Introduction - moorepark.sydney · _ Planned capital projects to be undertaken by the CPMPT ... The...
Transcript of Introduction - moorepark.sydney · _ Planned capital projects to be undertaken by the CPMPT ... The...
Moore Park 2040
Future Directions
6
‘The Master Plan will provide the framework for the sustainable use, management and renewal of Moore Park, whilst protecting its core values. It will also provide a guide for day-to-day operational and long term decision making, facilitate prioritisation of resource allocation, and provide a basis for accountability.’ Centennial Park and Moore Park Trust (CPMPT)
Project objectives as outlined by Centennial Park
and Moore Park Trust (CPMPT)
1. Maintaining and enhancing green open space2. Improving financial, social and environmental sustainability3. Responding to increasing visitation and usage demands4. Accommodating the changing and increasingly diverse sporting and
recreational needs of local and regional visitors5. Conserving the integrity of Moore Park’s important natural and cultural
values and heritage fabric6. Providing for dynamic community and stakeholder engagement7. Providing for the integration of the following developments within the
precinct: _ CBD and SE Light Rail route and the Moore Park Station _ Anzac Parade Shared Path Bridge _ Planned capital projects to be undertaken by the CPMPT _ Planned capital projects proposed by Parklands licensees
(e.g. Entertainment Quarter, Fox Studios, etc) _ Planned capital projects implemented by surrounding stakeholders
(e.g. Sydney Cricket and Sports Ground Trust (SCGT))8. Providing solutions for transport and access to this busy and important
precinct
The CPMPT’s mission is to manage Centennial Parklands as a place of national significance for the enjoyment, social connection and wellbeing of the community by:
_Maintaining and strengthening the integrity of the Park _Ensuring equity of access and diversity of leisure experiences _Working in partnership with key stakeholders _Achieving a sustainable organisation that delivers sound business practice and improved revenue
Purpose of the Master Plan
The Moore Park Master Plan responds to current needs, trends and issues facing not only the Park itself, but the wider Sydney context. The Plan provides a framework for the sustainable future use, management and renewal of the Park to ensure its long term viability.
It will respect Moore Parks core values and is, in short:
_Solutions based _Future focused _Effective _Reasonable _Sustainable
What the Master Plan is about
The Moore Park Master Plan will support and expand the CPMPT’s vision to create powerful connections between people and this valuable Park. The Master Plan will aim to exemplify design excellence, improve the social, environmental and financial sustainability of the Park, increase visitation and conserve historic fabric and natural systems for future generations.
The Moore Park Master Plan sits within a greater Plan of Management for Centennial Parklands that includes Centennial Park and Queens Park. The Plan will align itself with the overall strategic vision for the Park to secure its sustainable future.
The Master Plan will seek to: _Respond to the increasing population and changing demographic of Sydney moving toward 2040 _Find solutions to the current and future challenges of Moore Park _Create a shared understanding of Moore Park’s values and present balanced objectives _Identify opportunities for sustainable commercial activities _Celebrate and conserve Moore Park’s rich culture and heritage values _Review, incorporate and align planned projects within Moore Park _Integrate with other planned infrastructure and developments such as the CBD and SE Light Rail, Anzac Parade Shared Path Bridge, and Centennial Park Master Plan _Set the framework for high quality urban design, landscape and architecture
_Provide for dynamic community and stakeholder engagement _Guide strategic day to day operations, planning and management
What the Moore Park Master Plan
is not about
The Master Plan is not a fixed proposal with a predetermined outcome. It is a framework that allows the Park to evolve, responding to the needs and demands of the community. The plan will help facilitate decision making while guiding day to day strategic planning and operations.
