May 2019 (2019).
Year 2017
2. Wu, C.H., Cheung, T., Leung, P.P.L., Lau, W.Y. & Ip, W.H., “An Experimental Learning Model for
Rfid”, In: Proceedings of The European Conference on Education 2017, Brighton, the United Kingdom,
30 June – 2 July 2017 (2017).
Year 2016
3. Tseng, K.K., Lee, D.C., Hurst, W., Lin, F.Y. & Ip, W.H., “Frequency rank order statistic with unknown
neural network for ECG identification system”, In: Proceedings of The 4th International Conference on
Enterprise Systems, Melbourne, Australia, 2-3 November 2016 (2016).
4. Leung, P.P.L., Wu, C.H., Ip W.H., Ho. G.T.S., Cho, V.W.S. & Kwong, K.K.Y., “Customer loyalty
enhancement of online-to-offline marketing in beauty industry”, In: Proceedings of The 4th International
Conference on Enterprise Systems, Melbourne, Australia, 2-3 November 2016 (2016).
5. Wang, J., Muddada, R., Ip, W.H. & Zhang, W.J., “Managing a holistic supply chain network for proactive
resilience”, In: Proceedings of The 2016 IEEE International Conference on Systems, Man, and
Cybernetics (IEEE SMC), Budapest, Hungary, 9-12 October 2016 (2016).
Year 2015
6. Leung, P.P.L., Wu, C.H., Ho, G.T.S., Ip, W.H. & Mou, W.L., “Modelling, analysis and projections: a
case study on nursing workforce demand in a local nursing home”, In: Proceedings of the World
Conference on Business and Management (WCBM 2015), Seoul, Korea, 29 June-2 July 2015, pp. 306-315
(2015).
7. Leung, P.P.L., Wu, C.H., Ho, G.T.S., Ip, W.H. & Mou, W.L., “Workforce modelling, analysis and
planning: a feasibility study in a local nursing home”, In: Proceedings of the 2015 IEEE International
Conference on Industrial Engineering and Engineering Management (IEEM 2015), Singapore, Singapore,
6-9 December 2015, pp. 81 (2015).
Year 2014
8. Wu, C.H., Ng, C.K., Leung, P.P.L., Lau W.Y., Ho. G.T.S. & Ip, W.H., “Design of a EHS module for an
intelligent automobile parking platform”, In: Proceedings of the 2014 Second International Conference on
Enterprise Systems, Shanghai, China, 2-3 August 2014, pp. 184-189 (2014).
9. Ng, C.K., Wu, C.H., Wang, L.X., Ip, W.H. & Zhang, J., “A RFID-enabled Wireless Sensor Network
(WSN) monitoring system for biological and pharmaceutical products”, In: Proceedings of the 2014
International Symposium on Computer, Consumer and Control, Taichung, Taiwan, 10-12 June 2014, pp.
757-760 (2014).
10. Wu, C.H., Ho, G.T.S., Tseng, K.K., Ip, W.H. & Mou, W.L., “Studying learning performance using a m-
learning approach”, In: 2014 The Forth National Conference on Web Intelligence and Applications,
Penghu, Taiwan, 2-3 May 2014, IS15-04 (2014). (in CD-ROM Format)
17 2020-Feb
Year 2013
11. Wu, H., Huang, M., Cho, V., Ip, W.H. & Wang, X., “Due-date assignment on a single machine
scheduling problem with nonlinear deterioration function”, In: Proceedings of 2013 International
Conference on Intelligent System, Applied Materials and Control Technology, Taiyuan, Shanxi, China;
13-15 January 2013, pp. 280-284 (2013).
12. Jiang, H., Kwong, C.K., Law, M.C. & Ip, W.H., “Development of customer satisfaction models for
affective design using rough set and ANFIS approaches”, In: Proceedings of 17th International
Conference in Knowledge Based and Intelligent Information and Engineering Systems, Kitakyushu, Japan,
9-11 September 2013, pp. 104-112 (2013).
13. Wang, D. & Ip, W.H., “Review on modeling and optimization problems about RFID technology and
applications”, In: Proceedings of 25th Chinese Control and Decision Conference, Guiyang, China, 25-27
May 2013, pp. 1258-1263 (2013).
14. Ng, C.K., Wu, C.H., Wei, Y.F., Ip, W.H., Chen, Z.Q. & Zhang, J., “Optimal energy consumption in
wireless sensor networks using a PSO-based approach”, In: Proceedings of 2013 Conference on
Information Technology and Applications in Outlying Islands, Kinmen, Taiwan, and Xiamen, China, 24-
26 May 2013, pp. 1086-1090 (2013).
Year 2012
15. Chan, Y.Y., Chan, C.K. & Ip, W.H., “Knowledge agent formation for organisational learning: A multiple-
case study in a stochastic demand industry”, In: Proceedings of 5th Annual EuroMed Conference of the
EuroMed Academy of Business: Building New Business Models for Success through Competitiveness and
Responsibility, Montreux, Switzerland, 4-5 October 2012, pp. 279-288 (2012).
16. Chan, C.Y., Xue, F., Ip, W.H. & Cheung, C.F., “A hyper-heuristic inspired by pearl hunting”, In:
Proceedings of 6th International Conference on Learning and Intelligent Optimization, Paris, France, 16-
20 January 2012, pp. 349-353 (2012).
Year 2011
17. Ng, K.K.W., Lau, W.S., Ip, W.H., Ting, S.L. & Lam, H.K., “Intelligent cabinet with automatic adjustment
by mean of radio frequency identification”, In: Supplementary Proceedings of the 14th International
Manufacturing Conference in China, Tianjin, China, 13-15 October 2011, pp. 6-10 (2011).
18. Ting, S.L., Tsang, A.H.C. & Ip, W.H., “COHEALS: A context-aware healthcare learning system for
medical equipments usage education”, In: Proceedings of the 5th International Technology, Education and
Development Conference (INTED 2011), Valencia, Spain, 7-9 March 2011, pp. 001928-001932 (2011).
