Introduction to Tailings Management

download Introduction to Tailings Management

of 18

Transcript of Introduction to Tailings Management

  • 8/3/2019 Introduction to Tailings Management

    1/18

    Introduction to Tailings ManagementMarch 15, 2011

  • 8/3/2019 Introduction to Tailings Management

    2/18

    Components of a Mine

    Tailings

    ImpoundmentMill or

    Processing Plant

    Access Roads

    Process Ponds &Water Supply

    Open Pits &

    UndergroundWorkings

    Waste Rock

    Dumps

    Reclamation

    Soil Stockpiles

  • 8/3/2019 Introduction to Tailings Management

    3/18

    What are Tailings?

    Waste product from ore

    grinding & mineral extraction

    Rock ground to sand and siltsizes to maximize liberation of

    metals in extraction processes

  • 8/3/2019 Introduction to Tailings Management

    4/18

    What are Tailings?

    Two ore more stages of crushing typical

    Primary crushing to 12 mm

    Fine grinding circuits

  • 8/3/2019 Introduction to Tailings Management

    5/18

    Function of Tailings Impoundments

    Operations:

    Safe storage of tailings solids &

    process water Sedimentation & clarification

    of water for reclaim to process

    plant Store & attenuate floods at

    mine site

    Mitigate Acid Rock Potential

  • 8/3/2019 Introduction to Tailings Management

    6/18

    Function of Tailings Impoundments

    Closure:

    Safe storage of tailings solids &

    water Polish water for release to

    environment

    Reclaimed to meet post-closure land uses

    Mitigate Acid Rock Potential

  • 8/3/2019 Introduction to Tailings Management

    7/18

    Challenges

    Tailings dams are now

    largest dams in the world

    Focus of intense

    environmental scrutiny

  • 8/3/2019 Introduction to Tailings Management

    8/18

    Tailings Management Studies

    Main Components

    Site characterization

    Climate

    Hydrology studies

    Geotechnical & geology studies

    Hydrogeology studies

  • 8/3/2019 Introduction to Tailings Management

    9/18

    Tailings Management Studies

    Main Components

    Tailings characterization

    Geotechnical properties

    Geochemical properties

    Technologies assessment

    Thickened tailings

    Paste tailingsFiltered tailings

  • 8/3/2019 Introduction to Tailings Management

    10/18

    Tailings Management Studies

    Main Components

    Design criteria

    Factors of safety

    Seismic design parametersDesign flood events

  • 8/3/2019 Introduction to Tailings Management

    11/18

    Tailings Management Studies

    Main Components

    Engineering Design

    Tailings staging plan

    Dam structuresWater balance

    Surface water management plan

  • 8/3/2019 Introduction to Tailings Management

    12/18

    Tailings Management Studies

    Main Components

    Risk Assessment

    Continuous evaluation of

    environmental risks at eachproject development stage

    Enables tracking of risk

    mitigation throughout design

    process

    Failure Modes and Effects

    Analysis (FMEA) technique

  • 8/3/2019 Introduction to Tailings Management

    13/18

    Tailings Management Studies

    Main Components

    Environmental Management Plans

  • 8/3/2019 Introduction to Tailings Management

    14/18

    Tailings Management Studies

    Main Components

    Closure Plans

    Meet long-term land uses

    (agriculture, industrial, etc.)Stable against landslides and

    seismic loading

    erosion

  • 8/3/2019 Introduction to Tailings Management

    15/18

    Tailings Management Studies

    Main Components

    Quantities & cost estimate

    Initial Capital costs

    Sustaining Capital costsOperating costs

    Closure costs

  • 8/3/2019 Introduction to Tailings Management

    16/18

    Process of Design Studies

    ConceptualPreliminary Economic

    Assessment (PEA)

    Pre-Feasibility

    Feasibility

    Initial project financialassessment (go/no go)

    Bankable feasibility costestimates

    Permitting support document

  • 8/3/2019 Introduction to Tailings Management

    17/18

    Project Timelines

    Exploration

    Preliminary Economic Assessment Pre-Feasibility Feasibility

    -30 t = 0 yr 2 3 4

    Conceptual

    Engineering Pre-Feasibility Feasibility

    Engineering Studies

    Baseline Studies EIA

    Environmental Studies

    3+ mths 6+ mths 12+ mths

  • 8/3/2019 Introduction to Tailings Management

    18/18

    Preguntas?