INTRODUCTION The Ministry of Urban Development was renamed as Ministry of Urban Affairs & Employment and bifurcated into two Departments viz., (1) Department of Urban Development and (2) Department of Urban Employment & Poverty Alleviation in March 1995. 2. The Ministry of Urban Affairs & Employment has two distinct sets of responsibilities. One pertains to the broad policy formulation and monitoring of programmes in the areas of housing, urban development, urban poverty alleviation and urban water supply. These are essentially State subjects but the Government of India plays a coordinating and monitoring role and also supports these programmes through Central Sector Schemes, institutional finance and expertise. In addition to this, the Ministry has been entrusted with the responsibility of planning and coordinating urban transport matters in the country. 3. The other set of responsibilities pertains to the construction and maintenance of Central Government buildings, including residential accommodation, with the exception of those under the Ministries of Defence, Railways and Posts & Telegraph. It is also responsible for the management of Central Government land/ property, most of which is confined to Delhi and some of the metropolitan cities. These functions are discharged through the agencies of the Central Public Works Department which has field organisations spread all over the country and the Land and Development Office located in Delhi. This Ministry is also responsible for meeting printing & stationery requirements of the Central Government Ministries/Departments, stocking and selling of Government publications. Department of Urban Development 4. The Department of Urban Development handles the subjects like Urban development, water supply & sanitation, urban transport etc. which are primarily State subjects wherein the Central Govt. plays a catalytic and supportive role by guiding and assisting the State Govts. in implementation of policies and programmes through legislative support and financial assistance. There are three Attached and four Subordinate Offices under its control. There are also two Public Sector Undertakings & five Statutory/Autonomous Bodies under this Department (Appendix Ill). 5. There has been a steady increase in the population of cities since Independence on account of rapid industrialisation, natural growth and migration from rural areas. Cities have, therefore, now become engines of growth in the economy and major contributors to the creation of national wealth. Recognising the importance of urban development, the Department of Urban Development is in the process of formulating a national urban policy keeping in view the recommendations of the National Committee on Urbanization, the economic reforms and the elements of National Urbanization Strategy listed out in the ESCAP Regional Action Plan on Urbanization adopted in the New Delhi Declaration. 6. In the area of legislative reforms, the Delhi Rent Bill, 1994, has been passed by both the Houses of Parliament, and it received the assent of the President on 23.8.95. Representations had been received from some State Governments about the difficulties faced by them in the implementation of the Urban Land (Ceiling & Regulation) Act, 1974. The matter has been discussed with the State Governments in different fora and in the light of that and various representations received from the State Governments, proposals are under consideration of the Government to make the Act more workable.The Constitution (74th Amendment) Act, 1992, known as Nagar Palika Act, which was passed by the Parliament in the winter session of 1992 and assented to by the President on 20-4-93, got implemented, as a result of various initiatives taken by the Ministry of Urban Affairs & Employment, by all State Governments/UT administrations where the same was applicable, by 31.5.1994, the target date.The State Governments have enacted necessary amendments to bring their municipal laws in conformity with this Act. Under this Act, Election Commissions have been set up by the States for conducting elections to Urban Local Bodies. Elections to Municipal bodies have already been completed by most of the States. 7. Considering the need to upgrade the environment in cities and towns, this Ministry has elicited five strategy papers in critical areas of urban environment viz., water supply, health & sanitation, solid waste management, urban pollution and institutional strengthening. The studies have been completed by reputed Institutions. The outputs of the studies will enable Government of India to develop policies and strategies for protection and preservation of the urban environment. Efforts have been initiated to strengthen the capacity at the municipal

Transcript of INTRODUCTION - mohua.gov.in

INTRODUCTION

The Ministry of Urban Development was renamed asMinistry of Urban Affairs & Employment and bifurcatedinto two Departments viz., (1) Department of UrbanDevelopment and (2) Department of Urban Employment& Poverty Alleviation in March 1995.

2. The Ministry of Urban Affairs & Employment hastwo distinct sets of responsibilities. One pertains to thebroad policy formulation and monitoring of programmesin the areas of housing, urban development, urbanpoverty alleviation and urban water supply. These areessentially State subjects but the Government of Indiaplays a coordinating and monitoring role and alsosupports these programmes through Central SectorSchemes, institutional finance and expertise. In additionto this, the Ministry has been entrusted with theresponsibility of planning and coordinating urbantransport matters in the country.

3 . The other set of responsibilities pertains to theconstruction and maintenance of Central Governmentbuildings, including residential accommodation, with theexception of those under the Ministries of Defence,Railways and Posts & Telegraph. It is also responsiblefor the management of Central Government land/property, most of which is confined to Delhi and someof the metropolitan cities. These functions are dischargedthrough the agencies of the Central Public WorksDepartment which has field organisations spread all overthe country and the Land and Development Officelocated in Delhi. This Ministry is also responsible formeeting printing & stationery requirements of the CentralGovernment Ministries/Departments, stocking andselling of Government publications.

Department of Urban Development

4 . The Department of Urban Development handles thesubjects like Urban development, water supply &sanitation, urban transport etc. which are primarily Statesubjects wherein the Central Govt. plays a catalytic andsupportive role by guiding and assisting the State Govts.in implementation of policies and programmes throughlegislative support and financial assistance. There arethree Attached and four Subordinate Offices under itscontrol. There are also two Public Sector Undertakings

& five Statutory/Autonomous Bodies under thisDepartment (Appendix Ill).

5 . There has been a steady increase in the populationof cities since Independence on account of rapidindustrialisation, natural growth and migration from ruralareas. Cities have, therefore, now become engines ofgrowth in the economy and major contributors to thecreation of national wealth. Recognising the importanceof urban development, the Department of UrbanDevelopment is in the process of formulating a nationalurban policy keeping in view the recommendations ofthe National Committee on Urbanization, the economicreforms and the elements of National UrbanizationStrategy listed out in the ESCAP Regional Action Planon Urbanization adopted in the New Delhi Declaration.

6. In the area of legislative reforms, the Delhi RentBill, 1994, has been passed by both the Houses ofParliament, and it received the assent of the Presidenton 23.8.95. Representations had been received fromsome State Governments about the difficulties facedby them in the implementation of the Urban Land (Ceiling& Regulation) Act, 1974. The matter has been discussedwith the State Governments in different fora and in thelight of that and various representations received fromthe State Governments, proposals are underconsideration of the Government to make the Act moreworkable.The Constitution (74th Amendment) Act, 1992,known as Nagar Palika Act, which was passed by theParliament in the winter session of 1992 and assentedto by the President on 20-4-93, got implemented, as aresult of various initiatives taken by the Ministry of UrbanAffairs & Employment, by all State Governments/UTadministrations where the same was applicable, by31.5.1994, the target date.The State Governments haveenacted necessary amendments to bring their municipallaws in conformity with this Act. Under this Act, ElectionCommissions have been set up by the States forconducting elections to Urban Local Bodies. Electionsto Municipal bodies have already been completed bymost of the States.

7 . Considering the need to upgrade the environmentin cities and towns, this Ministry has elicited five strategypapers in critical areas of urban environment viz., watersupply, health & sanitation, solid waste management,urban pollution and institutional strengthening. Thestudies have been completed by reputed Institutions.The outputs of the studies will enable Government ofIndia to develop policies and strategies for protectionand preservation of the urban environment. Efforts havebeen initiated to strengthen the capacity at the municipal

level to undertake programmes for protection of theenvironment and prevent its deterioration.

8. The Department of Urban Development is alsooperating a number of Centrally Sponsored Schemesf o r a s s i s t i n g t h e S t a t e s i n m e e t i n g t h e c h a l l e n g e o f r a p i durbanisation. The scheme of “Integrated Developmentof Small and Medium Towns (IDSMT)” aims at theimprovement of infrastructure in selected towns, withpopulation up to 5 lakhs, having growth potential so asto enable them to emerge as regional centres ofe c o n o m i c g r o w t h a n d e m p l o y m e n t a n d f a c i l i t a t e a r r e s t i n gmigration of population to large cities/towns. The MegaCity Scheme aims at infrastructural development ofBombay, Calcutta, Madras, Bangalore and Hyderabad,the five mega cities with a population of 4 million andabove as per 1991 census. Under this Scheme, fundsare provided to State governments for infrastructuraldevelopment in the ratio of 25:25 through a designatednodal agency and the balance 50% is to be met by theStates from institutional finance through public financinginstitutions or capital market etc. The scheme of LowCost Sanitation for Liberation of Scavengers providesfunds for conversion of existing dry latrines into low costwater seal pour flush latrines and construction of newlatrines where none exists, to prevent open defecationwith a view to liberate scavengers from the obnoxiouspractice of carrying head load of night soil. TheAccelerated Urban Water Supply Project launched inMarch 1994 aims at to provide safe and adequate watersupply to the entire population of towns having populationless than 20,000 (as per 1991 census), which have noeconomic base and are worst affected during times ofd r o u g h t . T h e s c h e m e i s f u n d e d b y t h e C e n t r a l a n d S t a t eGovernments in the ratio of 50:50. In the area of SolidWaste Management, Government has taken specialinitiatives for supporting projects for taking up garbagec o l l e c t i o n a n d d i s p o s a l s c h e m e s i n c l u d i n g d e v e l o p m e n tof non-conventional and renewable sources of energyby HUDCO.

9 . Recognising the necessity of improving the urbantransport system in large cities, the Ministry has beenimplementrng a scheme to substitute 40% of cost off e a s i b i l i t y s t u d i e s / d e t a i l e d p r o j e c t r e p o r t s c a r r i e d o u t b ythe respective State/UT Governments for improvingurban transport system. Rail based Mass Rapid TransitSystem (MRTS) are also considered for improving thetransport system in major cities where concerned State’UT Government have shown willingness to share a partof the cost. There is a proposal to set up a Mass RapidTransit System (MRTS) in Delhi with the first phasecomprising of 55.30 kms. which would cost Rs. 4182

crores at April 1995 prices. For implementation ot thisproject, a new company viz , Delhi Metro RailCorporation Limited has been incorporated in May 1995with an authorised share capital of Rs. 1 ,000 crores.

10. Amongst the attached/subordinate offices underthe department, the Central Public Works Department(CPWD) which is entrusted with the responsibility ofconstruction and maintenance of Govt. Buildings, bothoffice and residential, excluding those belonging to afew departments like Railways etc, is the largest, itswork load during the year 1995-96 is expected to go upto about Rs. 1500.00 crores. The Directorate of Printingwith its 21 printing presses in various parts of the country,caters to the printing requirements of the CentralG o v e r n m e n t M i n i s t r i e s / D e p a r t m e n t s . T i n e D i r e c t o r a t e o fE s t a t e s i s m a i n l y r e s p o n s i b l e f o r a d m i n i s t r a t i o n o f G o v t .Estates and Hostels. The Land and Development Officeadministers nazul rehabilitation leases in addition tomanaging Central Govt. lands in Delhi. The Town andCountry Planning Organisation is the technical arm ofthe Ministry in matters of town planning, regionalplanning and urban development. The Stationery Officeis responsible for procurement and supply of stationeryrequirements of the Central Govt. offices. ThePublication Department located in Delhi stocks and sellsGovt. publications.

11. Amongst the Public Sector Undertakings, theNational Buildings Construction Corporation Ltd. is acivil construction agency which has major clients bothi n I n d i a a n d a b r o a d . I t h a s a n u m b e r o f t u r n - k e y p r o j e c t sto its credit including bridges, flyovers. industrialstructures, water treatment plants. hostels. TV Towers.hospitals, railway buildings etc. The Hindustan PrefabLtd. is engaged mainly in the manufacture of pre-stressed cement concrete poles. railway sleepers.wooden joinery items, precast concrete components.water storage tanks, vayutan {light weight auto-clavedcellular concrete) blocks for insulation, partitions etc.

12. The Delhi Development Authority has statutoryjurisdiction over all development and land use in theNational Capital Territory of Delhi and the Delhi UrbanArts Commission has statutory mandate to preserveand develop the aesthetic quality and environment inDelhi. The National Capital Regional Planning Boardconstituted in March 1985 under the NCR PlanningBoard Act, 1985 has two important goals to be achievedviz., (i) evolving harmonised policies for the control ofl a n d u s e s a n d d e v e l o p m e n t o f i n f r a s t r u c t u r e i n t h e N C Rso as to avoid any haphazard development of the Regionand (ii) achieving a manageable Delhi by 2001 A D The

National Institute of Urban Affairs (NIUA) was set up in1976 as an autonomous organisation registered underthe Societies Registration Act, 1868 for carrying outurban research in the country and collecting, processing,storing and disseminating information relating to urbanlocal bodies, their functioning, management. finances,development programmes and personnel training.Rajghat Samadhi Committee was constituted in 1951 inaccordance with the Rajghat Samadhi Act, 1951 toadminister the Rajghat, the Samadhi of MahatmaGandhi ,

Department o f Urban Employment & PovertyAlleviation

13 This Department is responsible for implementationof the National Housing Policy, all policy issues coveringhousing, building materials & technology, housinglegislations, Centrally Sponsored Schemes and mattersregarding international co-operation & technicalassistance in the field of Housing & Human Settlements.It is also responsible for formulating specific programmes/schemes/projects relating to peverty alleviation andemployment in urban areas. The Department under itscontrol has one attached office, one public sectorundertaking, and three autonomous/statutory bodies(Appendix-Ill).

14. Urban poverty alleviation is a challenging taskbefore the nation and its eradication requires anintegrated attention to the economic, social and physicalcondition of the poor. The Central Government hasaccorded a high priority to the programmes meant forimproving the life of urban poor and the Department ofUrban Employment & Poverty Alleviation is monitoringimplementation of four significant urban povertyalleviation programmes which are Nehru Rozgar Yojna.Urban Basic Services for the Poor, EnvironmentalImprovement of Urban Slums & Prime Minister’sIntegrated Urban Poverty Eradication Programme. TheNehru Rojgar Yojana through its component schemesseeks to promote self-employment ventures and createopportunities for wage employment through constructionof public asset in municipalities and upgradation of thedwelling units of the urban poor. The programme of UrbanBasic Services for the Poor seeks to provide anintegrated package of social services by creatingneighbourhood committees of the residents at the slum

level. Its emphasis is on mother and child healthcare,supplementary nutrition and growth monitoring, pre-school, non-formal and adult education, and assistanceto the handicapped or destitute. The scheme ofEnvironmental Improvement of Urban Slums aims atameliorating the living conditions of urban slumsdwellers and envisages community facilities. The PrimeMinister’s Integrated Urban Poverty EradicationProgramme envisages a holistic approach to urbanpoverty eradication by creating a facilitatingenvironment for a significant improvement in the qualityof life of the urban poor.

15. The National Housing Policy seeks to reducehouselessness, improve housing conditions of theinadequately housed and to provide minimum basicservices and amenities to all. The role of Govt.. at various levels is stipulated as that of a facilitator rather than abuilder or provider. The various housing relatedprogrammes in the central sector aim at removal ofconstraints, providing technology support for costreduction as well as environment protection, increasein flow of housing finance from internal and off-shoresources and strengthening of data on housing.

4 6. The National Buildings Organisation functions asa data bank and management information base onsocio-economic aspects of housing & other activities.The Housing and Urban Development Corporation is apremier techno-financing organisation extending vitalsupport in the area of housing, both rural and urban,including infrastructure viz., water supply, sanitation,innovative building materials and components etc.

1 7 . The Building Materiais and Technology PromotionCouncil undertakes the task of extension and applicationof innovetive technologies and low-cost buildingmaterials based on industriai and agricultural wastes,developed by research institutions. It encouragesdevelopment of appropriate standards for new materialsand their adoption in the schedules and specificationsof the public housing and construction agencies. TheCentral Government Employees Welfare HousingOrganisation has been set up with the sole intention ofproviding housing on ownershlp basis, to CentralGovernment employees in various parts of the country.The National Co-operative Housing Federation of Indiais a national apex organisation spearheading the entirecooperative housing movement in India,

ABMlNISTRATlON &ORGANISATION

During the year under report Smt. Sheila Kaulrelinquished the charge of the Minister for Urban Affairs& Employment on 10th September, 1995 and Shri P.K.Thungon relinquished the charge of the Minister of Statefor Urban Affairs & Employment on 13th September,

/1995. Shri R.K. Dhawan assumed charge as Ministerof State (Independent Charge) for Urban Developmentw.e.f. 15-9-1995. Shri S.S. Ahluwalia assumed chargeas Minister of State for Urban Employment and PovertyAlleviation w.e f.15-9-1995. Shri R.K. Dhawanrelinquished the charge of Minister of State (IndependentCharge) on 21-2-96. Shri S.S. Ahluwalia assumed thecharge of Minister of State for Urban Affairs andEmployment w.e.f. 8-3-96.2 . Dr. J.P. Singh, IAS (UP: 61), Secretary (UD) retiredon superannuation from Govt. service w.e.f. 30-6-l 995(AN). Shri C. Ramachandran, IAS(TN:63) took overcharge as Secretary Department of Urban Developmentw.e.f. 14-7-1995 (FN). Shri C. D. Tripathi, IAS (AM:62)took over charge as Secretary, Department of UrbanEmployment and Poverty Alleviation w.e.f. 20-6-l 995(FN). Consequent upon his transfer as Secretary in theDepartment of Official Language, Shri C. D. Tripathirelinquished the charge of Secretary, Deptt. of Urban

, Employment & Poverty Alleviation on 13-12-95(FN).

Shri K. S. Sharma, IAS (MP:64) took over charge asSecretary, Department of Urban Employment andPoverty Alleviation w.e.f. 13-12-95(FN).3 The Department of Urban Development has onepost of Additional Secretary and three posts of JointSecretary heading Finance, Administration &Works andUrban Development wings. The Deptt. of UrbanEmployment & Poverty Alleviation has one post of JointSecretary heading Housing and Urban PovertyAlleviation wing. The Finance and Administration Wingsand Official Language Division are common to both thedepartments. The distribution of work among the Addl.Secretary and Joint Secretaries in both the Deptts. underthe Ministry is indicated in the organisational chart atAppendix-l. The subjects allocated to the Ministry areindicated at Appendix-II.

4 . Excluding the work charged staff. the Ministry has,as on 31-3-96,39162 employees of whom 1237 belongto Group ‘A’, 2991 to Group”B’(Gazetted), 537 to Group‘B’ (Non-Gazetted), 24319, to Group ‘C’ and 10078 toGroup ‘D’. The Strength of the work charged staff is31140.

Budget

5 . The Ministry administers three Demands for Grantsviz. Demand No. 80-Urban Development, Housing andPoverty Alleviation, Demand No. 81-Public Works andDemand No. 82-Stationery & Printing, which havesubsequently been changed to Demand Nos. 81,82 and83 during 1996-97.

6 . The Demand-wise R.E. 1995-96 and B.E. 1996-97provisions, separately for Plan and Non-plan, are asunder:-

Revised Estimates 1995-96 (Gross figures).- (Rs. in crores)

Demand No. 80 Demand No. 81 Demand No. 82Plan Non-Plan Total Plan Non-Plan Total Plan Non-Plan Total

Revenue: 354.62 173.21 527.83 3.40 186.85 190.25 - 125.84 125.84

Capital: 167.78 71.26 239.04 90.42 295.15 385.57 1.75 3.00 4.75

Total: 522.40 244.47 766.87 93.82 482.00 575.82 1.75 128.84 130.59

Budget Estimates 1996-97 (Gross figures)(Rs. in crores)

RevenueCapital

Total

Demand No. 81 Demand No. 82 Demand No. 83Plan Non-Plan Total Plan Non-Plan Total Plan Non-Plan Total

387.50 183.54 571.04 4.50 199.43 203.93 - 148.20 148.20

162.09 75.04 237.13 84.98 315.85 400.83 0.50 4.00 4.50- -

5 4 9 . 5 9 258.58 808.17 89.48 515.28 604.76 0.50 152.20 152.70

7 . The monitoring and progress of expenditure overthe budget allocation as well as the accounting thereofis looked after by the Chief Controller of Accounts (CCA)in the Ministry who is also responsible to render themonthly account of the Ministry to the Controller Generalof Accounts, Ministry of Finance. Two Controller ofAccounts at the headquarters and four Deputy Controllerof Accounts in the field offices and a team of Pay andAccounts Officers, Junior/Asstt. Accounts Officers assisthim in this task.

8 . The Chiei Controller of Accounts (CCA) alsoformulates the estimates of receipts by way of amountsreceived through Revenue Account and the Loans andAdvances. The major constituents of the RevenueReceipts are sale proceeds of dead stock, dismantledbuilding materials, lapsed deposits, fines and profits onre-valuation, interest receipts from States/UnionTerritories/PSUs etc. r e n t o f G e n e r a l PoolAccommodation, leases administered by Land andDevelopment Office, hire charges of machinery andequipments guarantee fee and receipts of the Directorateof Printing. Recoveries of Loans and Advances to theState Govt./UTs/PSUs also contribute to the totalreceipts of the Ministry.

House Building Advance

9 . The scheme of House Building Advance to CentralGovernment employees is aimed at providing assistanceto the Government employees to construct/acquire ahouse/flat of their own. This was introduced in 1956, asa welfare measure. Ministry of Urban Affairs &Employment acts as the nodal Mnistry for this scheme.

10. House Building Advance is admissible to allpermanent Central Government employees as well asto those temporary employees who have rendered 10years of continuous service. The applications fromindividual employees are scrutinised and sanctionsissued by the respective Ministries/Deptts. in accordancewith the House Building Advance Rules.

11. The maximum house building advance admissibleis 50 times the basic pay of the employee concerned orRs. 2.50 Lakhs or the cost of construction/acquisitionof the house, whichever is the least, subject to therepaying capacity. During this year the cost-cei!ing hasbeen revised to 200 times the basic pay subject tominimum of Rs. 3.00 Lakhs and maximum of Rs. 8.00Lakhs. Earlier this was 150 times the basic pay of theGovernment servant concerned, subject to a minimumof Rs. 2.5 lakhs and a maximum of Rs. 6.00 Lakhs.

12. The allocation of funds for house building advanceas a whole is included in the demands for grants of the

Ministry of Finance, who intimate the same to theMinistry of Urban Affairs & Employment. A sum of Rs.225.00 crores has been allocated at the R.E. stage for1995-96 and also at the B.E. stage for 1996-97.

Work Study Unit

13. The IWSU of the Ministry performs all 0 & MFunctions of the Sectt. of the Ministry and undertakesstudies in respect of its Sectt. and its Attached/Subordinate offices on various aspects viz. staffstrength. working procedures etc. During the year 1995-96 the fallowing studies were completed and their reportswere finalised:-

* Method Study of functions of the CPWD Centre atKushak Road, New Delhi.

* Comparative Study of responsibilities, jobs andduties of Ferro printers in CPHEEO and CPWD.

* Method Study of functioning of CPWD ServiceCentre at Chanakya Puri, New Delhi.

Besides, the following studies were also conducted andtheir reports are under finalisation:-

* Work Measurement Study in respect of A-2 SizeDouble Colour Offset Printing in GOI Press,Faridabad;

* Work Measurement Study of the offices of theArbitrators in the Ministry

* Work Measurement Study of Accounts andAdministration Wing of the TCPO (Town & CountryPlanning Crganisation).

O & M Activities

1 4 . Annual Inspections of 30 Sections/Desks etc. inthe Ministry were carried out. A special drive on FecordManagement was conducted in the Ministry and itsattached Qffices during the month of May, 1995 andFeb. 96. During the year, 1994 files were recorded and3506 files were reviewed, out of which 2588 files wereweeded out in the Secretariat of the Ministry.

Progressive use of Hind

1 5 . As a result of the intensified efforts like: (a) doublingthe amount of various Cash Awards under Annual AwardScheme for noting & drafting in Hindi, (b) Annual Schemefor encouraging dictation in Hindi at officers level, and(c) introduction of monthly allowance scheme for stenos/LDCs doing their work in Hindi in addition to English,the Ministry was able to achieve most of the targets asprescribed in the Annual Programme of use of Hindi by100% (except that for originating correspondence) during

the year. In recognition of their performance, theHUDCO, a PSU of the Ministry, received the llnd bestRajbhasha Award 1994-95 among PSUs located inDelhi. As regards the originating correspondence in Hindito States, individuals & Central Govt. offices in region A& B the Ministry was able to raise the level ofcorrespondence in Hindi from 16% in 1990-91 to 55%during 1995-96, The performance of offices/ PSUs etc.under the Ministry in making correspondence in Hindiduring the year had been as under:

Targets achieved

(ij between 80-85%Name of the offices

T,C.P,O, N.B.O., H.P.L. &Controller of Publication

(II) Retween 70-75%

(Ill) Between 60-65%Between 55-60%

HUDCOMe. of Printing and DDADG (W), Dte, of Estate &0.U.A c.

(IV) Between 50--55% L & D.O., NC.R PlanningBoard, N.B.C C.

(V) Less than 30% N.C.H.F., B.M.T.P.C..N.l.U.A., StationeryOffice & C.G.E.W.H.O

16 As regards the compliance of section 3 (3) of theOfficial Language Act, all Offices/PSUs etc. (except afew Zonal/Circle Offices of C.P.W.D., the N.B.C.C. theD.D.A. & the Stationery Office) issued all specifieddocuments (except contracts & agreements signed afteracceptance of tenders) bilingually. The erring offices havebeen advised to improve their performance by reviewingtheir QPRs of use of Hindi in Quarterly meetings of theOfficial Language Implementation Committee (O.L.I.C.)of the Ministry. Review of progressive use of Hind1 inthe Official work is being made by the respectiveorganisations in the Quarterly meetings of their O.L.I.Cs.

Hindi training

17. With the retirements and fresh recruitments; 14Officials of the Ministry need to acquire workingknowledge of Hindi & in pursuance of Presidential ordersin this regard 6 of them have been nominated for HindiPrabodh/Praveen/Pragya classes w.e.f. January, 1996.Besides, 2 stenos &. 4 LDCs have been nominated forHindi shorthand and typing respectively. The NBC C.& H U.D.C.O. had made their own arrangements for Hindishorthand/typing training. Other offices are getting thisfacility under the Hindi Teaching Scheme.

17.11 Eighteen employees of the Ministry have been[rained in Hindi noting & drafting in two generalworkshops & under section-wise training on workshop

pattern. Hindi workshops have also been organised byall major organisations under the Ministry.

Action under rule 10 (4) & 8 (4) of 0.1. Rule, 1976

18. So far 294 offices of the Ministry and their 80%staff who have acquired working knowledge of Hindi,have been notified in the Gazette of India under rule 10(4). The newly notified offices (44) have been advisedto specify under rule 8 (4), the items of work to be donein Hindi. A total of 10 sections of the secretariat of theMinistry stand specified for doing some items of work inHindi only.

Creating enabling atmosphere for propagation anduse of Hindi

19. Following steps have been taken in this report:-

(i)

(ii)

{iii)

(vi)

Cash awards for official noting & drafting inHindi-In order to attract more & moreemployees for doing work in Hindi, the amountsof cash awards have been doubled and 10employees were given cash awards by theMinister.

Organising various compet/tive events on theoccasion of Hindi day created further conduciveatmosphere for use of Hindi. During the year51 employees of the Ministry participated inthose events and Prizes of Rs. 11,000/-weredistributed to the winners by the HonourableMinisters at a special function organised on11.1.1996.

Making available popular Hindi literature to theemployees is yet another step in removing theirhesitation in using i-lindi in the official work andabout 35% amount of annual Library budget isbeing spent on popular Hindi literature since1994-95. The various offices under the Ministryare also following this,

All 92 Codes/Manuals/Items of Proceduralliterature have been translated & printed in Hindialso.

Q.L. inspections: The Ministry inspected its 30Unit offices at Lucknow, Allahabad, Hyderabad,Shillong, Guwahati, Siliguri. Gangtok &Madrasand Head Offices of 14 organisations at NewDelhi.

!n order to facilitate work in Hindi, there are 2Dy. Directors, 15 Asstt. Directors, 15 Sr.Translators, 108 Jr. translators and adequatenumber of trained Hindi Stenos/Typists underthe overall supervision of Director (O.L.) for the

(vii)

(viii)

Ministry, including its subordinate formations.The HUDCO, a PSU, has appointed NodalOfficers (Hindi) in its Unit/Division offices ail overthe country and the NBCC review performanceof O.L. implementation in their High Level AnnualReview meetings also.Adequate number of bilingual/Hindi typewriiershave been made available in all the offices.The TCPO has been using Hindi in drafting itsvarious survey reports on Urban/Tourismdevelopment projects located in Hindi areassince long.

Parliamentary Matters

20. Parliament Section of the Ministry deals with allParliamentary matters pertaining to both theDepartments viz. the Department of Urban Developmentand the Department of Urban Employment and PovertyAlleviation under this Ministry. During the year 199596,this Ministry answered 933 (61 Starred and 872Unstarred) Parliament Questions on various subjectsrelating to Local Bodies, Housing, Central Public WorksDepartment, Water Supply, Urban Development, UrbanPoverty Alleviation Programme etc. While 749 of theseQuestions related to the Department of UrbanDevelopment, 184 Questions pertained to theDepartment of Urban Employment and PovertyAlleviation. While answering to these 933 Questions.Assurances were given in respect of 97 ParliamentQuestions. During 1995-96 various Divisions in theMinistry implemented 171 Parliamentary Assurancesgiven to both the Houses of Parliament (this includesAssurances given to Parliament in the years prior to1995 also).

21. Ten matters raised as a Special Mention in theRajya Sabha and under Rule 377 in the Lok Sabha,were received by various Divisions of the Ministry duringthe year 1995-96. Two matters raised as a SpecialMention in the Rajya Sabha and two under Rule 377 inthe Lok Sabha are still pending final reply.

22. During 199596, five meetings of the ConsultativeCommittee attached to the Ministry of Urban Affairs andEmployment were organised wherein the followingimportant issues were specifically discussed, in additionto general discussion on various matter relating to thisMinistry:-

(i) Mega City Scheme

(ii) Developmental Activities of the National CapitalRegion Planning Board in the National CapitalRegion,

(iii)

(v)(vi)(Vi i )

Prime Minister’s integrated Urban PovertyEradication Programme (PMIU PEP).Follow-up Action on the Constitution (74thAmendment) Act, 1992.Functioning of Delhi Urban Art Commission.Review of National Housing Policy.Functioning of Building Centres (HUDCO)

23. Annual Reports and Audited Accounts of thefollowing Organisations for the years 1993-94 and 1994-95 were laid on the Table of both the Houses ofParliament auring 1 9 9 5 - 9 6 : -

(i) Delhi Development Authority(ii) National Capital Region Planning Board(iii; National Buildings Construction Corporation(iv) Hindustan Pre-Fab. Ltd.(iv) Delhi Urban Art Commission(vi) Housing and Urban Development Corporation(vii) Central Government Employees Welfare

Housing Organisation(viii) Building Material Technology Promotion Council

(ix)) National institute of Urban Affairs.

24, Apart from this, during the year 1995, theParliament Section of the Ministry has been fullycomputerised and all the functions, including ParliamentQuestions of the Section are done on the Computerwith the help of NIC officials.

Welfare

25. Staff Welfare activities in the Ministry and itsAttached/Subordinate Offices continued to receive dueattention and encouragement. Eight Recreation Clubsfunctioning in the Ministry and its Attached/ Subordinateoffices in various disciplines participated in the Culturaland Sports activities organised by the Central CivilServices and Sports Board, Department of Personnel&Training.

26, During the year 1995-96, the Ministry’s teamparticipated in the Table-Tennis, Carrom, Football,Hockey. Cricket, Power-Lifting,VoWey-Bail, Athletic Meet,Wrestling, Weight-Lift ing and Best PhysiqueChampionships/Tournaments organised by the CentralCivil Services Cuiturai and Sports Board, nepartmentof Personnel &Training. in the Weight-Lifting competitlonour two players achieved 1st position, and two playerstook 2nd position. In Wrestling and Best Physique, ourthree players stood 1st and in Power Lifting, our twoplayers achieved 2nd position. in Carrom, our team wasadjudged at 3rd position.

27. Out of a total amount of grants-in-aid of Rs. onelakh, a sum of Rs. 93,563 has been released to thevarious Recreation Clubs under this Ministry.TheDepartmental Canteen of the Ministry of Urban Affairs& Employment continued to function efficiently cateringto the requirement of the officers and staff of the Ministry.J.C.M.28. Follow-up activities by the J.C.M. continued to beperformed satisfactorily.Employment of Ex-Servicemen

29.M

The Deputy Secretary (Administration) in theinistry is the Liaison Officer for the work relating to the

employment of ex-servicemen. Additional LiaisonOfficers in the Attached/Subordinate offices and PublicSector Undertakings also watch the implementation ofGovernment rules, regulations and orders on the subject.Statistics relating to appointment of ex-servicemen inthe Ministry and its Attached/ Subordinate Offices, PublicSector Undertakings are given in Appendix V.Reservation for Scheduled Castes and ScheduledTribes

of public. The grievances received in the Ministry areduly acknolwedged and referred to the concerned off icesunder this Ministry for redressal. As per the instructionsreceived from the Directorate of Public Grievances,Cabinet Secretariat & Ministry of Personnel, PublicGrievances and Pensions, the grievances arecontinuously monitored and the over-all positionreviewed periodically. A watch is also kept on thegrievances appearing in the newspaper columns. Thecell has contributed to the speedy disposal of genuinecomplaints and representation during the year.