19. Peng, S.X., Chan, C.K., Ip, W.H. & Luximon, A., “3D parametric body model based on Chinese female
anhtropometric analysis”, In: Proceedings of the Third International Conference on Digital Human
Modeling, Vol. 6777, Orlando, USA, 9-14 July 2011, pp.22-29 (2011).
20. Wu, C.H., Ip, W.H., Dong, N. & Chen, Z.Q., “A chaotic hybrid algorithm approach for micro gear
inspection”, In: Supplementary Proceedings of the 14th International Manufacturing Conference in China,
Tianjin, China, 13-15 October 2011, pp. 11-14 (2011).
21. Chen, Z.Q., Zou, K.S., Ip, W.H. & Chan, C.Y., “Model retrieval based on fuzzy weighted shape
distributions”, In: Proceedings of 2nd International Conference on Manufacturing Science and
Engineering, Guilin, China, 9-11 April 2011, pp. 1678-1681 (2011).
22. Chan, Y.Y., Chan, C.K. & Ip, W.H., “Quality management model of qualitative research for university-
industry cooperation”, In: Proceedings of 3rd International Conference on Education and New Learning
Technologies, Barcelona, Spain, 4-6 July 2011, pp. 5834-5843 (2011).
18 2020-Feb
23. Xue, F., Chan, C.Y., Ip, W.H. & Cheung, C.F., “Pearl hunter: a cross-domain hyper-heuristic that
compiles iterated local search algorithms”, In: Proceedings of OR53 Annual Conference, East Midlands
Conference Centre, Nottingham, United Kingdom, 6-8 September 2011 (2011).
24. Wang, L.X. & Ip, W.H., “A Soft Case-based Reasoning System for Travelling Time Estimation”, In:
Proceedings of the 3rd International Conference on Future Computational Technologies and Applications,
Rome, Italy, 25-30 September 2011, pp. 69-74 (2011).
Year 2010
25. Huang, M., Bo, G., Wang, X. & Ip, W.H., “The optimization of routing in fourth-party logistics with soft
time windows using harmony search”, In: Proceedings of International Conference on Natural
Computation (ICNC), Yantai, China, 10-12 August 2010, pp. 4344-4348 (2010).
26. Zhang, Z., Tong, J., Chen, Z., Ip, W.H., Chan, C.Y. & Yung, K.L., “Application of chaos in network
video security”, In: Proceedings of 1st International Conference on Information Computing and
Applications, Tangshan, China, 15-18 October 2010, pp. 229-236 (2010).
27. Pego-Guerra, M.A., Zhang, W.J. & Ip, W.H., “Robust management of Virtual Enterprises”, In:
Proceedings of ASME 2010 International Design Engineering Technical Conferences and Computers and
Information in Engineering Conference, Montreal, QC, Canada, 15-18 August 2010, pp. 299-306 (2010).
28. Lam, C.Y., Ip, W.H., Wu, C.H. & Chan, S.L., “Agent-based scheduling with a learning effect model”, In:
Proceedings of IEEE International Conference on Industrial Engineering and Engineering Management,
Macao, China, 7-10 December 2010, pp. 1702-1705 (2010).
29. Mo, J.H. & Ip, W.H., “A Pull Strategy in Manufacturing using Fuzzy Logic”, In: Proceedings of the Ninth
International Conference on Information and Management Sciences, Ü rümchi, Xinjiang, China, 11
August 2010 (2010).
30. Chung, R.C.P., Chan, S.L. & Ip, W.H., “A Study of Cross-Functional Teams in the New Product
Development Process”, In: Proceedings of the 6th CIRP-Sponsored International Conference on Digital
Enterprise Technology, Hong Kong, China, 14-16 December 2010, pp. 385-397 (2010).
31. Xue, F., Chan, C.Y., Ip, W.H. & Cheung, C.F., “Towards a learning-based heuristic searching reform
scheme”, In: Proceedings of 24th European Conference on Operational Research (EURO XXIV), Lisbon,
Portugal, 11-14 July 2010 (2010).
32. Xue, F., Chan, C.Y., Ip, W.H. & Cheung, C.F., “A learning-based variable assignment weighting scheme
for heuristic and exact searching in Euclidean traveling salesman problems”, In: Proceedings of 1st
International Conference on Computational Logistics (ICCL2010), Shanghai, China, 20-22 September
2010 (2010).
33. Wu, C.H., Dong, N., Ip, W.H., Chan, C.Y., Yung, K.L. & Chen, Z.Q., “Chaotic hybrid algorithm and its
application in circle detection”, In: Proceedings of EvoCOMPLEX, EvoGAMES, EvoIASP,
EvoINTELLIGENCE, EvoNUM, and EvoSTOC, EvoApplicatons 2010, Istanbul, Turkey, 7-9 April 2010,
Part 1, pp. 302-311 (2010).
Year 2009
34. Bo, G., Huang, M., Ip, W.H. & Wang, X., “The harmony search for the routing optimization in fourth
party logistics with time windows”, In: Proceedings of IEEE Congress on Evolutionary Computation,
IEEE, Trondheim, Norway, 18-21 May 2009, pp. 962-967 (2009).
35. Huang, M., Cui, Y., Xu, X., Ip, W.H. & Wang, X.W., “Model and algorithm for the multi-task routing
optimization problem in 4PL”, In: Proceedings of the Chinese Control and Decision Conference (CCDC),
Guilin, China, 17-19 June 2009, pp. 3094-3098 (2009).
36. Huang, M., Dong, H.Y., Wang, X.W., Zheng, B.L. & Ip, W.H., “Guided variable neighborhood harmony
search for integrated charge planning in primary steelmaking processes”, In: Proceedings of the 1st
ACM/SIGEVO Summit on Genetic and Evolutionary Computation (GEC), Shanghai, China, 12-14 June
2009, pp. 231-238 (2009).
37. Ip, W.H. & Wang, D.W., “Resilience evaluation approach of transportation networks”, In: Proceedings of
International Joint Conference on Computational Sciences and Optimization, Vol. 2, IEEE Computer
Society, Sanya, China, 24-26 April 2009, pp. 618-622 (2009).
