Introduction to Fiber Documentation Fabian Guerrero ver 1.1.

21
Introduction to Fiber Documentation Fabian Guerrero ver 1.1

Transcript of Introduction to Fiber Documentation Fabian Guerrero ver 1.1.

Introduction to Fiber Documentation

Fabian Guerrero ver 1.1

Documentation Examples:

Documentation Examples:

Metro Splice-Point

Level 3 Fiber

Level 3 Lateral

2 0 21

Miles

Confidential & Proprietary

11-23-0410802 Airport Ct to1850 Pearl St

I 76

I 25

I 70

I 270

US

HW

Y 28

7

US H

WY 36

PE

CO

S S

T

ST

AT

E H

WY

121

W 20TH AVE

COUNTY HWY 58

WA

SH

ING

TO

N S

T

ST

AT

E H

WY

95

LO

WE

LL B

LVD

W 80TH AVE

W 58TH AVE

US HW

Y 6

W 64TH AVE

E 88TH AVE

STATE HWY 72

W 104TH AVE

W 92ND AVE

W 112TH AVE

STATE HWY 128

HU

RO

N S

T

YO

RK

ST

COUNTY HWY 180

COUNTY HWY 181

W 38TH AVE

QU

EB

EC

ST

COUNTY HWY 34

E 112TH AVE

W 32ND AVE

SMITH RDS

HE

RID

AN

BLV

D

STA

TE H

WY

265

CO

LO

RA

DO

BL

VD

STATE HWY 224

E 120TH AVE

ST

AT

E H

WY

2

W 84TH AVE

W 72ND AVE

CO

UN

TY

HW

Y 5

W 52ND AVE

W 82ND AVE

E 104TH AVE

MC

INT

YR

E S

T

E 26TH AVE

CA

RR

ST

W 26TH AVE

SIM

MS

ST

20TH ST

W 86TH PKWY

HW

Y 2

HO

LLY

ST

QU

AK

ER

ST

W 120TH AVE

23RD ST

E 56TH AVE

W 108TH AVE

W 88TH AVE

E 64TH AVE

MONTVIEW BLVD

W 44TH AVE

IND

IAN

A S

T

E 58TH AVE

RAMP

LARIMER S

T

DA

HLIA

ST

OA

K S

T

CO

UN

TY

HW

Y 1

9

COUNTY HWY 172

KIP

LING

ST

IRM

A D

R

W 70TH AVE

W 74TH AVE

ALK

IRE

ST

MA

I N S

T

WA

RD

RD

PIE

RC

E S

T

OBER

ON

RD

MO

NA

CO

ST

COUNTY HWY 4

ELD

RID

GE

ST

RALSTON RD

80TH AVE

100TH AVE

W 72ND AVE

YO

RK

ST

W 80TH AVE

RA

MP

YO

RK

ST

STATE HW

Y 2

W 32ND AVE

I 70

W 88TH AVE

RAM

P

SIM

MS

ST

0550-0127 0550-01250550-0121

0550-0117

0550-0065

0550-00570550-0050

0550-0028

0009-5994

0009-5928

0009-58730009-5868

0009-5832

0009-5799

0009-5776

10802 Airport Ct

1850 Pearl St

Metro Splice-Point

Level 3 Fiber

Level 3 Lateral

1,000 0 1,000500

Feet

Confidential & Proprietary

11-23-041850 Pearl StDenver, CO

STOUT ST

15TH ST

CHAMPA ST

CURTIS S

T

LARIMER ST

PARK AVE

WELTON S

T

BLAKE ST

22ND ST

21ST ST

CALIFORNIA S

T

16TH AVE

17TH AVE

18TH AVE

20TH AVE

SPEER BLVD

WAZEE S

T

28TH ST

I 25

PE

AR

L S

T

GR

AN

T S

T

LO

GA

N S

T

CL

AR

KS

ON

ST

EM

ER

SO

N S

T

WYNKOOP S

T

DELGANY ST

RAMP

PLATTE ST

COURT PL

WA

SH

I NG

TO

N S

T

19TH ST

FO

X S

T

9TH ST

12TH ST

HU

RO

N S

T

INC

A S

T

7TH ST

8TH ST 11TH

ST

13TH ST

BA

SS

ET

T S

T

GR

INN

EL

L C

T

LIT

TL

E R

AV

EN

ST

CURTIS ST

19TH ST

RAMP

I 25

19TH ST

FOX ST

FO

X S

T

11TH ST

0550-0065

0550-00570550-0050

0550-0028

0009-5994

1850 Pearl St

200 0 200100

Feet

Metro Splice-Point

Level 3 Fiber

Level 3 LateralConfidential & Proprietary

11-10-0410802 Airport CtBroomfield, CO

120TH AVE

HANGAR C

T

AIRPORT CT

0550-0125

0550-0127

Level 3 to meet up with existing customer conduit. Two new HH’s to be set.

Project Name

Management LayerInstallation (MAC) Layer Disaster Recovery Layer

Segment/Project Name (BRAN, BEAR, BiSON) Link to Logical diagram, description and detail.-Legend including:

*Splice/Patch Icon *Color coded “Owner” identifier

-Segment Length in fiber miles (major spans)-Segment Details Document – Each segment:

*Contract Agreement *Circuit Number *Contract Duration *Circuit Endpoints – Collocation Information

-Endpoint Hardware Icon – General information (Cisco 6509, Juniper, Movaz)

*Equipment maintenance - Installation Layer *What is connected – Installation Layer

-Accompanying table: *Distance Table *Project Dates

Equipment Documentation- Manufacturer and p/n, equipment name, and location (bldg/room/rack/equipment #).