Vigilance Activities

30. A special Cell in the Ministry watches theimplementation of Government orders regardingreservation in services for Scheduled Castes andScheduled Tribes through the periodical returnsprescribed by the Government of India for the purpose.In addition, the Cell also monitors the filling up of thebacklog vacancies reserved for Scheduled Castes andScheduled Tribes under the Special Recruitment Drivein respect of the Attached/Subordinate offices and thePublic Sector Undertaking of this Ministry. The Ministryhas also issued instructions to the offices under itscontrol for strictly observing the instructions issued bythe Department of Personnel & Training in respect ofthe reservations made for Other Backward Classes(OBC). The Cell periodically monitors the filling up ofvacancies reserved for OBCs in respect of the Attached/Subordinate offices of the Ministry. The statisticsregarding the representation of Scheduled Castes/Scheduled Tribes in the Ministry and its other officesare contained in Appendix VI-IX.Public Grievance Cell

32. The Administrative Vigilance Unit of the Ministryfunctions under the charge of a Joint Secretary who isalso the Chief Vigilance Officer. The Chief VigilanceOffiier is assisted by one Deputy Chief Vigilance Officerof the rank of Deputy Secretary, three AssistantVigilance Officers and Vigilance Officers of the Attached/Subordinate Offices of the Ministry and also the ChiefVigilance Officers of the Public Sector Undertakings andthe Autonomous Bodies under the administrative controlof this Ministry. This Unit is responsible for all matterspertaining to vigilance in the Ministry of Urban Affairs &Employment including its Attached and SubordinateOffices, Public Sector Undertakings and AutonomousBodies.33. Vigilance work consists of preventive vigilance,surveillance and detection and deterrent punitive action.Under preventive action, rules and procedures arereviewed from time to time and surpriie inspections areregularly conducted in sensitive areas under the Ministry.As regards surveillance and detection, lists of officersof Gazetted status whose conduct needs to be watchedare prepared in consultation with the Central Bureau ofInvestigation. Under the punitive action, penaltiesprescribed under the rules are imposed on those whoare found guilty.34. Generally, the charges relate to execution of sub-standard work in the construction and maintenance ofbuildings, over-payments to contractors, irregularities incalling of tenders/quotations and award of contracts,disproportionate assets, illegal gratification, sublettingof Government accommodation/shops and violations ofthe CCS (Conduct) Rules, 1964.

35. In addition to the departmental examination ofcomplaints and investigation, the Ministry also receivesreports from the Central Bureau of Investigation aboutthe misconduct of offiiers either with a view to takingdepartmental action or for issuing sanction forprosecution under the Prevention of Corruption Act,1988.

31. The Public Grievance Cell in the Ministry ensuresredressal of the grievances of the public under the overallsupervision of Joint Secretary (Admn.) who acts as theDirector of Grievances. Grievances are also receivedthrough the Department of Administrative Reforms andPublic Grievances, Department of Pension andPensioners Welfare, Directorate of Public Grievances,Cabinet Secretariat, President’s Secretariat, PrimeMinister% Office, registered associations and members

36. In respect of Public Sector Undertakings, thisMinistry processes the cases against the Board levelofficers only. Autonomous bodies initiate action againsttheir officers themselves. However, in case an officer ison deputation to these bodies from the CentralGovernment, action is taken by this Ministry.

3 7 . During the period January, 1995 to March, 1996,85 surprise and regular inspections were carried out,338 officers were charge-sheeted, 42 officers wereplaced under suspension, major penalties were imposedupon 36 officers and minor penalties upon 140 officers.

Computerization in the Ministry

3 8 . In order to modernise the functioning of the Ministryand to achieve optimum efficiency various softwarepackages for different types of activities have beendeveloped.

3 9 . Telephone information System (TELLIS) has beendeveloped and made operational to cover all activitiesregarding processing of telephone and telex billsreceived by the Ministry. From the time a bill is received,to the time it is finally settled by the Ministry, the softwarekeeps track of the status of the bill. Different MIS reportscan be generated as and when required.

40. Library Information System (LIFIS) was installedto computerize all the functions of the Library. Databaseof some 11,000 books in English as well as in Hindi hasbeen developed.41. Computerized lists on the following are beingtransmitted through NICNET to the Department ofPersonnel.

i. List of ACC decision challenged in courts.

i i . Incumbency Posit ion l ist for al l the off icers ofthe level of Under Secretary and above.

Monthly reports for the Cabinet Secretariat are beinggenerated regularly on the computer.

42. Software package on movements of the C. Rs ofall the gazetted officers has been developed tostreamline the present manual system.

43. Parliament Question Information System wassuccessfully implemented in the Parliament Cell of theMinistry during all the Parl iament sessions in the year1995-96. Timely reports on starred, unstarred, admittedquestions and assurances were generated as and whenrequired.

44. In addition, new software modules as mentionedbelow have been developed and made operational inthe Parliament cell:

a . Matters raised in the Lok Sabha/Rajya Sabha /Special Mentions

b . Papers laid on the TableC . Parl iamentary Committeesd . Diary and f i le Managemente . Telephone Info. Systemf . Generation of Casual Entry Passes.

45. Case Monitoring System for Delhi Division hasbeen developed and a database of some 1000 currentcases has been developed.

46. A Software Package for Computerized generationof Numerical Abstract of the various Monthly reportspertaining to Cabinet Decisions. CCA Decisions, PMO,Cabinet Sectt. etc., has been developed andimplemented.

47. Diary and Reference Monitoring Systems havebeen developed and implemented in the offices of boththe Ministers.

Computerization in the Directorate of Estates

48. A system for computerized generation of allotmentletters has been implemented for all types of quarters.Monthly waiting lists were regularly generated throughcomputer.

File monitoring system for ad-hoc allotments andComputerized generation of sanction letters wasdeveloped and implemented.

Various MIS reports (as listed below) based on theHousing Stock and the allotments in the year weregenerated regularly to provide decision support to theDirectors of Estates.

a . List of quarters in different pools

b . List of allotments made over specified timeperiods.

C . List of ad-hoc allotments over specified periods

d . List of unauthorized occupations based on theretirement dates.

A software package for monitoring the allotments madeby VIPs was developed.

A system for developing a database on sublet quartershas been developed and made operational.

Computerization in the Directorate of Printing

49. Payroll package was developed and madeoperational.The system successfully generates monthlypaybills, payslips and licence fee statements etc. for theDirectorate.

Machine Utilization Monitoring System was developedto generate reports on the performance of some 25government presses scattered all over India Thepackage is being used to project statistics of controllable& uncontrollable factors of the machines.

Computerisation in the Department of Publication

50. NIC has been regularly transmitting monthly listsof fresh arrival of publications to all the state and districtheadquarters over the NICNET.

Training

51. Necessary training was imparted to the concernedstaff in order to operate the software packagesmentioned above.

52. Stystems under Study/Development

1. Monitoring of House Building Advance (Admn.)

2. Inventory Management (Admn.)

3. Monitoring of Pension cases (Admn.)

4. Job allocation (Directorate of Printing)

5. Contract Management System (Dte. of Ptg.)

6. Monitoring of rent (Dte. of Estates)

Outstandingobjections:-

Inspection Reports/Audit

Training in word processing under DOS and Unix 53. Department-wise details of outstanding Inspectionenvironment was imparted to about 25 members of the Reports/Audit objections as on 31-3-96 is given atstaff of the Ministry and the Directorate of Estates. Appendix-X.

20-POINT PROGRAMME &THEMINISTRY OF URBAN AFFAIRS &EMPLOYMENT

The Ministry of Urban Affairs & Employment isresponsible for monitoring of Point nos. 14(d), 14(e) and15 of the Twenty Point Programme- of theGovernment. These relate to Housing for theEconomically Weaker Sections and Low Income Groupin urban areas under Points 14(d), 14(e) andEnvironmental improvement of Urban Slums under Pointno. 15. These are State Plan Schemes. The funds areallocated by the implementing States/UTs from their ownplan resources keeping in view their needs and priorities.Besides, two evaiuatory items namely Use of Low CostBuilding Materials under Point no. 14 and RestrictingGrowth of Urban Slums under Point no. 15 are alsomonitored. While the monitoring of Point nos. 14(d), 14(e)and 15 is done on monthly basis, the evaiuatory itemsare monitored on half yearly basis.

2. The 20-Point Programme envisages the nation’scommitment to eradicate poverty, reduce disparities inincome and seeks to remove social and economicinequalities and also to raise the quality of life. Ail theabove mentioned programmes assumed considerablesignificance in view of the priority. accorded under theNational Housing Policy for improving access to shelterto the houseless and disadvantaged groups such asSC/ST, widows and economically weaker sections in theurban areas and the manifesto targets for night shelters,expanded housing for SC/ST and backward classes andbasic facilities for slum dwellers. These activities formpart of National Housing Policy and Action Plan ofGovernment.

3. The physical targets for Point nos. 14(d), 14(e) and15 of the Twenty Point Programme for the year 1995-96were fixed by the Ministry of Urban Affairs & Employmentafter due consultations with the State Governments/UTAdministrations having regard to the plan provision, pastperformance and other resources of the state agencies.

4. The Monitoring Ceil in the Ministry of Urban Affairs& Employment monitors the above mentionedprogrammes which involve collection of data from variousState Governments/UT Administrations on a monthly

basis. As a part of the monitoring exercise, the Ministryof Urban Affairs & Employment also conducts theregional review meetings at various state capitals toreview the performance of various programmes. Periodicreports are sent to the Department of ProgrammeImplementation.

5. The level of performance varies among differentStates. There are many reasons for inadequateperformance in housing schemes like low budgetprovision, land acquisition problems, difficulty in providingservices, institutional capability, lack of access toinstitutional finance, shortage of materials and escalatingcosts. These deficiencies have been pointed out to StateGovernments from time to time who in turn have assuredthis Ministry that they are taking corrective measures.

14(d)-EWS Housing6. Direct public sector investment is made for providinghousing to the economically weaker sections in the urbanareas, supplemented by the HUDCO loans.

6.1 During the year 1995-96, 1.13 lakhs dwelling unitshave been constructed against the annual target of 0.72iakh dwelling units, The State Governments/UTAdministrations have been requested to take action tomake up for the shortfall. In addition HUDCO providesloans to construct houses for EWS category to the extentof 15% of its resources. Refinance is also available fromthe National Housing Bank.

6.2 it has been agreed to raise the income ceiling whichwas Rs. 700 per month per household in the 7th FiveYear Plan to, Rs. 1250/-during the 8th Five Plan. Theloan component has also been raised to Rs. 19,500/-forconstruction and Rs. 9,500/-for repairs of dwelling unitsin the urban areas. The emphasis is on sites and servicesand self construction, There are also special schemesfor handioom workers and beedi workers.

14(e)-LIG Housing

7. The Ministry of Urban Affairs & Employment is alsomonitoring the programme of LIG housing which hasbeen incorporated in the 20-Point Programmeannounced in 1986. It is being monitored from the year1987-88. This is primarily a loan scheme and is beingexecuted by the State Governments through HousingBoards and Housing Departments. The budget provisionis supplemented by institutional finance. The Incomeeligibility which was Rs. 701-1500 in the 7th Five YearPlan has been raised to Rs. 1251-2650 during the 8thFive Year Plan. Duirng the year 1995-96, 0.34 lakhs unitshave been allotted against the annual target of 0.34 lakhs

dwelling units. The State Governments/ UTAdministrations have been requested to step up theirefforts and take necessary steps to achieve the target.HUDCO also supplements the efforts of the StateGovernments/UT Admns. in providing loans. TheHUDCO loan component for this category of houses isRs. 55,000 for construction and Rs. 27,500 for repairs/additions of the dwelling units.

15 - Environmental Improvement of Urban Slums

8. The present policy of the Government lays emphasison environmental improvement of urban slums ratherthan their massive clearance and relocation.The schemeenvisages provision of seven basic amenities viz. watersupply, storm water drains, community bath and latrines,widening and paving of existing pathways and streetlighting and other community facilities etc. to slumdwellers. The scheme was introduced during the 6thFive Year Plan and is continuing in the 8th Five YearPlan. The ceiling of per capita cost has been raised fromRs. 525/- to Rs. 800/- per slum dweller w.e.f. 1.4.1995in consultation with the Planning Commission. Theprogramme is linked with the central schemes of UrbanBasic Services for the Poor and Nehru Rozgar Yojnaand involvement of resident associations.

8.1 During the year 1995-96, 17.40 lakh slum dwellershave been covered under the scheme against the annualtarget of 15.88 lakh slum dwellers.

8.2 The State Governments/UT Admns. have beenasked to ensure that houses and benefits reach thefamilies belonging to scheduled castes/ scheduled tribesin proportion to their population in the city/state. Thestate agencies reserve 15% to 20% of the houses andsites for these disadvantaged groups and this is ensuredin HUDCO assisted schemes.

9. Bar charts indicating the performance of theseprogramme during the year 1995-96 are at Annexure Ito Annexure III. Statements indicating the targets andachievements during the year 1995-96 are at AnnexureIV to Annexure VI.

Slum Improvement Projects Funded by ODA(UK)

10. The Overseas Development Administration (ODA)of the Government of UK has been supporting SlumImprovement Projects in seven Indian cities, incollaboration with the Ministry of Urban Affairs andEmployment. The Programme started in 1983 inHyderabad (Andhra Pradesh), and since 1988 additional

projects have been approved in Visakhapatnam,Vijayawada (Andhra Pradesh), lndore (Madhya Pradesh)and Calcutta (West Bengal). In additional to this, twoprojects are being implemented in Cuttack (Orissa) andCochin (Kerala) recently. A Project proposal from theGovt. of Andhra Pradesh for covering 32 class-l townshas been received and forwarded to ODA. This projectis expected to be launched soon.

10.1 The ODA Slum Improvement Projects entails notonly development of physical infrastructure and provisionof civic amenities but also community development andprovision of social, economic and educational inputswhich assist in raising the standard of living of theinhabitants of slum areas. Efforts are also being madeto dovetail the ODA-assisted schemes with schemes ofGovernment of India for achieving synergy and improvedefficiency of the projects. Once a project is completedin a city, activities for project sustenance such asproviding necessary allocation in the Budget of therespective Municipalities for continuing the activitiesinitiated by ODA will also be made.

10.2 A statement giving the financial and physicalstatus of the ODA assisted slum improvement projectsis at Annexure VII.

Slum Improvement Project with the assistancefrom Govt. of Netherlands

11. Apart from the slum improvement projects assistedby ODA, the Govt. of Netherlands has also beensupporting a pilot project viz. Bangalore Urban PovertyAlleviation Project (BUPP) at an estimated cost ofRs. 1.5 crores.The Phase-l of the project started duringNov., 1993 and is tikely to be completed by the end ofJune, 1996. The second Phase which has beenrecommended by the Formulation Mission set-up by theGovt. of Netherlands is likely to start from 1 st July, 1996,The project is being executed under the responsibilityof the Ministry of Urban Affairs and Employment,HUDCO and the Govt. of Karnataka.

Slum Improvement Project with GermanAssistance

12. Germany has also shown interest in supportingPoverty Alleviation Projects. A slum improvement projectat Nagpur city with assistance from Germany is underconsideration.

Annexure-IV

Point No. 14D- EWS HOUSES PROVIDED UNITS : NOS.

SI. State Target Ach ievement PercentageNo. N a m e 95-96 95-96

1. Andhra Pradesh 25000 550342. Assam 2028 771 383. Bihar 500 192 384. Delhi 3200 831 2 65 . Goa 100 0 06 . Gujarat 2474 5 27 . Haryana 300 31 10a . Himacha l Pradesh 3 0 3 0 1009 . J .&K . 10 11 11010. Kamataka 2380 4572 19211. Kerala 13000 30373 23412. M.P. 4000 4254 10613. Maharashtra 1500 1500 10014. Manipur 125 0 015. Meghalaya 0 0 -

16. M i z o r a m 100 0 017. Orissa 5 0 0 477 9518. Pun jab 5 0 0 388 7819. Rajas than 1000 1382 13820. Sikkim loo 150 15021. Tami l Nadu 6500 7366 11322. Tr ipura 100 0 023. U.P 4ooo 3810 9 524. West Bengal 3ooo 0 025. A&N Islands 5 0 026. Daman 8 Diu 0 0 -

Grand Total 72778 113646 156

Annexure- V

Poin t No. 14E- LIG HOUSES UNITS : NOS.

SI . State Target Ach ievementNo. Name 95-96 95-96

Percentage

1 . Andhra Pradesh2 . Assam3 . Bihar4 . Delhi5 . Goa6 . Gujarat7 . Haryanaa . Himacha l Pradesh9 . J. & K.10. Kamataka11. Kerala 12. M.P.13. Maharashtra14. M a n i p u r15. Mizoram16. Orissa17. Pun jabla. Rajas than19. Tami l Nadu20. Tripura21. U.P.22. West Bengal

25001001 0

26721200 2500485025025016001000750

7000a 0

1500

1240 1005 19

100 202 9 7 7 a5

150 1042003 1002500 loo112 1123 5 350

1033 3 92590

---- ‘216

3058 1224312 a 9

0 0130 5 21942 121764 7 6

2160 2887374 105

0 01522 101

0 0

Annexure V I

Point No. 1 &-SLUM IMPROVEMENT (POP) UNITS : NOS.

Sl. State Achievement PercentageNo. N a m e 95-96

1. Andhra Pradesh 279168 1 2 42 . Assam 7000 4 9 5 0 7 1

3 . Bihar 11000 3401 3 1

4 . Delhi 133000 114375 865. Goa 150 0 0

6. Gujarat 100000 211070 2 1 2

7 . Haryana 9 5 4 4 8 1 9 1

8. Himachal Pradesh 10125 10128 100

9 . J .&K. 17687

10. Kamataka 66500 1 0 1

11. Kerala 2 5 3 0 4 101

12. M.P. 116232 9 4 9 1 0 0 2

13. Mharashtra 520000 472214 9 1

14. Manipur 5 7 1 4 0 015. Meghalaya 4 9 3 0 9916. Mizoram 10017. Orissa 10000 14162 142

18. Pondicherry 10000 10169 102

19. Punjab 12500 9201 7 4

2 0 . Rajasthan 4 3 7 5 0 52181 1 1 9

21. Sikkim 1500 1500 100

22. Tamil Nadu 31500 35649 113

23. Tripura 10000 10000 100

24. U.P 1 5 0 0 0 0 147355 9 8

25. West Bengali 3700 57517 155

26. Ah N island. 100

Grand Total 115811 1740819 1 1 0

S ate

S. No. Name of Project & implementing Duntion of the Project Total approved cost No. of alum8 Expenditure incurred agency of the project Propo-dtob (Rs. in crower)

#ts. in crores1 COV8red

4.

5. tndorp SIR More Development Authority

Hyderabad SIWII, Municipal Corpn., Hyderabad

Visakhapatnam SIP, Municipal Corpn. Vizag

Viyavde~ StP, Municipal Cwpn.Viyawada

Calcutta Sip, CMDA

Cuttack SIR Phase-l Cuttack Mpl. and CDA

Co&in Websnn Pc~v~rtRf)’ R+duction Project, Phase-l, Corp. of Cwh

1!389-SO to

31.3.96 1980-89

to 31.3.96 lQQ3-Q4

b 31.3.96

1990-91 to

30.6.97 1990-91

to 31.3.97

1990-91 to

31 .l2.Q6 1995-

lQQ5-

42.75

28.59

6.95

49.15

60.50

46.19

25.70

30.00

300 42.00 (Upto D&.95)

198 27.96 (Upto D&95)

(Upto DIE?;

336 32.94 (Upto March,‘QB)

103 (Upto FaL:!g

49

152 (Upto 0,~;;;

0.13 (Upto Dec,‘95)

*This is being dane as an extentiorr ofbakhapatnsm SIP and is a msottlement Project.

URBAN DEVELOPMENT

Urban Development is a State subject and theDepartment of Urban Development assists the StateGovernments in their programmes of urban developmentby way of formulating broad policy frame work; providinglegislative support by way of constitutional amendment,legislation or issue of guidelines; implementing a numberof centrally sponsored schemes; processing andmonitoring assistance from multilateral institutions forState Govt. projects and finally providing technicalsupport and advice for promoting orderly urbanisation.

I. POLICY AND LEGAL INITIATIVES

National Urban Policy

2. The Department of Urban Development. is in theprocess of formulating a National Urban Policy keepingin view the recommendations of the NationalCommission on Urbanisation, the economic reforms andthe elements of national urbanisation strategy listed outin the Regional Action Plan on Urbanisation adopted bythe ESCAP countries vide the New Delhi Declaration.The National Urban Policy will take into account thesuggestions of the State Governments, StateUrbanisation Strategy papers prepared in the contextof the IDSMT Scheme and the decentralisation reformsenvisaged by the Constitution (74th) Amendment Act,1992. Due cognizance would be given to overalldevelopment goals of States, their physical and financialresources, growth potential of towns in different regionsand integration of spatial and economic planning. Withthe formulation of oyerall national urbanisation strategy,it would be possible to identify thrust areas and addressthe various urban problems such as infrastructuraldeficiencies, poverty and environmental deterioration ina systematic manner, keeping the goals of sustainabledevelopment in view.

2.1 The Planning Commission and the M/UA&E havejointly constituted a Task Force on Urban Perspectiveand Policy. Three Technical Groups have also beenconstituted to assist the Task Force, namely, (1) TechnicalGroup on Urban Planning System; (2) Technical Groupon Financing of Urban-Infrastructure and (3) TechnicalGroup on Urban Perspective and Policy. The Reports of

the Technical Groups are expected to be ready by 1 996.Thereafter, the Report of the Task Force will be finalised.The recommendations of the Task Force will also be aninput for the National Urbanisation Policy.

Constitution (74th Amendment) Act, 1992.

3. The Constitution (74th Amendment) Act, 1992relating to Municipalities (known as Nagarpalika Act)was passed by the Parliament in Winter Session of 1992and it received the assent of the President on 20.4.1993.This Act seeks to provide a comman framework for thestructure and mandate of Urban Local Bodies and enablethem to function as effective democratic units of Local-Self Government.

3.1 Government of India notified 1st June, 1993 as thedate from which the 74th Amendment Act came intoforce. The Act provided for a period of one year fromthe date of its commencement, within which theMunicipal Laws which were in force at that time in States/Union Territories, were required to be changed/amended/modified in order to bring them in conformity with theprovisions of the Constitution (74th Amendment) Act,1992.

3.2 As a result of various initiatives taken by the Ministryof Urban Affairs and Employment, the Constitution (74thAmendment) Act, 1992 was got implemented by all StateGovts./U.T. Administrations, where the same wasapplicable by the target date, viz., 31st May, 1994. Allthe State Governments enacted amendments to bringtheir Municipal Laws in conformity with the NagarpalikaAct.

3.3 The salient features of the Constitution (74thAmendment) Act cover the following:-

Constitution of MunicipalitiesComposition of MunicipalitiesConstitution of Wards CommitteesReservation of SeatsFixed duration of MunicipalitiesPower, Authority and Responsibilities of Munici-palitiesAppointment of State Election CommissionAppointment of State Finance Commission.Constitution of Metropolitan and District Plan-ning Committees.

3.4 Action has been taken by the State/UTGovernments to set up State Finance Commissions/State Election Commissions as follows:

(I) State Finance Commissions (SFCs): All Statesexcept Orissa have set up their Finance

Commissions. The Orissa State Governmenthas been requested at the level of Chief Minis-ter to constitute the State Finance Commissionw i t h o u t f u r t h e r d e l a y .Conscious of the need to assist the SFCs, theMinistry of Urban Affairs and Employment pre-pared and circulated widely among the Statesand Union Territories several papers on princi-ples and practices of municipal finance. Fournational level meetings have been organisedinvolving SFC Chairmen, experts and officialsto discuss and clarify various issues of munici-pal functions, finances and devolution for thebenefit of the SFCs. A Resource Group underthe Chairmanship of Dr. Raja Chellaiah hasb e e n c o n s t i t u t e d t o p r o v i d e t e c h n i c a l a s s i s t a n c eto the State Finance Commissions.

(II) Election Commission: All State Governments/UTs. have set up their Election Commissionsfor conducting elections to Urban Local Bod-ies. Elections to municipal bodies have beencompleted in many states.

3.5 Nagarpalika Act is a historical Act which providesfor major structural changes in local government in orderto restore rightful place of the Municipalities asdemocratic units in the present system of governanceand to give decision making powers to the people at theg r a s s r o o t s l e v e l .

Urban Land (Ceiling & Regulation) Act, 1976

4. The Urban Land (Ceiling & Regulation) Act, 1976came into force on 17th February, 1976 in the States ofAndhra Pradesh, Gujarat, Haryana, Himachal Pradesh,Karnataka, Maharashtra. Orissa, Punjab, Tripura, UttarPradesh and West Bengal and in all the Union Territories.The Act was subsequently adopted by the States ofAssam, Bihar, Madhya Pradesh, Manipur, Meghalayaand Rajasthan. Out of 4,06,222 applications filed inrelation to the excess vacant land, 2,59,177 cases havebeen decided by the State Govts./UTs so far. Out of2,20,674 hectares of land so far declared surplus, theextent of land taken over has been 15,320 hectares.Out of 1,28,124 applications submitted for grant ofe x e m p t i o n u n d e r S e c t i o n 2 0 o f t h e A c t , e x e m p t i o n s h a v ebeen granted in 53,953 cases involving 56,581 hectaresof land. So far 9,638 schemes have been received underSection 21 of the Act for construction of dwelling unitsfor the Weaker Sections of the Society. 2,984 schemesh a v e b e e n a p p r o v e d f o r c o n s t r u c t i n g 4 8 3 , 1 3 2 t e n e m e n t son 5,327.42 hectares of land.

4.1 Certain deficiencies and drawbacks have beenn o t e d i n t h e a c t a n d i t s i m p l e m e n t a t i o n . T h e G o v e r n m e n ti s , t h e r e f o r e , c o n s i d e r i n g v a r i o u s p r o p o s a l s t o a m e n d i tin order to make the Act more workable by shifting itst h r u s t f r o m a c q u i s i t i o n t o d e v e l o p m e n t o f e x c e s s v a c a n tland in urban agglomerations.

The Delhi Rent Act, 1995

5. The Delhi Rent Bill, 1995 was passed by both theHouses of Parliament. The Delhi Rent Bill, 1995 wasassented to by the President on 23.8.95 and has beenpublished in the Gazette of India Extraordinary Part-IISection I dated 23.8.95 as Act No: 33 of 1995.

5.1 The Government have received representation formaking changes in certain provisions of the Act. TheChief Minister, Government of NCT of Delhi appointedan All Party Committee to suggest changes in the Act.Suggestions from various quarters have been receivedand are under. examination. The suggestions relateprimarily to deemed rent, registration of tenancies,inheritability of tenancies, evictions, etc. and are underconsideration of the Govt. The Act will be brought intof o r c e s u b j e c t t o f i n a l d e c i s i o n i n t h e m a t t e r .

II SCHEMES

6. The Department of Urban Development isi m p l e m e n t i n g a n u m b e r o f c e n t r a l l y s p o n s o r e d s c h e m e sf o r a s s i s t i n g t h e s t a t e s i n m e e t i n g t h e c h a l l e n g e o f r a p i du r b a n i s a t i o n . B r i e f d e t a i l s o f t h e s c h e m e s i n t h e s p h e r eof urban development are given in the succeedingparagraphs.

Scheme of lntegrated Development of Small & MediumTowns (IDSMT)

6.1 The Centrally Sponsored Scheme of IntegratedDevelopment of Small and Medium Towns (IDSMT) wasinitiated in the VI Plan (1979-80). The Scheme hascontinued in the VII and VIII Plans. It aims at theimprovement of infrastructure in selected towns havinggrowth potential so as to enable them to emerge asregional centres of economic growth and employmentand facilitate arresting migration of population to largec i t i e s / t o w n s .

Constraints earlier faced in implementing the Scheme

6.2 Till 1994-95, almost the entire funding under IDSMT( C e n t r a l a n d S t a t e S h a r e s a n d i n s t i t u t i o n a l f i n a n c e ) w a sin the form of loan. Due to their unsound financialcondition, most of the municipalities found it extremelydifficult to tap institutional finance which was to the extent

of 40-70% of the project cost under the guidelines invogue. It was felt that in the absence of some elementof grant, it would not be possible for the municipalitiesto tap institutional finance to be able to take up a judiciousmix of remunerative, cost-recovery based and non-r e m u n e r a t i v e / s e r v i c e - o r i e n t e d p r o j e c t s . A c c o r d i n g l y , a sa result of mid-term appraisal of the Scheme during VlllPlan and keeping in view the provisions of theC o n s t i t u t i o n ( 7 4 t h A m e n d m e n t ) A c t , 1 9 9 2 , t h e g u i d e l i n e sfor implementing the IDSMT Scheme have beendrastically revised in August, 1995.

Salient Features of Revised IDSMT Guidelines(August 1995)

6.3 (i) Scheme Coverage:

IDSMT will be applicable to towns/cities withpopulation upto 5 lakhs (earlier limit was 3 lakhs) whereelections to the local bodies have been held. IDSMTw i l l n o t b e a p p l i c a b l e t o t o w n s c o v e r e d u n d e r t h e P r i m eMinister’s Integrated Urban Poverty EradicationProgramme (PMIUPEP), i.e., towns with populationbetween 50,000 and 1 lakh (C Category). For thiscategory, IDSMT components will have to be taken upunder PMIUPEP The Revised Scheme provides fordevelopment of a selected number of potential growthcentres by adopting a ‘whole town development’approach rather than spreading the funds too thinlyamong a large number of towns.

(ii) State Urban Development Strategy Paper:State Govts./UT Admns. are required to formulate

State Urban Development Strategy Papers and identifygrowth centres (priority towns) for funding under IDSMTwith comprehensive justification.

(iii) Grant-in-aid for preparation of Town DevelopmentPlans and Project Reports:

In accordance with the State Urban DevelopmentStrategy Paper and Town/City Master Plans: the Town/City Development (Investment) Plans and IDSMT projectr e p o r t s f o r i m p l e m e n t i n g t h e s e P l a n s a r e r e q u i r e d t o b ep r e p a r e d b y t h e m u n i c i p a l i t i e s . T o e n a b l e t h e p r e p a r a t i o nof such plans and project reports, grant-in-aid will beavailable to State Governments/Municipalities (throughthe State Nodal Agencies) on a 60 (Central Grant): 40(State Grant) basis with total cost restricted betweenRs. 3 lakhs and Rs. 6 lakhs depending upon thepopulation category of town.

(iv) Scheme Components:The components will consist of works having city/

townwide significance which are in accordance with theCity/Town Development Plans. These may include

strengthening of Master Plan roads (including streetlighting) and drainage works, development of bus/truckterminals, sites and services, market and shoppingcomplexes, tourist facilities, city/town parks, etc. Severalt o w n s h a v e b e e n benefited u n d e r ’ p r o j e c t s t a k e n u p u n d e rt r a f f i c a n d t r a n s p o r t a t i o n , m a r k e t s a n d m a n d i s a n d s i t e sand services components, etc.

(v) Financing Pattern:

The Scheme envisages a mix of grants (Central andState) and loans/internal (municipal) resources forIDSMT projects. Project cost, grant and loan/ internalresources components will vary between towns asfollows:

Category of Town/Population Range

Minimum Grant Loan/P r o j e c t % Internal

cost Reso-(Rs. lakhs) urces%

A (<20000) 1 0 0 8 0 % 2 0 %

B (20000-50000) 2 0 0 7 5 % 2 5 %c (50000-100000) 3 5 0 71,% 2 9 %D (l-3 lakhs) 5 5 0 6 4 % 3 6 %E (3-5 lakhs) 7 5 0 6 0 % 4 0 %

The Grant component is to be shared between theCentral and State-Governments in the ratio of 60:40.Thus. the maximum Central Grant permissible will varyfrom Rs. 48 lakhs (for A category) to Rs. 270 lakhs (forE category). The State grant will range from Rs. 32 lakhs(for A category) to Rs. 180 lakhs (for E category). CentralAssistance for ongoing schemes sanctioned in earliery e a r s w i l l h o w e v e r , c o n t i n u e a s a s o f t l o a n .

(vi) Revolving funds at municipal level are require? tobe set up for promoting self-sustaining development ofu r b a n i n f r a s t r u c t u r e .

(vii) Implementation Machanism:

At the Central level, the Town and Country PlanningOrganisation (TCPO), New Delhi is the Nodal Agencyfor appraisal, monitoring and evaluation of IDSMTp r o j e c t s , I D S M T p r o j e c t s a r e t o b e s a n c t i o n e d b y a S t a t eLevel Sanctioning Committee consisting of Central andState Government representatives. Based on thesanctions, Central assistance will be released.

Progress of IDSMT Scheme

6.4 From inception till date, 828 towns in 25 States and5 UTs have been covered under IDSMT and CentralAssistance of Rs. 258.05 crores released. As reportedby TCPO, the State Govt.s./UT Admns. have reported atotal expenditure of Rs. 349.32 crores till March. 1996.The estimated employment generated under IDSMT

Scheme till March, 1996 was 848.96 lakhs of mandays.As against the allocation of Rs. 96 crores and Rs. 88crores during the VI and VII Plans respectively, theallocation of funds for IDSMT during VIII Plan isRs. 155 crores including Rs. 35 crores for 1995-96. Thetargets and achievements during the first four years ofVIII Plan are given below:

(Rs. in crores)

Year Budget Funds Additional AdditionalAllocation Released Towns Towns

targetted covered

1992-93 15.00 11.60 33 441993-94 22.00 21.56 54 841994-95 25.00 24.41 72 1041995-96 35.00 29.65 82 79

[during1995-97]

Total: 97.00 87.16 241 311

6.5 The new IDSMT guidelines have beencommunicated to all concerned in August 1995. TheState Govts. have constituted the state level IDSMTSanctioning Committees and 79 towns were coveredunder IDSMT during 1995-96 as per the revised Schemeguidelines and Central grant amounting to Rs. 19.40crores released. The total Central Assistance ofRs. 87.16 crores released during the first four years ofthe VIIl Plan also includes an amount of Rs. 16.87 croreson account of subsequent/final instalments for ongoingprojects in 104 towns covered under IDSMT from VIIPlan onwards.