19 2020-Feb
38. Chan, Y.Y., Chan, C.K. & Ip, W.H., “Knowledge acquisition and understanding through students' self-
organised learning activities is indifferent to organisational learning”, In: Proceedings of 3rd International
Technology, Education and Development Conference (INTED2009), Valencia, Spain, 9-11 March 2009,
pp. 3728-3738 (2009).
39. Huang, M., Tong, W., Ip, W.H. & Wang, X.W., “A Routing Optimization Method for Single Point to
Multipoint Fourth Party Logistics”, In: Proceedings of 8th International Conference on Information and
Management Sciences (IMS09), Kunming & Banna, China, 20-28 July 2009, pp. 884-888 (2009).
Year 2008
40. Chan, S.L. & Ip, W.H., “A markov chains repurchasing model for CRM using system dynamics”, In:
Proceedings of 19th IASTED International Conference on Modelling and Simulation (MS), Quebec,
Canada, 26-28 May 2008, pp. 353-357 (2008).
41. Wang, D.Z., Wu, C.H., Ip, A., Chan, C.Y. & Wang, D.W., “Fast multi-template matching using a particle
swarm optimization algorithm for PCB inspection”, In: Proceedings of European Workshops on the
Theory and Applications of Evolutionary Computation, EvoWorkshops 2008, Naples, Italy, 26-28 March
2008, pp. 365-370 (2008).
42. Zhan, R.X., Chau, K.Y., Lu, Z.M., Liu, B.B. & Ip, W.H., “Robust image hashing for image authentication
based on DCT-DWT composite domain”, In: Proceedings of 8th International Conference on Intelligent
Systems Design and Applications, Kaohsiung, Taiwan, 26-28 November 2008, pp. 119-122 (2008).
43. Chen, B., Liu, W.H., Li, Y.J., Yang, D., Ip, W.H. & Chen, G.Y. “The analysis to lead-time difference of
exporting containers between Hong Kong and Yantian port”, In: Proceedings of 2008 IEEE International
Conference on Service Operations and Logistics, and Informatics, Beijing, China, 12-15 October 2008,
pp. 2415-2419 (2008).
44. Huang, M., Bo, G., Tong, W., Ip, W.H. & Wang, X.W., “A hybrid immune algorithm for solving Fourth-
Party Logistics routing optimizing problem”, In: Proceedings of IEEE Congress on Evolutionary
Computation (IEEE CEC), Hong Kong, China, 1-6 June 2008, pp. 286-291 (2008).
45. Huang, M., Jiang, G.J., Chen, K.G., Ip, W.H. & Wang, X.W., “Research on GA/CPM/MarKov integrated
programming of dynamic risk for virtual enterprise”, In: Proceedings of the 3rd International Conference
on Innovative Computing Information and Control (ICICIC), IEEE Computer Society, Dalian, China, 18-
20 June 2008, pp. 227 (2008).
46. Lam, C.Y., Ip, W.H. & Wang, L., “Simulation and analysis using a process centric activity model to
achieve business process excellence”, In: Proceedings of the 19th IASTED International Conference on
Modelling and Simulation (MS), Quebec, Canada, 26-28 May 2008, pp. 253-257 (2008).
47. Wang, D., Wu, C.H., Ip, A., Wang, D. & Yan, Y., “Parallel multi-population particle swarm optimization
algorithm for the uncapacitated facility location problem using OpenMP”, In: Proceedings of IEEE
Congress on Evolutionary Computation (IEEE CEC), Hong Kong, China, 1-6 June 2008, pp. 1214-1218
(2008).
48. Wang, L.X., Ip, W.H. & Lee, C.K.M., “Resource constrained project scheduling of construction
engineering with genetic algorithm”, In: Proceedings of Chinese Control and Decision Conference,
Shandong, China, 2-4 July 2008, pp. 1466-1470 (2008).
Year 2007
49. Chen, B.C., Ip, W.H. & Li, Y.J., “The study and application of CPFR model and its analysis in China”, In:
Proceedings of 2006 International Conference on Service Systems and Service Management, Troyes,
France, 25-27 October 2006, pp. 745-749 (2007).
50. Jiang, Z., Wang, D. & Ip, W.H., “Fuzzy programming model and algorithm for optimal design of
distribution centers for B2C e-commerce”, In: Proceedings of the IEEE International Conference on
Automation and Logistics, Jinan, China, 18-21 August 2007, pp. 1533-1539 (2007).
20 2020-Feb
Year 2006
51. Wang, Q., Yung, K.L. & Ip, W.H., “A generic reconfigurable agent model for distributed manufacturing
system”, In: Proceedings of the 2006 IEEE International Conference on Control Applications, Munich,
Germany, 4-6 October 2006, pp. 1438-1443 (2006).
52. Ding, J., Liu, Z., Ip, W.H., Yung, K.L. & Wang, X., “Optimization of control strategy of a serial supply
chain based on pheromone evolutionary algorithm”, In: Proceedings of 2006 IEEE Congress on
Evolutionary Computation, Vancouver, BC, Canada, 16-21 July 2006, pp. 2707-2712 (2006).
53. Huang, M., Wu, X., Wang, X., Ip, W.H. & Yung, K.L., “PSO based single strategy risk programming
problem for virtual enterprise”, In: Proceedings of the American Control Conference, Minneapolis, MN,
United States, 14-16 June 2006, pp. 4506-4510 (2006).
54. Huang, M., Jiang, G.J., Liu, Z.H., Ip, W.H. & Wang, X.W., “Research on SA/CPM/MarKov integrated
programming of dynamic risk of virtual enterprise”, In: Proceedings of 2006 1st IEEE Conference on
Industrial Electronics and Application, Singapore, Singapore, 24-26 May 2006, pp. 1-6 (2006).
55. Huang, M., Wu, X., Wang, X., Ip, W.H. & Yung, K.L., “The risk programming of virtual enterprises
based on algorithms of Min / Max / Mean / Random-PSO”, In: Proceedings of 2006 1st IEEE Conference
on Industrial Electronics and Applications, Singapore, Singapore, 24-26 May 2006, pp. 1-7 (2006).