Objectives
The Master Plan will establish Moore Park as a local, national and international sporting and recreation destination. It will actively support the conservation of our natural systems, supporting good health in people and urban ecosystems. The Master Plan will be a framework for the following objectives;
_Conserving the integrity of Moore Park’s natural and cultural heritage for appropriate future uses _Understanding the diverse parts while planning for the whole _Providing appropriate mitigation strategies to the ongoing challenges presented by climate change _Creating improved access and permeability including greater promotion of sustainable transport options allowing for a more vibrant and better connected precinct _Conserving and enhancing flora and fauna biodiversity _Adopting environmentally sustainable water use _Maintaining and enhancing green open space _Increasing opportunities for both passive and active recreation use across the parkland _Allowing for new experiences for residents and visitors with greater visitation and participation _Creating robust and sustainable commercial opportunities _Responding to the population growth and needs of Sydney moving toward 2040, particularly around neighbouring localities of Green Square, East Redfern, Surry Hills, Randwick and Paddington _Responding to planned capital projects and initiatives from within the Park and neighbouring stakeholders.
01 Introduction
Purpose and Objectives
MOOREPARK
CENTENNIAL PARK
RANDWICK RACECOURSESYDNEY
PARK
THE AUSTRALIAN GOLF CLUB
BOTANICAL GARDENS
QUEENS PARK
SYDNEY CBD
NORTH SYDNEY
SYDNEY AIRPORT
SURRY HILLS
ZETLAND
ALEXANDRIA
PADDINGTONWOOLLAHRA
DARLINGHURST
CENTRAL
KENSINGTON
RANDWICK
SYDNEY HARBOUR
PACIFIC OCEAN
BOTANY BAY
Figure_1.1. Site location within Sydney context
BONDI JUNCTION
7HASSELL
© 2017
01 Introduction
Process
Structure of the Report
This report is structured in a manner that reflects the approach to developing and refining the Moore Park Master Plan.
The report looks at Moore Park in its urban context, discussing the implications of broader demographic trends, natural and cultural heritage, patterns of community usage, access and movement as well as trends in visitation and participation.
The Master Plan has been developed in consultation with members of the public, community groups and key stakeholders such as sporting clubs, codes and tenants across the precinct. Additionally, the Sydney Cricket and Sports Ground Trust (SCGT), local Councils and MPs have all had an interest in the future of Moore Park. Accordingly, their critical feedback and input is outlined and discussed within this report.
A series of Master Plan principles and key moves emerged from this investigatory work and have been applied to the Master Plan. The Master Plan has also been broken down into layers to be explored and understood in two ways; from a spatial or environmental theme or from the perspective of user groups.
Volume 2 includes a compilation of specialist reports and desktop site analysis, which underpins many of the key strategies presented in the Master Plan.
‘The role of public parkland becomes ever more complex and critical as our cities grow denser. Rather than being viewed simply as a threat, this reality should be embraced as an opportunity to bring new vigour and life to an already valuable resource.’Matthew Pullinger, HASSELL
Master Plan Process
The Master Plan has been developed in a highly transparent and collaborative manner. The design methodology and process adopted is as follows:
_Information collection and data analysis of natural and cultural heritage, traffic and transport patterns, sport and recreation trends, landscape character, land use and visitation _Initial workshop with CPMPT to establish a list of ‘agreed issues’ needing to be addressed in the Master Plan _The development of a Strategic Brief, endorsed by CPMPT, which encapsulated the strategic objectives identified for the Master Plan which were drawn from the early phases of work _The development of ‘7 Big Ideas’ for the future of Moore Park – which were tested in the first round of public consultation through a series of detailed interviews, information days and on-line public consultation _The analysis and compilation of feedback to the 7 Big Ideas received from all parties, which was used to inform the subsequent Master Plan _The preparation of an interactive website and supporting Master Plan report, synthesising all phases of work to date, and outlining the Master Plan that will guide the future development and management of Moore Park to the year 2040 _The Master Plan report and interactive website have been endorsed by CPMPT and the Minister for Environment and Heritage before being formally exhibited for public comment and feedback _Pending review of feedback and any final amendments that may arise from the formal public exhibition, the final Master Plan Report will be adopted by CPMPT
STAGE 6Approval and endorsement
STAG
Appro
endor
STAGE 5Public exhibition of draft document – and updating stakeholders
STAG
Public
of draf– and stakeh
STAGE 4Drafting strategic document informed by consultation process
STAG
Draft
documinformconsuproces
STAGE 3Reviewing feedback
STAG
Revie
feedb
STAGE 2Stakeholder feedback
STAG
Stake
feedba
STAGE 1Development of ‘7 Big Ideas’
WE ARE
HERE
Figure_1.2. Existing Moore Park Precincts Plan
Moore Park 2040
Future Directions
8
01 Introduction
Study Area
GREEN SQUARE
By 2031:30,500 new homes
61,000 new residents21,000 new jobs
WOOLLAHRA
MUNICIPAL COUNCIL
by 2031:11,400 new residents
2,900 new homes
WAVERLEY COUNCIL
by 2031:11,600 new residents
2,200 new jobs2,200 new homes
RANDWICK CITY
COUNCIL
By 2031: 8,400 new homes
CITY OF SYDNEY
COUNCILBy 2031:
55,000 new homes
CARLTON STREET
STOP
MOOREPARK STOP
CENTENNIAL PARK STOP
RAILWAY SQUARE BUS
INTER- CHANGE
1.05km = approx. 14.5min walk
1.4km = approx.
20min
wal
k
0.8km = approx. 10min walk
1.0km = approx. 1 4min walkExisting pedestrian tunnel
1.8km = approx. 24min walk
1.2km =
approx. 18min w
alk
al
BONDI JUNCTION STATION
CENTRAL STATION
GREEN SQUARE STATION
EDGECLIFF STATION
REDFERN STATION
A
NZ
AC
PD
E
AN
ZA
C P
DE
C L E V E L A ND
S T
EA
ST
ER
N D
I ST
RI B
UT
OR
MO
TO
RW
AY
D A C E Y A V E
DR
IVE
R A
VE
M O O R E P A R K R D
CO
OK R
D
LA
NG
RD
MA
RT I N
RD
A L I S O N R D
O X F O R D S T
L A N G R D
Urban Context
Moore Park sits within an urban environment that is undergoing substantial change and growth, with a number of Sydney’s important transport projects and renewal precincts at its front door. The rapidly growing population in neighbouring areas will increase pressure and demands on the use of the Park:
_The Green Square urban renewal precinct lies to the south west of Moore Park. This area is expected to grow to 60,000 new residents by 2030. With no sizeable green space provision, this will place increasing demands and pressures on the use of Moore Park _Access to Moore Park is an ongoing challenge. Although the majority of visitors arrive by car, there is a large percentage (40-50%)* who arrive by foot. _Light rail will increase the number of people arriving to the Park by public transport, however, it is expected that walking will continue to be a popular mode of access during events, particularly from surrounding residential areas _Pedestrian traffic from Central Station typically follows Foveaux and Fitzroy Streets. This route has a steep gradient and inadequate crossing capacity at Drivers Triangle creating safety concerns during large events. Devonshire Street has been identified as the new pedestrian and transportation corridor linking Moore Park to Central Station, via the Devonshire Street pedestrian tunnel. It is envisaged that this will link directly to Albert Tibby Cotter Bridge, providing direct access between Central Station and Sports Stadia.