Mega City Scheme

7. The National Commission on Urbanisation hadrecommended that Central assistance be provided fordevelopment of infrastructure in cities of nationalimportance. Considering this and the persistentdemands by the’ccncerned State Governments, theCentrally Sponsored Scheme of lnfrastructuralDevelopment in Mega cities has been introduced from1993-94.

7.1 The salient features of the Scheme are:

(a) It is applicable to Bombay, Calcutta, Madras,Bangalore and Hyderabad.

(b) It is administered through the Ministry of UrbanAffairs & Employment and funds would bechannelised through a special institution/ nodalagency at the State level.

(c) the fund sharing between Central Govt. andState Govt. is 25% : 25% and the balance 50%

(d)

(e)

(f)

is to be met from institutional finance, throughpublic financing institutions or capital market.

The nodal agency would provide project relatedfinance for urban infrastructure including watersupply, sewerage, drainage, sanitation, citytransport, land development, slum improvement,solid waste management etc.

The projects to be included under the Schemeare of three categories:

(i) basic services where minimum returns arenot expected and for which loans couldbe at marginal or zero interest rate andsome grants could be provided:

(ii) Where user charges could be levied -for which loans could be at 8%; and

(iii) Projects which are remunerative and forwhich loans would be given at market rateof interest.

The Mega City Scheme nodal agencies are re-quired to constitute a Revolving Fund with thehelp of the Central and State share. It is stipu-lated that after accounting for interest on bor-rowed capital etc., a minimum of 75% shouldremain in the Corpus of each Nodal Agency atthe end of Ninth Plan (2092). The objective isto create and maintain a special fund for thedevelopment of infrastructural assets on a sus-tained basis.

7.2 The nodal agencies for the Mega City Scheme are:

Bombay Bombay Metropolitan Region Develop-ment Authoriiy (BMRDA)

Calcutta Calcutta Metropolitan DevelopmentAuthority (CMDA)

Madras Metropolitan Infrastructure DevelopmentCorporation (MIDC)

Hyderabad Hyderabad Urban Development Authority(HUDA)

Bangalore Karnataka Urban Infrastructure Develop-ment Finance Corporation (KUIDFC)

Projects under the Scheme are to be sanctioned by aState Level Sanctioning Committee with three membersfrom the State and two members from the CentralGovernment. Joint Secretary (UD) of Ministry of UrbanAffairs and Employment and Adviser (HUD), PlanningCommission are the Cen t ra l Gove rnmen trepresentatives in the Project Sanctioning Committee.

7.3 The 8th Plan indicated an outlay of Rs. 700 ctoresfor this Scheme (Bombay - Rs. 200 ctores, Calcutta -Rs. 200 crores, Madras - Rs. 100 crores, Hyderabad -Rs. 100 crores and Bangalore - Rs. 100 crores). During93-94, an amount of Rs. 70 crores was released by thePlanning Commission - treated as CentralGovernment’s share for the Scheme. In addition, anamount of Rs. 50 lakhs (Rs. 10 lakhs each for the fivemega cities)) was released for undertaking preliminarystudies/project preparation exercises. During 1994-95,Rs. 74.5 crores were released to the five mega cities asCentral Share (Bombay - Rs. 16.1 crores, Calcutta -Rs. 16.1 crores, Madras R s . 1 1 . 1 crores, Bangalore-Rs. 20.1 crores and Hyderabad - Rs. 11 .1 crores).During 1995-96, Rs. 83.5 crores were released underMega Cii Scheme (Bombay - Rs. 18.0 crores, Calcutta -Rs. 18.0 crores, Madras - Rs. 17.0 crores Bangalore -Rs. 15.0 crores and Hyderabad - Rs. 15.5 crores). Anamount of Rs. 8.00 lakhs each was also released to thefive mega cities for taking up feasibility studies,preparation of Mega City Development Plans etc.

7.4 The works on the project to be implemented underthe Mega City Scheme have been commenced by theState Governments. According to the Schemeguidelines, the State level Project SanctioningCommittee will approve projects and CentralGovernment will have only a monitoring/reviewing role.The Sanctioning Committee in all the Mega Cities haveapproved projects for implementation. By 31.3.96projects amounting to Rs. 1245.66 crores have beenapproved by these Committees.

Urban Mapping

8. The fast growth of urban areas both physically anddemographically has resulted in rapid changes intownship structure, land use patterns, physicalinfrastructure base as well as so&-economic activities.However, the mapping of towns and cities incorporatingall such changes from time to time has not kept pace.Due to this many urban areas in the country do not haveup to date base maps today. The National Commissionon Urbanisation in their report has recognised theinadequacy of proper base maps for majority of the urbancentres and suggested preparation of latest base mapsand their periodic updating by the use of moderntechniques of aerial photography and remote sensingfor all the towns and cities. To meet the requirements ofbase maps for towns and cities, a scheme for preparingurban maps using aerial photography was proposedduring the 8th Five Year Plan so as to enable updatingof the maps in a revision cycle.

8.1. The major objectives of the Urban MappingScheme are:- to obtain aerial photographs and photo mosaics

for the selected priority cities on a scale of1 10,000.

- to develop technical capabilities of Town Plan-ning Organisations at Central and State levelsin terms of manpower and equipment for inter-pretation and use of aerial photographs forpreparation of urban maps.

- to prepare base maps, with necessary specifi-cations and details for the selected prioriiy cit-ies on 1:2500 scale coinciding with the legaland technical requirement of town planning ex-ercises; and

- to generate digital graphic inputs for GeographicInformation Systems for updating base mapsin revision cycle.

8.2. In consultation with State Governments, TCPOhas identified 25 towns from various States, to becovered under the first phase of scheme. Aerialphotography for ten towns has already been taken bythe National Remote Sensing Agency (NRSA) and forthree more towns, part of the job of aerial photographyhas been completed. Urban Mapping for the 25 townswill involve aerial photography, ground control/truth datagathering, rectification of aerial photographs andpreparation of base maps by NRSA within next threeyears. On receipt of the these maps, the same can beused by the State Town Planning Departments for thepreparation/revision of developmental plans of therespective towns as an immediate use. Simultaneously,TCPO in collaboration with the concerned State TownPlanning Departments would undertake interpretationof aerial photographs and collection of other secondarydata/information to generate thematic maps/layers asgraphic and attribute data base for the development ofGIS and processing of information for use of TownPlanning Departments, local bodies, developmentauthorities, PWD, Tax Departments and other sectoraldevelopment agencies, as multi-purpose maps.

8.3. The allocation for the project together with researchand training in urban and regional planning included inthe 8th Five Year Plan is Rs. 5.50 crores. A sum of Rs.6.08 crores has already released to TCPO under thescheme up to March, 1996 out of which a sum of Rs.2.59 crores has been paid to NRSA as an advancepayment for the work of aerial photography and basemapping and Rs. 21 lakhs have been utilised forupgrading hardware/software facilities and training ofpersonnel. Considering the importance of the Urban

Mapping scheme, the Planning Commission has beenrequested to enhance the allocation under the UrbanMapping Scheme (including research and training)to Rs. 19 crores during the 8th Five Year Plan.

Provision of lnfrastructural Facilities in theDisplaced Persons’ Colonies in West Bengal.

9 . After considering a note submitted by theMinistry of Rehabilitation in 1976, the Cabinetapproved the proposal to fund infrastructuraldevelopment in displaced persons’ (East Bengalrefugee) colonies in West Bengal. A total number of103157 plots for refugees waere to be developedcovering 612 colonies at a cost of Rs. 23.85 crores.

9.1. The various components of development in therefugees’colonies included provision of water supply,drainage, roads and pathways, sanitation and otheritems (at the rate of Rs. 2500 per plot in CalcuttaMetropolitan Development Authority (CMDA) area andat Rs. 1700 per plot in non-CMDA areas). In the 1 stphase, 12000 plots were taken up at a cost of Rs.2.68 crores (implemented during 1976-82). 2ndphase was approved in 1982 for developing 29,825plots at a cost of Rs. 7 crores. The balance plots wereproposed to be covered in the 3rd phase. Before thethird stage was taken up, the State Govt. and theMinistry of Home Affairs raised certain issues suchas increase in the ceiling cost of development andinclusion of additional 607 post 1950 colonies in theprogramme. The Ministry of Home Affairs appointeda Technical Group to examine the cost of developmentand in 1987, the Technical Committee recommendeda uniform amount of Rs. 11,931 per plot. Meanwhilethe State Govt. reported that 59,132 plots weredeveloped as against 41,825 plots approved for phaseI and II. The State Govt. had incurred an expenditureof Rs. 12.01 crore as against the Central Grant ofRs. 9.68 crores.

9.2. After detailed examination of the issues inconsultation with the Ministry of Home Affairs, theState Government and the Planning Commission,proposals were submitted by this Ministry to theCommittee of Secretaries. Based on the decisions ofthe Committee of Secretaries, revised proposals wereput up to the Cabinet which approved in January,1995, a revised ceiling cost of Rs. 17,777/- per plotfor development, reimbursement of Rs. 2.33 croresto the State Government and provision of Rs. 78crores in the Central budget to be released to the StateGovt. as grant for completing action on the balance

44,025 plots (originally approved by the Cabinet in1976) in a phased manner.

9.3. During 1995-96, a budget provision of Rs. 20crores was available, out of which Rs. 2.33 croreswere provided to the Government of West Bengal forreimbursement of the expenditure already incurred.On the basis of recommendations of the ProjectImplementation Committee appointed for the purpose,the Ministry has released the entire amount of Rs. 20crores to the Government of West Bengal.

EXTERNALLY AIDED URBAN DEVELOPMENTPROJECTS

I. World Bank aided Urban Development Projects

10. The World Bank is assisting various StateGovernments in the implementation of UrbanDevelopment Projects. At present such projects areunder implementation in the States of Uttar Pradeshand Tamil Nadu. The Urban Development Projectwhich was under implementation in Gujarat wasclosed on 31 st March, 1995. The details of the on-going Projects are shown in the Table below. TheProject covers several Sectors/Areas such as Sitesand Services/Area Development,T ransport, Low CostSanitation, Water Supply, Solid Waste Management,Shelter/Slum Upgradation, Municipal DevelopmentFund, etc. The Ministry of Urban Affairs & Employmentmonitors the implementation of World Bank AidedProjects in States.

10.1 Proposals for urban development projects werereceived by the Ministry of Urban Affairs &Employment from the States of Kerala, Orissa andMadhya Pradesh for seeking assistance from theWorld Bank. The Government of Maharashtra alsoforwarded a request for World Bank assistance forthe proposed Bombay Urban Infrastructure Project.These projects have been recommended by thisMinistry’to the World Bank through the Deptt. ofEconomic Affairs. However, due to a rethinking in theWorld Bank on their policy towards financing UrbanSector projects in India, these projects have not yetbeen formally appraised by the Bank for possiblefunding. The matter has been taken up with the Deptt.of Economic Affairs and action on the proposed/pipeline projects will be taken on receipt of decisionof the Bank. It is likely that the Bank may favourlending for urban sector projects through financialintermediaries. This issue was discussed in theworkshop jointly held by this Ministry and the WorldBank during 8-9 March, 96 at Hyderabad. Finaldecision from the Bank is awaited.

SI.No. Project

1. Uttar PradeshUrban Dev.Project

2. Tamil NaduUrban Dev.Project

Period Original Cost Revised ,Cost Revised Expenditure(Rs. in Crores) Credit upto

(Cr. SDR Million) 30.09.95

Feb. 88 to March, 1996 (Extension has 246.12 346.12 83.9 282.66been sought upto March, 1997).

March 88 to Sept., 1996 (Extension was 632.55 988.50 267.00 640.95granted upto September, 1996)

II. Asian Development Bank Assisted UrbanDevelopment Projects

11. As per an agreement signed between the AsianDevelopment Bank (ADB) and the Government ofKarnataka, a Technical Assistance (TA) project wasimplemented to conduct a study in connection with thepossible financing of an Urban infrastructureDevelopment Project in Karnataka with the support ofADB. Based on the TA report an agreement has beenreached between the ADB, Government of Karnatakaand Government of India for the financing of an UrbanInfrastructure Development Project at an estimated costof US $ 132.00 million (about Rs. 440 crores). Theobjective of the project is to promote decentralisation ofeconomic growth away from the rapidly expandingBangalore City, lessen the strain on its existinginfrastructure system and check the deterioration of livingconditions in the city.11 .1 Another proposal of Government of Karnatakafor financial assistance for development of West CoastDistricts of Karnataka has been recommended to DEAwho have posed the project to ADB. The estimated costof the project is Rs. 758 crores out of which externalassistance component is Rs. 430 crores.

11.2 This Ministry has recently given clearance forundertaking a Technical Assistance Project in connectionwith a possible Urban Infrastructure Development Projectcovering six towns in Rajasthan with the support of ADB.

11.3 A Technical Assistance project based onagreement between ADB and Ministry of Urban Affairs &Employment was signed during 1994 involving financialassistance amounting to US $ 435,000. This project iscurrently under progress. Out of the total amount of US$ 435,000, a sum equivalent to US $ 35,000 is to bemet by the Government of India in kind. The TechnicalAssistance is primarily meant for a review of urban sectorpolicies and programmes with a view to determining thepotential for ADB investment in the urban sector of thecountry.

Matters Relating to Research Projects/Studies

12. This Ministry considers various researchproposals submitted by Government, Semi-Government,Academic and Research Institutions and VoluntaryOrganisations and releases grant-in-aid to them. Thesefunds are mainly released for conducting researchstudies pertaining to subjects such as the Evaluation ofOn-going Plan Schemes in the Urban Development andHousing sector Urban Management, Upgradation of theFinancial and Administrative Capability of the UrbanLocal Bodies, System of Devolution of State Resourcesto Municipalities, Operation of Urban Land Market,Measures for Promoting Privatisation/Public-PrivatePartnership, etc. and also for relevant TrainingProgrammes for Municipal/Town Planning functionaries.

12.1 Some of the important research/training projectsundertaken during 199596 are as follows:-

(i)

(ii)

(iii)

(iv)

(v)

(vi)

IDSMT Training Programmes by TCPO, Schoolof Planning and Architecture, Ahmedabad andRegional Centres for Urban and EnvironmentalStudies, Hyderabad;

Studies in connection with (a) Inter-MinisterialTask Force on Urban Perspective and Policiesand (b) Technical Groups on Urban Perspective,Financing of Urban Infrastructure and UrbanPlanning System;

Organisation of the 4th Meeting of State FinanceCommissions;

Preparation of Sectoral Housing Action Plan ofMadhya Pradesh;

Seminar on Potentiality and Problems of SmallTowns in North East India;

Lectures by Mr. Liu Thai Ker, former ChiefPlanner of the city of Singapore on PlanningExperiences in Singapore and Public Housingin Singapore.

(vii) Development of Strategy Papers on the CriticalAreas of the Urban Environment, Water Supply,Sewerage and Sanitation, Solid WasteManagement, Urban Air Pollution Control, andInstitutional Strengthening for the Protection andPreservation of the Urban Environment.

12.2 This Ministry has entered into a collaborativeagreement with ODA for undertaking a project:UrbanManagement Development Programme in India withsupport from ODA. The objective of the project is toenhance the management capabilities of professionalsin Urban Management. The programme would alsoprovide a framework for better production of Projectproposats and plans for action in specific programmessuch as Integrated Development of Small & MediumTowns, Service Maintenance, Resource Mobilisation,Urban Basic Services and Land Management. Theduration of the collaborative arrangement is for a periodof two years initially.

12.3 The Towns & Country Planning Organisation ofthis Ministry is the nodal agency for the programme.Besides TCPO, two institutions, namely Regional Centrefor Urban and Environmental Studies, Hyderabad andSchool of Planning & Architecture, Ahmedabad, havebeen identified as the core institutions for theprogramme. Trainers from these institutions are now

imparting training to the field staff engaged in theimplementation of Centrally Sponsored Schemes suchas IDSMT. They are taking assistance of othersupporting institutions in the country.

Prime Minister’s Award for Excellence in UrbanPlanning and Design.

13. It has been decided with the approval of the PrimeMinister to institute two National Awards for:-

(i) implemented Urban Planning and DesignProjects. signifying built environment ofexceptional quality; and

(ii) innovative ideas/concepts and plans in UrbanPlanning and Design, where the projects arestill in the pipeline or at implementation stage.

13.1 These Awards are open to all Indian Architects,Town Planners and Allied Professionals, their firms andgovernment, public and private sector institutions/organisations who have planned/implemented projectsanywhere in India.

13.2 The first Prize in each category will carry a cashaward of Rs. 5 lakhs including a citation and the secondPrize will carry a cash award of Rs. 2.50 lakhs includinga citation. It has been proposed to award these prizeson a biennial basis commencing from 1995-96.

5

URBAN TRANSPORT

The pervasive influence of Urban Transport on cityenvironment is increasingly attracting the attention ofdiscerning city dwellers and the Government. It is beingappreciated that growth of urban transport influencesthe efficiency and economy of the city, determines thedistribution of activities within and around it, affects itsquality of life, its energy needs and the safety and welfareof its people. More importantly, Urban transportcontributes to the economic output of urban areas andenables this enhanced output to be utilised for thedevelopment of the surroundng hinterland and ruralareas.

Growth of vehicles in urban areas

2. The increase in population of cities due to naturalgrowth and migration has resulted in substantial increasein traffic demand. However, investment in public transportfacilities has not kept pace with this growing trafficdemand. The total number of vehicles in the countryhas gone up enormously in the last few decades, asmay be seen from the table given below:-

Per iod No. o f veh ic les Compos i t i on o f veh ic les (%)(in thousands) Buses Cars Two-wheelers Others

1960-61 4 9 7 11.47 62.37 17.71 8.451970-71 1522 6.18 44.81 37.84 11.171980-81 4 6 4 6 3.31 24.04 54.41 18.23

1989-90 15593 1.88 15.33 69.40 13.38

(Source: CIRT (1991) Performance Statistics of STUs 1988-89 and1989-90’& Review of Per formance 1989-90, Pune, P. 153)

3. In particular, there has been a virtual explosionin the number of motor vehicles in Delhi. The totalnumber of automotive vehicles in the national capitalhas gone up from a mere 0.54 million as on 1.4.81 to2.54 million as on 1 .10.95. This was more than the totalnumber of motor vehicles of all types in the other threemajor metropolitan cities of Calcutta, Bombay andMadras put together.

Need of Mass Transport Systems

4. There has been a phenomenal increase in thenumber of personalised vehicles in the urban areas. Thepercentage of buses, which was 11.5 per cent in 1961,decreased to a mere 1.9 per cent by 1990 and it is

estimated that it will further go gown to 1.3 per cent bythe year 2001 A.D. The share of personalised vehicles,on the other hand, has gone up sharply and now standsat 84.7 per cent of the total number of vehicles in theurban areas. Such a situation has resulted inunprecedented traffic congestion, unbearableatmospheric and noise pollution and increased accidentrates in most of the metropolitan cities in India. To tacklethis problem, introduction of multi-modal mass rapidtransit (MRT) systems in our metropolitan cities is ofutmost importance. However, such systems are highlycapital intensive and it has not been possible either forthe Government of India or for the concerned StateGovernment to provide adequate funds for theseprojects. Resources for such projects have, therefore,to be raised through loans, dedicated levies and taxesin the concerned cities and property development, etc.

Nodal Ministry for Urban Transport

5. The Ministry of Urban Affairs & Employment hasbeen entrusted with the responsibility of ptanning andcoordinating Urban transport matters in the country.However, staff support for the Urban Transport Divisionin the Ministry is still lacking. The Ministry extendsfinancial assistance to the State Governments/UnionTerritory Administrations to carry out feasibility studiesin the urban transport sector for various cities andcoordinates in exploring ways and means of funding MRTsystems in such cities.

6. During the year 1995-96, a sum of Rs. 7 croreswas provided for Urban Transport. This was utilisedmainly for assisting State Governments/Union TerritoryAdministrations in carrying out feasibility studies/preparation of detailed project reports for the Delhi MRTSand other projects and commissioning other studies inthe field of urban transport for selected cities in thecountry.

Urban Transport Projects in the country

Delhi

7. A proposal has been taken up for implementing aRail-based Mass Rapid Transit System (MRTS) in Delhi,keeping in view the acute problem of road congestionand air pollution prevailing in the city. The Governmentof NCT of Delhi is expected to be an equal partner inthe funding and implementation of this project. Whilethe complete network for the Delhi MRT Systemproposes to cover 184.5 Kms., the modified first phaseof the project envisages to cover 55.3 Kms. Loanassistance for the project has been sought from the

OECF (Japan) and the technofinancial appraisal of theproject by the OECF has been done under its SAPROFScheme. A company under the name and style of theDelhi Metro Rail Corporation Limited (DMRC Ltd.) hasbeen incorporated on 3.5.95 in pursuance ofGovernment decision. At present the company has apaid up share capital of Rs. 3.60 crores. The detailedproject report for the Modified Phase-l prepared byRITES estimates that this phase would costapproximately Rs. 4182 crores at April, 1995 prices andwill take about 10 years for its completion, after finalinvestment approval is accorded and funds are madeavailable.

Bombay

8 . An Urban Transport Project in Bombay (BUTP-II)comprising of a road component as well as a railcomponent is being processd by the Government ofMaharashtra and BMRDA in consultation with theMinistry of Railways. Detailed studies in this regard havebeen taken up with World Bank support, based on whichthe final project is expected to be firmed up.

Calcutta

9 . An under-ground Metro Rail Corridor has startedfunctioning in Calcutta covering a length of 16.45 Kms.from Dum-Dum to Tollygunj. A proposal has beenmooted by the Government of West Bengal for extensionof this facility by a further length of 8.48 Kms. fromTollygunj to Garia. The proposal has been referred backto the Government of West Bengal for indicating theirwillingness to share a part of the cost of the project.

Madras

10. A surface-cum-elevated MRT System covering alength of about 5.05 Kms. from Beach to Chepauk hasstarted functioning in Madras. The line is sought to beextended upto Luz (3.5 Kms.) by the Ministry ofRailways. A proposal has also been received forextension of this line further from Luz to Taramani.Modalities of financing this line are under discussionbetween Government of Tamilnadu and Ministry ofRailways.

Hyderabad and Bangalore

11. The Government of Andhra Pradesh hasproposed the implementation of a Light Rail TransitSystem (LRT) in Hyderabad through joint public andprivate sector participation, but the proposal has notmade much progress due to lack of financial participationby the State Government. The Government of Karnatakaalso proposes to implement a similar Light Rail TransitSystem, with public and private sector participation, forthe city of Bangalore.

Formulation of National Urban Transport Policy

1 2 . With a view to implement the National UrbanTransport Policy, Ministry of Urban Affairs andEmployment initiated a study in 1993 through M/s. RailIndia Technical and Economic Services Limited, whichcovers a study of a sample of 21 cities in India. A draftreport in this regard has been prepared by M/s. RITESand is under discussion with them. The objective of thisstudy is to create a proper institutional framework andexplore possible methods of funding Urban Transportprojects in the country It is expected that the final reportby M/s. RITES would become available during the earlypart of 1996-97.

6

WATER SUPPLY & SANITATION

Water Supply & Sanitation are basic necessitiesaffecting the quality of life in urban areas, The Ministry’srole is to supplement the sector through policyformulation, technical guidance, Central assistance,training, workshops, research and internationalcooperation. The programmes undertaken during 199596 are as under:-

Low Cost Sanitation for Liberation of Scavengers:-

2 . This Centrally sponsored scheme is underimplementation through this Ministry since 1989-90. Itprovides for conversion of existing dry latrines into lowcost water seal pour flush latrines and construction ofnew sanitary units where none exist to prevent opendefecation. The basic objective is to liberate thescavengers from the obnoxious practice of carrying headloads of night soil and the scheme is being implementedon a ‘whole town’ basis.

2 . 1 The scheme is operated by providing subsidy fromthis Ministry and loans from HUDCO in a synchronisedmanner so that the conversion/construction of low costsanitation units and liberation of scavengers is done on‘whole-town’ basis. The financing pattern is as follow:-

Benef ic ia ry Monthly Income Loan Subsidy Beneficiarycategory cont r ibu t ion

EWS Upto Rs. 1250 50% 45% 5%

L I G Rs.1251 to Rs. 2650 60% 25% 15%

M I G Rs. 2651 to Rs. 4450 75% N i l 25%

H I G above Rs. 4450 75% N i l 25%---~- ~-- - -The Central subsidy and loan are released by HUDCOdirectly to the local bodies or the nodal agenices identifiedby the State Governments. The repayment period forthe HUDCO loan is a maximum of 7 years and theinterest rate for all categories is 10.5%.

2.2 The per unit cost fixed upto plinth level are:-

(i) 5-user units - Rs. 3000/-(ii) lo-user units - Rs. 4500/-

(iii) 15-user units - Rs. 5250/-

An additional 25% over these amount is also availableto hill areas and the North-Eastern States.

2.3 A Task Force of the Planning CornmissIonconstituted in 1988-89 had estimated that there are 72. 1lakhs dry latrines and 4 lakh scavengers in the urbanareas. As per available reports, the total number of drylatrines converted and new latrines constructed are4,99,626.

2.4 The Employment of Manual Scavengers andConstruction of Dry Latrines (Prohibition) Act, 1993 wasenacted by the Central Government on 5.6.93. It was amilestone achieved to bring about an element ofcompulsion on the society towards abolishing mannualscavenging. In order to step up the progress of thisscheme, the Chief Ministers were requested by the UnionMinister for Urban Development to take appropriate steps

to make the country scavenger-free by the target dateof March, 1997. This was followed up with a meetingwith the concerned State Secretaries on 17.11.95 andagain on 12.3.96. The physical and financial progressof the scheme is at Annexure-1.

Accelerated Urban Water Supply Programme(AUWSP)

3 . This Centrally scheme sponsored was launchedin 1993-94 to provide safe and adequate water supplyfacilities to the entire population of the towns havingpopulation less than 20,000 (as per 1991 Census j inthe country within a fixed time frame since these townshave a low economic base. The scheme is funded bythe Central and State Governments in the ratio of 50:50.Out of the 8th Plan allocation of Rs. 50 crores, Hs. 48 49crores has been I eleased against 204 sanctionedscheme upto 31.3.96. Rs. 20 crores has been proposedin the budget estimate for 1996-97. The StateGovernment’s response to the scheme has beenencouraging. A statement showng the financial progressduring the last 3 years is at Annexure-II

Solid Waste Management

4 . The Urban Local Bodies and Municipalities areprimarily responsible for the formulation andimplementation of schemes for management of urbanwaste. The Ministry’; role is to a c t as a facilitatorwherever possible4 . 1 The problem of waste man agement around thevicinity of IAF airfields has been e g a g i n g the attention.of the Government for quite some time Open dumpingof waste and carcass disposal attract birds, which havecaused a number of air accidents An Inter-MinisterialJoint Sub-Committee constructed by the Ministry ofDefence had, therefore, recommended that propersanitation facilities, including solid waste management,

should be provided at the following 10 airfields toovercome the bird menace:--

(i) Gwalior (M.P.)(ii) Ambala (Haryana)(iii) Hindon (U.P.)

(iv) Jodhpur (Rajasthan)

(v) Tezpur (Assam)

(vi) Dindigul (Andhra Pradesh)

(vii) Sirsa (Haryana)(viii) Adampur (Punjab)

(ix) Pune (Maharasthra)

(x) Bareily (U.P.)

4.2 It was initially decided that the concerned StateGovernments and Urban Local Bodies should share one-third of the cost as they would benefit from thisprogramme for maintaining a clean city. Accordingly, theywere requested to formulate and submit detailed projectproposals for consideration. Since there was noresponse, from the State Govts., the matter wasreviewed by the Central Government and it was furtherdecided that 100% Central assistance would be providedthrough this Ministry for improvement of water supply,sewerage/sanitation and solid waste management.Improvement of slaughter houses and carcass disposalwould be assisted through the Ministry of Agriculture.

4.3 A provision of Rs. 45.0 lakhs had been made inthis Ministry’s budget during 1995-96. The matter waspursued with the concerned State Governments andMunicipalities for taking remedial action within a radiusof 10 Kms. around the airfields and submission ofcomprehensive project proposals. HUDCO andCPHEEO are assisting in the preparation of feasibilityreports for the project towns of Ambala, Sirsa. Gwalior,Jodhpur, Hindon and Tezpur A meeting was convenedby the Ministry on 17.10.95 to review the progress andexpedite proposals for consideration. Further follow-upaction is being taken by the concerned authorities.

4.4 A Pilot Demonstration Project on Solid WasteManagement was commissioned by the Hon’ble ChiefMinister of Goa at Panaji on 3.10.95. It is a modern,well-synchronised system based on the concept ofcommunity participation. The UNDP/ World Bank andthis Ministry had provided technical and financial supportfor the implementation of this project. The Ministry hadcontributed Rs. 12.0 lakh for the project costing Rs. 79lakhs during 1994-95. The project report has been sentto all State Governments and Union Territories for theirinformation and guidance.

PHE Training

5 . Development of trained manpower is one of thethrust areas of the Ministry, The CPHEEO organisesvarious training courses through academic institutes andfield departments. Grants are provided to recognisedPublic Health Engineering Colleges and traininginstitutions for conducting post-graduate, short-term andrefresher courses. About 1280 (tentative) in-serviceengineers and technical personnel have been benefitedfrom this programme during 1995-96 as detailedbelow:-- Post Graduate Courses - 80 Degree engineers.- Short-Term courses - 100 Diploma engineers.- Refresher courses - 1100 Engineers and

Technicians

Grants amounting to Rs. 67.66 lakhs were sanctionedduring 1995-96.5.1 Besides Central assistance, the Ministry haddeputed about 60 officials from the State Governments,UTs, etc. for advanced training programmes andworkshops in U.K., U.S.A., Sweden, Japan. Malaysiaand South Korea under various fellowships and ColomboPlan training programmes.

Seminars/Workshops

6 . A National Workshop on Solid Waste Managementwas organised by the Ministry in collaboration with theWorld Health Organisation at New Delhi on the 7th and8th April, 1995, The Workshop was inaugurated by Smt.Sheila Kaul, former Minister for Urban Development andattended by officials from the State Governments/Municipalities, public and private sector.The proceedingsof the workshop have been circulated to all StateGovernments for follow-up action.6 . 1 A training programme on computer aided designof watertreatment plants was sponsored by the Ministryat Sri Jayachamarajendra College of Engineering.Mysore from 8th to 13th April, 1995. About 20participants attended the workshop.6.2 An Indo-French Workshop on Sustainable PublicUtilities in Urban Areas was organised by the Ministryand the Governnient of France in New Delhi on the 21 stand 22nd November, 1995. The workshop wasinaugurated by His Excellency, Mr. Philippe Petit.Ambassador of France and attended by officials fromthe State Governments, Municipalities, public and privatesector companies and international organisations. Itprovided a forum to discuss the possibilities of public-private partnerships in the management of urban utilities.French and Indian experiences as well as future scopeof cooperation.

6.3 A workshop on preparation of the Manual onOperation & Maintenance of Water Treatment Plantsand Distribution System was organised by the Ministryin collaboration with the Hyderabad Metropolitan WaterSupply and Sewerage Board (HMWSSB) at Hyderabadfrom 18-20th January, 1996. It was attended by the ChiefEngineers and sector professionals. The workshop wasfunded by the W.H.O.

Management information System (MIS)

7 . Management information System (MIS) is anessential tool for establishing a strong data base, whichwould facilitate the process of planning and decisionmaking. A computer based MIS software has since beendeveloped and distributed to all States/UT PHEDepartment/Water Supply and Sanitation Boards. Useof the software has been demonstrated in workshopsand meetings. At the same time, it is essential to createmonitoring cells at the State and Central levels foreffective use of the system. This has not taken place tothe desired extent mainly due to financial constraints atthe State level. It has also not been possible to provideany Central assistance to the States in this regard.Hence, the expenditure under the Ministry’s budgetprovision has been negligible.

External Assistance

8. Water Supply & Sewerage projects requireconsiderable investment. The resources allocated underthe State Plans are wholly inadequate, particularly inview of the inter-se priorities. One of the policy issueshas been to encourage external assistance for viableprojects and to make them sustainable through adequatecost recovery.

8 . 1 The World Bank is the major lending agency inthis sector followed by the Overseas EconomicCooperation Fund (OECF) of Japan. Efforts are alsobeing made by the Government to obtain externalassistance from bilateral agencies. A list of externallyaided projects and those in the pipeline/underconsideration is at Annexure-III to Annexure V.

8.2 The World Bank approved a loan of US $275.8million on 20.6.95 for the II Madras (New Veeranam)Water Supply Project estimated to cost Rs. 1638.037crores. The project envisages augmentation of watersupply to Madras city from Veeranam irrigation tank overa distance of 235 Kms., improving the distribution and

strengthening the conservation of water. The World Bankalso approved a loan of US $ 192 million on 6 7.95 forthe Bombay Sewage Disposal Project estimated to costRs. 1003.80 crores. The project envisages completionof the Sewerage works in Bombay. It includesconstruction of marine outfalls at Worli and Bandra fordisposal of primary treated sewage in the sea, pumpingstations, aerated lagoons, as well as low cost sanitationfor slum dwellers.

8.3 The OECF, Japan approved a loan assistance ofJapanese Yen 28,452 million on 19.1.96 for BangaloreWater Supply & Sewerage Project, estimated to costRs. 1072 crores. The project envisages drawal of 270mld of water from the river Cauvery to Bangalore over adistance of 80 kms., laying of trunk mains, distributionsystem and laying sewer mains. The OECF has alsoapproved a loan of Japanese Yen 8670 million on 19.1.96to HUDCO for Urban Water Supply & SanitationImprovement Programme. The project envisagesimprovement of water supply, sewerage and/or drainageand solid waste management in India through HUDCO’Sfinancing scheme.