56. Huang, M., Ding, J.Q., Ip, W.H., Yung, K.L., Liu, Z.H. & Wang, X.W., “The research on the optimal
control strategy of a serial supply chain based on GA”, In: Proceedings of 2nd International Conference
on Natural Computation, ICNC 2006, Xi'an, China, 24-28 September 2006, Volume 4221 LNCS - I, 2006,
pp. 657-665 (2006).
Year 2005
57. Chan, Y.K., Neailey, K. & Ip, W.H., “Effects of implementing a customized management system model
on organizational performance”, In: Proceedings of the 1st International Conference on Quality
Management and Six Sigma, Vol. 1, Hong Kong, China, 14-15 January 2005, pp. 16-21 (2005).
58. Huang, M., Xu, F., Wang, X. & Ip, W.H., “CBR based risk management for virtual organization”, In:
Proceedings of 5th International Conference on Electronic Business, Hong Kong, China, 5-9 December
2005, pp. 662-666 (2005).
59. Chen, B. & Ip, W.H., “The study on the two characters in a kind of Markov chain's CRM model”, In:
Proceedings of 2005 International Conference on Services Systems and Services Management,
Chongquing, China, 13-15 June 2005, pp. 230-232 (2005).
60. Chen, B.C. & Ip, W.H., “The study on a kind of supply chain integrated process model-an analysis based
on CPFR model”, In: Proceedings of the 4th International Conference on Quality and Reliability, Beijing,
China, August 2005 (2005).
Year 2004
61. Chen, B., Ip, W.H., Peng, S. & Yu, H.L., “Analyzing and modeling the CRM chain - the basis of SCM”,
In: Proceedings of the 8th World Multi-conference on Systemics, Cybernetics and Informatics, Vol. IV,
Orlando, U.S.A., 18-21 July 2004, pp. 364-368 (2004).
62. Cheung, A., Ip, W.H. & Lai, C.L., “Staff rostering and scheduling using AI in the aircraft service
industry”, In: Proceedings of HKIE CAI Symposium, Hong Kong, China, April 2004, pp. 57-65 (2004).
63. Huang, W., Wang, X., Wang, D., Ip, W.H. & Kwong, C.K., “The system dynamic in the simulation
analysis of a CONWIP controlled lamp production line”, In: Proceedings of 2004 IEEE Conference on
Robotics, Automation and Mechatronics, Singapore, Singapore, 1-3 December 2004, Vol. 1, pp. 277-280
(2004).
64. Chen, B.C., Ip, W.H. & Peng, S., “Customer relationship modeling and analysis”, In: Proceedings of the
International Conference on Service Systems and Service Management, Beijing, China, July 2004 (2004).
21 2020-Feb
65. Chen, B.C., Ip, W.H., Zhou, Y.B. & Yu, H.L., “The design of a lean CRM software process model”, In:
Proceedings of The 4th International Conference on Electronic Business (ICEB2004), Beijing, China, 5-9
December 2004, pp. 335-339 (2004).
66. Chen, B.C., Ip, W.H., Zhou, Y.B. & Yu, H.L., “Comparing sales strategies using the markov chain
relationship model”, In: Proceedings of The 4th International Conference on Electronic Business
(ICEB2004), Beijing, China, 5-9 December 2004, pp. 266-271 (2004).
67. Huang, M., Yang, H.M., Wang, X.W., Ip, W.H. & Yung, K.L., “Virtual enterprises risk management DSS
under electronic commerce”, In: Proceedings of The 4th International Conference on Electronic Business
(ICEB2004), Beijing, China, 5-9 December 2004, pp. 718-721 (2004).
68. Huang, M., Xu, F., Wang, X.W., Ip, W.H. & Yung, K.L., “A risk identification method of virtual
enterprise”, In: Proceedings of The 4th International Conference on Electronic Business (ICEB2004),
Beijing, China, 5-9 December 2004, pp. 687-691 (2004).
69. Huang, M., Li, F.G., Wang, X.W. & Ip, W.H., “Risk sorting for enterprise under EC environments”, In:
Proceedings of The 4th International Conference on Electronic Business (ICEB2004), Beijing, China, 5-9
December 2004, pp. 708-712 (2004).
70. Huang, M., Yang, H.M., Wang, X.W., Ip, W.H. & Wang, D.W., “Risk evaluation for virtual enterprise”,
In: Proceedings of The 4th International Conference on Electronic Business (ICEB2004), Beijing, China,
5-9 December 2004, pp. 702-707 (2004).
Year 2003
71. Liu, Y., Ip, W.H., Yung, K.L., Zhang, Y. & Wang, D.W., “A reliability model for multi-state networks
with link-capacities of production line”, In: Proceedings of International IEEE Conference on the
Business of Electronic Product Reliability and Liability, Hong Kong, China, January 2003, pp. 80-84
(2003).
72. Wang, Q., Yung, K.L. & Ip, W.H., “A pattern-based evolving mechanism for genetic algorithm to solve
combinatorial optimization problems”, In: Proceedings of the 2003 IEEE International Workshop on Soft
Computing in Industrial Applications, Binghamton, U.S.A., 23-25 June 2003, pp. 97-101 (2003).
Year 2002
73. Huang, M., Yung, K.L., Wang, X.W. & Ip, W.H., “The system dynamic based simulation analysis of a
virtual enterprise”, In: Proceedings of the 2002 International Conference on Control and Automation
(ICCA), Vol. 1, Xiamen, China, 16-19 June 2002, pp. 177 (2002).
Year 2001
74. Wong, W.K., Chan, C.K. & Ip, W.H., “Application of fuzzy concept in the apparel industry”, In:
Proceeding of Joint 9th IFSA World Congress and 20th NAFIPS International Conference, Vol. 5,
Vancouver, Canada, 25-28 July 2001, pp. 2547-2550 (2001).
75. Wong, W.K., Chan, C.K. & Ip, W.H., “Earliness and tardiness production planning and scheduling in
apparel manufacture”, In: Proceedings of the 6th Asian Textile Conference, Hong Kong, China, 22-24
August 2001 (2001). (in VCD format)
Year 2000
76. Wang, Q., Yung, K.L. & Ip, W.H., “Simulation of object-oriented methodology on manufacturing
execution system”, In: Proceedings of the 6th Guangdong - Hong Kong Symposium on Advances in
Mechatronic Research and Industrial Development, Wuhan, China, 25 November 2000, pp. 237-247
(2000).
