Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... ·...
Transcript of Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... ·...
![Page 1: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/1.jpg)
Energy Research Institute (ERI)
Showa Shell Sekiyu K.K.
University of Tokyo
Department of Electrical Engineering
Chulalongkorn University
Introduction to
Chulalongkorn University’s
7 March 2016
![Page 2: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/2.jpg)
Outlines
Project Background
Project Overview
Sensors & Meters
Renewable Energy Integration (towards net-zero bldg.)
User Interfaces
Public display, Web App & Android App Demand response test on A/C
![Page 3: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/3.jpg)
Project
Background
![Page 4: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/4.jpg)
Objectives of the Project
To demonstrate a future building energy management system (BEMS) at the department of Electrical Engineering, Chulalongkorn University (EECU)
To raise awareness of individuals’ consumptions
An informative, not an automation system
To study/compare people’s behavior before and after BEMS installation
Study demand response to control signals
![Page 5: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/5.jpg)
Funding/Budget
Installation was supported financially by Energy Conservation Promotion Fund (ENCON Fund) under the Energy Policy and Planning Office (EPPO). Supported and sponsored by several partners 1-year project: Sep 2013 – Sep 2014
EE Dept. takes care of O&M System expansion Data analysis costs.
![Page 6: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/6.jpg)
EECU-BEMS Members
![Page 7: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/7.jpg)
Supporters/Sponsors
Sensor / IEEE1888 -
Smart Meters – previous projects were sponsored by
Application: Server/Storage/Web Application/Mobile APP
(Thailand) – Home-brew IEEE1888
(Thailand) – Commercial IEEE1888
PV Modules - donated 5kW CIS-type panels
EV Charging Station - supported partly by
![Page 8: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/8.jpg)
Project
Design
![Page 9: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/9.jpg)
Components
![Page 10: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/10.jpg)
IEEE1888 Power Meters (50A,300A) @ Power Distribution Boards
Server/Storage
LAN
System Controller (APP)
WAN
GW Modbus/RS485 (Digital I/O)
HVAC (Air Conditioner)
GW
ZigBee
Sensors
GW Modbus
Strings monitor
PV, Wind, Battery
IEEE1888 IEEE1888
IEEE1888 IEEE1888 IEEE1888
IEEE1888 IEEE1888 IEEE1888
Designed by CU Installed by CU with UoT help
Facility Status and Control on your smartphones/Tablet
The Internet
IEEE1888
Simple SCADA
Communication & IT Architecture
![Page 11: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/11.jpg)
Characteristics of EECU-BEMS
Application Protocol – IEEE1888
Sensors-to-Gateway – ZigBee or 6loWPAN
Gateway-to-Server – Wired or Wi-Fi LAN
Renewable Energy Sources – PV, Very Small Scale Wind, and Energy Storage System (Battery)
EV Charging station – (EV cars of another project) • Battery charge/discharge data will also be stored in the server.
App – Android only, iOS is under development
![Page 12: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/12.jpg)
Environment Sensors &
Energy Meters
![Page 13: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/13.jpg)
Sensor
![Page 14: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/14.jpg)
Sensor
![Page 15: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/15.jpg)
Sensor
Sensor installed at 2nd floor of EE Bldg.
![Page 16: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/16.jpg)
In-house Submeters
With experiences, an
Energy Measurement Unit (EMU) was designed.
In a small box, there are up to 32 submeters.
Need small additional space.
A lot cheaper <10x
IEEE1888-ready
EMU V1 & V2 have been installed more than 1Y.
EMU V3 is under development.
![Page 17: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/17.jpg)
EMU V1 & V2
![Page 18: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/18.jpg)
Renewable Sources
Integration
![Page 19: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/19.jpg)
Renewable Energy Sources PV and Micro & Wind Turbine with batteries
![Page 20: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/20.jpg)
User
Interface
![Page 21: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/21.jpg)
Web Application
![Page 22: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/22.jpg)
Web Application
Web Application developed by EECU-BEMS Team
![Page 23: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/23.jpg)
Web Application
Web Application developed by EECU-BEMS Team
![Page 24: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/24.jpg)
Web Application
Web Application developed by EECU-BEMS Team
![Page 25: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/25.jpg)
Mobile Application
Android-based APP developed by EECU-BEMS Team
![Page 26: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/26.jpg)
Public Display
![Page 27: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/27.jpg)
Demand Response
Trial
![Page 28: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/28.jpg)
Notification System – Link with Facebook
![Page 29: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/29.jpg)
5-Mode Split-type AC Control
AC Control developed by EECU-BEMS Team
![Page 30: Introduction to Chulalongkorn University’s › fileadmin › AHK_Thailand › Services › ... · 2018-09-07 · Objectives of the Project To demonstrate a future building energy](https://reader035.fdocuments.us/reader035/viewer/2022063001/5f1639fbfc331c08797e7cb0/html5/thumbnails/30.jpg)