8.4 The World Health Organisation providedassistance under the Project IND CWS 001-UrbanCommunity Water Supply & Sanitation during 1995 forsponsoring officials for study tours. international trainingworkshops, conferences, consultancy studies andprocurement of supplies and equipments. The UNDP/World Bank-Regional Water and Sanitation Group forSouth Asia also assisted in the development of the sectorby providing support for pilot projects and participationin workshops/meetings.

Technical clearance of urban water supply &sanitation schemes

9 . A list of Schemes cleared by the CPHEEO in theMinistry from technical angle during 1995-96 is atAnnexure-VI

Manual on Sewerage and Sewage Treatment

10. The Manual on Sewerage and Sewage Treatmentwas revised and updated by an Expert Committeeconstituted by this Ministry. The Manual has been printedand circulated to the State PHE Departments/WaterSupply & Sanitation Boards. Copies would also beavailable through the Government sales counters.

LOW COST SANITATION FOR LIBERATION OF SCAVENGERS

Financial progress of Schemes upto 31.3.96

1 No of Schemes sanctioned

2 . No. of Towns sanctioned

3 . Project cost of sanctioned schemes

4. Subsidy sanctioned

5. Loan sanctioned

6 Subsidy released

(a) upto 31.3.95

(b) from 1.4.95 to 31.3.96

7. Loan Released

(a) upto 31.3.95

(b) from 1.4.95 to 31.3.96

Physical Progress of Schemes upto 31.3.96

1 No. of units sanctioned for conversion

2 No. of units sanctioned for new construction

3. No. of Scavengers to be liberated

4 No. of units completed

5 No. of units in progress

-

-

-

-

-

-

-

-

-

-

-.

- 16,84,495

.- 12.84,981

- 1,04,918

- 4,99,626

- 57,750

698

1064

Rs. 888.74 Crores

Rs. 294.94 Crores

Rs. 415.78 Crores

Rs. 133.89 Crores

Rs. 114.47 Crores

Rs. 19.42 Crores

Rs. 134.02 Crores

Rs. 122.26 Crores

Rs. 11.76 Crores

Annexure - II

AS ON 31.3.96

CENTRALLYSPONSORED ACCELERATED URBAN WATER SUPPLY PROGRAMME (AUWSP) FINANCIALPROGRESS DURING 1993-94 to 19951996

(Rs. lakhs)

SI. State 8th Plan No. of Total Funds Released (Central Share)No. Allocation D P R’s Estimated

Approved cost1993-94 1994-95 1995-96 Total

1 2 3 4 5 6 7 8 9

1 . Arunachal Pradesh 16.95

2 . Assam 111.62

3 . Bihar 261.94

4 . Goa 32.59

5 . Gujarat 280.27

6 . Haryana 109.22

7 . Himachal Pradesh 41 .12

8 . Jammu & Kashmir 50.00

9 . Karnataka 337.74

10. Kerala 120.83

I l . Madhya Pradesh 784.50

12. Maharashtra 332.03

1 3 . Manipur 35.35

1 4 . Meghalaya 30.00

1 5 . M izoram 18.27

1 6 . Nagaland 8.78

1 7 . Orissa 209.58

1 8 . Punjab 114.57

1 9 . Rajasthan 321.57

20. Sikkim 2.65

21. Tamilnadu 319.95

22. Tripura 23.46

23. Uttar Pradesh 1269.12

24. West Bengal 167.89

3

2

8

6

4

2

7

1

51

6

5

1

1

3

3

18

-

204.53

319.89

1607.38- -

10 438.62- -

69 5858.67

3 325.88

-

135.31

233.14

51 .13

508.09

778.70

326.10

155.10

438.90

233.72

3604.70

515.11

186.39

195.63

46.48

0.00 0.00 0.00 0.000.00 26.06 0.00 26.06

0.00 0.00 94.50 94.50

6.24 10.14 0.00 16.38

71.08 87.24 27.30 185.62

30.25 34.00 77.65 141.90

8.79 9.88 82.83 101.50

5.32 20.0 28.45 53.77

85.15 105.12 0.00 190.27

28.21 37.62 25.00 90.83

205.10 343.19 380.53 928.82

85.36 92.50 36.30 214.16

7.65 20.50 39.00 67.15

0.00 0.00 48.90 48.90

4.26 0.00 7.10 11.36

0.00 0.00 0.00 0.00

50.23 51.13 0.90 102.26

26.73 35.64 77.76 140.13

81.97 177.97 237.00 496.94

0.00 0.00 0.00 0.00

82.24 9.59 0.00 91.83

5.16 0.00 0.00 5.16

327.88 586.17 764.87 1678.92

39.13 52.25 71.56 162.94

Grand Total 5000 .00 204 16163.47 1150.75 1699.00 1999.65 4349.40

Annexure - IIIWORLD BANK AIDED WATER SUPPLY AND SANITATION (WS&S) PROJECTS

SI. N a m e o fNo. Project

Project Cost(Rs. in crores)

Original Revised

Amount of Assistance(US $ Mi l l i on)

Or ig inal Revised

Date ofCommence-

ment

Cred i t c los ing

Onginal Revised

1. III Bombay WS & S 396.00 915.00 185.00 145.00 12.05.87 30.06.94 30.06.96

2. Madras WS & S 150.803 255.951 69.00 -... 01.04.86 31.12.95 31.12.96

3. Hyderabad WS & S 257.06 --- 89.90 --- 01.10 90 31.03.98 ---

4. II Madras WS & S 1638.037 --- 275.08 --- --- --- ---

5. Born bay Sewage 1003.80 --- 192.00 --- --- --- ---

Disposal Project

Annexure-lV

WATER SUPPLY & SANITATION PROJECTS IN THE PIPELINE FOR WORLD BANK ASSISTANCE

SI. No.

-

Name of pro jec t Estimated Cost

(Rs. in Crores)

1. III Madras WS & S 1105.193

2 II A.P. WS & S 640.00

3. II Rajasthan WS & S 442.40

4. Punjab WS & S 283.47

5. Rajasthan WS & S Project for five major towns 2022.95

Annexure- V

WATER SUPPLY & SANITATION PROJECTS FOR BILATERAL ASSISTANCE

SI. No. Name of the Project Estimated Cost Posed to(Rs. in Crores)

1 .

2 .

3 .

4 .

Shimla WS &S

Manali WS & S

Flood Water Harvesting in Madras

Water Supply, Sanitation & Solid Waste Management in 9 towns of Haryana

76.34

16.07

21.90

312.31

5 . Water Supply, Sanitation & Solid Waste Managment in 13 towns of Haryana 189 .OO

6 .

7 .

8 .

9 .

1 0 .

11.

12.

1 3 .

1 4 .

Greater Aizwal Water Supply Scheme Phase-l

Comprehensive WSS to Meenand & adjoining

Comprehensive WSS to Pattovam and adjoining 14 Villages (Kerala)

Comprehensive WSS to Cheratala and adjoining 19 villages (Kerala)

Improvement of WSS to Calicut region (Kerala)

Improvement of WSS to Kochi Region (Kerala)

Improvement of WSS to Thiruvananthapuram Region (Kerala)

Integrated WS. Sanitation & SWM for Patana & Ranchi (Bihar)

Regional WSS in Talcher, Mera Mundali Angul, Dhan Kanal & Bhupan urban

Conglomerate (Orissa)

37.00

7 1 . o o

42.00

69.25

285.20

234.50

199.20

369 .90

135.70

1 5 ..

1 6 .

1 7 .

Hoganekkal Water Supply project in Dharmapuri District (Tamil Nadu) 572 .OO OECF, Japan

WS & S projects for Bhopal and Jabalpur (Madhya Pradesh) 370.384 German

WS & S projects for four towns of Uttar Pradesh 577.80 OECF, Japan

German

German

ODA, U.K.

Asian Development

Bank

Asian Development

Bank

German

OECF, Japan

OECF, Japan

OECF, Japan

OECF, Japan

OECF, Japan

OECF, Japan

OECF, Japan

OECF, Japan

Annexure-VIURBAN WATER SUPPLY & SANITATION SCHEMES CLEARED BY C.P.H.E.E.O.

sl. No. Name of the scheme Approved cost(Rs. in Lakhs)

Date of Approval

1 .

2 .

3.

4 .

5 .

6. Drinking water supply scheme-Jawala Mukhi town

7 .

8 .

9 .

MADHYA PRADESH

Group water supply scheme Garoth town and 29 villages

Jamai Augmentation water supply scheme chindwara Distt.

Badnagar Augmentation water supply scheme

Biaora town interim water supply scheme Phase II

Nawa Pam water supply Augmentation scheme

HIMACHAL PRADESH

1276.00 26.04.95

168.83 17.08.95

232.00 21. 08.95

166.00 30.10.95

2m.m 30.10.95

290.00

3778.80

531 .00

23.02.95

06.09.95

04.04.95

375.00 20.03.95

1 0 . Augmentation of water supply scheme to Siddipet from Manair river as source 1900.00 19.07.95

MAHARASHTRA

1 1 . Augmentation of Chikhali water supply scheme 1268.00 06.06.95

DEPARTMENT

The Central Public Works Department (CPWD), is theprincipal agency of the Government of India forconstruction as well as maintenance of all CentralGovernment buiidings and projects excepting thosebelonging to the Railways, Defence, Communication.Atomic Energy, Airports (National and International) andAll India Radio.The existence of CPWD could be tracedback to the year 1863 when the Ajmer Provincial Divisionwas created. However, CPWD was formally created inits present form in 1930.

1 .1 CPWD has to its credit construction of prestigiousbuildings like Rashtrapati Bhawan, North Block, SouthBlock, Parliament House, Vigyan Bhawan and manyMulti-Storeyed Structures, Stadias like J. L. NehruStadium, National Stadium in Delhi and beautifullandscapes and gardens in the hot and arid areas likeDelhi. It is an organisation which can render the mostcomprehensive services in the field of planning, design,construction and maintenance management, for all CivilEngineering Projects with an aim for Total QualityManagement for ail types of structures.

1.2 CPWD involves itself in a project right from it ie stageof selection of site, takes up geo-technical investigations,field data collection, prepares architectural, structural,electrical, air condinioning and land scaping designs anddrawings, undertakes construction managementincluding quality assurance and continues itsresponsibility through post completion maintenancemanagement etc.

1.3 The CPWD handles a wide range of projects likehousing and office complexes, educational institutions,sports complexes, hospitals, workshops and factories,hostels and hotels, foodgrain storage structures, roads,national highways, bridges & flyovers, airports, computercentres, environmental and other utility services. it isalso executing border fencing, flood lighting and roadprojects in difficult terrain and under hostile conditions.CPWD has its field units spread all over India to take upconstruction and maintenance works even in theremotest parts of the country. Through its country-widenetwork of planning and construction units, it also

undertakes the wcrks of Public Sector Under takings andAutonomous Bodies as deposit works. CPWD has alsoexecuted man;/ overseas works suc h as construction ofembassies and hospital buildings in various countriesand roads & bridges in Nepal.

1. .4 It renders consultancy in the field of panning n &design, and also takes up supervision consultancythrough its Consultancv Wing for PSUs. AutonomousBodies, Co-operative :;%.Societies and for projects abroadIt has so far provided consultancy services for manyworks in as many as 10 countries outside India.

1.5 During the span of more than six decades o f itsexistence, CPWD has developed proven competencyin the fields of architectural, structural, highways andbridge engineering, utility services, horticultural. andproject management with an inbuilt quality system.

1.6 It has approximately 7000 qualified Engineers. 230Architects and 21 1 Horticulturists on its rolls, in additionto about 46,000 employees (Technica! and Non-technical). Computerisation has been introduced inareas like architectural design, structural design &detailing, project scheduling and rnonttoring prepara-tion of schedule of rates, pay rolls. personnel man-agement, inventory control, accounting and budgetingetc.

1.7 The department is moving forward in the field ofconstruction by developing innovative new techniquesand adopting State-of-the-Art technologies. TheTechnology Application and Development Cell (TAD Cell)has been established to identify and select environmentfriendly construction materials and technology in closeliaision and coordination with Research Organisations.CPWD is playing a major role towards sustainabledevelopment of human settlement. it has also developedexpertise in rehabilitation of structures.

1.8 CPWD has well documented Specifications 6Standards, and Schedules of Rates which are updatedfrom time to time, to keep pace with latest technologiesand market trends with a definite Quality AssurancePlan. These Specifications & Schedule of Rates arebeing followed by various construction organisations -both in public as well as private sectors.

Establishment

2. The CPWD is headed by the Director General (DG)(Works). After the recent Cadre Review andrestructuring, DG(W) will be assisted by Six AdditionalDirector Generals (ADG) for headquarters functions andworks of six regions as under:

(1) ADG (S&P):

He will be incharge of works in New Delhi Region having4 Chief Engineers (CEs) (Civil) and 2 CEs (Elect.) CE(Vig.), Chief Engineer (Trg.) and CE (PS) will also beattached with him for headquarters functions.

(2) ADG (TD):

All works of Northern Region (excepting Delhi works)will be looked after by him with the help of 3 CE(C),1 C E ( E ) , C E ( D ) , CE(TSQ), CE(E)DIS & E D(Consultancy) will also be attached with him for HeadQuarter functions.

(3) ADG (DR) :

He will have under him CE(ODZ) to look after the CPWDworks on the periphery of Delhi and works of Delhi PWDZones (3 regular zone and Project units of Delhi PWD).

(4) ADG (SRj :

He will look after all the works of Southern Region with3 CEs (Civil) and 1 CE(Elect.).

(5) ADG (WR) :

All works of the Western Region and Madhya Pradeshwill be looked after by him through 3 CEs (Civii) and1 CE (Elect.) under him.

(6) ADG (ER) :

He will be incharge of all works of the Eastern Regionincluding North Eastern States and will have 3 CEs (Civil)and 1 CE (Elect.) under him.

DG (Works) is also assisted by Deputy Director Generalfor policy planning, project monitoring and other technicalmatters. In addition, there is one ADG(Arch.), 4 ChiefArchitects supported by Senior Architects etc. as wellas a Horticulture Unit under different Chief Engineers.

2.1 The restructuring has decentralised the working ofCPWD which will provide better & easily accessibleservice as the units are placed close to work centres.Besides, it will provide more autonomy to the RegionalUnits headed by ADGs. A highly improved work culture,closer control on the works with speedier completion ofworks will meet the ultimate goal towards greater clientsatisfaction. The head quarters of the regional units havebeen kept in Calcutta, Bombay, Madras and Delhi.Similarly, the zonal CEs have been located mostly inthe capital of major States, based on workload potentialand available limited strength of officers, to keep themvery close to the projects.

2.2 One post of ADG(Border), is also attached to DG(W)who coordinates the activities of various organisationinvolved in construction of border fencing, roads and

lighting systems for both lndo-Bangladesh and Indo-Pakborders.The following zones are engaged in these workson behalf of CPWD.

- Border Fencing Zone, New Delhi.- Border Flood Lighting Zone, New Delhi.- Indo-Bangla Border Zone, Siliguri.

2.3 The public works of National Capital Territory of Delhiare also handled by CPWD through its Delhi PWDZones. The following zones headed by CEs are workingunder the Govt. of Delhi:

- Delhi Admn. Zone I- Delhi Admn. Zone II- Yamuna Bridge Project.- Delhi Admn. Zone IV,

2.4 CPWD also assists the Income Tax Department inimplementation of direct tax laws so far as they relate toimmovable properties. The follwing CEs alongwithnecessary complement of other officers and staff areworking in the Income Tax Department.

- 2 CEs (Valuation) one each at Delhi & Madras.

- 7 CEs (Appropriate Authority) at Delhi, Calcutta,Bombay, Madras, Bangalore, Lucknow &Ahmedabad.

2.5 The Ministry of Environment has also created a CivilConstruction Unit, headed by a CE. This encadred unitof the CPWD helps the Ministry of Environment in theirprojects.

Workload

3. During 1994-95, a workload of Rs. 1200 crores wastargetted and a workload of Rs. 1300 crores wasachieved. Similarly the targetted workload for 199596was Rs. 1320 crores and against that achievement wasRs. 1500 crores. These figures are excluding worksexecuted by CPWD engineers for Govt. of Delhi andMinistry of Environment through their dedicated units

Achievements/Performance

4. During the year 199.5-96, CPWD have constructedgeneral pool accommodation, both residential and non-residential buildings, for Ministry of UAE and also otherusers departments, such as Income Tax Department,Customs & Central Excise Deptt., Central PoliceOrganisations. ICAR, CSIR, Kendriya VidyalayaSangathan. Navodaya Vidyalaya Samiti.

4.1 So far CPWD has built approximately 1 lakh housesand 19 lakh sq m. of office accommodation underGeneral Pool. In 1994-95 CPWD has constructed 875

residential units and 34,596 sq.m. General Pool non-residential office accommodation. During 1995-96approx. 600 residential units and Non-residentialaccommodation 30,500 sq.m. have been completed.

4.2 Ministry of UAE has taken a bold step towardssolving the housing problem of Central Govt. Employeesand a programme to start around 5000 GPRA in Delhiand another 2500 GPRA (General Pool ResidentialAccommodation) in other cities in 1996 itself has beentaken up.

4.2.1 The former Hon’ble Prime Minister of India Shri P.V. Narasimha Rao laid the foundation stone forconstruction of 499 General Pool Residential units on13.11.95 in Sector X, R.K. Puram, New Delhi. This isthe first step towards taking up construction of residentialunits for Central Govt. employees on a large scale bythe Ministry of UAE through the CPWD.

4.2.2 The General Pool Office Building at Besant Nagar,Madras costing Rs. 750 lakhs has been completed andis to be formally inaugurated soon. Similarly, GeneralPool Off ice Building at Chandigarh costing Rs. 750 lakhshas been completed and is to be soon formallyinaugurated.

4.2.3 The foundation stone of Rs. 18 crore prestigiousproject of construction of general pool off ice building atLucknow, UP was laid by the former Hon’ble Ministerfor Urban Development, Smt. Sheila Kaul on 6.6.94. Thebuilding is to be constructed in 3 blocks, one block of13 storeys and 2 blocks of 9 storeys, with a total plinth.area of 20235 sq. m. It is targetted to be completed byNovember, 1996 and on completion, will provide officeaccommodation to 43 departments.

4.2 4 The work of construction of Rajiv Gandhi‘Ninaivagam’at Sriperumbudur Phase I has been takenup in June 1994. This memorial, being developed on12.12 acres of land having land- scaping and water bodyat a cost of Rs. 5 crores, will consist of 7 granite stonepillars each 1.2 metre diametre and 15 metres high. Inthis complex, a Mathematical Institute for developmentof sciences under phase II shall be taken up at a cost ofRs. 18 crores.

4.2.5 The prestigeous building to house ParliamentLibrary costing approximately Rs. 100 crores has beentaken up in hand which is expected to be completed inMarch, 1997. This library building is being designed toprovide all modern facilities like Micro Filming facility,Reprographing services, documentation, ComputerCentre and will have a stack area of about 3 millionvolumes.

4.2.6 CPWD in Border Roads, Fencing & LightingTowerworks :-

4.2.6.1 CPWD has completed the work of 451 km otfencing in Punjab Border and another work of 599 kmfencing in Rajasthan in 1995-96.

4.2.6.2 Lighting of Border Fencing both in the PunjabSector and the Rajasthan Sector for a total length approx.1072 km has been completed.

4.2.6.3 Border Road in Rajasthan Sector for 150 km hasbeen completed.

4.2.6.4 In Indo-Bangladesh Border in 1995-96 a totallength of 1466 km Road, 8614 metre River Bridge and578 km fencing have been completed.

4.2.7 Dr. Balram Jakhar, former Hon’ble Minister ofAgriculture inaugurated the new laboratory building ofCMFRI Visakhapatnam on 17.9.95.

4.2.8 28 Nos. of Special Type flats for MPs at BabaKharak Singh Marg, New Delhi were inaugurated by theformer Hon’ble Speaker of Lok Sabha, Shri Shivraj Patilon 28.3.95.

New Contract Format

5. The existing standard contract forms PWD 7 & 8which were put into use more than four decades ago,have now been replaced by revised forms PWD 7 & 8.The forms have come into effect w.e.f. 1st June, 1995.Adoption of the new form is expected to facilitateexecution of works through building up of mutual trustand lessening of disputes by simplification of contractconditions and clauses.

New Set of Specifications

6. The CPWD Specifications for civil works has beenupdated and compiled in six volumes during 1995- 96.This will be effective from 1996 and will be called CPWDSpecification of Works, 1996.

Enhanced Tendering Limits of Contractors

7 . In step with the escalation in the cost of construction,the tendering limits of various categories (B&R,Electrical, Furniture) and classes (class I to V) of enlistedcontractors, have been enhanced. Simultaneously,enlistment in Class I A (B&R) category has also beenrevived. The new tendering limits took effect from 15thSeptember, 1995.

Vigilance

8. The Vigilance Unit of CPWD is headed by CE(Vigilance) who is also the Chief Vigilance Officer of the

Department. The Vigilance Unit has an important roleto play in ensuring proper public accountability andtransparency of the operation in the various CPWD units.The activities of the Vigilance Unit include inspection offield divisions investigation of complaints and enquiriesagainst erring officers and staff. During 1995,investigation of 104 cases and inspection of 30 CPWDDivisions were conducted as a measure of preventiveVigilance and inspection of 48 divisions is targettedduring 1995-96.

Human Resources Development

9. The CPWD has a Training Institute which has beenset up to act as a nucleus for professional andmanagerial training for public work engineers/ architectsand other professionals.The CPWD Institute which hasso far been functioning from E Wing, Nirman Bhawan,New Delhi has been shifted to its new premises at KamlaNehru Nagar, Hapur Road, Ghaziabad U.P located about33 k.m. from Nirman Bhawan. It has now its ownexclusive campus spread over a plinth area of 14.5hectares. Its programme of imparting training to Group‘A, B & C’ officer for 1995-96 and Training imparted in1994-95 is given below.

Group 1994-95 1995-96

No. of No. of No. of No. ofCourses Trainees Courses Trainees

‘A’ 36 818 55 700‘B’ 59 833 6 1 800‘C’ 58 487 46 60 0

9.1 The Regional Training Centres of CPWD imparttraining to its large workforce to keep them agile, activeand updated.

Central Designs Organisation

10. The Central Designs Organisation (CDO), aspecialised unit of CPWD, was formed in the year 1969to carry out the structural designs’of major and complexprojects and to promote new techniques and materials.In its present form, the CD0 has three wings eachheaded by a Superintending Engineer.

10.1 The CD0 in addition to structural designs of majorprojects and conceptual planning of the projects, hasdeveloped software for applications relevant to CPWDin the fields of :-

(a) analysis, design & drafting (for which manualshave been prepared and will be released shortly),load calculations, integrated TABS (ThreeDimensional Analysis of Building Systems)

(b)

package, space frame analysis, Raft ‘Analysis byfinite grid method, computer aided drafting ofcolumn and beam drawings;

implementation of Hindi in computers by installingbilingual package “AKS"-

10.2 A project management software “Success Plan-ned” have been procured & installed in Computer Cell.

10.3 This unit of CPWD is preparing for certificationunder IS0 9001.

CPWD Consultancy Services

11. CPWD provides consultancy services for variouspublic sector organisations/autonomous bodies inplanning, design and execution of major buildingsprojects, complex structures and specialised planningand services like air-conditioning and electricalinstallations, project management etc. The CPWD alsoprovides consultancy services outside India inconstruction of hospitals, institutional buildings, housing,hostels and off ice buildings.

Technology Application & Development Cell

12. TAD Cell was established to identify and select (inclose coordination with Research Laboratories/Organisations) materials and technologies capable ofbeing adopted in CPWD works. The function of the cellis to observe and test their performance and establishproper building practices and codes, specifications,analysis of rates etc. So far, 50 technologies have beentaken up for studying and assessing their suitability foradoption in CPWD.

(a) Progress during 199596.

Wood Substitutes

Study on the following type of wood substitute doorshutters has been completed, detailed specificationshave been finalised for these door shutters and circulatedfor adoption in CPWD works.

-Medium Density Fibre (MDF) door & Cup BoardShutters.

-Red Mud Polymer Door Shutter.

-Fibre Glass Reinforced Plastic (FRP) door shutter.

-Eucalyptus Wood shutters.

-Expanded Polystyrene door shutter.

-Laminated Veneer Lumber door shutter & frames.

Technologies

Solar Passive Architecture

The TAD Cell has been instrumental in collaborating withIIT, New Delhi for training architects in the use of SolarPassive Architecture, using computer software. A fewprojects (spread over different climatic regions of thecountry) have already been designed using this softwareand it is hoped that soon this would be adopted on awider scale in CPWD.Ready Mixed Concrete

The TAD Cell is closely involved in developing a set ofspecifications, quality control instructions and contractconditions for the use of Ready Mixed Concrete inCPWD. A ready mixed concrete plant has already beenerected at Ghatorni and it is expected that the samewould be commissioned shortly.

Horticulture Works

13. The Horticulture Wing of CPWD has executed anumber of important works such as laying out of BudhaJayanti Park, land scaping around samadhis of nationalleaders, Rashtrapati Bhawan, Parliament House, VigyanBhawan, in addition to floral decoration in connectionwith the Republic Day celebrations. In Delhi alone,CPWD has planted 51000 trees during 1994-95 and45,000 trees during 1995-96. The latest techniques ofmultiplying plants are being used in GovernmentNursery, Sunder Nagar, New Delhi.

Innovative Techniques

14. It has always been the endeavour of the CPWD toadopt innovative techniques whenever required. ForParliament Library Building under construction, due toclose proximity of Parliament House and high groundwater table, unconventional & innovative foundationsystem using Diaphragm Wall, curtain grouting and rockanchors has been adopted. Further, the terrain beingrocky and use of explosives being prohibited, heavymachinery such as hydraulic excavators, hydraulic krupphammer, hydraulic Rock splitter etc. are being used forexcavation.14.1 The Parliament Library Project has also beenselected for IS0 9001 Certification and proposal in thisrespect is being formulated.

Samadhis

15. The samadhis of national leaders situated in theRajghat Samadhi area at Ring Road, New Delhi aremaintained by the C.P.W.D. Official functions were

organised by the Ministry of Urban Affairs & Employmentat Shanti Van, Vijay Ghat, Shakti Sthal, Kisan Ghat andVir Bhumi on the birth and death anniversaries of Pt.Jawahar Lal Nehru, Shri Lai Bahadur Shastri, Smt. IndiraGandhi, Ch. Charan Singh and Shri Rajiv Gandhi. SinceRajghat is administered by the Rajghat SamadhiCommittee, a statutory body set-up under the RajghatSamadhi Committee Act, 1951, all official functions onthe birthday and martyrdom day of Mahatma Gandhiwere organised by Rajghat Samadhi Committee. “VirBhumi”, the samadhi of former late Prime Minister ShriRajiv Gandhi is being developed at the site locatedbetween Rajghat and ”Shakti Sthal” under the directionsof the Rajiv Gandhi Samadhi Committee, of which PrimeMinister is the Chairman.

Statues

16. The Government has decided to instal the statueof Mahatma Gandhi at a suitable location in the AugustKranti Udyan in the India Gate Complex.

16.1 For installing the statue of Mahatma Gandhi inthe India Gate Complex, a Concept Committee has beenconstituted which has since selected the Sculptor. Thework of making the Statue has already been completedby the sculptor.

16.2 The Group of Ministers have selected two locationsfor installation of the statues of Pandit Jawaharlal Nehruand Smt. Indira Gandhi on either side of Vijay Chowknear North Block & South Block. The selection of modelsis under process.16.3 The installation of the statues of Shri Lal BahadurShastri and Shri Rajiv Gandhi, in New Delhi. is alsounder process.

August Kranti Udyan

17. On a decision taken by the National Committee onthe Celebration of Golden Jubilee of Quit IndiaMovement (under the Chairmanship of Prime Minister)the area around India Gate was dedicated by the PrimeMinister at a function held on 9.8.92 for developmentinto August Kranti Udyan. A Concept Committeeunder the Chairmanship of Secretary (UD) has beenconstituted and the Concept Committee approved theholding of two-stage open competition for invitingconcepts for development of August Kranti Udyan. Thefirst stage of the open competition has been concludedand three entries have been short-listed for the secondstage of the competition.

Annexure-ll

LIST OF ESTIMATES OF GENERAL POOL ACCOMMODATION APPROVED DURING 1995-96

Sl. Name of Work Estimate CostNo. (Rs. in Crores)

1 .

2 .

3 .

4 .

5 .

6 .

7 .

8 .

9 .

1 0 .

11.

12.

13.

14.

15.

16.

17.

18.

C/o. GPOA at Pushp Vihar 15.34

C/o 112 Nos. GPRA (Type II/42, Ill/60 IV/10) at residency area lndore 5.50

C/o 198 Nos. GPRA (Type l/24, ll/60, Ill/102 & lV/l2) at Lalpur, Varanasi 5.82

C/o 354 Nos. GPRA (Type l/160 and II/194 at Sitapur Road, Lucknow (Phase Ill) 8.43

C/o 150 Nos. GPRA (Type ll/24, ill/102, IV/18, V/4 & Vl/2) at Begum Sarai, Allahabad. 5.78

C/o 294 Type V Qtrs at Sector X at R.K. Puram, New Delhi. 14.05

C/o Type ll/16, Ill/16, IV/12, V/12 with servant quarters, garages etc. at K.K. Nagar, Madras, 2.29

C/o 44 quarters for CPWD staff at Dehradun 1.02

C/o Type l/24, ll/16, Ill/16 & IV/14 quarters at Guwahati. 4.60

C/o Type IV/42 & V/32 Nos. quarters at Sitapur Road, Lucknow. 4.85

C/o Type l/24, ll/36, IV)24 & V/24 quarters at Gujaini, Kanpur. 4.99

C/o Type V/98 and VI/28 Nos. quarters at I.N.A., Aliganj, New Delhi. 26.00

C/o Type l/96, ll/200, ill/160, IV/40 & VI/ 3 at Hosur Sarjapur Road, Bangalore. 22.45

C/o 84 G.P. Residential Units at Vidyadhar Nagar (Phase Ill), Jaipur (Type l/16, [l/30, Ill/28 & IV/10) 2.18

C/o 56 Type III residential units (Phase II) at Guwahati. 2.45

C/o 32 Nos. Type IV quarters (MS) in North West Moti Bagh, New Delhi. 3.82

C/o additional accommodation in Nirman Bhawan Complex, Hyderabad to accommodate 2.00the offices of CE (SZ) II SSW (SZ) II and SA. I I

C/o Office Building & Staff quarters for CPWD Circle/Dn. Office at Allahabad. 0.13

8

DIRECTORATE OF PRINTING

The Directorate of Printing, an attached office of theM/o. Urban Affairs & Employment, since i tsre-organisation as an independent unit. was primarilyassigned the work of executing printing jobs for ailMinistries/Departments of Union of India alongwithprinting of publications of various Ministries/Departments. Thus, a major function of this Directorateis to act as a Government Printer and as such it fulfilsall types of printing requirements/needs for Ministries/Departments and also all types of Special/Military formsand publications for Defence purposes as well, beingone of the important function of this Directorate. Havingprofessionals in various units under its administrativecontrol, this Directorate also renders technical advicefrom time to time to various State Governments andCentral Government Ministries/ Departments related toprinting technology and allied matters, It has under itsadministrative control, 21 Government Presses.responsible for all types of printing jobs including threeText Book Presses spread throughout the country, oneOutside Printing Branch and a Forms Store at Calcuttaexclusively fulfilling the requirement of various standardforms of the entire Government of India.

2. The most prestigious jobs undertaken by thisDirectorate in addition to above are overnight printingrequirements of Lok Sabha and Rajya Sabha and otheremergent jobs and printing requirements of variousMinistries/Departments specially for ElectionCommission of India and Supreme Court, High Courtsetc. in particular. which includes reports, ElectionMaterial, Ballot papers, Publicity materials, ScientificPublications, Periodicals, Gazzette etc. Facilities forPhoto-Composing Offset Printing with colour effectshave been developed for better quality, which is of utmostimportance for maintaining quality control. TheDirectorate also undertakes jobs of Government ofNational Capital Territory of Delhi and also its Assernbly.

Modernisation of Govt. of India Presses/Branches.

3. The first phase of modernisation of Govt. of IndiaPress, Rashtrapati Bhavan, New Delhi has beencompleted under the Non-Plan Scheme. Themodernisation of Govt. of India Press, Ring Road, NewDelhi is already in progress and is likely to be completedby 1996-97 under Plan-Scheme.

3.1 Phased modernisation programme prepared by theDirectorate of Printing for Govt. of India Press (LPU),Faridabad will be considered by the Standing FinanceCommittee very soon, whereas modernisationprogramme of other Govt. of India Presses/Brancheswill be taken up in phased manner.

4. Production Data of Govt. of India Presses/BranchesYears 1995-96

SI. items ActualsNo. 1994-95

Ongrnal1995-96

Revised’1995-96

Estimated1996-97

1 . No. of pages Composed in A-5 sizeboth in Book and Forms works (In lakhs). 8.410 10.670 5.080 8.000

2 No. of Impressions pnnted both In Bookand Forms works (In Crores). 86.080 100.00 88.642 100.00

3. Quantity of paper Consumption (In MTs.) 14874460 15500.00 15000.00 15000.00

‘The figure relates to the period endlng 31 396

Progress done in Respect of forms review andmonetary savings in use of paper.

5 . During the Financial Year 199596.2105 Military/Civil Stand-ard and Special Forms were reviewed.The review resulted insaving of 2.78,36,900 sheets of paper in A-4 Size, themonetary value of which comes to about Rs. 4160.27%. perannum. The savings are of recurring nature.

Bonus to Employees of Govt. of India Presses/Branches during the year 1994-95.

6. The eligible employees of the Govt. of lndia Presses/

Branches. drawing emoluments upto Rs. 3500/- p.m.were sanctioned Productivity Linked Bonus (PLB) for 20days for the year 1994-95, the ceiling limit for calculationsof bonus has been Rs. 2500/- p.m.Public Grievances Cells.

