Introduction to Reliability Centred Maintenance
Keith Ashington
M.Eng CM.EngNZ C.Eng M.ICE
![Page 2: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/2.jpg)
Summary
• Background
• What is RCM2?
• The RCM2 process
• Application to track assets
• Benefits
![Page 3: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/3.jpg)
Background
![Page 4: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/4.jpg)
Initial assumptions
• Every aircraft has a specific ‘life’
• Every major component has a specific ‘life’
• Servicing carried out just before ‘life’ reached
• Life can be predicted / defined
• Reducing service life increases reliability
![Page 5: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/5.jpg)
Study findings
![Page 6: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/6.jpg)
What is RCM2?
“A process used to determine what must be done to ensure that any physical asset
continues to do what is users want it to do in its present operating context”
![Page 7: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/7.jpg)
Further publications
![Page 8: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/8.jpg)
RCM2 in the UK rail network
• NR/L2/SIG/10662
• NR/L2/MTC/10662
![Page 9: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/9.jpg)
The RCM2 Process
FMECA+
![Page 10: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/10.jpg)
Workshop
RCM2
Facilitator
Engineering Supervisor
Operative
External specialist
Operator
Operations Supervisor
![Page 11: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/11.jpg)
Operating Context
![Page 12: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/12.jpg)
Stage 1 - Function
• “What are the functions and associated performance standards of the asset in its present operating context?”o “To…
o …Verb…
o …Noun…
o …Performance Standard”
• Primary Function
• Secondary function
![Page 13: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/13.jpg)
Stage 2 - Functional Failure
• In what ways does it fail to fulfil its functions?
![Page 14: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/14.jpg)
Stage 3 - Failure modes
• What causes each functional failure?
![Page 15: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/15.jpg)
Stage 3 - Failure modes
![Page 16: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/16.jpg)
Stage 4 - Failure effects
• What happens when each failure occurs?
• Identifies potential failure points
• Defect may not become observable
100% Capability
Starts to degrade
Defect becomes
observable
Further degradation
Failure
![Page 17: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/17.jpg)
Stage 5 - Failure Consequences
• Hidden Consequence • Safety / Environmental consequence
![Page 18: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/18.jpg)
Stage 5 - Failure Consequences
• Operational • Non-operational
![Page 19: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/19.jpg)
Stage 6 - On-condition tasks
• Predictive / Preventative
• Defects lead to Faults
o P = potential for failure identified (Defect)
o F = failure identified (Fault)
o P-F = inspection interval + rectification period
![Page 20: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/20.jpg)
Typical on-condition tasks
![Page 21: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/21.jpg)
KiwiRail example – track geometry
• Rectification periodso P4 = 13 weeks
o P3 = 2 weeks
o P2 = 3 days
o P1 = 1 days
o U1 = FAIL
• BUT P2 requires TSR, so failure.
• Very little time to plan rectification
• Inspection Intervalso Class A(M) = 17 weeks
o Class A(NM) = 26 weeks
o Class B = 35 weeks
o Class C = 52 weeks
![Page 22: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/22.jpg)
KiwiRail P-F Intervals
P4 P3 P2 P1 U1
Class A(M) 30 weeks 19 weeks 17.3 weeks 17.1 weeks 17.0 weeks
Class A(NM) 39 weeks 28 weeks 26.3 weeks 26.1 weeks 26 weeks
Class B 48 weeks 37 weeks 35.3 weeks 35.1 weeks 35 weeks
Class C 65 weeks 54 weeks 52.3 weeks 52.1 weeks 52 weeks
• P-F Interval = inspection interval + rectification period
• More time needed to rectify
o Reduce inspection interval
o Find P5
![Page 23: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/23.jpg)
Stage 7 - Scheduled tasks
• On-condition tasks not possible
• Still a risk of failure
• Discard
• Restoration
![Page 24: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/24.jpg)
Stage 8 - Default Actions
• Hidden Consequenceso Failure finding tasks
• Safety / Environmental consequenceso Compulsory re-design
• Operational / Non-operationalo Desirable re-design
o Do nothing
![Page 25: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/25.jpg)
Implementation
• Improved Maintenance Regime
o On-condition Tasks
o Scheduled Tasks
o Re-designs
o Failure finding tasks
Improved Maintenance
Regime
Professional Head Approval
Implementation
Review
![Page 26: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/26.jpg)
RCM2 analysis of track assets
• Exeter - Barnstaple
• Bristol - Exeter
• Euston – Rugby
• Bletchley – Bedford
• Paddington -Heathrow
• Etc
![Page 27: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/27.jpg)
RCM2 analysis - findings
• Consequences o Hidden – Low (Buffer stops, guard rails)
o Safety / environmental - high (Wrong side failures)
o Operational – low (Right side failure, IBJ)
o Non-operational – low (Wheel squeal)
• On-condition taskso Already in place
o Changes in frequency
o Changes in rectification periods
![Page 28: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/28.jpg)
Changes to on-condition tasks
• All inspections intervals and periods justified
Inspection Change
Patrolling Removed
SM(T) Inspections Replaced with verifications
TME Inspections Maintained (Assurance)
Track Geometry recording
Non-mandated AL faults became mandated
Ultrasonic inspections Non-mandated faults became mandated, all suspects verified
Structure Gauging No change (ORR mandated)
Grinding No change
Lubrication No change
![Page 29: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/29.jpg)
Impact on traditional track
• On condition taskso Small P-F
o Worth doing?
• scheduled restorationso Screw tightening
o Lubrication
o Joint adjustment
o Fastening maintenance
• Default actionso Redesign (Modern track)
• Operating context
o Low tonnage
o Low speed
o Low spend!
![Page 30: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/30.jpg)
Impact on modern track
• On-condition taskso Automated
o Fewer visual inspections
• Scheduled Restorationso Grinding
o Rail lubrication
• Scheduled Discardso Re-padding
• Default actionso Turnout redesigns
![Page 31: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/31.jpg)
Results of RCM2 analysis
• Greater reliance on automated systems
• Targeted track patrolling / verifications
• Maintenance backlog reduced
• Opex reduction
• Risk reduction
![Page 32: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/32.jpg)
Do we need to patrol at all?
• Safety risk on site
• Safety risk travelling to site
• Age / fitness
![Page 33: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/33.jpg)
What can be achieved?
![Page 34: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/34.jpg)
![Page 35: Introduction to Reliability Centred Maintenance · 2020-03-09 · Introduction to Reliability Centred Maintenance Keith Ashington M.Eng CM.EngNZ C.Eng M.ICE](https://reader034.fdocuments.us/reader034/viewer/2022052314/5f149cb8ff9efb135f6ea252/html5/thumbnails/35.jpg)
Thank you!
Questions?
Keith Ashington CM.EngNZ, C.Eng M.ICE