Introduction to Lunar Capability Concept Review · Introduction to Lunar Capability Concept Review...

3
Introduction to Lunar Capability Concept Review Jeff Hanley Manager, Constellation Program

Transcript of Introduction to Lunar Capability Concept Review · Introduction to Lunar Capability Concept Review...

Introduction toLunar Capability Concept Review

Jeff HanleyManager, Constellation Program

2

The New Fleet for Space Exploration

Ares VCargo Launch Vehicle

Ares ICrew Launch Vehicle

OrionCrew ExplorationVehicle

AltairLunar LanderEarth Departure Stage

3

CxP Integration Roadmap – Path Forward DATES FOR REFERENCEONLY

•Orion•Ares•Ground Ops•Mission Ops•EVA Systems

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

APMC10/11/07

SDR/PAR

ARES I-X4/2009 u/r

Project Formulation Pre-ProjectFormulation

CDRSynchronization

IC Implementation Phase

2009 PBS

2010 PBS

2011 PBS

2012 PBS

2013 PBS

2014 PBS

PMR ’08/PPBE ‘10

PA-14/2009

APMC u/r

Initi

al C

ap

ab

ility

Luna

r Ca

pa

bili

ty

PSDR/PBS6/16-17/08

PROGRAM

APPROVAL

EXECUTI

ON

RESOURCES

IDAC 3 IDAC-4A IDAC 5 IDAC 6 IDAC 7Design &Analysis

Constellation Program Planning &Control

Updated: Sept 23, 2008

External Version

PDR

PSRR / PPAR – Program System Requirements Review / Preliminary Program Approval ReviewPSDR / PAR – Program System Definition Review / Program Approval ReviewPDR / NAR – Preliminary Design Review / Non-advocate ReviewCDR / PRR - Critical Design Review / Production Readiness Review

•Lunar Surface Systems

You

are

here

.

PDRSynchronization

Pre-Project Formulation

LSCR – Lunar Surface Concept ReviewHLR / SRR – Human Lunar Return / System Readiness Reviewu/r – Under Review

Lunar Surface Systems Review6/2010

Program

Projects

Human LunarReturn•Ares V•Altair

MCR6/18-20

Q1 Q2

SRR/PrePAR

IC Formulation Phase

SIR

Project PDRs/NARs

Project CDRs/PRRsProject SDRs/PNARs

SIR

Fiscal Year 2008 Fiscal Year 2009 Fiscal Year 2010 Fiscal Year 2011 Fiscal Year 2012

VM-16/2009 u/r

VM-24/2010

Ares Test Flight

Virtual Mission

Pad Abort (PA)/Ascent Abort (AA)

PMR ’09/PPBE ‘11

PMR ’10/PPBE ‘12

PMR ’11/PPBE ‘13

Flight Tests& Simulations

Quarterly Program Management Review

Top Risk ReviewAgency Program Management Council

Lunar Projects SRR(U/R)

LCCR6/18-20

LunarCheckpoint

LC Formulation Phase

HLRSRR

Program

Core LunarInfrastructure

AA-17/2010

2009 PresidentBudget Submitto Congress

OMBPassback

2010 PresidentBudget Submitto Congress

OMBPassback

2011 PresidentBudget Submitto Congress

OMBPassback

2012 PresidentBudget Submitto Congress

OMBPassback

2013 PresidentBudget Submitto Congress

OMBPassback

PMR ’12/PPBE ‘14

CDR