7. A Public Grievances Cell is in operation for both retiredand in service Govt. employees in this Directorate andis functioning under the overall control of Director ofPrinting, to attend to the various complaints received fromthe employees from Govt. of India Presses/Branchesand the Directorate.

DIRECTORATE OF ESTATES

The Directorate of Estates is mainly responsible for:-(a)

(b)

(c)(d)

(e)

Administration of Government Estates (Resi-dential/Office accommodation) at Delhi, Bombay,Calcutta, Madras, Shimla, Chandigarh, Faridabad,Ghaziabad and Nagpur. Besides these places,general pool accommodation is also available at14 other stations viz. Hyderabad, Imphal, Kohima,Bhopal, Kanpur, Bangalore, Lucknow, Cochin,Shillong, Indore, Agartala, Allahabad, Rajkot andSrinagar. Administration of these residential unitsis being handled by the CPWD offices located inthese areas.Administration of Requisitioning and Acquisitionof Immovable Property Act, 1952;Allotment of accommodation in Vigyan Bhawan;The Control and Administration of Grand Hotel,Shimla and other Government Hostels;Administration of markets in Government Coloniesin Delhi.

2 . Residential accommodation for Central Governmentemployees in Delhi meets a little above 60% of thedemand based on ‘restricted’ applications, Satisfactionratio at the main Regional stations ranges from 20-40%.Demand, availability and shortage of General PoolResidential Accommodation at Delhi and at variousStates is given at Annexure-l.3. The position of office accommodation is also not veryencouraging; we have a shortage of about 16 lakh sq.ft.in Delhi alone. The Regional Offices also have a largedeficiency. The demand, availability and shortage ofoffice accommodation at various stations is given atAnnexure-Il.4. As a welfare measure, a Holiday Home is being runat Shimla. Holiday Homes at two new stations are alsoproposed to be commissioned - one at Kanyakumariand the other at Amarkantak in Madhya Pradesh. Hostelaccommodation for touring employees is available atBombay, Calcutta, Madras, Delhi, Shimia, Bangalore andTrivandrum. The details of hostel accommodationavailable in Delhi is given at Annexure-lll.5. There is a separate residentiai pool for MPs of LokSabha a.s well as Rajya Sabha. Details of these are at,Annexure-/V: With a view to meeting the requirementsof guest accommodation 4 s u i t es in Vitthalbhai Patel

House and 16 suites in Western Court Hostel have beenkept reserved for allotment to guests of Members of theUnion Council of Ministers.6. Two canteens and 25 shops in North/South Avenuecater to the needs of Members of Parliament. One flatand two garages in V.P House have been allotted toSuper Bazar for use of Members of Parliament.

7. During the period from 1.1.95 to 31.3.96, 193Conferences were organised by Government orga-nisations, 27 by Public Sector Undertakings, PublicOrganisations and 13 by private parties, in VigyanBhawan. An amount of Rs. 1,48,70,539/-was recoveredas licence fee for the use of Vigyan Bhawan for holdingthese Conferences.

8. An amount of Rs. 7,71,600/- was recovered for theuse of Mavalankar Hall as licence fee for holdingConferences/functions.

9. There were 700 cases of unauthorised occupants ason 1 .1 .1995 pending on the litigation side. 3032 freshcases were filed and a total of 2318 cases were finalised.There were 149 cases pending realisation of outstandingdues and 336 cases were added during the period 1 .1.95to 31.3.96. Out of these, 165 cases were disposed ofduring the year. There were 80 cases pending forrecovery of licence fee during the beginning of the year.114 cases were added during the year and a total of 73cases were disposed off.

10. As per the provisions of SR-317-B-12, an officerwho was allotted another residence had to vacate hisearlier accommodation within 48 hours of occupation ofnew residence. In view of the hardship faced by officers,an amendment has been carried out whereby an officeris now allowed a period of 8 days from date of occupationof new residence, on payment of normal licence fee, forvacation of the old premises.

11. The Directorate has in its charge 34 markets, amajority of which are located at Central Governmentcolonies. The Government decided to grant ownershiprights to the shopkeepers of 10 markets namely BabuMarket (Sarojini Nagar), Mehar Chand Market (LodiRoad), INA (Mohan Singh Market), I.N.A. Market(Platforms only), Aliganj Market (Lodi Road), KasturbaNagar Market (Sewa Nagar), Sector VI, VII, IX. & XIImarkets (R.K. Puram). It has also been decided to giveownership rights to shopkeepers in 4 Rehabilitationmarkets, viz., Kamla Market, Sarojini Nagar Market,Pleasure Garden Market (Opposite Lal Qila) andShankar Market.

12. As regards computerisation, the Directorate ofEstates is shortly being provided with a Pentium System

whereafter all work pertaining to allotments, etc., will becomputerised. At present allotment letters and sanctionsare being issued on computers. All subletting cases arealso being monitored on computer.

13. During the period 1995-96 the total number ofallotments of residential accommodation in each typehave been indicated in the statement at Annexure-V

14. Since the number of out-of-turn allotments werebecoming extremely large and a number of complaintswere received in this regard, such allotments werestopped under orders from the Prime Minister on 25thMay, 1995. Subsequently, vide order dated 17-7-95 inCivil Writ Petition No. 585/94, the Supreme Court ofIndia has imposed a ban on all out of turn allotmentsexcept on genuine medical grounds.

15. The Directorate of Estates has been engaged to alarge extent in defending its position in the public interest

litigation mentioned above in which the Suprerne Courthas been taking up for consideration various aspects ofthe functioning of the Directorate of Estates. Theseinclude:

(a) Unauthorised occupation of Government houses.

(b) Large scale subletting of Governmentaccommodation.

(c) Waiver of penal rent from a number of allottees.

(d) Large scale out-of-turn allotments.

16. A number of measures have been initiated by theDirectorate of Estates by way of streamlining of the wholesystem pertaining to allotment of Government PoolResidential Accommodation to Government employeeson the waitlist, with the objective of providingaccommodation to them strictly in accordance withpredetermined criteria.

Demand, Availability and Shortage of General Pool ResidentialAccommodation at various stations as on 31.12.95.

Station D e m a n d Availability Shortage

BombayCalcuttaMadrasNagpurChandigarhShimlaFaridabadGhaziabadHyderabadBangaloreLucknowCochinShillongIndoreAgartalalmphalKohimaKanpurAhmadabad- (Rajkot)AllahabadBhopalSri Nagar*Delhi

41,92411,4265,2984,0167,3382,3212,2601,105977

5,0524,745287

1,79265349814181

8,448595

1,292404-

1,03,222

85285823227213762285879

182282075690850024484

29868726475514071716630

63,400

33,3965,60330262,6405,0531,442438285225

4,1444,245

431,7083554316917

7,693455575238-

39,822

*Demand position not available.

Demand, Availability and Shortage of General Pool Office Accommodationat various stations as on 31.3.1996

Station D e m a n d Availability Shortage(Sq.ft.) (Sq.ft.) (Sq.ft.)

Calcutta 31,92,939

Bombay 18,04,410

Madras 15,90,747

Shimla 3,48,403

Nagpur 3,63,000

Faridabad 2,49,920

Ghaziabad 1,09,200

Hyderabad 2,68,095

Trivendrum 97,562

Delhi 99,12,000

17,36,644 14,56,295

6,65,662 11,38,742

7,60,878+ 2,54,115(5,75,754)

2,78,604 69,799

2,74,000 89,000

1,82,126 57.794

1,20,330

80,932

1, 1 3 0{surplus)1,87,163

60,665 36,897

83,79,000 15,33,OOC

GOVERNMENT HOSTELS IN NEW DELHI

Name of the Hostel

1 . Working Girls Hostel 1372 . Curzon Road Hostel 4783 . Minto Road Hostel (Old) 964 . Tagore Road Hostel (Old) 965 . Pragati Vihar Hostel 7926 . Asia House Hostel 1317 . Minto Road Hostel (3 roomed) 18 . Minto Road Hostel (New) la4

Working Girls Hostel :

A proposal of construction of New Building for the Working Girls Hostel at the same site i.e. Curzon Road, afterdemolishing the old one is already under consideration. Further allotment has been stopped since 31.12.92.

Accommodation for Casual Visitors :

41 Single Suites (without Kitchen) at Curzon Road Hostel are set apart for the use of Govt. officials commingon tour to Delhi/New Delhi.

Annexure-IV

(i)

(ii)

(iii)

(iv)

(v)

(vi)

(vii)

(viii)

(ix)

(x)

Details of MPs Pool Accommodation(Lok Sabha & Rajya Sabha)

Bungalows 242 (159+83)

Twin Flats in North/South Avenue 55

Single Flats in North/South Avenue

Flats in B.K.S. Marg

Flats in Meena Bagh

314

17

39

Flats in Rabindra Nagar 01

Flats in other places 10

Western Court Hostel/VP. House 64

Servant Quarters 454

Detached garages 241

Total number of allotment of residential accommodation(1 .1 .95 to 31.3.96)

Annexure- V

Type Total allotment Out of turn allotment(including regularisation cases etc.)

I

I I

III

IV

IV Spl.

V A

V B

VI A

Hostel

1391

2887

2304

1686

93

165

83

102

624

194

747

311

97

06

31

21

07

23-

Total 9335 1437

1 0

LAND & DEVELOPMENT OFFICE

Land & Development Office is a subordinate office ofthe Ministry of Urban Affairs and Employment and isresponsible for administration of about 60,000 leases ofthe Central Government in Delhi. Out of which 3147 arePerpetual Leases of Nazul Land and the remaining areRehabilitation Leases transferred from the Departmentof Rehabilitation from 1962 onwards. The Land &Development Office is also the Competent Authorityunder the Urban Land (Ceiling & Regulation) Act, 1976for Sections 26 & 27. The permissions are granted afterexamination of applications. In addition to above, thefollowing items of work are also being handled by theLand & Development Office:-

(1)

(2)

(3)

(4)

Allotment of land to various Government/Semi-Government Departments andinstitutions of different categories under thedirections of the Ministry.

Auction of vacant land/built-up propertiesunder its charge under the directions of theMinistry.

Removal of squatters on Government landand recovery of damages from them underPublic Premises (Eviction of Un-authorisedOccupants) Act, 1971 in respect of landsunder its control.

Conversion of lease-hold residentialproperties into free-hold.

2. As part of the lease administration, the requests forvarious permissions under the lease namely; SalePermission, Gift Permission, Mortgage Permission,Substitution, Mutation, change of purpose etc. areprocessed and disposed of. The number of applicationsdisposed of on the subjects during the period i.e.

1 .1 1 995 to 31.3.1996 is 2004. The break up is asfollows:-

Sale permission -Substitut ion -Mutation -Mortgage -Gift permission -

3141284

3 7 23 3

12 0 0 4

3. The revenues are received towards premium forallotment of lands, unearned increase on grant of salepermission, damages, misuse charges for the breachescommitted by the lessees, ground rent, revised groundrent and charges for change of use (conversion charges).The total revenues received on this account during thecurrent year i.e. from 1.4.1995 to 31.3.1996 isRs. 43,45,68,222.4 . Fresh allotments of plots were made to 20 Institutions/Government Departments during the year.5 . Under the Public Premises (Eviction of Un-authorisedOccupants) Act. 1971, 436 cases were pending beforethe Estate Officer as on 31.3.1996. During the year 8cases were filed. These cases were for recovery ofdamages and also for eviction of unauthorisedoccupants.6. Under the Displaced Persons (Compensation andRehabilitation) Act, 1956, Leases were executed in 17cases. There are still 636 cases remaining for executicnof the leases. In most of these cases, the slow progressis due to the difficulty in getting the legal heirs of theallottees on record and due to the Litigation amongstthe legal heirs. Moreover, the Settlement Officer cumManaging Officer has not yet been appointed and the‘post is lying vacant since 1.6.1995. The matter regardingfiling up the post is under active consideration of theMinistry.7. In 8 cases, the’lease deeds were executed in case ofshops in different markets which were transferred fromthe Directorate of Estates on conferring the ownershiprights on the licencees.8. Under the scheme of conversion from lease hold intofree hold of the residential plots measuring 5OOsq. mts.and the tenements, so far 8263 applications have beenreceived, of which 7169 applications have beensanctioned and 498 applications rejected. Governmenthas so far received Rs. 12,22,56,575 towards theconversion charges under this scheme.

11 recommendatioconsolidated.

ns of specialised agencies were

TOWN AND COUNTRY PLANNINGORGANISATION

The Town & Country Planning Organisation (TCPO) isthe apex technical advisory body on matters relating tourban and regional planning strategies, research,monitoring and evaluation of Central Governmentschemes and urban development policies. It providestechnical inputs to the Ministry of Urban Affairs andEmployment for formulation of urban development andinfrastructural development programmes and policies.It also provides consultancy-services for various kindsof projects to Central Ministries/State Governments/public sector agencies and other Organisations/Depart-ments.2. As in previous years, during 1995-96, TCPO continuedto be involved in the appraisal, monitoring and evaluationof important schemes of the Government of India likethe Integrated Development of Small and Medium Towns(IDSMT), P.M.‘s special grant programme for Bombay,World Bank assisted State Urban Development Projects,Environmental Improvement of Urban Slums Scheme(EIUS) and Mega City Scheme, etc.TCPO is also lookingafter the implementation of central sector Urban MappingScheme.

3. During the year 1995-96, Rs. 35.00 crores wereearmarked for central assistance under IDSMT Scheme.Technical Appraisal reports for 79 new towns and 47ongoing towns were prepared till March, 1996 for releaseof central assistance of Rs. 27.88 crores (includingrelease made to ongoing towns covered in the 7th Planand two Annual Plans, i.e. 1990-91 and 1991-92). UnderIDSMT, by March 1996, employment to the tune of848.96 lakh mandays is estimated to have beengenerated which includes 169-l 72 lakh mandays forskilled employment and rest for unskilled. Under EIUSscheme, during the period from April, 1995 to Feb., 1996about 11.68 lakh slum dwellers constituting about 74per cent of the yearly target have been covered. UnderWorld Bank aided Urban Development projects, theassessment of the progress was made on the basis ofthe reports received for the ongoing project of Bombay,Tamil Nadu and Uttar Pradesh and sent to the Ministry.

4. For the Steering Committee constituted by the Ministryof Urban Affairs and Employment to guide thestipulated review of Master Plan for Delhi-2001, the

5. Chief Planner TCPO is the Convenor-Member of theTechnical Group on Urban Planning System constitutedby the Planning Commission to review the existingplanning process and suggest simplified procedures forurban planning system in the light of 74th ConstitutionAmendment Act. Accordingly, TCPO as the TechnicalSecretariat has assisted the group substantially and draftreport of the Group is ready. TCPO is the TechnicalSecretariat of the Working Group on Urban Transportcreated by Ministry of Urban Affairs and Employment.The report of the Group has been submitted to theMinistry. TCPO is also the Technical Secretariat of theGroup on Research and Training. The work is inprogress.

6. Technical assistance and advice has been providedto the Ministry of Urban Affairs and Employment andDDA in various cases of change of land use in the MasterPlan for Delhi. Project proposals of Bombay, Hyderabad,Calcutta & Madras under the Mega City Schemepertaining to truck/bus terminals, parking, subwayalignments etc. have been examined and commentsoffered to the Ministry for consideration.

7. Status Note on State Capital Projects of Goa,Arunachal Pradesh, Mizoram and Nagaland has alsobeen prepared and sent to the Ministry. Following anagreement between Government of India and ODA (UK),an in-country programme on Management of UrbanDevelopment has been taken up in collaboration withUniversity of Birmingham and related core institutionsin India on a networking basis. The first and secondcycles of the programme were successfully organisedby the three core institutions viz. TCPO, School ofPlanning, Ahmedabad and Regional Centre for Urbanand Environmental Studies (RCUES), Hyderabad duringApril-June, 1995 and January-February, 1996respectively in a common framework. The programmewas targeted at middle level functionaries of.municipalities and state town planning departments. Inall, 42 and 40 officers participated in the first and secondcycle respectively of the programme.

8. Assistance was provided in the preparation of reportof the Committee on Misuse of Residential Premises inDelhi. Chief Planner, TCPO as Enquiry Officernominated by DDA prepared a report on the case relatingto the allotment of land to a nursary school by DDA inSarita Vihar as directed by the L.G. Delhi.

9. Details of the major projects/studies completed duringthe year and the ongoing projects are given inAnnexure-I and II.

Annexure-l

S I .No.

Important Projects/Studies completed during the year 1995-96

Project/Study Date of Date of RemarksCommence- Completionment

1 2 3 4 5

A.

1 .

2 .

3 .

B .

1 .

C .

1 .

2 .

3 .

4 .

53

Entrusted by the Ministry of UrbanAffairs and Employment and

other Central Agencies

Report for theSteering Committeeconstituted by theMinistry to guidethe Review of MPD-2001.

Working Group onUrban Transportconstituted by the Ministry.

Nov. Jan.1994 1996

Revised Guidelines Jan.of IDSMT Scheme. 1995

Projects for States/UTs.

Study on EnvironmentalImprovementof Pushkar Lake Areain Rajast han.

TCPO’s work

A study on WomenEntreprenurship inUrban Areas.Study on UrbanLand Price (Phase-II)Research Projecton Development ofGIS Data Base atTown Level :Lutyens Bangalow Zone Delhi.Appraisal of UrbanLand Policies andProgrammes in selected cities.A case study of Delhi, Ghaziabadand NOIDA.

Sept. Nov.

1994 1995

Aug. Printed and1995 circulated

April Sept.1990 1995

Aug. Sept.1990 1995

June Oct.1992 1995April Sept.1991 1995

1988 Sept.1995

Draftrecommendationsof the ExpertGroups andspecialisedagencies are ready

Report submittedto Ministry ofU.A. & E.

Completed.

Completed.

Completed.

Report sent toDDA forclarification onAreas.

Completed.

1 2 3 4 5

5.

6.

D .

1 .

2.

A compendium on slums in India.Evaluation studyof Pryog Vihar(Delhi) slum upgradation project.Consultancy Projects asEntrusted by Deptt. of Tourismand other agenciesTourismDevelopment Planfor Dadra & NagarHaveli (Part-l).Urban DevelopmentProjects inLakshadweepIslands.

1992 Dec. 1995Oct. Dec.1992 1995

Final Draft is readyCompleted.

April1993

March1995

Draft reportsubmitted toclient agency.

Sept.1994

March1995

Draft projectsent to clientagency.

Annexure-lII

Important Ongoing Projects/Studies during the year 1995-96

1 2 3 4 5

A.

1 .

2 .

3.

4.

5 .

6.

7 .

8 .

9 .

Entrusted by the Ministry ofUrban Affairs & Employment andother Central Agencies

Urban MappingProject.

Technical GroupOn UrbanPlanning Systemconstituted by PlanningCommission. i .Monitoring ofWorld Bank AidedUrban Develop-ment Projects.IndustrialGrowth CentresScheme.

Industrial ModelTown (IMT)

ExportProcessing Zone.

Export PromotionIndustrial Park(EPIP)

Assistance inCoastal ZoneManagementplans .

TrainingProgramme onManagement of Urban

/ April1993

June1995

Continuing

Continuing

Continuing

Continuing

Continuing

Continuing

Continuing

March1997

March1996

Aerial Photos for4 towns and linemaps for 5 townsreceived from NRSAare being scrutinised.Photography forother towns isin progress.Draft Report isready.

Assistance isbeing providedto State Govts.

Assistance isbeing providedto Ministry ofIndustry.Assistance isbeing providedto Ministry ofIndustry.Assistance isbeing providedto the Ministryof Commerce.Assistance isbeing providedto the Ministryof Commerce.Assistance isbeing providedto Ministry ofEnvironment andForests.Second advancedcourse organised.Follow up action

Development. is being taken

1 2 3 4 5

B.

1 .

C.

1 .

2 .

3 .

4 .

5 .

6 .

D .

1 .

2 .

3 .

Draft Report isready.

Draft reportcompleted.

Draft report isready.

Draft report forBombay, Calcutta,Delhi and Madrasis in progress.Draft report on5 Mega cities isis in progress.Work is inprogress.

Base map digiti-sed for furtherprocessing andfurther work inin progress.

Working Drawingprepared andsubmitted to theClient Agency.

Work is inprogress. Delayis due to nonavailability of BaseMap from SOI.Stage-l has beencompleted. ForStage-II, TOR arebeing finalised.

Projects for States and UTs.

Development Planfor Cuttack-Bhubaneshwar-Puri Region.TCPO’s Work

Urban and RegionalPlanning andDeve lopmen t i n States (State Profile).Study on Integ-ration ofEnvironmentalImpact Assessmentwith Development - Acase study of Ghaziabad.TransportProfile ofMetropolitanCities.Profile onMetropolitanCit iesDocumentation-ofUrban Research(Vol. II)GIS Study atTown Level - ACase study ofAnand Town.

Consultancy Projects asEntrusted by Deptt. ofTourism and other Agencies

Planning anddesigning ofSewa Hydel Town-ship at Basholi,Mushka, Hutt andGatti.Master Plan forJammu.

Tourism Develop-ment Plan forthe District ofDadra and NagarHaveli.

Dec. March1992 1996

Dec. Dec.1994 1996

Dec. Dec.1992 1996

Oct. March1993 1996

July April1993 1996

April Dec.1994 1996

Sept. June1995 1996

June March1993 1997

Sept. Dec.1993 1996

- -

1 2

STATIONERY & PUBLICATIONS

GOVERNMENT OF INDIA STATIONERY OFFICE(GISO)

This Department is responsible for the procurement andsupply of paper and paper made articles and otherstationery items as required for day-to-day functioningof all Ministries and Departments of Government of Indiaincluding Indian Missions/Posts abroad, Union Territoriesand some quasi-Government Organisations.

Organisational structure

2. This Department with its headquarter at Calcutta is asubordinate office headed by the Controller of Stationery.There are three Regional Stationery Depots at NewDelhi, Bombay & Madras. There is an inspection Wingwith a Laboratory in Govt. of India Stationery Office,Calcutta and Inspection Cell with skeleton staff at NewDelhi and Bombay.

3. It was decided in the year 1987 to wind up theDepartment. However, subsequently, it was revived, asan interim measure, in early 1991. Its present workingstrength is only 934 (as on 31-3-96) as against thesanctioned strength of 1210. A decision on its future willdepend on the outcome of-a study entrusted to theDepartment of Administrative Reforms and PublicGrievances.

Activities

4. GISO, Calcutta and its 3 Regional Stationery Depotscater to the needs of nearly 13,320 indentors forStationery Stores, different types of papers and papermade articles by inviting open tenders. It concluded ratecontract of the value of Rs. 66 lakhs and running contractof about Rs. 10.02 crores during the year 1994-95. Duringthis period it placed 269 supply orders for stationery otherthan paper. The total expenditure incurred on purchaseof papers and stationery stores was about Rs. 10.85crores.

5. There is a budget provision of Rs. 16.00 crores for theyear 1995-96 for procurement of stationery artic- les.GISO has placed orders for supply of stationery storesother than paper of about the value of Rs. 11.93 croresand for paper for about Rs. 2.28 crores, upto March,1996.

6. GISO, Calcutta has a Vigilance Cell headed byDeputy Controller (Admn.) and complaints of variousnature are handled in this Cell.

DEPARTMENT OF PUBLICATIONS

Function

7. The Department of Publication has been playing avital role in creating awareness about various nationalprogrammes and policies through Govt. publications byselling, displaying and distributing Govt. publications onvarious themes/subjects having relevance to Nationalpriorities including Social, Scientific, Economic, Politicaland Legal aspect etc. The Deptt. is the publisher ofsaleable official publications and is responsible forstocking, distribution, advertising, cataloguing and saleof Govt. publications including Periodicals, Gazette ofIndia and Delhi Gazette (all parts) of Ministries, Attachedand Subordinate Offices of Central Government. TheDeptt. also handles Army publications and arranges itssale/distribution to various units as per instructionsissued by the Defence Authorities. This Deptt. alsosecures advertisements for insertion in Govt.publications.

Organisational Set up

8. The Deptt. of Publication is a subordinate officefunctioning under the Ministry of Urban Affairs &Employment. The Deptt; is headed by the Controller ofPublications.

(i) The Department consists of :

(a) Main Office of the Controller of Publications,Civil Lines, Delhi.

(b) Sale

(i)

(ii)

(iii)

Depots./Units:Kitab Mahal, Baba Kharag Singh Marg,New Delhi.Govt. of India Book Depot., 8, K.S. RoyRoad, Calcutta.Sales Counter, New C.G.O. Complex,New Marine Lines, Bombay.

(c) Sales Counters(i) Sales Counter Main Office, Civil Lines,

Delhi-54.(ii) Sales Counter, Delhi High Court, New

Delhi.(iii) Sales Counter, Udyog Bhawan, New Delhi.(iv) Sales Counter, U.P.S.C. New Delhi.(v) Sales Counter, C.B.R. Building, I.P Estate,

New Delhi.

(d) Gazette Distribution Unit at Government of IndiaPress, Mayapuri, New Delhi.

(e) in addition to the Book Depots/SalesCounters, the publications are sold throughabout 1084 Selling Agents, 183 S&R Agents,325 Employment Exchanges, 58 SmallIndustries, 40 Extention Centres, 3 RailwayBook Stalls and 24 Foreign Agents, 201Regular and 250 Restricted Agents.

Activities

9 . During the year 1995-96, the major activities of Deptt.of Publications have been as follows:

(i) The total number of titles handled as on 31-3- 96was about 53429.

(ii) The publications of the value of Rs. 528.62 lakhsapproximately were sold/distributed.

(iii) The Department of Publication secured adver-tisement valuing Rs. 164.03 lakhs approximatelyfor inserting in Govt. publications.

(iv)

(v)

(vi)

(vii)

The total number of periodicals handled by theDepartment as on 31-3-96 was 24 and the’numberof subscribers including those on the freedistribution list were 8717 and 705 subscribersfor Gazette of India all parts.Supply of Publications under ExchangeAgreement: The prompt and regular supply ofnewly released publications and monthlycatalogues is made to U.S. Congress Library.This Department has participated in the IndiaInternational Trade Fair held in New Delhi from14.11.95 to 27.11.95 and World Book Fair from3-2-96 to 11-2-96. Books worth Rs. 10,97,117were sold out in these fairs.4142 titles were weeded out from 1.4.95 to31.3.96. With the weeding out of obsoletepublications, considerable space has becomeavailable for keeping the new publications safe inthe required manner.

13

PUBLIC SECTOR UNDERTAKINGS

NATIONAL BUILDINGS CONSTRUCTIONCORPORATION LIMITED

Introduction

1. The National Buildings Construction Corporation(NBCC) was incorporated as a public sector under-taking in November, 1960. Its main line of business isexecution of civil engineering projects, rendering ofconsultancy services and development of real estateprojects with major focus on home market and turnkeyventures.The paid up share capital of the Corporation is Rs. 19.95crore against the authorised capital of Rs. 20 crore.NBCC to-day is a Flag Ship company in the Country forconstruction of High Rise Chimneys using Slip-formTechnology. It has also entered into the field ofconstruction of Cooling Towers with Slipform Tech-nology and is planning to establish its expertise in thissector.

Land marks

2. NBCC to-day is a Rs. 200 crore company with alarge net work of projects spread all around the countryand abroad. During the span of 35 years of its operations,NBCC has completed a number of prestigious projectsin home & overseas market in various sectors such asHousing, Health, Environmental, Industrial, Transpor-tation, Energy, Institutional, Tourism and Real Estate.Some of the major projects executed are:

Home Projects* Mass housing complex consisting of 1800 houses

at Sanpada & Koperkhariane, New Bombay.* Water treatment plants, 455 MLD at Haiderpur, Delhi

and 132 MLD at Coimbatore in Tamil Nadu.l Modernisation/expansion of Delhi Airport.* Metro Tube Railway and major stations in Sourthern

part of Calcutta City.* Main Railway Station, Secondary Buildings, subway

etc. at Jui Nagar Railway Station, New Bombay.* New Exhibition Centre ”A 16 domed space structure

a marvel in Architecture” at Pragati Maidan, NewDelhi.

l 220 KV Transmission Line for Salal-Kishanpur-Sarna(J&K).

Overseas Projectsl 200 beded Super Speciality Indira Gandhi Memorial

Hospital at Male, Maldives.*

l

Kohalpur-Mahakali National Highway 48 KM longalongwith bridges in Nepal.VIP Recreation Centre with five star recreationalfacilities at Taiz, Yemen.

Performance 1995-96

3. (a) Memorandum of Understanding

NBCC is an MOU signing company.The performance ofNBCC has been evaluated as “GOOD” for the year 92-93 & 93-94 and “VERY GOOD” for the year 94-95 and95-96. The MOU for the year 1996- 97 envisages thefollowing targets:l Business Development Rs. 300 crore* Turnover Rs. 200 crore* Gross Margin (Home) Rs. 4.6 crore

(b) Achievement during 1995-96

NBCC during the year 1995-96, upto end of March, 96developed a business of Rs. 287 crore against the targetof Rs. 275 crore and achieved a turnover of Rs. 187.00crore against the target of Rs. 185 crore.

(c) Achievement for the year 1994-95

During the year 1994-95, NBCC developed a businessof Rs. 275 crore against the target of Rs. 225 crore andachieved a turnover of Rs. 179.91 crore against thetarget of Rs. 175 crore.

3.1 The turnover achievement trend since 1991-92 isgiven in the Chart as under

TURNOVER SINCE 1991-92VALUE IN RS, CRORE

I

91-92 92-93 9 3 - 9 4 94-95 95-96YEAR

aa HOME m OVERSEAS

Order Book Position

4. NBCC has effective orders in hand worth Rs 422 croreat the close of year 199596. The Order Book Position ofthe Corporation is quite comfortable. Some of the majorProjects secured during 95-96 are as under:

Water Conductor System, SuratgarhThermal PowerPlant, valuing Rs. 10.29 crores.

Krishi Anusandhan Bhawan Phase-II, at Pusa, NewDelhi, valuing Rs. 9.50 crores.

. Mining Quarter at Dhanbad, valuing Rs 7.43 crore.

Commercial Complex at Mangoelane, Calcutta, valu-ing Rs. 11.1 8.crores.

Community Centre at Pushp Vihar. New Delhi, valu-ing Rs. 45.76 crores.

Integrated Brackish Water Aquaculture DevelopmentProject at Nayachar Island, Midnapor (WB), valuingRs. 13.02 crores.

l SAIL/JPC office Complex at Ballygunj, CircularRoad, Calcutta valuing Rs 8.00 crores.

32 units of Standard Design Factory blocks at NoidaExport Processing Zone, valuing Rs. 11 crore

Multiflue RCC Chimney275 M high for VindhyachalSuper Thermal Power Project Stage- II, valuingRs. 9.59 crores.

l B.P. Koirala lnsitute of Health Sciences at Dharan(Nepal), valuing Rs. 9.40 crore.

4.1 The business development trend since 1991-92 isgiven in the Chart as under:

BUSINESS DEVELOPMENT SINCE 1991-92VALUE IN RS. CRORE

148.9162.7

287

95-96YEAR

Real Estate

5. NBCC has entered into Real Estate sector forirnproving its liquidity. It has already completed threecommercial complexes at New Delhi, Ghaziabad andAhmedabad. A large commercial complex named NBCC

Place, at Pragati Vihar, New Delhi is also nearingcompletion. The undermentioned real estate projectsare in progress:

Community Centre at Pushp Vihar, New Delhi.Commercial Complex at Mangoelane, Calcutta(WB).Housing Complex at Paiian. Calcutta (WB).Development of new township at Rajarhat, Calcutta(WB).Standard Design Factories at Madras (MEPZ) &Cochin (CEPZ).

Diversification Plan

6. In tune with the changing times, NBCC has beendiversifying its activities from time to time. Its thrust ar-eas are environmental engineering plants, tall stacks,real estate, project management, cooling towers, etc.‘The diversity of business is given in the Pie-Chart asunder:

DIVERSITY OF BUSINESS DEVELOPMENTDURING 1995-96

Engery 4%

7. Some of the major ongoing projects

MTNL Office Complex a? Cuffee-Parade, Bombay

The MTNL Office complex comprising of 12 storeyedTechnical Block & 8 storeyed Administrative Blockwith a basement in each block valued at Rs 8.20crore is under construction at Cuffee-Parade,Bombay. The project is about 88% complete.

l Engineering College at Gurdaspur, Punjab

The project comprising of Institutional Buildings,Student Hostels. Staff Quarters, lnfrastructuralFacilities and complete development of collegecomplex spread in an area of 150 acre valued atRs. 21.20 crore is under construction a: Gurdaspur.The project is about 56% complete and isprogressing as per schedule.

Engineering College at Ferozpur, PunjabThe project comprising of Institutional Building,Student Hostel, Staff Quarters, lnfrastructuralFacilities and complete development of collegecomplex spread in an area of 98 acre valued at Rs.21.20 crore is under construction at Ferozpur Theproject is about 60 % complete and is progressingas per schedule

* Air India Staff Housing Complex at Nerul, NewBombayThe housig complex comprising of 508 houses inPhase-l and other ancillary works such asCommunity Centre, School, Hostel Block, ShoppingComplex and development works valued at Rs 40crore is under progress at Nerul, New Bombay.The, entire complex is spread in an area of 24 acres. Theproject is about 48% complete and is likely to becompleted by March 1 997.

* NFL Complex at Noida, Uttar PradeshThe project comprising 4 storeyed with a basementfully air conditioned office complex for NFL valuedat Rs. 10.20 crore is under construction at Noida.The project is about 69% complete and is likely tobe completed by September 1996.