*CBD and SE Light Rail Project - Environmental Impact Statement,
2013
MOORE PARK CENTENNIAL
PARK
QUEENS PARK
0 225 450 675 900Met er s
LGAs
Proposed light rail stop within Moore Park vicinity
Existing heavy rail station within Moore Park vicinity
Green Square urban renewal precinct
Proposed new open space within Green Square precinct
Existing open space
Existing shared bridge
Proposed bridge to be delivered with new light rail stop
Pedestrian entry
Existing wall / fence
Proposed new square within Green Square Precinct
Proposed light rail route
Figure_1.3. Existing pedestrian and public transportation network including planned capital works project and projected population growth in surrounding areas
*Map references: _ Strategic concept study: improved pedestrian
and cyclist connection between Central Railway
Station and Moore Park, March 2014
_ Amendment to South Sydney DCP 1997: Urban
Design - Part G: Special Precinct No.9 Green
Square (Lachlan Precinct) and Part H: Green
Square Town Centre
_ Existing and Proposed Public Open Space in
Green Square (2014)
_ forecast.id.com.au
_ www.cityofsydney.nsw.gov.au/vision/
major-developments/green-square
_ atrf.info/papers/2011/2011_Brooker_Uddin.pdf
Moore Park is in the midst of a changing city.Upwards of 60,000 extra people are estimated to be moving in around Moore Park over the next 20 years.With no sizeable additional green space close to the city, Moore Park must utilise its green space to cope with increasing demands whilst ensuring the conservation integrity of these spaces is a priority.
Proposed Aquatic Centre within Green Square Precinct
Moore Park boundary
Proposed major boulevards within Green Square urban renewal precinct
Existing light rail route
Existing train route
Leasehold boundary
9HASSELL
© 2017
A
NZ
AC
PD
E
AN
ZA
C P
DE
C L E V E L A ND S T
EA
ST
ER
N D
I ST
RI B
UT
OR
M
OT
OR
WA
Y
SO
UT
H
DO
WL
I NG
ST
D A C E Y A V E
DR
IVE
R A
VE
M O O R E P A R K R D
C OO
K RD
L A N G R D
MA
RT I N
RD
A L I S ON R D
O X F O R D S T
A N
L EL
DD AA CC EE YY AA VV EE
DDR
IVE
RA
VE
L A NNN GGG RR DDR D
AA RR KK RR DDDD
ROBERTSON
ROAD
PRECINCT
MOORE PARK
EAST
ENTERTAINMENT
PRECINCT
E.S. MARKS
PRECINCTMOORE PARK
GOLF PRECINCT
MOORE PARK
GOLF PRECINCT
MOORE
PARK WEST
Park Identification
_The study area comprises 146 hectares, 115 of which consist of open space. The area is physically divided, by its road network, into six diverse precincts (see Fig 1.2). Each of the six precincts has its own complexities and diverse range of uses. _The adjacent map describes Moore Park and its key features; illustrating its current uses, precincts, heritage, transportation and cycle networks. Refer to Volume 2 for a more detailed analysis of the existing conditions.
SFS
SCG
ShowRing
FOX Studios
Entertainment Quarter
Mt Steel
SGHS
SBHS
1
2
3
4
5
6
7
8
1 Korean War Memorial
2 Moore ParkRotunda
3 Cricketer’sMemorial
4
5
Kippax LakeDrinking Fountain
6
Moore ParkToll House
7
Moore ParkGolf House
8
Federation Place
ComrieMemorial Fountain
Sample* of heritage items across the Park:
Figure_1.4. Summary of existing Moore Park context
01 Introduction
Study Area
*refer to Volume 2 for complete list
*Map references: _ City of Sydney Cycling Guide
and Map
Cricket
Rugby / Touch / Soccer
AFL
Tennis Courts
Basketball / Netball
18-hole Golf Course
Rugby
Soccer / Touch
Existing
Pedestrian Bridge
Proposed Pedestrian
Bridge to be delivered
with new light rail stop
Bus stop
Signalised Intersection
/CrossingOff-road cycle &
pedestrian route
Proposed Light Rail
Route and Stops
Cricket / AFL
Equestrian Centre
Multi-Purpose
Synthetic Fields
Amenities
Kippax Lake
Athletics Field
Hordern Pavilion/
Royal Hall of Industries
Fox Studios
Entertainment Quarter
Leasehold boundary
Federation Way
Baseball / Softball
On-road cycle way (low
to medium traffic)
On-road cycle way
(high traffic)
Other Buildings
Heritage Items
Access to Entertainment
Quarter
On-road separated
cycle way