-Equipment Maintenance-Equipment breakdown and population (Blade to Port)

*Patch cable physical information (MM,SM, connectors, length)

-Connection Identification and xWDM *Lambdas *Channels

Project Documentation (Each project)-Project Name / Description-Project Dates and Schedule-Project Contributors and Collaborators-Project Setting Detail - Where is it connected

*Patch Document-Test Documentation

*OTDR launch organized by Project?/Segment/Fiber/Date *Power Meter results by Project?/Segment/Fiber/Date *OSA results by Project?/Segment/Fiber/Date *Photographs by Project?/Segment/Fiber/Date

Dedicated CAD diagram including GPS coordinates for access locations, waypoint and/or track information for fiber pathway-GIS diagram with waypoint information along pathway

-Locating Agreement Information *What is Covered -Maintenance Work Agreement-Spare Location

*Equipment *Hardware

Management Layer – Logical Map

-Segment/Project Name (BRAN, BEAR, BiSON) Link to Logical diagram, description and detail.-Legend including:

*Splice/Patch Icon*Color coded “Owner” identifier

-Segment Length in fiber miles (major spans)-Segment Details Document – Each segment:

*Contract Agreement *Circuit Number*Contract Duration*Circuit Endpoints – Collocation Information

-Endpoint Hardware Icon – General information (Cisco 6509, Juniper, Movaz)*Equipment maintenance - Installation Layer *What is connected – Installation Layer

-Accompanying table:*Distance Table*Project Dates - when was the project completed

BRAN Distance Table:

Management Layer – Logical Map

-Segment/Project Name (BRAN, BEAR, BiSON) Link to Logical description and detail-Legend including:

*Splice/Patch Icon*Color coded “Owner” identifier

-Segment Length in fiber miles (major spans)-Segment Details Document – Each segment:

*Contract Agreement *Circuit Number*Contract Duration*Circuit Endpoints – Collocation Information

-Endpoint Hardware Icon – General information (Cisco 6509, Juniper, Movaz)*Equipment maintenance - Installation Layer *What is connected – Installation Layer

-Accompanying table:*Distance Table*Project Dates - when was the project completed

Installation (MAC) Layer – Data sheets, Diagrams and Documentation

Equipment Documentation- Manufacturer and p/n, equipment name, and location (bldg/room/rack/equipment #).

-Equipment Maintenance-Equipment breakdown and population (Blade to Port)

*Patch cable physical information (MM,SM, connectors, length)-Connection Identification and xWDM

*Lambdas*Channels

Project Documentation (Each project)-Project Name / Description-Project Dates and Schedule-Project Contributors and Collaborators-Project Setting Detail - Where is it connected

*Patch Document-Test Documentation

*OTDR launch organized by Project?/Segment/Fiber/Date*Power Meter results by Project?/Segment/Fiber/Date*OSA results by Project?/Segment/Fiber/Date*Photographs by Project?/Segment/Fiber/Date

Archive Documentation

Disaster Recovery Layer (cut/break) – Physical Diagram

Dedicated CAD diagram including GPS coordinates for access locations, waypoint and/or track information for fiber pathway-GIS diagram with waypoint information along pathway

-Locating Agreement Information*What is Covered

-Maintenance Work Agreement-Spare Location

*Equipment *Hardware

Project Name

Administrative LayerInstallation (MAC) Layer Disaster Recovery Layer

Segment/Project Name (BRAN, BEAR, BiSON) Link to Logical diagram, description and detail.-Legend including:

*Splice/Patch Icon *Color coded “Owner” identifier

-Segment Length in fiber miles (major spans)-Segment Details Document – Each segment:

*Contract Agreement *Circuit Number *Contract Duration *Circuit Endpoints – Collocation Information

-Endpoint Hardware Icon – General information (Cisco 6509, Juniper, Movaz)

*Equipment maintenance - Installation Layer *What is connected – Installation Layer

-Accompanying table: *Distance Table *Project Dates

Equipment Documentation- Manufacturer and p/n, equipment name, and location (bldg/room/rack/equipment #).

-Equipment Maintenance-Equipment breakdown and population (Blade to Port)

*Patch cable physical information (MM,SM, connectors, length)

-Connection Identification and xWDM *Lambdas *Channels

Project Documentation (Each project)-Project Name / Description-Project Dates and Schedule-Project Contributors and Collaborators-Project Setting Detail - Where is it connected

*Patch Document-Test Documentation

*OTDR launch organized by Project?/Segment/Fiber/Date *Power Meter results by Project?/Segment/Fiber/Date *OSA results by Project?/Segment/Fiber/Date *Photographs by Project?/Segment/Fiber/Date

Dedicated CAD diagram including GPS coordinates for access locations, waypoint and/or track information for fiber pathway-GIS diagram with waypoint information along pathway

-Locating Agreement Information *What is Covered -Maintenance Work Agreement-Spare Location

*Equipment *Hardware

Questions??

Thank You!!