* ESlC Hospital-cum-Residential Complex atNacharam, HyderabadThe project for constuction of 200 bedded ESICHospital at Nacharam, Hyderabad spread in area of6 acres as built by the Corporation was inauguratedby Sh. G. Venkat Swamy, Hon’ble Minister of Labouron 31 st January, 96. The Hospital Complex built ata cost of Rs. 14 crore was handed overto the Hon’bleChief Minister of Andhra Pradesh on the same day.The residential complex for the hospital is likely tocommence shortly. The estimated cost of theresidential complex works out to Rs. 1.25 croreapproximately.

8. Some major projects completed during1995-96

Multiflue RCC Chimney at Mejia, West BengalThe first flue ct multiflue RCC Chimney at Mejia hasbeen completed on schedule to match with thecommissioning of Boiier for un i t- I of 3x210 MW MejiaThermal Power Project.

* Institute for Physically Handicapped, New DelhiThe additional works of the Institute awarded fromtime to time have been completed on schedule.

* HUDCO Vishala, New DelhiCommercial Complex of HUDCO named HUDCOVISHALA at Plot No. 14, Bhikaji Cama Place, NewDelhi valuing Rs 17 crore has been completed onschedule

Subway at Narouji Nagar, New DelhiSubway on Ring Road at Narouji Nagar valuing Rs73 lacs has been completed. Hon’ble Chief Minis-ter of Delhi appreciated the performance andpresented a cash award of Rs 11 11,000/- to the staffwho worked at the above project.

** SAlL Stock Yard at Dhankuni, West BengalThe project comprising of erection of steel struc-tures for stacking of steel, Administrative Block, RCCOverhead Water Tank, and allied structures for SAILStockyard at Dhankuni spread in an area of 35 acresvalued at Rs 15.5 crore has been completed.

x* Recreation Centres at Taiz, YemenRecreation Centre at Taiz,Yemen valuing Rs 13 crore(4.09 Million US$) for Abudhabi fund has beencompleted. This project on account of its hillylocation, superior finishes & innovative architectureis a landmark in the Republic of Yemen.

9. Roll of Honours*

*

NBCC figured in the top 225 international construc-tion companies and ranked at 198th position by theEngineering News Record, published in New York.NBCC baged safety award from NTPC for con-.struction of Chimneys.Third Best Housing Award from institution ofEngineers Belapur Chapter for construction ofHousing Complex consisting 1005 houses at San-pada for ClDCO in Raiged and Thane Region ofBombay.The Chief Minister of Delhi gave a cash award tothe engineers of NBCC for completion of Subwayon Ring Road at Wazirpur in a record time of SIX

months.

Adoption of New Technology

10. NBCC is continuously exploring productive/moderntechnologies. After successfully adoption of SlipformTechnology for high rise structures the Corporation isnow engaged in development & promotion of Trenchless(No Dig) Technology and Micro Tunnelling. Thistechnology on adoption will solve many problems beingfaced in the congested Metro Cities. As a result of itscontinuous efforts, Corporation has secured two projectsto be executed through this technology.The first contractis for laying of 110 mm dia HDPE Pipe for a length of1.44 KM at Railway Crossing near Andheri RailwayStation, Mumbai, valuing Rs. 30.12 Lakh. The secondcontract is for laying of Mesh Earthing under 66 KV sub-stations at School Lane in Connaught Place and VidyutBhawan New Delhi, valuing Rs. 28 Lakh.

Profitability

11. The financial results for the year 1995-96 are notyet available, however the Corporation has incurred aloss of Rs. 16.43 crore during 1994-95 against a loss ofRs. 42 53 crore during 1993-94.

The main reason for loss is huge interest burden of Rs.31.56 crore. The interest burden has increased during94-95 as Euro-Dollar loans pertaining to Iraqi projectswere converted into rupee loans resulting in increase ofinterest liability from L IBOR rate (of around 6%) to 15%on Rupee loan.

Settlement of Iraqi Dues

12. During the year significant progress has been madein the settlement of receivables of Iraqi projects andliquidation of bank borrowings raised for execution of Iraqiprojects to the extent of Rs 134.42 crore through cashpaymentof Rs.133.70 crore by the MOUAE&RBI bonds.The receivable amounting to Rs 167.14 crore in respectof Iraqi projects have since been assigned to the Govt.

Computerisation

13. NBCC has set up a modern state of art computercentre at the Corporate Office and instatted computersin all the zonal offices. The following applications havebeen developed and fully implemented in-house:

* MIS Reports (including Bank Guarantees, HeadOffice investment, Realisation of Outstanding duesect.)

l Payroll & C.P. F. Accounting System.l Financial Accounting System.* Personnel Information Management System.l Preparation of Balance Sheet and Annual

Accounts.

Human Resource Development

14. The Corporation as on 31.03.96 has on its roll 3493employees which include about 1500 qualifiedprofessional in the field of engineering, finance, personnel& administration, material management etc. A TrainingInstitute has been set up at v i l la ge Ghitorni near Mehrauli,for the purpose of imparting training for skill upgradationof the workers. The purpose of the Training institute is toretrain the workers in multi-fields to increase theirproductivity. Discipline wise deployment of humanresources is given in the pie-chart as under:

HUMAN RESOURCES(As On Mar. 31, 1996)

personnel 282 Finance 31i2

Tradesmen 2004Material MGMT. 134

Administrative Procedures

15. (i) Accounts Manual

(ii)

Accounts Manual which contains AccountingPolicies, Procedures and various instructionsissued from time to time has been prepared. Thismanuat wilt hefp in smooth working of theCorporation.

Personnel Manual

Personnel Manual which comprise all rules andregulation is under compilation. The system ofpersonnel audit has been introduced to ensurethat the personnel, industrial relation policies andadministrative instructions are followed.

(iii) Works Manual

Works manual which contains procedures andpolicies for execution of Projects is also underpreparation.

Welfare of SCs & STs in Service

16. A special cell to took after the welfare of SCs/ STs isfunctioning in the Corporation under the control ofManager (P&A). He is also the Liaison Offiier of thisCell. The Corporation has eleven zonal offices, all theZonal Head are functioning as Liaison Officers of theirrespective zones. This Cell ensures the compliance ofinstructions issued by the Government. The grievancesof SCs/STs employees are attended promptly. Rostersare maintained in the Corporate Office as per instructionsissued by the Government f&m time to time.

Propagation of Use of Hindi

17. In order to propagate the use of Hindi, Corporationcelebrates Hindi Diwas and Hindi Saptah during themonth of September every year and organises severalHindi compet i t i o ns. During the year 95-96, six HindiWorkshops were organised and a large number ofemployees from Engineering, Accounts, Personnel andAdministration disciplines took part in these workshops.A Hindi manual named “NBCC and your personnel guide”has been printed and circulated to promote the use ofHindi. “AKSHAR’ software has been installed on all thecomputers at the Corporate Office. In Hindi stenographyand typing, 16 stenographers and 34 typists have beentrained. 60% of the original correspondence is done inHindi at the Corporate Office.17.1 Besides above, Co-ordination officers for implemen-tation of Hindi have been nominated in every division aswell as in each zone. A sum of Rs. 1OOO/- p.a. is beinggiven to them for propagation of use of offcial language.

TOTAL MANPOWER : 3493 NOS.

The use of Hindi in the daily correspondence in eachzone have been inspected during the year. Regularmeetings of Official Language ImplementationCommittee (OLIC) are being held in the CorporateOffice. Daily one Hindi word is being displayed at thereception of the Corproate Off ice. A column “Seekhenaur Sikhain-Rajbhasha Apanaie” is published in theNBCC News Bulletin. The progress achieved inimplementation of Hindi as an official language isreviewed during the performance review meetings heldat the Corporate Off ice.

Hindustan Prefab Limited

18. Hindustan Prefab Limited is a Government of Indiaenterprise functioning under the administrative controlof the Ministry of Urban Affairs and Employment since1955. The Company has its Registered Office andFactory at Jangpura, New Delhi.

M a n a g e m e n t

19. The Company is managed by a Board of Directors.It had 739 permanent employees on its rolls as on31.03.96.

Operational Areas

20. (a) Construction works.

(b) Manufacturers:-

(i)

(ii)(iii)

(iv)(v)

Prestressed Cement Concrete Rly.Sleepers.R ly. Bridge slabs/ballast retainer.Prestressed Cement Concrete electricpoles.Wooden/wood substitute (MDF) shutters.Light weight autoclaved cellular concreteblocks for insulation and partition walls etc.

(c) Land Development works,

(d) Technical Consultancy:

Planning and designing of construction projects,Project Management.

(e) Technical Services:Testing of concrete cubes/bricks and otherbuilding materials at our modern laboratory &timber seasoning.

Construction Works

21. At present, the Company is executing the followingmajor construction works: (Rs. in lakhs)

(a) Construction of flats for Indian OilCorporation at Panipat. 305.00

(c)

(d)

(e)

(f)

(g)

(h)

(i)

(j)

(k)

Construction of 636;quarters for minersof BCCL, at Dhanbad 828.00Construction of Houses for HSEB atPanipat. 111 .00Construction of Buildings for EmployeesProvident Fund Organisation. at :(i) Janakpuri

(ii) Nasik(iii) Jabalpur

624.00208.00371 .00

Construction of Staff qyarters forReserve Bank of India at; Salboni,Distt. Midnapur in West Bengal,Construction works for Delhi Instituteof Technology at New Delhi.Construction of Workshop &TechnicalTraining institute for Eastern CoalField Ltd. at Sonepur BazariConstruction of 0ffii.e Building forGMDC at Bhuj ,& Ahmedabad 2Construction of Boundary VVaII forInternational Airport Authority of India.Construction of Milk Booths f o r DelhiMilk Scheme.Const. of ftats for HUDCO atAndrews Ganj, New Delhi

2349.00

346.00

570.00

861 .00

180.00

31 .50

1378.00

Capital

22. The Company’s authorised. and paid-up capitalstands at Rs. 10.00 crores a n d Rs. 6.97 croresrespectively. The loan liability to the Government is Rs.1113.00 lakhs excluding. interest of Rs. 1831.81 lakhsthereon as on 31.3.96. Proposals for capital restructuringare under consideration-of the Govt.

Performance

23. Though there had been a curtailment of productionduring the yeari 1995-96, o f Rly, sleepers by NorthernRailways, the. Company had achieved, production a n dturnover of Rs. 28.76 crores. and Rs. 39.17 crores,respectively and incurred a loss of Rs. 2.21. Crores beforeaccounting for Rs. 2.04 Crore interest on Govt. loans.

Awards

24. HPL's quarterly (Prefab News) has been awardedthe 2nd prize Tamra Patra for the year 1993-94, Thisaward was presented to CMD, HPL by the Hon’bleMinister of Urban Affairs & Employment on 23.595

24.1 HPL has also been awarded the 2nd Jawahar LalNehru Memorial National Award 1994-95 for excellancein Indian Industry for effective implementation of Pollution

Control Methods by the International Green LandSociety. This award was presented to the CompanySecretary, HPL by the Hon’ble Minister of State forIndustries on 11.4.95.

Achievement During 199596

25. Turnover (Rs. in Crores)

Target .4ctual %achieve-1995-96 1995-96 ment

(a) Factory turnover - 1 1 . 9 8 12.80 106.84

(b) Construction works &Land Development 19.71 19.37 98.27

31.69 32.17 101.51-

Order Book Position

26. The net value of orders to be executed as on 31.12.95is as under:

(a) Factory products

(b) Construction works

(c) Land Development

(Rs. in crores)4.00

47.71

1 .0052.71

Industrial Relations

27. A cordial atmosphere prevails on the industrialrelations scene. No mandays were lost due to industrialact ion.

Family Welfare

28. Family Welfare Schemes encouraging small familynorms continued/remained in operation. 10 employeeswere benefited by way of cash incentives, one additionalincrement and special casual leave.

Voluntary Retirement Scheme

29. Under the Voluntary Retirement Scheme,92 employees were given voluntary retirement during1995-96.

Vigilance

30. Special attention was paid to preventive vigilance,transfers from sensitive seats and amendment toprocedures. Surprise checks were conducted.

Energy Conservation

31. Power savers were introduced to reduce wastage ofelectrical energy and to effect improvements in thelighting system. This has shown remarkable results.

Welfare of SCs/STs

32. (a)

(b)

(c)

(d)

Activities of the special cell set-up under thecontrol of Liaison Officer,SC/ST Cell set-up under the control of theLiaison Officer continued to keep watch overthe implementation aspects of reservation ofposts in the Company as per Government’sdirectives. Rosters were maintained as perGovernment directives.Inspection of rosters conducted by the LiaisonOfficer.Inspection of rosters was conducted by theLiaison Officer with a view to check up theentries in the rosters.The 40 point roster on oldsystem was closed after issue of instructionsby Govt. for 27% reservation for OBCs. 200point new roster has been adopted.Advertisements were released to clear backlogof SC/ST.Appreciation/Orientation courses for SC/STcandidates at various levels:Employees belonging to these communitieswere sponsored for crientation courses.Scheme of special interest free advance to theemployees belonging to SC/ST and weakersections of society continued. A total amountof Rs. 4,48,600 was advanced to 198 employeesof these communities including scavengers.

Abatement of Pollution for Clean Environment

33. Company has already installed energy savingmeasures like Solar Kiln for seasoning of timber. Tocombat pollution in the factory, Company uses batterypowered prime movers within the factory sheds pro-viding a clean environment to the work-force.

Research and Development

34. HPL continued its thrust for research anddevelopment. A full fledged Manager (R&D) is in positionin the Company to introduce new products in the Prefabfield. The PRC Bridge slabs and ballast retainersdeveloped with HPL’s design and Prefab Technologyused in Railway Bridges have been appreciated byRailways.

Use of Official Language

35. The Official Language Implementation Committeeunder the Chairmanship of CMD, HPL continued tomonitor the use of Hindi and suggest ways and meansfor its promotion in official work. Use of Hindi in officialwork is also being encouraged by converting the existingcomputer applications into bilingual form.

1 4

AUTONOMOUS & STATUTORYBODIES

1. DELHI DEVELOPMENT AUTHORITY

I. The Delhi Development Authority was set up inDecember, 1957 under the Delhi Development Act, 1957,to promote and secure the development of Delhiaccording to plan and for that purpose the Authority hasthe power to acquire, hold, manage and dispose of landand other property, to carry out building, engineering,mining and other operations to execute works inconnection with supply of water and electricity, disposalof sewage and other services and amenities andgenerally to do anything necessary or expedient forpurposes of such development and for purposesincidental thereto.

2. The Authority consists of 13 Members includingLt. Governor of Delhi who is its ex-officio Chairman.

Increased Consumer Satisfaction and Time BoundDisposal

3. During the year 1995-96, a number of measures forincreasing consumer satisfaction were taken.These areas follows:

(i) Holding of Lok Shivirs

(ii)

Four Lok Shivirs were held on 9th August, 23rdAugust, 6th September and 20th September,1995 for on-the-spot finalisation/disposaI ofconversion/mutatiori cases, both in the Lands aswell as Housing Departments 1798 cases ofconversion of properties as well as mutation werefinalised. This is in addition to the routine disposalof an average of 700-800 cases of conversion/mutation per month.

Revamping of ‘Reception’ Counter

(iii)

The reception was revamped to provide maximuminformation to the visitors on the ReceptionCounter itself. Standard letters were devised sothat reply/deficiency could be communicated tothe applicants expeditiously.

Improved Consumer Information System

Consumer Guide Books on Housing and LandsDepartments were published in the month of

October, 1995. These gave details of proceduresfor allotment, conversion, mutation of houses,plots, etc., under various schemes. Formats ofvarious documents to be submitted to DDA forgetting transfers, registrations, cancellation/allotment etc., were also printed and madeavailable to the customers at a nominal price atthe Reception.

(iv) Direct Interaction with the Public

All public hearing cases are being disposed of ina time-bound manner and monitoring sheets havebeen devised to monitor the progress of disposalat the highest level. This also includes disposalof grievances appearing through columns of thepress and also those referred by the Directorateof Public Grievances. As a result of this, thenumber of visitors visiting reception and numberof letters appearing in newspapers has gonedown considerably.

(v) Effective communication with consumers byimproving public hearing system and monitoringof disposals by periodic meeting was ensured.

(vi) Delegation of decision making powers helpedreduce movement of files and quicker disposal.

Increase in revenues

4. (i)

(ii)

(iii)

DDA receipts, which were static at about Rs. 350crores for four years from 1988-89 to 1991-92jumped over to Rs. 488 crores in 1993-94 andRs. 640 crores in 1994-95. Approximate netreceipts during 1995-96 are Rs. 765 croresagainst the actual receipts of Rs. 640 croresduring the year 1994-95, an increase of 20%.

The increase in DDA’s income has beencommensurate with the expenditure on de-velopment works during the year. The estimatedexpenditure during the year 1995-96 wasapproximately Rs. 496 crores.

Expenditure incurred on land acquisition alsoincreased manifold and was Rs. 108.59 croresduring 1995-96. This is the highest amount ascompared to the figures in the preceding 4 years.

Floating of new schemes coupled with relief todefaulter allottees

5. (i) During the year 1995-96, DDA floated two newHousing Schemes namely Vlllth SFS Scheme,1996 and Janta Housing Registration Scheme,1996 (JHRS). A total of 7488 flats were allotted/allocated under different Housing Schemes of

(ii)

‘(iii) In order to’ help allottees Who-have to pay hugeamount of arrears to DDA on account of non-payment of Hire Parchase instalments, a PenaltyRelief Scheme -was announced. Under this

“scheme, all the defaulting allottees ‘have beenprovided relief in penalty ‘towards delay inpayment upto abount 66%. This relief was a one-time offer and was open upto 31st of January1996. Atither scheme-known as Hire PurchasePenalty ‘Reli‘tif Scheme-96 was floated inFebruary’96 and will be open upto 31.7.96. It isexpected that allottes who have defaulted inpayment w i l l make their payments upto date andavail retief tinder the scheme.

Better land disposal

6. (i) During the year record number of 2834 propertieswhich included ihdustrial plots, commercial plots,institutional@&, residential plots and shops weredisposed of at a total price of Rs. 344.27 crores.A total of 777 shops were sold during 1995-96.

Co-operativen House Building Society Cell whichdeals with the allotment of land and execution ofsub ‘leases of ‘the plots allotted to co-operativesocieties, finalised 60 cases.

SFS; MIG, LIG & Janta Category including 1933allotments/allocations under the 8th SFS Scheme.

Since there wasno backlog of registrants underJanta Category, JHRS-1996 was launched on27.1 1996 for registering 20,000 persons forallotment of Janta Flats. This was closed on29.2.1,996. Under this Scheme, 26,317

applications have been received.

For the first time, the records of Hire PurchaseScheme were computerised upto March, 1995and about 84,000 defaulter notices were issuedto the defauIting allottees. Action for cancellationof 72 flats was taken and about 6,000 non-recovery certificates under the PP. Act wereissued. A special Counter at Vikas Sadan wasa l so opened for sorting out discrepancies in thedefaulter notices.

(ii)

Taking sports to the door steps of the residents

7. (i) DDA has so‘far-constructed 8 sports complexes,out of which 7 tire fully operational and the 8thone at Trans Yamuna known as Yamuna SportsComplex, has been partially thrown open to thepublic this year.

(ii) During the year,‘6 tnultigyms were constructed

(iii)

(iv)

(v)

(vi)

(vii)

(viii)

(ix)

(x)

in various play fields. People can avail the facilitiesin these gyms by paying a nominal fee.

Out of 36 Sports Fields identified for development,26 have been duly opened to the public.

lllrd DDA Open Squash Tournament was held atSiri Fort in February, 1996 and top ranking sportsplayers of the country took part. This tournamentwas an outstanding success.

Six Mini-Marathons in various sports complexeswere organised in which about 15,000 schoolchildren took part.

A Toddler Swimming Pool at Siri Fort was inau-gurated and the club size swimming pool atHarinagar was completed. Swimming Pools arealso being constructed in other Sports Com-plexes like Poorvi Delhi Sports Complex, Saketand Ashok Vihar Sports Complex,

A standard size skating rink has been thrown opento public in Siri Fort Complex. Similarly a skatingrink has been added in Major Dhyan ChandSports Complex of DDA at Ashok Vihar.

DDA Open Rolter Skating Championship wasconducted at Ashok Vihar in which 14 teams fromschools/colleges from six states participated.

DDA inter School Tennis Tournament organisedat Saket was first of its kind which received over600 entries from 94 schools of Delhi.

Another successful event was a fortnight of sportsextravaganza called DDA New Year Sports Gala’which was organised in the record time in all thecomplexes.

Quality Control8. During the year, 360 inspections were carried out bythe Quality Control Department and 440 samples werecollected.

special MajorProjects

9 . (i) The work of the water supply and sewerage pipelines in Phase-l of Dwarka was taken up at anaccelerated pace during the year. All sub- stationsites and one grid Sub-station site were handedover to the DESU for development.

(ii) Beautification of the area around Kalkaji TempleComplex was completed.

(iii) Plans were finalised for musical fountains andfountains at Janakpuri and Pitampura were taken

up

(iv) Work at Central Business District, Shahdara wasspeeded up.

(v) Construction of fresh bathing ghats along Ya m u n aRiver near Wazirabad was in full swing.

Removal of Encroachments

10. During the year 199596, concerted efforts weremade to remove encroachments on DDA lands. Asurvery was conducted on 31.12.95 and an area of3257.00 acres was found to be under encroachmentsof various types. It was gathered from the survey thatapart from other types of encroachments a total numberof 352 jhuggi jhopri clusters, which form the mostcommon type of encroachments on DDA lands, existcovering an area of 436 acres. About 1,77,000 jhuggiesare existing in these clusters.

10.1 During the year 1995-96, 216.38 acres of landswere reclaimed, after removing various types ofencroachments, including jhuggi jhopri clusters and 3749structures.

Finalisation of Zonal Development Plans

11. DDA has prepared eight Draft Zonal DevelopmentPlans under Master Plan Development-2001. ZonalPlans for Zone-A(Walled City) and Zones B, C, D, E, F,G & H are proposed to be finalised during 1996- 97.

II. NATIONAL CAPITAL REGION PLANNING BOARD12. The National Capital Region Planning Board hasbeen created under an act of Parliament in 1985 forpreparation of a Regional Plan for the development ofthe National Capital Region and for coordination andmonitoring the implementation of such plan and forevolving harmonised policies for the control of land useand development of infrastructure in the National CapitalRegion to avoid any haphazard development.

12.1. The Board has prepared a detailed developmentplan for the NCR-2001, is called Regional Plan-2001,has the distinction of being the only statutory Plan inthe country for the development of an inter-state region,which in this case, comprises, the National CapitalTerritory of Delhi end neighbouring districts of the Statesof Haryana, Rajasthan and Uttar Pradesh, respectively,covering an area of 36.242 sq. km.

12.2 The Regional Plan has the following two coreobjectives:

(a) Containing the population size of Delhi at thelevel of 112 lakhs by 2001.

(b) Balanced. and harmonised development ofthe National Capital Region.

12.3 The Board has identified 8 Priority Towns/Complexes and 2 DMA Towns for induced developmentthrough creation of employment generating activities inthem. Keeping this in view it also provides for theimprovement of the essential urban services andtransport infrasturcture both at Regional and local levels,so as to attract and absorb the surplus population to bedeflected from Delhi to the identified priority and DMAtowns.

Investment programme for the VIII Five Year Plan

13. In order to achieve these targets and objjes, theNCR Planning Board in its 16th meeting held on 28.6.93,has approved a multisectoral investment programme forthe VIII Plan period (1992-97) for an amount ofRs. 3,813 Crores with the follwoing breakup:

(i) CENTRAL SECTOR Rs. 1,846 cr.

(National Highways, Expressways,Railways, Telecommunications inNCR Towns and Countermagnet towns and water supplyin Delhi).

(ii) STATE SECTORShared Programme (Landacquisition and deveiopmentof selected DMA and PriorityTowns/Sub-Regional Centres,Counter-Magnet Towns). Rs. 1,266 cr.Exclusive State Programme(Power T & D and upgrada-tion of regional roads). Rs. 702 cr.Exclusive NCRPB Prog-ramme (InstitutionalStrenghtening) Rs. 5 cr.

TOTAL -. Rs. 3,813 cr.

13.1 Of the total NCRPB’s investment programme(excluding exclusive State Sector Programme) for VIIIplan would be of the order of Rs. 1265 cr. out of whichRs. 1260 cr. would be under the shared Programme forLand aqcuisition and Land development and Rs. 5 cr.for institutional strengthening for plan implementation.

13.2 The Central Ministries i.e., Railways, SurfaceTransport and Telecommunications, on the one hand,and participating State Governments on the other havebeen asked to earmark requisite finances for theimplementation of NCR schemes included in the CentralSector for Vlll Plan Period and to prepare their own NCRSub-Plan performance budgets for the purpose.

Resource Mobilisation & Utilisation during199596 (Financing of State Sector Programme)14. With the budgetary support of Rs. 40 croresfrom the Ministry (out of which investment to thetune of Rs. 25 crores was proposed to be made toequity of HUDCO by M/o U.A. & E, on behalf ofNCR), the NCR Planning Board proposed to takeup development projects of the order of Rs. 398crore relating to land acquisition and its developmentin the region during 1995-96. The additionalresources would be raised by market borrowings/floating of bonds through HUDCO (Rs. 190 crores),ploughing back of internal resources (Rs. 83 crores)and contributions by the participating StateGovernment and the GNCT Delhi (Rs. 85 crores).Approval of Planning Commission/Ministry ofFinance for transfer of funds to the equity capital ofHUDCO has been sought. M/o Finance have notagreed to provide funds during the current year asthe scheme has not been cleared by PlanningCommission.

Sub-Regional Plans

15. The Sub-Regional Plan for Rajasthan has beenapproved by the NCR Planning Board. The draftSub-regional plan for Haryana has been presentedto the Planning Committee and in the light of itsobservations, is to be suitably modified. The Sub-regional Plan for NCT-Delhi is in advance stageof finalisation.

I n c e n t i v e s a n d M o d a l i t i e s f o r S p e e d yImplementation of the Decentralisation Process

16. The package of incentives and the modalitiesfor speedy implementation of the decentralisationprocess was discussed in the 17th NCR PlanningBoard meeting and it was decided to constitute aninter-state Standing Committee under theChairmanship of Chief Secretary, GNCT-Delhi. Onthe recommendation of the inter-state StandingCommittee a sub group under the Chairmanship ofMember Secretary, NCR Planning Board wasconstituted to go into the details of the proposal forshifting of the industrial activities. The sub-grouprecommended a package of incentives to bep r o v i d e d b y t h e N C R p a r t i c i p a t i n g S t a t eGovernments, which were accepted by the NCRPlanning Board in its 19th meeting.

Studies

17. The progress of the following Expert ConsultantStudies have been taken up as part of the on-going

statutory mid-term review and also for implementingthe new strategies for accelerated development ofNCR has been monitored during this year.

S. StudyNo.

Consultants Date o f S t ipu la tedCorn- date ofmete- completionm e n t

I. Environment & Ecology Schoo l o f 7-6-93 completedPig. &Architecture

II. Alternative methods of Shri Krishna 15-6-93 In progresslands for Urban Devlp. & PratapHous ing

II I. Preparat ion of a Zonal Sh. H.S. 24-5-95 Draft ReportDevelopment P lan and M a t h u r Submi t tedPro jec t Repor t fo r i t sImplementation for BhiwadiTown

Meetings of the NCR Planning Board

1 8 . During this period, the Board met once and followjngmain business has been transacted and decisions taken:

(i)

(ii)

(iii)

(iv)

(v)

Board has approved Annual Plan proposals forthe year 1996-97.Board has approved Revised Estimates for199596 under non-Plan (Revenue) and Plan(Capital) and Budget Estimates 1996-97 undernon-Plan (Revenue).Board has approved Annual Report of NCRPBfor the year 1994-95.To Sponsor feasibility studies for Ghaziabad-Meerut and Sonepat-Panipat Expressways on thelines of the on-going feasibility studies forFaridabad-Noida-Ghaziabad (FNG) Expresswaybeing financed by ADB.Unified Transport Planning Group met and ap-proved the Functional Plan for Transport for NCR.The Functional Plan for Transport for NCR wasapproved by the Board.

19. As proviaed in the NCR Planning Board Act, 1985,a high level official committee called PlanningCommittee, comprising the Secretaries-lncharge ofUrban Development/Housing/Town & Country Planningin the various NCR constituent units, the respective ChiefTown & Country Planners, Chief Planner to theGovernment of India and senior representatives of theconcerned Central Ministries and the PlanningCommission, has been constituted under theChairmanship of Member Secretary, NCR PlanningBoard to assist in the discharge of its functions.

The Planning Committee me twice during period April,95 to March, 96 in which the following business havebeen transacted and decisions taken:

(i)

(ii)

(iii)

(iv)

(v)

(vi)

(vii)

(viii)

(ix)

(x)

Detailed NCR Sub-Compcnent Plans to beprepared on the basis of the approved VIII PlanInvestment Programme by the Central Ministries,State Governments and participating StateGovernments.

The Board has approved !he Functional Plan forTransport for NCR, which was approved byUnified Transport Planning Group in its firstmeeting.

Amendment of the U.P. Sub-Regional Plan forinclusion of Chola and Khurja Growth Centre inthe Bulandshahr-Khurja Complex was approved.The development of Tronica city by UPSIDC nearLoni was discussed at length.

The broad scheme for financing investmentprogramme and mobilisation of the resources forthe financing of the investmen? programme forthe State sector (Joint Programme) for the year1996-97 and the balance period of VIII Plan wasapproved for placing before the next BoardMeeting.

The implementation proposals of the NCR innergrid and outer grid roads were discussed inmeeting with Chief Secretaries of the respectiveStates and the Proposal has since beensubmitted to World Bank for assistance.

Annual Report for 1994-95 was approved forplacing the same in the next Board Meeting.

Constitution of Revolving Fund for NCR Schemeswas discussed.

Railway Board’s proposals for providing a railwayby-pass to Delhi for freight movement byconversion of metre-gauge between Hathras andMathura to its already on-going uni-gaugeprogramme from Alwar to Rohtak and laying ofnew broad-gauge between Meerut and Panipatwas approved by the Planning Committee.

The proposal for resource mobilisation andapplication of funds for financing of investmentprogramme for the State sector joint programmesfor the year 1996-97 and the balance period ofVIII Five Year Plan was approved.

The Planning Committee approved the AnnualPlan proposals for the year 1996-97.

(xi) The Revised Budget Estimates for the year 199596 under non-plan and plan and BudgetEstimates for 1996-97 under non-plan wereapproved.

Transport Sector-NCR

20. (i) A Unified Transport Planning Group was

(ii)

(iii)

(iv)

constituted to streamline the planning andmonitoring of transport sector in the NCR. Thefirst meeting of the Group was held under theChairmanship of the Minister of U.A. & E on20.10.95.A Functional Plan was prepared in the TransportSector in the NCR with a view to elaborate thetransport proposals contained in the RegionalPlan of NCR and the investment plan for itsimplementation. The plan was considered andapproved by the UTPG and subsequently by theBoard in its 17th meeting.A concept plan for an immediate and a long termimprovement of the regional road transportsystem was prepared which was sent to theMinistry of U.A. & E. and the Lt. Governor, NCT-Delhi for their consideration.Expressway:NCR Planning Board has interacted with ADB forsponsoring the detailed feasibility study ofFaridabad-NOIDA-Ghaziabad Expresswaythrough their Technical Assistance Programme.The study has been got completed by the Ministryof Surface Transport (MOST) and also is beingfurther processed for implementation by NCRPBfor further necessary action. A proposal was sentto the MOST for initiating similar studies for theremaining two expressways via Delhi-Ghaziabad-Meerut and Sonipat-Panipat as decided in theBoard meeting.

Developnient of In-House GIS Capabilities

21. As part of the mid-term review of the Regional Plan-2001 for NCR, action has been taken to prepare up-to-date base maps for NCR and development of in-houseGeographical Information System (GIS). A Task Forcefor this purpose was constituted with. representativesfrom various experts/organisations in Feburary 93. Thefollowing progress has been achieved with the help ofthe Task Force as on date.

21 .1 Digitisation: All the 67 maps covering entire regionhave been digitised and are under final checking afterwhich the final out-puts will be obtained for use. Forestablishing the GIS capability in the office of the NCR

Planning Board, hard disk computer i.e., AT 486 alongwith colour ink jet printer and plotter of AO Size digitiserhas been installed.

Housing

22. The strategy for the implementation of the RegionalPlan policies for NCR emphasises on an integrateddevelopment of selected towns and complexes in theRegion designed to attract core economic activities tofacilitate the generation of employment opportunities toattract and absorb additional population who wouldotherwise be potential migrants to Delhi. Housing beingone of the basic elements of this development scenario,it is imperative that a well articulated housingdevelopment strategy and commensurate action plan isevolved so as to ensure that the housing requirementsof various sections of the population in these townshipsare met adequately.

22.1 With this objective, the NCR Planning Board hassponsored specific studies to assess the prevailinghousing scenario and projected housing requirement ofselected Priority Towns. Subsequently, the Board hadconstituted a Study Group consisting of representativesof area de velopment authorities, housing development/financing agencies and renowned architects/planners/engineers to draft specific recommendations in respectof the following critical aspects:

(i)(ii)

(iii)

Methods of land acquisition for housing;

Application of cost-effective constructiontechniques;

Mobilising financial resources to meet thehousing needs.The Study Group and its sub-groups are at various stages of completingtheir assigned tasks.

Informal Sector

23. In the new townships development strategy adoptedby the NCR Planning Board, the informal sector whichis estimated to account for over 50% of the work forceand contributing a significant share in the overalleconomy of the region is perceived to be a vitalcomponent. Specific job programmes and relatedinfrastructure projects would, therefore, have to be drawnup to cater to the growth of informal sector and helpintegrate them with the main-stream economy of thesetownships.

