Transcript of Introduction to Primavera Reflections

REMINDER

Check in on the

COLLABORATE mobile app

Introduction to Primavera Reflections

Prepared by:

Megan Thomas

Primavera Trainer & Consultant

PPM Global Services, Inc.

Session ID#:

[email protected]

This is a divider slide title that can be two lines

This is a subtitle or bulleted list

Agenda

■ What is a Reflection?

■ Why use a Reflection?

■ Creating Reflections

■ Modifying Reflections

■ Merging Reflections with a Source Project

■ Viewing the Merged Changes

■ Frequently Asked Questions (Q/A)

What is a Reflection? ■ A reflection is a copy of a project that has the following

characteristics:

▪ Has the same name as the original source project with the word

“reflection” appended to the name.

▪ Contains an internal link to the source project that allows the

application to merge changes from the reflection into the source

project.

▪ Has a what-if status.

■ Changes made to the reflection project can be selectively merged into the source project.

Why use a Reflection? ■ Reflections facilitate the following work flows and processes:

▪ Provides a sandbox area to test different project scenarios.

▪ Enables changes to the reflection to be reviewed and accepted

before merging the reflection back into the source project.

▪ Can be used in combination with Team Member to enable

review and acceptance of progress updates from within P6

Professional thick client.

Creating a Reflection ■ A reflection can be created from any project within Primavera.

A new reflection can also be created from an existing reflection.

■ To create a reflection project from P6 Professional, follow the steps below:

1. Navigate to the Projects Window

2. From the Projects window, select the project from which you

wish to create the reflection. (note, the selected project will

become the source project for the reflection)

3. Right-click > Create Reflection

Creating a Reflection ■ If the source project does not contain a baseline:

▪ Primavera responds by creating a reflection.

■ If the source project contains a baseline:

▪ Primavera responds by displaying the Copy Baselines dialog

box.

▪ For any baselines you want to copy, mark checkbox(s) in the

Copy column of the Copy Baselines dialog box and click OK.

▪ Primavera then creates the reflection.

Creating a Reflection

Modifying a Reflection ■ To modify the reflection project, simply open the reflection

and make modifications as needed.

■ Modifications made to the reflection project do not affect the source project until merged.

■ Fields commonly updated via reflection process include:

▪ Dates

▪ Durations

▪ Resource Assignments

▪ Activity Code Assignments

▪ Costs

▪ Notebook items

■ In the example that follows, we will record progress updates against the reflection project.

Modifying a Reflection Existing Activities Updated

New Activity Added

New Resource Assignment

New Relationship Created

Merging Reflections into the Source Project ■ Changes made to the reflection project can be previewed and

selectively merged into the source project.

■ During preview, changes can be grouped by activity or by subject area.

■ To merge changes, the user must have Project Superuser privileges to source project and to the reflection project.

■ While merging changes, source project cannot be opened in Exclusive mode by another user

■ Source project cannot be checked out during merge.

Merging Reflections into the Source Project ■ Changes made to unique record identifiers (i.e. Activity ID,

WBS ID) will result in new records added to the source project.

■ A Reflection Differences Report can be printed from the Preview Changes dialogue window.

■ User can instruct Primavera to create a backup of the source project as a baseline and / or to export the source project to an .XER file, prior to merging changes.

■ User can instruct Primavera to keep, delete or replace the reflection project upon completion of the merge.

Merging Reflections into the Source Project ■ To merge changes from the reflection project into the source

project, follow the steps below:

1. Navigate to the Projects window.

2. From the Projects window, select the reflection project that you

wish to merge.

3. Right-click > Merge Reflection into Source project

4. From the Preview Changes window,

— Select changes to merge

— Select actions that Primavera should take prior to merge

— Select actions that Primavera should take after merge

5. Click the Merge Changes button

Merging Reflections into the Source Project

Viewing the Merged Changes ■ Upon completion of the merge, results should be inspected

by the user.

■ For this example, we will confirm the following changes appear within the source and reflection projects.

▪ Activity A1000

— Activity and resource assignment progressed to completion

▪ Activity A1010

— Activity and resource assignment in-progress with expected finish

date of April 29th

▪ Activity A1050

— Activity and resource assignment have been created

— FS relationship has been created between A1040 & A1050

▪ Copy of source project has been created as a baseline.

Viewing the Merged Changes

Frequently Asked Questions (Q/A) ■ Q. If an item is deleted from the Reflection project, how is the

Source project affected?

▪ A. Merging will not remove items from the source project that

have been deleted from the reflection.

▪ If major elements of a project have been deleted from the

reflection, the user must manually delete the items from the

source project.

▪ Elements that are not deleted during a merge include:

— Activities

— Resource Assignments

— WBS Elements

— Work Products and Documents

— Expenses

— Issues

— Risks

Frequently Asked Questions (Q/A) ■ Q. Can I view the link in the reflection to the source project?

▪ A. Yes. From the Projects window, Source Project field

■ Q. Can I have multiple reflections pointing to the same source project?

▪ A. Yes.

■ Q. What happens to the reflection when I delete the source project?

▪ A. The link is deleted from the source project field in the

reflection.

Frequently Asked Questions (Q/A) ■ Q. Why is the Merge Reflection into Source Project disabled?

▪ A. The right click option is disabled when any of the following is

true:

— The source project is checked out

— The source project and/or the reflection is currently open in Exclusive

mode by another user

— You do not have super user privileges to both the source project and

the reflection

■ Q. What happens if the merge fails?

▪ A. The system responds with a message that the merge process

failed, creating the prmReflectionMerge.log file in the temporary

directory, and notifying of log file's location.

Frequently Asked Questions (Q/A) ■ Q. How are changes to dates handled?

▪ A. Scheduling related date fields are not shown in the preview

but may be updated upon merging changes.

■ Q. How are baselines handled when the "Replace reflection" option is used?

▪ A. The new reflection will be created with the same baselines

that were in the original reflection.

Please complete the session evaluation We appreciate your feedback and insight

You may complete the session evaluation either

on paper or online via the mobile app

■ Our purpose is to inform and educate our members on current and future

functionality of Oracle Primavera products, while offering a forum for peers to

share their experience and knowledge in the use of Primavera.

■ Educational opportunities across the Primavera product suite

■ Online Learning Series August 17th – September 4th

■ Call for presentation opening April 27th

■ Monthly Community Calls

■ 3rd Thursday of the month at 1:00 pm ET

■ Networking with other users within the Primavera community

■ Partnering with Oracle Primavera to meet the needs of our diverse

membership.

■ Membership is open to anyone with an interest in the Oracle Primavera products,

with no dues for membership. All members can vote on matters brought before

the OPSIG. Membership requests may be reviewed by the OPSIG board.

OPSIG is the home for

Primavera Users