IP Expo 2009 - Enabling Business with Cisco Data Centre Virtualisation
-
Upload
ipexpo-online -
Category
Technology
-
view
402 -
download
0
Transcript of IP Expo 2009 - Enabling Business with Cisco Data Centre Virtualisation
© 2009 Cisco Systems, Inc. All rights reserved. 1 Confidential – Subject to joint NDACloud09-SGppt
Enabling Business with Cisco Data Centre Virtualisation
Stacey GoldsmithData Centre Solutions Manager
© 2009 Cisco Systems, Inc. All rights reserved. 2 Confidential – Subject to joint NDACloud09-SGppt
What is Cloud Computing?
Multi Tenancy
Fast Time To Market
Lower Costs $
Scale Up and Down
Abstraction / Virtualisation Source: A Break in the Clouds: Towards a Cloud DefinitionLuis M. Vaquero, Luis Rodero-Merino, Juan Caceres, Maik Lindner
© 2009 Cisco Systems, Inc. All rights reserved. 3 Confidential – Subject to joint NDACloud09-SGppt
The Evolution of Computing Architectures
Mainframe
Minicomputer
Client Server
Web
CloudVirtualisation
ComplexityDatacentre
Components
XX
CiscoUnified
Computing
“The Cisco Unified Computing System offers a clean-sheet approach to solve data center challenges by offering a single holistic solution with integrated
management and the critical support necessary for scaling virtualization,”
Vernon Turner, senior vice president of Enterprise Infrastructure, Consumer and Telecom Research at IDC
© 2009 Cisco Systems, Inc. All rights reserved. 4 Confidential – Subject to joint NDACloud09-SGppt
Virtual Desktop Infrastructure Example – 3,000 Users69% Reduction In Components
1,380 fewer infrastructure components to purchase,
provision, monitor, maintain, power, cool,
repair…….
© 2009 Cisco Systems, Inc. All rights reserved. 5 Confidential – Subject to joint NDACloud09-SGppt
Virtual Desktop Infrastructure Example 44% Reduction In Total Costs
$3.5m$3.9m
$2.1m$1.7m
$1.8m $1.7m
$2.2m
$1.3m
$0.8m
The financial feasibility assessment projects a cost avoidance of $1.72 million over 5 years with
Cisco Unified Computing System
© 2009 Cisco Systems, Inc. All rights reserved. 6 Confidential – Subject to joint NDACloud09-SGppt
Virtual Desktop Infrastructure Example Operating Costs Reduced by 48%
$404
$1,165
$451
$1,106$329
$458
© 2009 Cisco Systems, Inc. All rights reserved. 7 Confidential – Subject to joint NDACloud09-SGppt
Virtual Desktop Infrastructure Example Administration Costs Reduced by 59%
$253
$330
$157
$425
$229
$295
$314
$268
$194
$230
$16$17
© 2009 Cisco Systems, Inc. All rights reserved. 8 Confidential – Subject to joint NDACloud09-SGppt
Virtual Desktop Infrastructure Example 448 Less SAN/LAN Switch Ports Required
144
432
32
16
256
256
1616
80
© 2009 Cisco Systems, Inc. All rights reserved. 9 Confidential – Subject to joint NDACloud09-SGppt
Virtual Desktop Infrastructure ExampleCapital Cost Reduced by 40%
$1,199
$1,640
$997
$550
$544
$304
© 2009 Cisco Systems, Inc. All rights reserved. 10 Confidential – Subject to joint NDACloud09-SGppt
Virtual Desktop Infrastructure Example Space and Power Reduction
Power Consumption Reduced by 11kW
DC Floor Space Reduced by 4 Racks
© 2009 Cisco Systems, Inc. All rights reserved. 11 Confidential – Subject to joint NDACloud09-SGppt
Virtualised Data CentreCase Study #1 Challenge
Simplify ManagementReduce Datacentre OPEXEnsure Application Availability
SolutionUnified Computing SystemCisco Advanced Services
Results60% Reduction in Device Count38% Reduction in PowerRapid End to End Provisioning 22 ESX hosts – 3hrs Unified Computing System
© 2009 Cisco Systems, Inc. All rights reserved. 13 Confidential – Subject to joint NDACloud09-SGppt
UCS at Cisco
Office of the Chairman
News@Cisco
Corporate Positioning applications
Legal applications
Finance applications