23.1 Besides, the Planning efforts needed for sub-serving the needs of the informal sector within thedevelopment strategies drawn up for the new townships,a set of redevelopment and/or resettlement strategies

are also being evolved to cover the squatters and othersegments of the informal sector both in the NC%Delhiand Priority/DMA Towns of NCR to enable them toacquire permanent jobs and shelter of their own on apreferential basis in these new townships.

23.2 Keeping this in view, the NCR Planning Board hassponsored a study to the Society for Develop- mentStudies (SDS) to ascertain the socioeconomic profileof these informal sector groups and various options forthe re-habilitation and/or resettlement in Delhi (as wellas in the other NCRTowns).This study, with the supportof the detailed secondary data and field surveys ofselected pockets which have heavy concentration ofsquatters, informal sector wage earners and/or self-employed entrepreneurs, spells out a specific linkage/support programme to be implemented by the variousagencies in the NC%Delhi, the respective counterpartsin the states and the land owing agencies.

23.3 The study has been completed and its final reportand action plan has been given to the Govt. of Delhi forimplementation.Various Schemes implemented in the Centre and atthe Sta tes: -

24. All the on-going schemes in the 3 participatingStates viz. Haryana, Rajasthan & U.P. are in variiusstages of completion as per the details are given inAnnexure I.24.1 The progress of on-going schemes was firstreviewed on 19.1.96 by Member Secretary & ProjectSanctioning & Monitoring Group-l in its 24th meetingheld on 19th & 20th March, 1996 under theChairmanship of Secretary, Ministry of UrbanDevelopment which was attended by the representativesof all the 3 participating States, engineers of theimplementing agencies, Vice-Chairmen of the variousauthorities, Members of NCR Cells.Financial Assistance & Progress

25. An amount of Rs. 4000.00 lakhs was received fromthe Depatment of Urban Development as contributionfrom their plan made for:-

(i) Providing financial assistance to the partici-pating State/Development Authoriiies for theimplementation of both on going and new NCRSchemes ; and

(ii) Conducting surveys, studies and drawing upplans for the NCR

25.1 In addition, as amount of Rs. 350.00 lakhs contrib-uted by the Govt. of NC%Delhi into the fund of the Board.Also unspent balance of the previous year amounting

to Rs. 6319.00 lakhs and fresh receipts of Rs. 2708.00lakhs by way of debt services, payments, interest onbank deposits etc. were at the disposal of the Board.

25.2 The Board released the following sums by way ofinstalments of interest-bearing loans to the participat-ing States and/or their implementing agencies in1996-97.

HUDA, ChandigarhU.P. Govt., LucknowRIICO, Jaipur

Rs. 4223.00 lakhsRs. 4601.00 lakhsRs. 2150.00 lakhs

Rs. 10974.00 lakhs

25.3 The expenditure incurred on studies/surveys &preparation of plans amounted to Rs. 16.00 lakhs. Fur-ther an amount of Rs. 0.50 lakhs was paid for the officeaccommodation in the New Buitding Complex of IndiaHabitate Centre, Lodhi Road, New Delhi and an amountof Rs. 1.47 lakhs was paid towards long term advancesto the employees of the Board

25.4 The unspent balance aggregating to Rs. 2385.00lakhs has been carried forward to the accounts for theyear 1996-97.

Projects Sanctioned by Project Sanctioning &Monitoring Groups

26. The Group met twice in the year on 19.3.96 and20.3.96 and approved following projects.

1. Mastya Industrial Area, Alwar

2. Development of Industrial Area, Chopanki

3. Development of Khurshkhera Industrial Area,Bhiwadi

4. Warehousing & Godown Scheme at Alwar

5. Transport Nagar Part B Scheme, Alwar

6. Marketability of Assets Created by MeerutDevelopment Authority (MDR)

7. Transport Nagar Scheme at Bulandshahar

8. Fruit & Vegetable Market. Hapur

9. Transport Nagar Scheme at Gaziabad

10. Integrated Industrial Township at Loni

11. Industrial Area, Udyogpuram, Meerut

12. Integrated Industrial Township at Khurja

13. Kalindi Kunj Residential Scheme, Khurja

14. Jewal Road, Residential Scheme, Khurja

15. Preet Vihar Housing Scheme, Hapur

16. Development of Industrial Estate at Bawel.

26.1 The total estimated cost of the above projects isRs. 605.00 crores. In addition, the Group sanctioned acontribution of Rs. 4.00 crores into the Developmentfund of Counter Magnet town Barielly.

Special efforts made by the Organisation to bringabout changes in the administrative procedures soas to improve its effectiveness and efficiency.

27. With a view to have effective monitoring ofimplementation of various on-going schemes financedby NCR Planning Board. a separate Project Monitoring& Coordination Wing was created in the month of May,1995 and a retired Dy. Adviser from PlanningCommission was appointed as consultant w.e.f 1.7.1995to head the Monitoring team to provide guidance andtraining to the officers of the PMC Wing, in the field ofmonitoring and evaluation. The monitoring teamconsisting of Dy. Director, Asstt. Director & JuniorAccounts Offiier along with the consultant conductedsite inspections of 31 projects out of a total of ‘39 ongoingprojects. The inspection reports in respect of all these31 ongoing projects were submitted to MemberSecretary, NCR Planning Board. Site inspections ofsome of the projects could not be conducted as theywere sanctioned quite late during 1995-96 and nosubstantial progress was expected in theirimplementation.

28. As the NCRPB Secretariat consists of present staffstrength of 49 officers and officials of which only 9 Nos.and 2 No. belong to SCs and STs category respectively,there is no separate special cell in the NCRPB as such.However, the Senior-most Officer belonging to SCcategory is a Member of the DPCs for promotions,confirmations etc.

Annexure-lActual Physical Progress upto end of March, 96The details of State-wise on going schemes financed by NCRPB and of development of counter-magnet towns, theirinitial date of completion, revised date of completion and the reasons therefor are given below:

S . Name of the Scheme Original Revised Reasons for the delayNo. Date of Date of

Completion Completionas intimatedby I.A.

1 2 3 4 5

I. STATE OF U.P.A. MEERUT

1 .

2 .

3 .

Hathkargha Nagar Housing-cum-WorkCentre Scheme (Lohia Nagar)

Scissors Manufacturing Work-cum-ShelterComplexSports Goods Manufacturing and TradingUnit Complex (Dhyan Chand Nagar)

4 . Shatabdi Nagar (Sector 2 , 4B, 5 , 6 and8) Residential Infrastructure Project

5 . Ganga Nagar Residential SchemePhase 3

31.3.97 -

6 . Shatabdi Nagar Sector 4 (C) Scheme 31.3.96 -

7 . Vedyyas Puri Residential Scheme 31.3.97 -

8 . Shatabdi Nagar New TownshipDevelopment Project

31.3.99 -

B. BULANDSHAHR

9. Off ice-cum-Commercial Scheme

10. Yamunapuram Residential Scheme Phase II

11. Lal Talab Commercial SchemeC. KHURJA

March ‘91 March ‘96

March ‘94 Dec. ‘95

March ‘96 -

Completion report awaited.

Completed

12. Transport Nagar Scheme March ‘92 Not yet Due to change of project site originally

March ‘92 March ‘98

March ‘91 March ‘98

March ‘92 March ‘96

March ‘93 March ‘97

Delay in award. Delav in actualpossession due to farmers’ resistance.Curfew in the years 1987, 90 & 91.Rescheduling required on account of:a. Demand Scenariob. Liquidity position

-do-

Delay in award. Delay in actualpossession due to farmers’ resistance.Curfew in the years of 1990 & 91.Possession delayed and restricted dueto litigation.Delay in actual possession of land afteraward due to farmers’ agitation.Disbursement of balance compensationin Shatabdi Nagar Scheme were stayedby the Govt. and the famers did notallow work in about 40% of the schemearea.Delay in actual possession of land afteraward due to farmers’ resistance. Lackof proper demand.Cash flow of theAuthority.Delay in receipt of 1st instalment ofloan. Resistance of farmers’at the startof the project.Stay by Govt. ondisbursement of compensation.Delay in actual receipt of 1 st instalmentof loan. Resistance by farmers at thestart of the project. Lack of demand andliquidity problems.

Acquisition problem of some portion ofland.

1 2 3 4 5

13.Raichandi Commercial Schemefinalised planned in a congested area

March ‘95 Dec. ‘95 Completed

II. STATE OF HARYANAA. GURGAON

1. Construction of external link Roadconnecting Sector 4 with Sector 17

2. Residential Sector 393. Residential Sector 40

B. PANIPAT4. Sector 25 (Industrial) Phase II for

informal sector5. Development Scheme of Industrial Sector6. Residential Sector 13 and 17

C. REWARI

March ‘92 31.3.96

March ‘98 -March ‘98 -

31.3.94 31.3.98

31.3.94 31.3.98March ‘98 Dec. ‘96

7. Brass Market8. Shopping Centre Sector 39. Residential Sector 3 (Part II)

D. DHARUHERA10. Shopping Centre Sector 6

E. ROHTAK

March ‘93 March ‘96 CompletedMarch ‘93 - CompletedMarch ‘97 Dec. ‘96 -

March ‘93 March ‘96 Completed

11. Sector 2, 3 and 4 (Part) ResidentialScheme

March ‘95 -

12. Residential SchemeSector 2 and 3(Part)

F. SONEPAT

March ‘98 -

13. Residential Scheme Sector 12G. FARIDABAD

March ‘98 -

14. Industrial Sector 59 March ‘98 -

III. RAJASTHANA. ALWAR1. Residential Scheme at Hasan Khan,

Mawati NagarN.A.

2. Residential Scheme of Budh Vihar(Vijay Nagar Extension)(Plotted development)

3. Residential Scheme of Surya Nagar

March ‘93 Not Yet Problem in acquisition of land underdecided Army possessron.

-

4. Residential Scheme at Vaishali Nagar

5. Jindoli Ghati Tunnel (By RSBCC)B. BHIWADI

6. Residential and Commercial Scheme(Bhagat Singh Scheme)

7. Integrated Development Scheme, JawaharNagar Chandra Nagar, Chitrakoot,Vasundhra, and P a t el Nagar

8. Development of Industrial TownshipPhase 3 (By RIICO)

March’ 96

March ‘96

July ‘98

March ‘92

March ‘95

Not YetdecidedMay ‘98

NotavailableNotintimated

March ‘93 Dec. ‘95 Completion report awaited.

Completed

--

Due to poor response

-do--

5% land is yet to be acquired as landon which school, farm & samadhi issituated is under dispute. Late approvalof project estimates by HUDA.-

The Scheme is almost completedreport awaited.

Problem in acquisition of 20% of landas in Old Abadi the people are living.Due to poor response the developmentwork has been deferred.-

Nearing completion.

10% of the land is under dispute (suitpending in the target) as well as due topoor response.

Ill. DELHI URBAN ART COMMISSION

29. Delhi Urban Art Commission is an autonomous,statutory Advisory body set up in 1974 to provide adviceand guidance to the Government and to any local bodyin respect of any project of building operations orengineering operations or any development proposalwhich affects or is likely to affect the sky-line, theaesthetic quality of surroundings or any public amenityprovided therein. During the year 199596,584 projectswere referred by the NDMC, DDA and MCD to the DUACfor advice.These included a variety of projects like districtcentres, community centres, hospitals, group housing,schools, institutional buildings etc. These weredeliberated upon and suggestions for improvement weregiven in order to enhance their functionality as well asaesthetic quality, besides their overall impact on thedevelopments in the vicinity. Stress was laid on urbanforms, traffic and circulation patterns, landscaping ofareas, consolidation of green open spaces, meaningfuland adequate parking spaces, fenestrations and outerfinishing of the buildings, adequate servicing facilitiesfor commercial complexes, provision of lifts in respectof high rise buildings, etc. The general emphasis hasbeen to achieve a harmonious development andmaintaining the city’s architectural heritage whileexamining the development and redevelopment of anyarea in the city.

IV. NATIONAL INSTITUTE OF URBAN AFFAIRS

30. The Government of India in November 1975 decidedto set-up an autonomous body, to be named as “NationalInstitute of Urban Affairs” under the Ministry of Works &Housing (Now Ministry of Urban Affairs & Employment),with participation of the State Governments, urban andregional development authorities and other agenciesinterested in urban affairs. The Institute has beenregistered as a Society under the Societies RegistrationAct 1860 on January 12, 1976.

31. The objects of the Institute are as under:-

(i) To act as an autonomous scientific and researchorganisation to undertake, promote andcoordinate studies in urbanisation, rural-urbanrelationship, administration, environment andtechnology pertaining to human settlements andurban and regional development in India;

(ii) To act as a centre for advanced study of urbanproblems and to provide and promote necessarytraining and research facilities;

(iii) To initiate and assist in developing suitable policiesand programmes pertaining to the problems of

(iv)

(v)

(vi)

urban development and allied fields by theCentral, State and Local Governments as wellas private and public sector undertakings;

To study social, administrative, financial and otheraspects of the implementation of various plansfor urban development vis-a-vis policies indifferent regions;

To act as an agency for strengthening theinteraction on urban affairs between theGovernment and the people, local authorities,legislature, and members of academic industrialand business communities;

To mobilise available expertise in the field of urbanaffairs and to offer and coordinate technical andconsultancy services with or without payment ofremuneration as necessary.

32. The Institute has a Governing Council which directsand controls the affairs of the Institute. The GoverningCouncil consists of the President, appointed by theGovernment of India, two Vice-Presidents, elected bythe General Body and sixteen members including threemembers of the Government of India in their ex-officiocapacity. The Council may delegate its powers for theconduct of the business of the Institute to the President/Director/ any officer or any Committee or Sub-Committeewhich may be formed.

33. fhe Director of the Institute is appointed by theGovernment of India (this Ministry) and is responsiblefor the over-all supervision of the affairs of the Institute,under the direction and guidance of the GoverningCouncil. He regulates the work of the Instituteundertaken in furtherance of its objects as its technicaland academic head. He is responsible for alladministrative duties as a Chief Executive Officer of theInstitute.

34. This Ministry gives grant-in-aid (Non-Plan) to theInstitute to meet establishment and general mainte-nance expenditures including the salary and allowan-ces of the core staff (49 in number). The salary andother expenditures of the additional staff appointed byNIUA from time to time for research projects are metout of the Plan grants. During the year 1994-95 & 1995-96, this Ministry released a Non-Plan grants-in-aid ofRs. 49.97 lakhs & Rs. 58.15 lakhs respectively.

35. The Institute completed the Research projects onthe following topics:-

(a) Capacity Building for the Urban Environment-A Comparative Research, Training andExperiences Exchange Project.

(b)

(c)(d)

(e)

(f ( 9 )

( h )

( i )

( j )

( k )

( l )

( m )

(n)

(0)

(P)

(q)

(r)

(s)

(t)

(u)

(VI

Cost of Urban infrastructure.

Patterns and Impact of Migration.

Carrying Capacity based planning for NCR (incollaboration with NEERI, Nagpur).

Preparedness of Urban Local Bodies forPrivatisation.

Decentralisation of Municipal Administration.

Assessment of Current Urban Situation in Indiaand Urbanisation Strategies.

Evaluation of NCR Schemes.

Municipal Finances in Haryana and HimachalPradesh.

Transformation of Low-income Housing: A pilotProject in Collaboration with CARDO, Universityof New Castle, U.K.

Research Project on Municipal Finances and TaxAdministration in Kanpur.

Financing Urban Infrastructure: Role of UrbanLocal Governments.

Base Paper for National Urban EnvironmentalPolicy and Actions.

Institutional Strengthening for Urban Environ-mental Management: A Strategy Paper.

Report of the Expert Group on Land, Housingand Urban Renewal and Upgradation-Review ofMaster Plan of Delhi-2001.

Technical Paper for State Level Seminar, SFC,Kerala.

Background paper for Seminar on Role andFunctions of SFCs, Mussoorie.

Working Paper on Expenditure Norms.

Papers for the Fourth National Workshop on StateFinance Commissions, New Delhi, 34 November.

Report on the Proceedings of the Fourth NationalWorkshop of State Finance Commission, NewDelhi.

Policy Papers under the FIRE(D) Programme.

Regional Technical Assistance on Urban lm-provement Finance of ADB.

35.1 The following are the on-going projects/researchstudies:-

(i) Evaluation of Environmental Improvement ofUrban Slums Pfogramme.

(ii)

(iii)

(iv)

(v)

(vi)

(vii)

(viii)

Structure and Dynamics of Urban Economy.

Financing, Pricing the Cost Recovery for LandDevelopment.

Housing Action Plan for Maharashtra.

Institutional Mechanisms for Delivery of UrbanInfrastructure Projects.

Information System on Urban Infrastructure.

Pricing and Cost Recovery of Urban Infras-tructure.

Inventory of Financing of Urban Development inIndia.

(ix) Impact of Urban Development on Fringe Areas.

(x) Technical Group on Urban Perspective and Policy.

36. Besides research projects/studies, NIUA alsoconducted the following training programmes/seminars/workshops:-

(i)

(ii)

(iii)

(iv)

(v)

(vi)

(vii)

(viii)

(ix)

National Seminar on Financing Urban Infras-tructure through Debt Market;

NIUA 2000-A Strategic Planning Exercise;

National Workshop of State Finance Commis-sions;

National Workshop on Municipal Bond Ex-periences, Bangalore, December 4-5, 1995.

State Workshop on Financing Urban Infras-tructure FIRE(D);

Workshop on Exchange of Experiences-DelhiUBSP;

Regional Workshops-FIRE(D)

UBSP Training Programme;

FIRE(D) Training Programme;

37. NIUA also published the following books/journals/newsletter:

(i) Urban India;

(ii). Urban File;

(iii) Urban News;

(iv), Urban Poverty;

(v) Sudama (in Hindi) Hindi)

DEPARTMENT OF URBANEMPLOYMENT AND POVERTY ALLEVIATION

HOUSING AND HUMANSETTLEMENTS

Although housing is basically a State level activity, theUnion Government is responsible for the formulation ofthe broad policy frame work of this sector and overseeingthe effective implementation of the Social HousingSchemes, particularly for the weaker sections of thesociety.

National Housing Policy

2. The National Housing Policy is a broad policyframework for formulation and execution of plans andprogrammes for housing development activitiesthroughout the country. However, given the wide variationin housing needs and resource endowments in thecountry, Governments of the States and Union Territorieswould have to play the primary role in formulating specificaction plans and programmes, suited to local needs andconditions in consultation with local bodies and citizensgroups. The Central Government has to play the role ofa facilitator striving to create a conducive environmentfor increased housing activity by making policies forincreased flow of housing finance, serviced land,innovative building materials and technology, variousfiscal incentives and legal reforms. 1996-97 being thelast year of the Eighth Five Year Plan, action has to beinitiated for’preparation of the Ninth Five Year Plan.Planning Commission has constituted a Working Groupon Urban Housing under the chairmanship of Secretary(Urban Employment & Poverty Alleviation) for drawingup plans and policies for urban housing forimplementation during the Ninth Five Year Plan period.The Working Group has started its deliberations andwill submit its report by end ot June, 1996.

Building Centres and Technology Extension

3. The National network of Nirman or Nirmithi Kendras(Building Centres) has been established with centralassistance through HUDCO under a Central scheme.These centres impart training to artisans in tow costconstruction skills and produce building materials andcomponents including flyash bricks and stabilised mudblocks through innovative techniques. Under thescheme. a central grant of Rs. 2 lakhs was being giventill recently to each centre. The funding pattern of the

scheme has now been revised and circulated amongState/UT Governments in December, 1994. The Centralgrant-in-aid varying between Rs. 3.00 lakhs to Rs. 5.00lakhs is available to the Building Centres depending onthe level of their activity since May, 1993. In addition,HUDCO loan subject to maximum Rs. 22 lakhs to theseCentie is also available. So far 435 centres have beenidentified out of which 221 have become functional upto31.3.96. These Centres have received Government ofIndia grant of Rs. 5.75 crores and have imparted trainingto over 62000 construction workers as on 31.3.96.

Night Shelters/Sanitation Facility to FootpathDwellers in Urban Areas

4. This central scheme seeks to provide night shelterand sanitation facilities to footpath dwellers at a percapitacost of Rs. 5000 with 20% subsidy from CentralGovernment and. balance 80% as the contribution ofimplementing agencies/HUDCO loan, The scheme isbeing implemented through HUDCO and has now beenextended to cover all urban areas, wherever the problemof footpath dwellers exists.

4.1 As on 31.3.96, HUDCO has sanctioned loanamounting to Rs. 10.28 crores and Government subsidyamounting to Rs. 9.33 crores for a total number of 57schemes to provide about 18497 beds, 5719 pay anduse toilet seats, 46 baths and 92 urinals. Overall numberof beneficiaries under these schemes wilt be about50000. The guidelines of the scheme have since beenrevised with a view to generate more schemes during8th Plan.

Schemes for Other Priority Groups5. Housing schemes for handloom weavers and beediworkers are being implemented through CentralGovernment subsidy (being released by concernedMinistries) and HUDCO loan. HUDCO is also providingloan for construction of hostels for working women.

SOCIAL HOUSING SCHEMES:

6. The following Social Housing Schemes are beingimplemented in the State Sector with State. Planprovision and loan assistance from HUDCO and otherfinancial institutions:-

(i) Housing Scheme for EWS.

(ii) Housing Schemes for LIG.

(iii) Housing Schemes for MIG.

(iv) Rental Housing Scheme for StateGovernment Employees.

6.1 The income and cost/loan ceilings under thesegroups have since been revised by Government in thecontext of formulation of 8th Plan. These are underreview in the context of formulation of 9th Plan.

International Cooperation

7. United Nations Centre for Human Settlements(UNCHS) is an inter-Government body establishedthrough a resolution of the U.N. General Assembly forguiding habitat activities. India is a member of theorganisation since its inception. An annual contributionof one lakh US Dollars payable in Indian currency ismade by India.7.1 UNCHS will be organising Habitat-II Conference inIstanbul (Turkey) in June, 1996. All preparatory stepsas precursor to the participation in the main Conferenceat Istanbul have been taken under the supervision of aNational Steering Committee under the Chairmanshipof Secretary (UEPA).

KFW/OECF Loan Assistance For Housing Projects

8. Government had negotiated for line of credit toHUDCO and HDFC from KFW of Germany and OECFof Japan. KFW had provided assistance by way of twocredits of DM 50 million to HUDCO for undertakinghousing schemes for EWS. KFW agreed to provide grantassistance of DM 10 million to HUDCO for the BuildingCentre Programme in India. Out of this, an amount ofDM 5.50 million has been received by HUDCO. KFWhas also agreed to provide grant assistance of DM 35million to HUDCO for low cost housing in urban andrural areas and reconstruction of houses in earthquakeaffected areas of Latur (KFW IV) and DM 35 million forEWS housing in urban and rural areas, slumimprovement and low cost sanitation facilities (KFWV).The mode of facilitating funds to HUDCO has since beenchanged and KFW is providing grant assistance directlyto HUDCO. Under this project, KFW has released DM26.77 million to HUDCO.8.1 KFW has provided loan of DM 25 million to HDFCalso for financing EWS housing programmes and hascommitted a grant of DM 30 million to HDFC forundertaking low cost housing programrnes and urbaninfrastructure. Agreement in this regard was signed inFebruary 1994.8.2 A line of credit amounting to Yen 6 billion and 788million (Rs. 126 crores) from OECF Japan has beenagreed to for city water supply projects of Solapur andNew Bombay.

8.3 A line of credit amounting to Yen 8,670 million hasrecently been committed by OECF to HUDCO forinfrastructure development projects.

Reconstruction Programme in Earthquake AffectedAreas of Maharashtra

9. With a view to help Govt. of Maharashtra inundertaking the reconstruction programme in thedistricts of Latur and Osmanabad, severely hit by theearthquake of September 30, 1993, this Ministry hadset up an Advisory Committee on Reconstruction. Thiscommittee recommended several measures to the StateGovernment to undertake reconstruction work using costeffective and locally available material and appropriatetechnology. Nine Building Centres are being set up inthe affected region on priority to provide training to localartisans. This Ministry also played an effective role innegotiating World Bank line of credit of SDR 177 millionto the state government for undertaking reconstructionprogrammes in a big way. As per the latest report fromthe State Government, the initial bottlenecks have beenremoved and the reconstruction work is progressingwell.

Scheme for Cyclone Affected Areas in SouthernStates.

9.1 The Central Government had approved followingfinancial package for the rehabilitation of victims of theflood/cyclone occurred in 1992 in the States of Kerala,Karnataka and Tamil Nadu-

(Rs. in Crores)

N a m eo fSta te

No. of Total Central state HUDCOUni t s cost @ Subsidy Subsidy loanto be unit cost of 3 0 % 3 0 % 4 0 %

recon Rs.15,000/-structed

T a m i l 18,000 27.00 8.10 8.10 10.80N a d u

K e r a l a 31,520 47.29 14.19 14.19 18.91

Karnataka 33,428 50.14 15.04 15.04 20.06

9.2 The Central share of Rs. 18.66 crores meant forthe year 1993-94 had been released to HUDCO in Feb.,1994 with a direction to the HUDCO that the Centralsubsidy shall be released by it to the respective Stateson pro rata basis. The schemes are in progress in Keralaand Tamil Nadu.

2

URBAN POVERTY ALLEVIATIONPROGRAMMES

Urban Poverty Alleviation is a challenging task beforethe nation which calls for imaginative new approaches.The goal is to adequately feed, educate, house andemploy the large and rapidly growing number ofimpoverished city dwellers. The urban population hasincreased by 36.19% from about 160 million in 1981 toabout 217 million in 1991 further aggravating thesecenario of urban employment. The National SampleSurvey 43rd round (1987-88) has estimated that thereare about 40 million persons living below the povertyline in urban areas. However, according to LakadwalaCommittee Report of March 1994 (set up by the PlanningCommission) about 86 million persons (40% in UrbanIndia) as against total population of 217 million livedbelow the poverty line. Incidence of urban poor at 40%is higher than both rural and all India incidence of povertyat 39%.

2. The bulk of the urban poor are living in extremelydeprived conditions with insufficient physical amenitieslike low-cost water supply, sanitation, sewerage,drainage, community centres and social services relatingto health care, nutrition, pre-school and non-formaleducation. A significant portion of the urban poor belongsto Scheduled Castes, Scheduled Tribes and minorities.The need of the hour is to improve the skills of the urbanpoor and to assist them to set up micro-enterprisesthereby providing them avenues for enhancement of theirincomes. Another major area for assistance to this targetgroup is provision of funds for housing or shelterupgradation. The Central Government has accorded ahigh priority to the substantial expansion of prog-rammes meant for improving the quality of life of theurban poor.

3. The Deptt. of Urban Employment & PovertyAlleviation is monitoring the implementation of foursignificant urban poverty alleviation programmes.

(i) The Nehru Rozgar Yojana;

(ii) The Urban Basic Services for the Poor;

(iii) The Environmental Improvement of Urban Slums:and

(iv) Prime Minister’s Integrated Urban PovertyEradication Programme. A brief account of theseschemes is given in the following paragraphs.

NEHRUROZGARYOJANA

4 . In response to the challenge posed by urban poverty,the Nehru Rozgar Yojana was launched by the Ministryin October, 1989. It was recast in March, 1990 andaccordingly the guidelines were suitably revised. TheYojana consists of three schemes :

(i)(ii)

(iii)

the Scheme of Urban Micro Enterprises (SUME),

the Scheme of Urban Wage Employment(SUWE) : and

the Scheme of Housing & Shelter Upgradation(SHASU).

The entire expenditure on the Yojana is to beshared on a 60:40 basis between the CentralGovernment and the State Government w.e.f. VlllPlan.

The Scheme of Urban Micro Enterprises (SUME)

4 . 1 The Scheme of Urban Micro Enterprises (SUME)assists the urban poor in upgrading their skills andsetting-up self employment ventures. At present, thecriterion of urban poverty is an annual household incomeless than Rs. 11,850/-. A subsidy. is provided towardssetting up the micro enterprises upto 25% of the projectcost with a ceiling of Rs. 5,000/- for SC/ST/Womenbeneficiaries and Rs. 4,000/- for general beneficiaries.The remaining amount of the project cost is availablefrom banks as a loan upto a maximum of Rs. 15,000/-for SC/ST and Women beneficiaries and Rs. 12,000/-for general category beneficiaries. This Scheme is applic-able to all urban settlements. A large number of Stateshave set up State Urban Development Agencies/DistrictUrban Development Agencies for streamlining theadministrative mechanism for implementing the NehruRozgar Yojana. The Central Government had made anallocation of Rs. 21 .10 crores for subsidy and Rs. 5.27for training during 1995-96 for SUME. Against thetarget of 1.17 lakh beneficiaries to be assisted during1995-96, 1.25 lakh beneficiaries have been assistedtill 31.3.1996. Thus the target has already beenachieved. Similarly, against the target of 0.40 lakhpersons to be trained during 1995-96, 0.46 lakhpersons have been trained till 31.3.96. During 1994-95,1.25 lakh beneficiaries were assisted to set up microenterprises and 0.37 lakh persons were given training.

The Scheme of Urban Wage Employment (SUWE)

4.2 The Scheme of Urban Wage Employment (SUWE)provides wage opportunities to the urban poor by utilising

their labourfor construction of socially and economicallyuseful public assets in the jurisdiction of Urban LocalBodies. A material-labour ratio of 60:40 is to bemaintained under the Scheme for various public worksaggregating at the district level. The minimum wagesprevalent in each urban ‘area are to be paid to theunskilled labour. This scheme is applicable to all urbanareas with a population below one lakh. The CentralGovernment had made an allocation of Rs. 21.66 croresduring 1995-96 for SUWE. Against the target of 36.10lakh rnandays of work to be generated during 1995-96,54.64 lakh mandays of work were generated till 31.3.96.Thus the target has already been achieved. During thelast year 1994-95, about 50.85 lakh mandays of workwere generated.The Scheme of Housing & Shelter Upgradation(SHASU)

4.3 The Scheme of Housing & Shelter Upgradation(SHASU) seeks to provide assistance for Housing &Shelter upgradation to economically weaker sections ofthe urban population as well as to provide opportunitiesfor wage employment and upgradation of constructionskills. A loan upto a ceiling of Rs. 9,950/- and a subsidyupto a ceiling of Rs. 1 ,000/- is provided under thisscheme to entitled beneficiaries for housing/shelterupgradation. In case of enhanced financial requirementbeyond Rs. 10,950/-. an additional loan uptoRs. 19,500/- can be taken from HUDCO under itsscheme for EWS Housing. This scheme is applicable tourban settlements having a population upto twenty lakhs.Requirements for institutional finance for the schemeare met by the Housing & Urban DevelopmentCorporation (HUDCO). The Central Government hadmade an allocation of Rs. 9.90 crores for subsidy forshelter upgradation’and Rs. 2.47 crores for trainingduring 1995-96 for SHASU. Against the target of 1.65lakh dwelling units to be upgraded and 0.15 lakh personsto be trained during 1995-96, the achievement till31.3.1996 is 0.23 lakh dwelling units upgraded and 0.21lakh persons trained. The targets could not be achievedas the States are not coming forward with schemes toHUDCO due to post-sanction formalities like furnishingof State Guarantee etc. During 1994-95, about 0.62 lakhdwelling units were upgraded.4.4 Urban Local Bodies are playing a significant rolein the implementation of the Nehru Rozgar Yojana. Theyare involved in providing work places and selling-outletsto the beneficiaries, maintaining liasion with banks andensuring provision of backward and forward linkages sothat the micro enterprises set up under the Schemerecord stable growth. An amount of Rs. 3.55 Crores

has been earmarked for the purpose this year (i.e. 199596).

4.5 Non-Governmental Organisations (NGOs) are alsoexpected to play a significant role in the implementationof the Nehru Rozgar Yojana especially in relation totraining and strengthening backward-forward linkagesunder SUME, setting up Municipal Service Centres andcraftsmen’s guids under SUWE and HousingCorporation/Associations under SHASU. An amount ofRs. 2.13 crores has been earmarked for the samepurpose.

4.6 Thus, the Nehru Rozgar Yojana through activitiesaimed at skill upgradation, assistance for setting up microenterprises, wage opportunity through construction ofpublic assets and assistance for shelter upgradationseeks to usher in a brighter future for the urban poor inIndia. *

URBAN BASIC SERVICES FOR THE POOR (UBSP)

5. The Urban Basic Service (UBS) Programme in Indiawas initiated during the VII Five Year Plan period forurban poverty alleviation. Based on the experience ofimplementing the UBS Programme and therecommendations of the National Commission onUrbanisation, the Government revised it as Urban BasicServices for the Poor (UBSP) (1991) and integrated itwith other urban poverty alleviation programme, namely,Environmental Improvement of Urban Slums (EIUS),Nehru Rozgar Yojana (NRY) and Low Cost Sanitation(LCS).5.1. Objectives:-The objective of UBSP is to createparticipatory community based structures through whichcommunity participate in identifying normative/ feltneeds, prioritize them and play a major role in planning,implementing, maintaining services and monitoringprogress.

5.2 Salient Features:-One of the important featuresis to provide social services and physical amenitiesthrough convergence of various ongoing schemes ofMinistry of Urban Affairs & Employment and variousspecialist departments like Health, Family Welfare,Women & Child Development, Education, WelfareLabour, Small Scale Industry, Non-conventional EnergyResources and Science and Technology. Such aconvergent approach will lead to optimum utilisation ofscarce resources and help in successful implementationof various sectoral programme thereby providing socials&vices and physical amenities to the urban poor.

5.3. Target Group:-The urban poor residing in lowincome Neighbourhoods are the target groups for

provision of social services under the Scheme andphysical amenities to be provided under the Environ-mental Improvement of Urban Slums (EIUS) Scheme.Urban poor residing contiguous to low incomeneighbourhoodslslums would also be able to avail ofthe social services provided under the Scheme. Specialemphasis is given to women and child beneficiaries.