77. Wong, W.K., Chan, C.K. & Ip, W.H., “Architecture of capacity planning model for apparel manufacture
considering machine breakdown”, In: Proceedings of International Manufacturing Conference in China,
Vol. II, Hong Kong, China, 16-17 August 2000, pp. 149-150 (2000).
22 2020-Feb
78. Keung, K.W., Ip, W.H. & Lee, T.C., “An intelligent hierarchical workstation control model for FMS”, In:
Proceedings of International Manufacturing Conference in China, Vol. II, Hong Kong, China, 16-17
August 2000, pp. 259-260 (2000).
Year 1999
79. Wong, C.W.K., Chan, C.K. & Ip, A., “Genetic algorithm approach to cutting scheduling and planning of
computerised cutting system in clothing manufacturing”, In: Proceedings of World Congress on Textiles
in the Millennium, Huddersfield, U.K., 6-7 July 1999, pp. 273-283 (1999).
Year 1998
80. Chan, C.Y., Fang, S.L., Ip, W.H. & Qi, G.N., “Research on the methodology of concurrent engineering”,
In: Proceedings of the 5th Guangdong - Hong Kong Symposium in Advance in Mechatronic Research and
Industrial Development, Zhuhai, China, June 1998, pp. 195-206 (1998).
81. Fang, S.L., Chan, C.Y., Wu, H.F. & Ip, W.H., “Extended product data management”, In: Proceedings of
the 5th Guangdong - Hong Kong Symposium in Advance in Mechatronics Research and Industrial
Development, Zhuhai, China, June, pp. 184-194 (1998).
82. Lee, K.C., Ip, W.H. & Yung, K.L., “Data acquisition and MRPII”, In: Proceedings of the 98 Conference
on System Automation and Computer Integrated Engineering, Hong Kong, China, June 1998, pp. S33-
S36 (1998).
83. Wong, W.K., Chan, C.K. & Ip, W.H., “Application of genetic algorithm on the spreading operation in
garment manufacturing”, In: Proceedings of the International Conference on Nonlinear Programming
and Variational Inequalities, Hong Kong, China, 15-18 December 1998, pp. 52-54 (1998).
84. Wong, W.K., Chan, C.K. & Ip, W.H., “Efficiency of computerized cutting system”, In: Proceedings of
the 4th International Conference on Advanced in Materials and Processing Technologies, Kuala Lumpur,
Malaysia, 24-28 August 1998 (1998).
85. Wong, W.K., Chan, C.K. & Ip, W.H., “Preparation and installation of computerized cutting system”, In:
Proceedings of the 27th Textile Research Symposium, Shizuoka, Japan, 3-5 August 1998, pp. 240-247
(1998).
Year 1997
86. Gao, J.X. & Ip, W.H., “A systematic analysis and re-design of the logistics of a world-wide
manufacturing network”, In: Proceedings of CIRP International Symposium on Advanced Design and
Manufacture in the Global Manufacturing Era, Hong Kong, China, 21-22 August 1997, pp. 448-454
(1997).
87. Gao, J.X. & Ip, W.H., “Computer aided assembly planning and process modeling”, In: Proceedings of the
International Conference on Manufacturing Automation (ICMA), Vol. 2, Hong Kong, China, 28-30 April
1997, pp. 1173-1178 (1997).
88. Kam, K.W. & Ip, W.H., “MRPII system training for management studies”, In: Proceedings of the 5th
International Conference on Modern Industrial Training, Jinan, China, 26-29 October 1997, pp. 587-592
(1997).
89. Keung, W.K. & Ip, W.H., “The application of genetic algorithm in the planning of FMS system”, In:
Proceedings of the International Conference on Manufacturing Automation (ICMA), Vol. 1, Hong Kong,
China, 28-30 April 1997, pp. 542-547 (1997).
90. Lee, K.C., Ip, W.H. & Yung, K.L., “Hierarchical object-orientated supervisory monitoring and control for
manufacturing enterprises”, In: Proceedings of the Advances in Industrial Engineering Applications and
Practice II, Vol. 2, San Diego, U.S.A., 12-15 November 1997, pp. 1241-1246 (1997).
91. Lee, K.C., Ip, W.H. & Yung, K.L., “Intelligent supervisory monitoring and control system for automated
manufacturing”, In: Proceedings of the 4th International Conference on Manufacturing Technology in
Hong Kong, Hong Kong, China, 30 November-3 December 1997 (1997). (in CDROM format)
23 2020-Feb
92. Ng, K.C. & Ip, W.H., “The design and implementation of an intelligent enterprises information system”,
In: Proceedings of the International Conference on Manufacturing Automation (ICMA), Vol.2, Hong
Kong, China, 28-30 April 1997, pp. 838-844 (1997).
93. Ng, K.C., Ip, W.H. & Lee, T.C., “The design and implementation of MRPII system for global
manufacturing”, In: Proceedings of the Advances in Industrial Engineering Applications and Practice II,
Vol. 2, San Diego, U.S.A., 12-15 November 1997, pp. 823-828 (1997).
94. Tsang, H.C. & Ip, W.H., “Managing integrated manufacturing through real-time monitoring and TQM”,
In: Proceedings of the International Conference on Manufacturing Automation (ICMA), Vol. 2, Hong
Kong, China, 28-30 April 1997, pp. 971-977 (1997).
Year 1996
95. Gao, J.X. & Ip, W.H., “Manufacturing capability modelling for product design”, In: Proceedings of the
7th International Machine Design and Production Conference, Ankara, Turkey, 11-13 September 1996,
pp. 95-101 (1996).
96. Ip, W.H., “Integration of simulation analysis and time series models for production rule-based
knowledge”, In: Proceedings of the 2nd International Conference on Managing Integrated Manufacturing,
Leicester, U.K., 26-28 June 1996, pp. 177-182 (1996).
97. Li, Y., Ip, W.H. & Wang, D.W., “MRPII and JIT integration using earliness/tardiness scheduling
approach”, In: Proceedings of the 2nd International Conference on Managing Integrated Manufacturing,
Leicester, U.K., 26-28 June 1996, pp. 247-253 (1996).
98. Lo, V., Ip, W.H. & Yung, K.L., “A methodology for MRPII and FMS integration”, In: Proceedings of the
2nd International Conference on Managing Integrated Manufacturing, Leicester, U.K., 26-28 June 1996,
pp. 255-260 (1996).
99. Tsang, H.C. & Ip, W.H., “An integrated approach to the design and implementation of a manufacturing
system”, In: Proceedings of the 2nd International Conference on Managing Integrated Manufacturing,
Leicester, U.K., 26-28 June 1996, pp. 401-406 (1996).
100. Tsang, H.C. & Ip, W.H., “Manufacturing strategy implementation through a real-time control and
monitoring system”, In: Proceedings of the 2nd International Conference on Managing Integrated
Manufacturing, Leicester, U.K., 26-28 June 1996, pp. 51-57 (1996).
101. Yip, W.M., Man, H.C. & Ip, W.H., “Application of Taguchi method in Nd: YAG laser welding of super
duplex stainless steel”, In: Proceedings of the Laser Materials Processing Conference (ICALEO 96),
Detroit, U.S.A., 14-17 October 1996, Vol. 81, Section D, pp. 74-83 (1996).
102. Yung, K.L., Ip, W.H., Yung, K.C. & Chan, C.K., “The integration of MRPII with quality in mind”, In:
Proceedings of the 2nd International Conference on Managing Integrated Manufacturing, Leicester, U.K.,
26-28 June 1996, pp. 195-200 (1996).
Year 1995
103. Choi, C.K. & Ip, W.H., “Estimation of robotics assembly time”, In: Proceedings of the 6th International
Conference on Manufacturing Engineering, Melbourne, Australia, 29 November-1 December 1995, pp.
325-328 (1995).
104. Choy, K.L., Ip, W.H. & Wong, W.C., “Application of genetic algorithms aided simulation in production
resource planning”, In: Proceedings of the 3rd International Conference on Manufacturing Technology,
Chiang Chen Industrial Charity Foundation, Hong Kong, China, December 1995, pp. 511-520 (1995).
105. Ip, W.H. & Choy, K.L., “Computer-aided design of production line”, In: Proceedings of the 11th
International Conference on Computer-aided Production Engineering, Institution of Mechanical
Engineers, London, U.K., 20-21 September 1995 (1995). (Poster Session).
106. Ip, W.H. & Choy, K.L., “Maintenance productivity management information system”, In: Proceedings of
the 1st International Conference on Quality and Reliability, Vol. 2, Hong Kong, China, April 1995, pp.
313-317 (1995).
24 2020-Feb
107. Ip, W.H. & Lo, V., “A structural analysis on the implementation of MRPII system”, In: Proceedings of
the 3rd International Conference on Manufacturing, Chiang Chen Industrial Charity Foundation, Hong
Kong, China, December 1995, pp. 618-623 (1995).
108. Ip, W.H., “Integration of simulation and expert system through intervention modeling”, In: Proceedings
of the 3rd International Conference in Computer Integrated Manufacturing, Vol. 2, Singapore, Singapore,
11-14 July 1995, pp. 920-924 (1995).
109. Ip, W.H., Cheung, S.W. & Choi, C.K., “Implementation of statistical process control in PCB
manufacturing”, In: Proceedings of the 1st International Conference on Quality and Reliability, Vol. 2,
Hong Kong, China, April 1995, pp. 409-413 (1995).
110. Ip, W.H., Choy, K.L. & Lee, H.B., “Application of structural design and development methodology in
logistic modelling”, In: Proceedings of the 3rd International Conference on Manufacturing Technology,
Chiang Chen Industrial Charity Foundation, Hong Kong, China, December 1995, pp. 641-645 (1995).
111. Kam, K.W. & Ip, W.H., “Implementation of MRPII system in a model factory”, In: Proceedings of the
7th International Manufacturing Conference in China (IMCC), Vol. 2, Harbin, China, 19-21 October
1995, pp. 333-336 (1995).
112. Lee, S.Y., Ip, W.H. & Chu, K.F., “Strategic implementation of JIT: a case study in China”, In:
Proceedings of the 3rd International Conference on Manufacturing Technology, Chiang Chen Industrial
Charity Foundation, Hong Kong, China, December 1995, pp. 613-617 (1995).
113. Lee, S.Y., Ip, W.H. & Frankland, S., “A comparison of the psychophysical approach to determine manual
material handling safety limit with the biomechanical approach”, In: Proceedings of the 7th International
Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21 October 1995, pp. 521-525 (1995).
114. Lo, Y.F., Ip, W.H. & Yung, K.L., “Manufacturing integration using a generic MRPII model”, In:
Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21
October 1995, pp. 327-332 (1995).
115. Tsang, H.C. & Ip, W.H., “Manufacturing strategy formulation and implementation in China”, In:
Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21
October 1995, pp. 291-294 (1995).
116. Tsang. H.C. & Ip, W.H., “Total quality management through effective change management in China”, In:
Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21
October 1995, pp. 269-274 (1995). (Keynote)
117. Yung, K.C. & Ip, W.H., “Productivity scheme as competitive edge in manufacturing at China”, In:
Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21
October 1995, pp. 301-305 (1995).
118. Yung, K.L., Ip, W.H., Yung, K.C. & Chan, C.K., “Engineering change execution for TQM”, In:
Proceedings of the 7th International Manufacturing Conference in China, Vol. 2, Harbin, China, 19-21
October 1995, pp. 417-421 (1995).
Year 1994
119. Choy, K.L., Ip, W.H. & Wong, W.C., “Application of computer simulation technique to solve capacity
planning problem”, In: Proceedings of the 3rd International Conference on Automation Technology,
Taipei, Taiwan, 6-9 July 1994, pp. 201-204 (1994).
120. Ip, W.H. & Bing, Y., “The application of time series models in analyzing dynamic behavior of complex
manufacturing systems”, In: Proceedings of the 10th International Conference on Systems Engineering,
Vol. 1, Coventry, U.K., 6-8 September 1994, pp. 519-526 (1994).
121. Ip, W.H. & Choy, K.L., “Analyzing the dynamic behavior of production line using time series
intervention models”, In: Proceedings of the 3rd International Conference on Automation Technology,
Taipei, Taiwan, 6-9 July 1994, pp. 187-191 (1994).
122. Ip, W.H. & Lee, S.Y., “Productivity measurement system in a maintenance department”, In: Proceedings
of the 3rd International Conference on Automation Technology, Taipei, Taiwan, 6-9 July 1994, pp. 93-97
(1994).
123. Yung, K.C. & Ip, W.H., “Productivity and motivation strategy in manufacturing”, In: Proceedings of the
3rd International Conference on Automation Technology, Taipei, Taiwan, 6-9 July 1994, pp. 111-115
(1994).
25 2020-Feb
124. Yung, K.C. & Ip, W.H., “Productivity improvement in manufacturing: the new challenge in China”, In:
Proceedings of the 1st Asia-Pacific International Conference on Progress of Cutting and Grinding,
Shanghai, China, 26-28 September 1994, pp. 18-24 (1994).
Year 1993
125. Cheung, S.W. & Ip, W.H., “Simulation modeling using hierarchical, modular design and state space
analysis”, In: Proceedings of the 6th International Manufacturing Conference with China, Vol. 2, Hong
Kong, China, 10-13 March 1993, pp. 535-539 (1993).
126. Choy, K.L. & Ip, W.H., “Optimizing scheduling using simulation and rule-based expert system as an
experimental design tool”, In: Proceedings of the 9th International Conference on Computer-aided
Production Engineering, Nanjing, China, July 1993, pp. 280-284 (1993).
127. Ip, W.H. & Fok, C.M., “Implementation of a just-in-time material control system: a case study of a China
manufacturing plant”, In: Proceedings of the 9th International Conference on Computer-aided Production
Engineering, Nanjing, China, July 1993, pp. 74-79 (1993).
128. Ip, W.H. & Ho, K.C., “Implementation of MRP system: a problem solving approach”, In: Proceedings of
the 9th International Conference on Computer-aided Production Engineering, Nanjing, China, July 1993,
pp. 53-58 (1993).
129. Ip, W.H. & Lee, S.Y., “Implementation of modular quick response production system in a garment
factory”, In: Proceedings of the 2nd International Conference on Manufacturing Technology, Chiang
Industrial Charity Foundation, Hong Kong, China, December 1993, pp. 461-463 (1993).
130. Ip, W.H. & Popplewell, K., “Modeling of manufacturing systems using state space and ARIMA methods”,
In: Proceedings of the 6th International Manufacturing Conference with China, Vol. 2, Hong Kong,
China, 10-13 March 1993, pp. 507-513 (1993).
131. Ip, W.H., Choy, K.L. & Wong, W.C., “Implementation of MRP in a machinery manufacturing company”,
In: Proceedings of the 2nd International Conference on Manufacturing Technology, Chiang Chen
Industrial Charity Foundation, Hong Kong, China, December 1993, pp. 457-460 (1993).
132. Ip, W.H., Lau, W.S. & Popplewell, K., “Analyzing manufacturing systems simulation using time series
methods”, In: Proceedings of the 9th International Conference on Computer-aided Production
Engineering, Nanjing, China, July 1993, pp. 11-16 (1993).
133. Lau, K.H. & Ip, W.H., “Implementation of an MRP system: a case study of a Hong Kong manufacturing
company”, In: Proceedings of the 6th International Manufacturing Conference with China, Vol. 2, Hong
Kong, China, 10-13 March 1993, pp. 555-560 (1993).
134. Lee, S.Y. & Ip, W.H., “Application of the NIOSH prediction equation; biomechanical model, in job
safety analysis and pre-employment worker job tolerance determination”, In: Proceedings of the 9th
International Conference on Computer-aided Production Engineering, Nanjing, China, July 1993, pp.
411-416 (1993).
135. Yeung, V.W.S., Ip, W.H. & Cheung, Y.W., “SPC for multilayer PCB: a case study”, In: Proceedings of
the 9th International Conference on Computer-aided Production Engineering, Nanjing, China, July 1993,
pp. 174-180 (1993).
Year 1992
136. Ip, W.H., Lau, W.S. & Popplewell, K., “Analyzing MRP simulation using ARIMA models”, In:
Proceedings of International Conference of Manufacturing Automation, Hong Kong, China, 10-12 August
1992, pp. 506-511 (1992).
137. Ip, W.H., Lau, W.S. & Popplewell, K., “Modeling MRP simulation using transfer function analysis”, In:
Proceedings of the 2nd International Conference on Automation Technology, Vol. 4, Taipei, Taiwan, 5-8
July 1992, pp. 113-119 (1992).
26 2020-Feb
(c) Books / Book Chapters / Thesis
1. Patnaik, S., Ip, W.H., Tavana, M., Jain, V. eds., “New Paradigm in Decision Science and Management :
Proceedings of ICDSM 2018”, Advances in Intelligent Systems and Computing, Springer Nature
Singapore Pte Ltd (2020). (ISBN: 978-981-13-9329-7)
2. 容啟亮、曾國坤、葉偉雄與王朝,深度學習.技術與應用,台中市:長映科技股份有限公司
(2018)。(ISBN: 978-986-925-962-0)
3. Ip, W.H., W, C.H., Chan, C.Y. & Ho, G.T.S., IoT for The Elderly – Integrated Solution for Improved
Balance and Fall Prevention, Hong Kong SAR: e-Print Group Ltd. (2018).
4. 葉偉雄、胡鎮浩、何道森與曾國坤,應用於智能城市的雲端化能源管理、環境監控及人員監測,香港︰保諾時網上印刷有限公司 (2016)。// Ip, W.H., Wu, C.H., Ho, G.T.S. & Tseng, K.K., EES-Cloud
Applications for Smart Cities: from Concepts to Applications, Hong Kong SAR: e-Print Group Ltd.
(2016). (in Chinese and English) (ISBN: 978-962-367-802-5)
5. Ng, C.K., Wu, C.H., Ip, W.H., Zhang, J., Ho, G.T.S. & Chan, C.Y., “Network topology management
optimization of Wireless Sensor Network (WSN)”, In: Intelligent Computing Theories and Application,
Vol. 9772, Lecture Notes in Computer Science, Part II, Huang, D.S. & Jo, K.H. eds., Switzerland:
Springer International Publishing, pp. 850-859 (2016). (ISBN: 978-3-319-42293-0)
6. Wang, L.X., Ip, W.H. & Ting, J.S.L., “Design of a Radio Frequency Identification (RFID)-based
monitoring and vehicle management system”, In: Wireless Communications, Networking and
Applications, Vol. 348, Lecture Notes in Electrical Engineering, Part II, Zeng, Q.A. eds., New Delhi:
Springer India, pp. 537-551 (2016). (ISBN: 978-81-322-2579-9)
7. 葉偉雄、曾國坤、李加乾與胡鎮浩,物聯網基礎.應用與個案,台中市︰長高科技股份有限公司
(2016)。// Ip, W.H., Tseng, K.K., Li, J.Q. & Wu, C.H., IoT: The Basic, Applications and Case Studies,
Taichung City: DMATEK (2016). (in Chinese) (ISBN: 978-986-925-960-6)
8. 葉偉雄,RFID/物聯網技術於智慧城市的應用與案例研究,香港︰宏亞印務有限公司 (2014)。// Ip,
W.H., RFID/IoT Application and Case Study in a Smart City, Hong Kong SAR: Aisa One Printing
Limited (2014). (in Chinese) (ISBN: 978-962-367-784-4)
9. 葉偉雄、曾國坤、曾賦賦與胡鎮浩,生醫物聯網技術與系統設計,台中市︰長高科技股份有限公司 (2014)。 // Ip, W.H., Tseng, K.K., Zeng, F.F. & Wu, C.H., System Design and Technology of
Biomedical Internet of Things, Taichung City: DMATEK (2014). (in Chinese) (ISBN: 978-986-84784-7-3)
10. Wong, W.K., Kwong, C.K., Mok, P.Y. & Ip, W.H., “Optimizing fabric spreading and cutting schedules in
apparel production using genetic algorithms and fuzzy set theory”, In: Optimizing Decision Making in the
Apparel Supply Chain Using Artificial Intelligence (AI), Witney/Oxford/U.K.: Woodhead Publishing, pp.
131-152 (2013). (ISBN: 978-0-85709-779-8)
11. Wu, C.H., Dong, N., Ip, W.H., Chan, C.Y., Yung, K.L. & Chen, Z.Q., “Chaotic hybrid algorithm and its
application in circle detection”, In: Applications of Evolutionary Computation, Vol. 6024, Lecture Notes
in Computer Science, Part I, Chio, C.D. et al. eds., Berlin/Heidelberg: Springer, pp. 302-311 (2010).
(ISBN: 978-3-642-12238-5)
12. Lam, C.Y., Chan, S.L. & Ip, W.H., “A structural reliability business process modelling with system
dynamics simulation”, In: Modeling Simulation and Optimization - Focus on Applications, Shkelzen
Cakaj eds., Rijeka/Croatia: InTech, pp. 259-267 (2010). (ISBN: 978-953-307-055-1)
13. Ho, G.T.S., Lau, H.C.W., Chung, N.S.H. & Ip, W.H., “Fuzzy measurement in quality management
systems”, In: Production Engineering and Management under Fuzziness, Berlin/Heidelberg: Springer, pp.
515-536 (2010). (ISBN: 978-3-642-12051-0)
14. Bo, G.H., Huang, M., Ip, W. H. & Wang, X.W., “The application of harmony search in fourth-party
logistics routing problems”, In: Recent Advances in Harmony Search Algorithm, Geem, Z.W. eds.,
Berlin/Heidelberg: Springer, pp. 135-145 (2010). (ISBN: 978-3-642-04316-1)
15. Wu, C.H., Dong, N., Ip, W.H., Chen, Z.Q. & Yung, K.L., “Applying chaotic particle swarm optimization
to the template matching problem”, In: Advances in Computation and Intelligence, Vol. 5821, Lecture
Notes in Computer Science, Cai, Z.H., Li, Z.H., Kang, Z. & Liu, Y. eds., Berlin: Springer-Verlag, pp.
411-421 (2009). (ISBN: 978-3-642-04842-5)
27 2020-Feb
16. Wang, D.Z., Wu, C.H., Ip, A., Chan, C.Y. & Wang, D.W., “Fast multi-template matching using a particle
swarm optimization algorithm for PCB inspection”, In: Applications of Evolutionary Computing, Vol.
4974, Lecture Notes in Computer Science, Giacobini, M. et al. eds., Berlin/Heidelberg: Springer, pp. 365-
370 (2008). (ISBN: 978-3-540-78760-0)
17. Chan, C.K., Chan, Y.Y. & Ip, W.H., “Knowledge agent theory and its autopoietic characteristics for
authentic knowledge management”, In: The Open Knowledge Society: A Computer Science and
Information Systems Manifesto, Lytras, M.D. eds., Berlin/Heidelberg: Springer, pp. 507-512 (2008).
(ISBN: 978-3-540-87782-0)
18. Huang, M., Ding, J.Q., Ip, W.H., Yung, K.L., Liu, Z.H. & Wang, X.W., “The research on the optimal
control strategy of a serial supply chain based on GA”, In: Advances in Natural Computation, Vol. 4221,
Lecture Notes in Computer Science, Part 1, Jiao, L.C., Wang, L.P., Gao, X.B., Liu, J. & Wu, F. eds.,
Berlin/Heidelberg: Springer, pp. 657-665 (2006). (ISBN: 978-3-540-45901-9)
19. Ip, W.H., The Application of Time Series Models in MRP Simulation, Ph.D., Loughborough University of
Technology (1993). (EThOS Persistent ID: uk.bl.ethos.359393)