5.4. NGO:-NGOs are increasingly becoming criticalelement in the UBSP programme. Within the UBSPprogramme, NGOs are involved as Field TrainingInstitute for city level training. At city level, NGOs conductcollaborative activities including community mobilisation,basic education, women’s income generating and thriftsocieties and community nutrition etc.

5.5. Financial Outlay:--A total outlay of Rs. 100 croreshas been provided for the Scheme for the Eighth PlanPeriod. A sum of Rs. 18.00 crores was earmarked forthe Piogrammefor the year 1995-96 out of which a sumof Rs. 17.50 crores has been released as Central Shareto the States/UTs. An identical amount has beenearmarked for the year 1996-97.5.6. Achievements:-As on March 31,1996, over 7845Neighbourhood Development Committees comprisingprimarily of urban poor women had been set up in around301 towns taken up for provision of basic services allover the country. This represents community basedstructures covering around 65 lakh low income women& children, 3712 Mini Plans have already been prepareda na d 582 Community Organisers are in the field workingas catalysts for enriching community participation. 344Community Development Societies have been formedin 3455 slum pockets selected for coverage with 69228Resident community Volunteers.5.7 Target:-With the target of twelve lakh beneficiariesto be covered during. 1995-96, the Programme hasachieved the set target touching 60 lakh beneficiariesas on March 1996, from 48 lakh beneficiaries by theend of 1994-95. UBSP aims to reach the VIII Five YearPlan target of 70 lakh beneficaries covering theremaining 10 lakh beneficaries during 1996-97.

ENVIRONMENTAL IMPROVEMENT OF URBANSLUMS

6. The slum population of India was estimated to be466.24 lakhs in 1991.

6.1 The scheme of Environmental Improvement ofUrban Slums (EIUS) was formulated as a response tothe growing problem of slums during the Fifth Five YearPlan. The scheme was made an internal part of theMinimum Needs Programme (MNP) in 1974 and was

transferred to the State Sector. The scheme aims atameliorating the living conditions of urban slums dwellersand envisages provision of drinking water, drainage,community baths, community latrines, widening andpaving of existing lanes, street lighting and othercommunity facilities. The improvements are meant tobe carried out in notified slums which are not likely to becleared within the next 10-15 years.

6.2 The total outlay on this scheme during the SeventhPlan was Rs. 269.55 crores based on a per capitaexpenditure of Rs. 300 per slum dweller. The target forcoverage during the Seventh Five Year Plan period was9 million slum dwellers against which 9.98 million slumdwellers i.e. more than the target had been covered.Against the target of covering 15.40 lakh slum dwellersduring 1990-91, 12.93 lakh slum dwellers during1991-92,11.78 lakh slum dwellers during 1992-93,13.18lakh slum dwellers during 1993-94, 1994-95 and1995-96, the achievement were 19.35 lakh, 16.24 lakh,11.78 lakh, 13.01 lakh and 16.65 lakh slum dwellersrespectively. The target fixed for the current financialyear is 15.88 lakh slum dwellers against which 11.68lakhs slum dwellers have been covered upto Feb. 1996.Further, the per capita expenditure under the schemehas been increased from Rs. 525 to Rs. 800 andadditional inputs pertaining to community facilities,garbage removal and maintenance have been built intothe scheme. Moreover, the scheme is now to beimplemented in covergence with the programme ofUrban Basic for the Poor,

PRIME MINISTER’S INTEGRATED URBAN-ERADICATION PROGRAMME (PMI UDEP)

7. Recognising the seriousness and complexity ofurban poverty problems, especially in the small townswhere the situation is more grave due to lack of resourcesfor planning their environment and development, thePrime Minister had announced on 15th August, 1994an integrated scheme for eradication of poverty knownas Prime Minister’s Integrated Urban Poverty EradicationProgramme (PMI UPEP), which seeks to address theproblems of urban poverty with a multi-pronged and ong-term strategy. The new strategy is to put the communitystructures in the centre with direct participation andcontrol by the very groups who are envisaged to benefitfrom this programme.

7.1 The programme launched in November 1995 isapplicable to all Class II Urban Agglomerations (345Nos.) with a population ranging between 50,000 andone lakh as per 1991 Census, subject to the conditionthat election* to urban local bodies have been held there.

However, in order to ensure that the urban poor couldavail of the benefits under this new Programmeirrespective of the fact that elections to urban local bodieshave not been held for one or the other reason, it wasdecided with the approval of the Prime Minister to allowimplementation of the Programme in such towns as well,as a one time exception (1995-l 996). Also keeping inview the peculiar problem of backward and hilly States,it has been decided to extend the PMI UPEP to thedistrict towns in North Eastern States, Sikkim, J & K,Himachal Pradesh and Garhwal & Kumaon Regions ofUttar Pradesh subject to the condition that (i) the districttown has urban population not exceeding one lakh and(ii) neither the district town nor any other Class II townunder it is already covered being a Class II UrbanAgglomerations.

7.2 The foremost objective of the new programme isto attack several root causes of urban povertysimultaneously in an integrated manner with anappropriate and suitable plan strategy for covering theinputs available in other sectoral programmes of CentralGovernments, Ministries/Departments as well as Non-Governmental Organisations by envisaging participatoryimplementation of the programme with the aim toeradicate urban poverty from the targetted areas by theturn of the century.

7.3 The specific objectives under the new programmeare (i) effective achievement of social sector goals,

(ii) community empowerment, (iii) Convergence throughsustainable support system, (iv) improvement of hygieneand sanitation, (v) employment generation & shelterupgradation and (vi) environmental improvement. Theprogramme will be implemented on whole town/projectbasis extending the coverage to all the targetted groupsfor having visible impact and facilitating overalldevelopment of the towns to be covered. While the targetgroup of the programme is urban poor, specially womenbeneficiaries and beneficiaries belonging to ScheduledCastes and Scheduled Tribes will constitute specialtarget groups among the urban poor.

7.4 There would be a provision of Rs. 800 crores asCentral Share for the entire programme period of fiveyears (1995-96 to 1999-2000) benefitting over 5 millionurban poor. Out of the available provision of Rs. 100crores plus Rs. 7.20 crores sought by way of matchingsavings from out of other urban poverty alleviationprogrammes during 1995-96, a sum of Rs. 106 croreshas been released as Central Share to the States/UTsfor implementation of the Programme.

7.5 Since the programme has been recently launched,it is too early to assess the benefits accruing to the urbanpoor during 1995-96. However, it is proposed to benefitapproximately 150 lakhs urban poor under thisProgramme by the end of 1996-97.

3

NATIONAL BUILDINGSORGANISATION

National Buildings Organisation (NBO) was establishedin 1954 as an attached office of the Ministry to take upresearch in low cost building designs, improvement ofthe building and housing conditions alongwith the socio-economic aspect. NBO also functions as the regionalcentre for housing for ESCAP.

2. Having regard to current requirements under theNational Housing Policy to strengthen the managementinformation system and various other related socio-economic and statistical functions connected withhousing and other activities and also to ensure moreeffective and systematic technology transfer at variouslevels involving large scale dissemination, use andcommercial application of low cost and innovativetechnology, NBO has been restructured during the year

1992-93 to take up mainly the socio-economic andmanagement information system and creation of databank functions. The .technical functions relating tobuilding materials and designs have been taken out ofthe purview of the NBO and given to Building Materialsand Technology Promotions Council within the Ministry.

3. In order to cope up with the creation of a strong database and also to prepare itself for handling dataconnected with monitoring of implementation of NationalHousing Policy with the help of State agencies, thecomputer facilities in NBO have been substantiallystrengthened. Based on the recommendations ofTechnical Advisory Committee set up under thechairmanship of Shri M.G. Sardana, the then DirectorGeneral of Central Statistical Organisation, a StandingAdvisory Committee has been set up to suggestmeasures for evolving a commonly acceptable definitionof house; review/modification of the existing methodologyfor estimation of housing stock and its need andshortage: to review the existing 3 Tier Scheme of datacollection taking into account factors such asassessment of data requirement/availability,determination of data gap and ways to fill such gapsthrough existing operation of agencies viz. NSSO etc.The Committee had four meetings during 1995 anddeliberations are continuing.

HOUSING AND URBANDEVELOPMENT CORPORATION

The Housing and Urban Development Corporation(HUDCO) was set up as a fully owned GovernmentCompany in 1970 as an apex techno-financial organ-isation. with a view to providing loans and technicalsupport to State and other eligible organisations forvarious types of housing activity and infrastructuraldevelopment. The present authorised capital of HUDCOis Rs. 385 crores which has been subscribed to theextent of Rs. 324 crores by the Government till 31.3.96.

2. HUDCO is a major instrument of National HousingPolicy and has been entrusted with the implementationof the priority programmes of the Ministry like Low CostSanitation, Night Shelter for Footpath Dwellers, BuildingCentres, shelter upgradation under Nehru Rozgar Yojana(NRY) and rural housing under Minimum NeedsProgrammes (MNP). It is operating the centrallysponsored scheme ‘of building centres and has takenmajor initiatives for the upgradation of skills of artisans,small contractors and professionals. It is providing equityand loan support to building material manufacturing unitsand promoting through. technical and professional sup-port, cost effective and innovative building materials andcomponents and systems using agricultural andindustrial wastes. It is a major multi-dimensional andmulti-functional organisation addressing the entire gamutof shelter issues in the country, Various measures arebeing taken to strengthen its operations and widen itsresource base.

Operatlons and profitability during 1995-96

3. During 1995-96,(as on 31 .3.96) HUDCO sanctionedloans for an amount of R s . 1967 crores against MoUtarget of Rs. 1900 crores.The actual loan released byHUDCO during 1995-96 was R s . 1348.06 crores againstMoU target of Rs.1435 crores .The schemes sanctioned

during 1995-96 would enable construction and upgradation of 3.96 lakh residential units, development

of 18,258 residential plots and construction/conversionof 6.85 lakh sanitation units, besides augmentation ofwater supply and drainage facilities. Seventy percent ofthe total residential units and thirty nine percent of theplots sanctioned during the year were meant forEconomically Weaker Sections/LIG. HUDCO has beenempowered by the Government to expand lending for

urban infrastructure, especially water supply andsanitation at non-subsidised rates and there has beengrowing response to this from various States and cityagencies.3.1 During the year 1994-95, despite the interestsubsidy given for lower income groups HUDCO earnedgross profit of Rs. 100.16 crores. The net profit afterproviding for tax is Rs. 70.37 crores. HUDCO paiddividend of Rs. 16.11 crores to government during 1994-95. HUDCO has earned gross (pretax) profit of Rs.109.66 crores during 1995-96.

Rural Housing

4. HUDCO started financing of rural housing schemesonly from 1977-78, but still has made considerablecontributions. As on 31.3.96, HUDCO has cumulativelysanctioned loans amounting to Rs. 1300 crores for 1698Rural Housing Schemes for the construction of 30.08lakh rural houses. During 1995- 96 (as on 31.3.96),HUDCO sanctioned 102 Rural Housing Schemes witha loan commitment of Rs. 162.34 crores for theconstruction of 1,74,418 rural houses.

Urban Infrastructure

5. Since March 1989, HUDCO started financing citylevel urban infrastructure schemes in a big way. A fullfledged separate urban infrastructure wing has been setup for processing loan proposals from public and privateagencies. Priority is given to water supply, sewerageand drainage schemes especially in small and mediumtowns with population of less than 10 lakhs. As on31.3.96, HUDCO has sanctioned 420 UrbanInfrastructure schemes for a loan amount of Rs. 2837.93crores of which 109 schemes for Rs. 874.18 crores weresanctioned during 1995-96.

Prlorlty Programmes

6. (a) Low Cost Sanitation Programme for Liberationqf Scavengers.

As part of the Action Plan of the Ministry of Urban Affairsand Employment, HUDCO has started financing projectsunder this scheme to cover 700 small towns in the firstphase. During current year (as on 31.3.96) 88 schemeshave been sanctioned for a loan amount of Rs. 66.38crores covering 685134 units. HUDCO has cumulativelysanctioned 692 such schemes for a loan amount ofRs. 392.74 crores covering 29,63,869 units.

(b) Night Shelter Scheme for Footpath Dwellers

This is also an Action Plan programme of the Ministryof Urban Affairs and Employment and being

implemented by HUDCO. HUDCO has sanctioned a loanelement of Rs. 1.0.28 crores and Central subsidy of overRs. 9.33 crores for 57 such schemes covering 12 States.These schemes will provide about 18497 beds, 5719pay and use toilet seats, 46 baths and 92 urinals.

(c) Urban Employment through Housing & ShelterUpgradation

This scheme under Nehru Rozgar Yojna (NRY) was

initiated in December 1989 and aims to.provide urbanemployment through loan cum subsidy for renovationand upgradation of existing housing in slums, inner citiesand other areas inhabited by the weaker sections. Duringthe year 1995-96 as on 31’.3.96,83 schemes for a loanamount of Rs. 33.65 crores have been sanctioned whichwill help upgradation of 94822 dwelling units in 12 States.HUDCO has sanctioned a total of 501 such schemescovering 24 States and approximately 7.49 lakh dwellingunits

HUDCO Operations During 1994-95 and 1995-96

Type 1994-95 1995-96(as on 28-2-96)

No. of Loan No. of LoanSchemes Amt. Schemes Amt.

(Crores) (Crores)

Urban Housing Schemes

-Cooperative

-Site and service-Plotted Development-Night Shelter

-OthersRural Housing Schemes

-Cooperative

-Landless Labourers-OthersUpgradatlon Schemes

-Slums-Repairs & Improvements-Selter Upgradation (NRY)

Basic Sanitation Schemes

Building Material Schemes

Cash Loan Schemes

-Cooperative-OthersLand Acqulstlon Schemes

Infrastructure Schemes

-Urban Infrastructure-lntg. Low Cost Sanitation

1 0.70 6 8.39

7 0.75 1 0.52

1 2 21.03 2 1 43.50

2 0 3.32 5 1.35476 508.86 268 387.56

3 9 32.26 1 3 17.426 3.28 4 2.01

68 117.60 85 142.91

- -

2 5 29.69

46 26.353 0.29- -

31 31.35 7 5 117.48

91 126.45 64 146.31

2 0 47.32 1 4 34.76

8 9 673.91 109 874.18

1 3 3 64.83 88 66.38

-

1 3831

-

-

33.0033.65

0.07-

7. Upto 31.3.96, cumulative loan sanction anddisbursement of HUDCO aggregates to Rs. 11829crores and Rs. 8058 crores respectively which wouldhelp in the construction/upgradation of over 60 lakhresidential dwelling units, 23569 units under Night Shelterscheme, 17282 non-residential buildings, developmentof 412904 plots and construction/conversion of 3448747sanitation units covering 30 States/UTs.

Resource Mobilisation

8. Upto 1985-86, HUDCO had been raising resourcesthrough traditional sources like issue of Governmentguaranteed Debentures, loans from LIC, GIC etc.. In1987-88 HUDCO raised funds in the open market forthe first time through floating its Urban and Shelter Bondsof Rs. 50 crores and followed it up by Rs. 100 crores in1988-89, Rs. 250 crores in 1989-90,Rs. 300 crores in1990-91 and Rs. 300 crores in 1991-92. During 1992-93 HUDCO was permitted to raise Rs. 400 crores by

way of public issue of bonds. The process could,however, not be completed till March, 1993 and HUDCOwas allowed to raise the resources by March, 1994.During 1993-94, HUDCO made record resourcemobilisation of over Rs. 1750 crores.

8 . 1 During the year 1994-95 HUDCO launched a PublicDeposit Scheme to mop up household savings forchannelising funds to housing development activit ies.The scheme has received good response in the marketand during the year 1995-96, HUDCO collected anamount of Rs. 30.80 crores under the scheme. During1995-96, HUDCO had been granted permission to raiseRs. 300 crores by way of taxfree bonds. As on 31.3.96HUDCO had raised Rs. 273.50 crores out of this. Thetotal resource mobilised by HUDCO during 1995-96 fromvarious sources stood at Rs. 1348.06 crores as on31.3.96.

5

AUTONOMOUS & STATUTORYBODIES

BUILDING MATERIAL AND TECHNOLOGYPROMOTION COUNCILIn order to bridge the gap between research anddevelopment and to promote large scale application ofinnovative building materials and technologies, anorganisation named Building Materials and TechnologyPromotion Council has been set up as a Society underthe aegis of the Ministry of Urban Affairs & Employment.The Council is structured to undertake the task ofextension and application of innovative technologies andlow cost materials developed by research institution, topromote the manufacture of building materials fromindustrial and agricultural wastes and residues toencourage entrepreneurs in this sector and to ensuredevelopment of appropriate standards for the newmaterials and their adoption in the schedules andspecifications of the public housing agencies. Thefollowing are some of the areas where the Council hasmounted thrust in its activities:-

(i)

( i i )

(iii)

(iv)

Economy and eff iciency in public agencies byadoption of cost effective materials and tech-nology.Utilisation of flyash and other industrial andagricultural wastes for producing buildingmaterials.Identification of appropriate technologies and widescale dissemination through entrepreneurialsupport.Standardisation, validation and certification ofinnovative materials and techniques.

(v) Promotion of production units of new buildingmaterials.

CENTRAL GOVERNMENT EMPLOYEES WELFAREHOUSING ORGANISATION

2. The Organisation started functioning from October,1990. Steps have already been taken for acquiring landfor executing housing schemes for Central GovernmentEmployees in different parts of the country. HousingSchemes have been announced at Nerul, New Bombay;Calcutta; Madras; NOIDA (U.P.); Kharghar. Bombay,Panchkula and the latest scheme announced in July,1995 is at Gurgaon. These schemes will provide housesto 5560 beneficiaries. Central Government hascontributed a total amount of Rs. 18.00 crores towardsthe capital of the Organisation to facilitate landprocurement. Government is also providing annualgrants to the organisation.

NATIONAL COOPERATIVE HOUSING FEDERATIONOF INDIA (NCHF)

3. National Cooperative Housing Federation of India wasset up in 1969 as the national level organisationspearheading the entire cooperative housing movementin India. As part of Government’s policy to encouragecooperative housing, Ministry of Urban Affairs andEmployment has been providing f inancial support toNCHF. Out of 25 State level Apex Cooperative HousingFederations, 24 are members of NCHF Upto 31.3.95,State Level Apex Federations have advanced a loan ofRs. 3407 crores to Primary Cooperative Societies. Sofar, construction of 12,82,370 houses have been com-pleted and about 3,88,576 houses are under con-struction. Presently, an amount of Rs. 300 crores is beingadvanced annually through the Apex federations. Thehousing cooperatives are getting finance from LifeInsurance Corporation of India, National Housing Bank,HUDCO and Commercial/Cooperative banks. During1995-96, grant-in-aid amounting to Rs. 15.00 lakhs wasreleased to NCHF

Appendix-X

MINISTRY OF URBAN AFFAIRS & EMPLOYMENTORGANISATION CHART AS ON 31-03-1996.

(Vide Chapter 2 Para 3)

DEPARTMENT OF U R B A N D E V E L O P M E N T DEPARTMENT O F U R B A N E M P L O Y M E N T & P O V E R T Y A L L E V I A T I O N S

M O SI

Secretary(UD)

MOSI

Secretary (UE & PA)

Addl. Secy. (NPS) ..

Adm. & Coordn. (incl. Plan Coordn), Vig, Works, NBCC & HPL, UrbanTransport, Land policy Delhi Divn. & 20 Point Programme,

‘IiS,

External Assistance Adm. & Coordn. & Plan Coordn, ULCA, DRCA, DAOA, land UD andCoord. & Miscellaneous Vig, Works (lncl. Samadhi) Divin. incl. land LSG Divn.matters, WS&S and NBCC, HPL, 20 Pt. Programme policy andOfficial Language. and PSI? (Through A.S.) Estate-I&II(Direct to Secy.) (Through AS)

JS (F)1Budget, InternalFinance Control,Accounts matters,

I IWSU, HBA & policymatters.-

DS( A&C) DS(W)

I,II II,III so (PS) DO-II

1AU subjects relating to new D e p t .

HS&H (incl. NBO, HUDCO, BMTPC, CGEWHOand NCHF) matter relating to UNC/C for Humansettlement incl. Habitat II conference,ICTA in the field of HS&H, UD relating toSlums incl. SS and IC&A in this field

1. A.S. Addl. Secretary

A&C2. Administration &Coordination

3 . AVO Assistant Vigilance Officer4. A Administration5. AFA Assistant Financial Advisor6. A.0 Accounts Officer7. BMTPC’ Building Material & Techno-

logy Promotion Council8. Bt. Budget9. CCA Chief Controller of Accounts10 CGEWHO Central Government Employees

Welfare Housing Organisation

11. C Coordination12. DRCA Delhi Rent Control Act13. DAOA Delhi Apartments Ownership

Act.14. D S Deputy Secretary15. Dir Director16. DD Delhi Division17. DD(M) Deputy Dir. (Monitoring)18. DD(T) Deputy Director (Technical)19. Ew Establishment Works20 F Finance21. H. Housing22. HPL Hindustan Prefab. Ltd.24 3..2- HL DCO Housing and Urban Develop

ment Corporation Ltd.24. HBA House Building Advance25. HS&H Human Settlement and Housing

For DRCA. Dy Secy. (W) submits to JS (UD).For DXOA and ULCA, SO (UCU) submits dir to JS IUD).Admn. Coordn. Plt. works, Vig. Finance’& House Keeping Jobs of UE&PA is looked after by Deptt. of U.D,

2 6 . HEPA Housing Employment and 39. NCHF National CooperativePoverty Alleviation Housing Federation

27. IC&A International Cooperation 4 0 . OL Official Languageand Assistance 4 1 . PHE Public Health Engg.

2%. ICTA Interanational Cooperation 4 2 . PS Public Sectorand Technical Assistance 43. Pub Publication

2 9 . Iwsu International works study unit 44. PSP Printing Stationary and30. JS Joint Secretary Publication31. JCM Joint Consultative Machinery 45. s & P stationery & Printing32. JA Junior Analyst 4 6 . SA Senior Analyst33. LSG Local Self Government 4 7 . SS Squatter Settlements34. L 48. ULCA Urban Land Ceiling Act35. Mos Minister of State 4 9 . UD Urban Development36. NBO National Bldg. Organ. 5 0 . UCU37. NBCC

Urban Ceiling UnitNational Bldg Construction 5 1 UCD Urban CommunityCoorporation Ltd. Development

38. AD Assistent Director 5 2 . UT&LP Urban Transport and LAndP o l i c y

53. us Under Secretary53A. UE&PA Urban Employment &

Poverty Alleviation

& 1 1 1 &IV (Plt). NBCC DO-III (OL) (PHE) (P) (UCD) DO-IIA (H-III) DO-II&JCM HPL DO-VA&

IDO-III

DO-IIBAO(L)

Dir. (H) Dir (Employment)

I IUS(H) US(I) US(II) US(III) DD(T)

I I I ISO(HI)& SO(I ) SO-II,III ROSO(HII) AO and IV

54.

55.56.57.58.59.60.61.62.

UNC/C United NationsCommision/Centre

VIg. VigilanceWA Work anbd AdministrationW WorkWS&S Water Supply & SanitationD o Desk Officerso Section OfficerP l t . ParliamentDD( OL) Deputy Director

(Official Language)

Appendix-II

(Vide chapter 2 and para 3)

List of subjects allocated to the Ministry of Urban.Affairs and Employment

A. DEPARTMENT OF URBAN DEVELOPMENT(SHAHARI VIKAS VIBHAG)

1. Properties of the Union, wtiether lands or buildings,with the following exceptions:-

(i)i

( i i )

(iii)

Those belonging to the Ministry of Defence(Raksha Mantralaya), the Department ofRailways (Rail Vibhag) and the Department ofAtomic Energy (Parmanu Oorja Vibhag) and theDepartment of Space (Antariksh Vibhag).

Buildings or lands, the construction or acquisitionof which has been financed otherwise than fromthe Civil Works Budget; and

Buildings or lands, the control of which has at thet ime o f const ruc t ion or acqu is i t ion orsubsequently been permanently made over toother Ministries and Departments.

2. All Government Civi l Works and Buildings includingthose of Union Territories, excluding Roads and excludingworks executed by or buildings belonging to the Railways,P&T and the Department of Atomic Energy (ParmanuOorja Vibhag), and the Department of Space (AntarikshVibhag).

3. Horticulture operations.

4. Central Public Works Organisation.

5. Administration of Government estates includingGovernment Hostels under the control of the Ministry.Location or dispersal of off ices in or from the Metropolitancities.

6. Allotment of accommodation in Vigyan Bhavan

7. Administration of the Requisitioning and Acquisitionof Immovable Property Act, 1952 (30 of 1952).

8. Administration of Delhi Hotels (Control of Accom-modation) Act, 1949 (24 of 1949).

9. The Public Premises (Eviction of UnauthorisedOccupants) Act, 1971 (40 of 1971).

10. Administration of four Rehabil i tation Markets viz.Sarojini Nagar Market, Shanker Market, PleasureGarden Market and Kamla Market.

11. Issue of lease or conveyance deeds in respect ofGovernment built properties in Delhi and New Delhiunder the Displaced Persons (Compensation andRehabilitation) Act, 1954 (44 of 1954) and conversion

of lease deeds, allotment of additional strips of land andcorrectional areas adjoining such properties

12 Stationery and Printing for the Government of Indiaincluding official publications. *

13. Planning and Coordination of Urban ‘transportsystems, with technical planning and road basedsystems being subject to items 22 and 23 under theMinistry of Surface Transport (Jal-Bhootal PariwahanMantralaya) and technical planning or rail based systemsbeing subject to i tems 1 and 2 under the Ministry ofRailways (Rail Mantralaya), Railway Board (Rail Board).

14. Town and Country Planning; matters relating to thePlanning and Development of Metropolitan Areas;International ‘Co-operation and Technical Assistance inthis field.

15. Schemes of large scale acquisit ion, developmentand disposal of land in Delhi.

16. Delhi Development Authority.

17. Master Plan of Delhi, Co-ordination of work in respect ’of the Master Plan and Slum Clearance in the UnionTerritory of Delhi.

18 .

19.

(61

20.

21 .

22 .

Erection of memorials in. honour of freedom fighters.

Administrat ion of the Delhi Development Act, 1957of 1957).

The Delhi Rent Control Act, 1958 (59 of 1958).

Development of Government Colonies.

Local Government, that is to say, the constitutionand powers of the Municipal, Corporations (excludingthe Municipal Corporation of Delhi), Municipalities(excluding the New Delhi Municipal Committee), otherLocal Self Government Administrations excludingPanchayati Raj Institutions.

23. The Delhi Water Supply and Sewage DisposalUndertaking of the Municipal Corporation of Delhi.

24. Water Supply (subject to overall national perspectiveof water planning and coordination assigned to theMinistry of Water Resources), sewage, drainage andsanitat ion relat ing to urban areas and linkages fromallocated water resources. International cooperation andtechnical assistance in this f ie ld .

25. The Central Council of Local Self-Government.

26. Allotment of Government land in Delhi.

27. All Attached or Subordinate Offices or otherorganisation concerned with any of the subjects specifiedin this list.

28. Public Sector Projects falling under the subjectincluded in this list except such projects as arespecifically allotted to any other Department.

29. The Urban Land (Ceiling and Regulation) Act, 1976(33 of 1976).

30. Delhi Urban Art Commission, Delhi Urban ArtCommission Act, 1973 (1 of 1974):

31. Administration of Rajghat Samadhi Committee.

32. All matters relating to Planning and Development ofthe National Capital Region and Administration of theNational Capital Region Planning Board Act, 1985 (2 of1985).

33. Matters relating to the Indian National Trust for Artand Cultural Heritage (INTACH).

8. DEPARTMENT OF URBAN EMPLOYMENT ANDPOVERTY ALLEVIATION (SHAHARI ROZGAR AUR

GARIBI UPSHAMAN VIBHAG).1. Formulation of housing policy and programme (exceptrural housing which is assigned to the Department ofRural Development), review of the implementation ofthe Plan Schemes, collection and dissemination of dataon housing, building materials and techniques, generalmeasures for reduction of building costs and nodalresponsibility for national Housing Policy.2. Human Settlements including the United NationsCommission for Human Settlements and InternationalCooperation and Technical Assistance in the field ofHousing and Human Settlements.3. Urban Development including Slum ClearanceSchemes and the Jhuggi and Jhonpri RemovalSchemes. International Cooperation and technicalassistance in this field.4. National Cooperative Housing Federation.5. Implementation of the specific programmes of UrbanEmployment Schemes such as Prime Minister’s RozgarYojna and other programmes evolved from time to time.

Appendix-IV

Statement showing staff strength as on 31.3.96 (Vide Chapter 2 para 4)

S. Name 0; Office Group Group Group Group Group work Total No. A B B C D charged

(Gazetted) Non- staff Gazetted)

1 2 3 4 5 6 7 8

A. Secretariat (including attached and Subordinate Offices)

2.

3. 4. 5.

6.

Min/o Urban Affairs & Employment (Sectt.) Pr. A. Office M/o UA&E C.PW.D. Dte. of Estates Dte. of ptg. National Buildings Organisations Controller of publication Controller of Stationery Land and Dev. Off ice Town and Country Planning Organisation

Hindustan Prefab Ltd. National Building Construction Corp. Ltd. Housing and Urban Development Corp. Ltd.

50 60 97 165

6 78 572 1088 2766 206 13665

8 48 75 482 28 89 103 8967

7 3 13 13

2 5 - 311 3 7 2 456

7 8 1 179 44 5 40 81

6. Public Sector Undertakings

48 30 - 425 571 - 408 636

366 .-+ 76 - 320

'70 6824

2109 17

466

60 54

236 1829

115

726 31140 55689

842 11296

53

538

934

255 224

739

49 3493

877

Appendix- V( Vide chapter 2 para 29)

Position regarding employment of Ex-Servicemen as on 3 7.3.96 in the Ministry its Attached and SubordinateOffices and Public Sector Undertakings.

Group Number of vacanciesreserved

Number of vacancies Number of Ex-Servicemenfilled appointed against

unreserved vacancies

1 2 3 4

C .D

Ministry and its Attached/Subordinate Offices

4 4 2 03 8 2 1

16

Public Sector Undertakings

c 1 1 -D - - -

Appendix- VI(Vide Chapter 2 para 30)

Total number of Government servants and the number of Scheduled Castes and Scheduled Tribes amongst themas on 3 1st March, 1996 in the Ministry of Urban Affairs & Employment and its Attached/Subordinate Offices

G I roup/Class Permanent /Temporary Total Scheduled Percen- Schedu led Percen- Remarksn u m b e r Castes tage Tr ibes tage

o f to total to tota lemployees employees employees

1 2 3 4 5 6 7 8

Group A(CL I

Group B (Class Ii)

Group C (Class III)

Group D (Class IV)(Excluding Sweepers)

Group D (Class IV)(Sweepers)

Permanent(i) Other than Lowestrung of Class 1.

(ii) Lowest rung ofClass 1

9 8 7 157 15.90 25

144 1 9 13.19 8

Total : 1131 176 15.56 3 3

Temporary(i) Other than Lowestrung o f C lass 1

( i i ) Lowest rung o fClass 1

2 5 8 32.00

4 4 10 22.72

T o t a l :

Permanent /Temporary

Permanent /Temporary

Permanent/Temporary

Permanent /Temporary

6 9 18 26.08

2 7 9 2 428 15.32

1

1

1 9

23342 4296 18.40 1187 5.08

9 9 4 6 21.06 677 6.80

9 7 7 95.49 14

2.53

5.55

2.91

2.72

1.44

0.68

1.43

Appendix- VII (Vide Chapter 2 para 30)

Number of reserved vacancies filled by member of Scheduled Castes and Scheduled Tribes as on 3 1st March, 1996 in the Ministry of Urban Affairs & Employment and its Attached and Subordinate offices

SCHEDULED CASTES SCHEDULED TRIBES

Class of Post

Total No. of vacan-

ties

Noti- Fill- fied ed

No. of No.of No. of No. of No. of vacancies SC SC ST can- reser-

resenred can- vacan- didates vation did&S ties ap- lapsed

out out ap- carried poined after of of poined forward against carry-

Cal. cot. from vacan- ing 2 3 previ- ties re- forward

ous served for3 year for SCs years

in the 3rd year of carty forward

No. of No. of No. of No. of No. of Re- vacancies ST ST SCs reser- marks reserved can- vat- can- vation

didates ancies didates lapsed out out ap- carried ap- after

of of pointed forward pointed carry- Cal. Cl. from against ing

2 3 previ- vacan- forward ous ties re- for3

year served years for

STS. in the

3rd year

of carry-

forward

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

I. Posts fiHad by Direct Rewuitmsnt -

Other than lowest rung 4 4 1 ------ -- 1 - --

of Class 1 Lowest rung 24 24 6 6 6 l- -- - - - - --

of Class 1 Class II 48 20 9 3 4 4 - - 3 3 3 2 1 2 - Class Ill 964 525 177 111 106 40 - 2 101 47 39 31 3 3 - Class IV 567 278 105 65 96 3 - -49 25 24 4 - --

(excluding Sweepers) Class IV (Sweepers) 14 10 8 8 9 1 - - 3 3 2 2 - --

II. Posts filled by PromoW

Other than lowest rung 16 230 2 43 45 l- -- 6 7 2 - -- of Class I Lowest rung 4 4 1 1 l- - -- - - - - --

of Class I

Class II 442 302 73 61 28 1- -35 24 3 12 3 3 - Class III 903 737 150 133 121 2 - -73 51 45 - - - 28 Cl&s IV (excluding 74 54 19 15 24 - - - 5 - 1 2 - -- (Sweepers) Class IV (Sweepers) 3 - 1 ------ ------

Appendix- WI

(Vide Chapter 2 para 30)

Statement showing the total number of Government Servants and the number of Scheduled Castes and Scheduled Tribes amongst them as on 31st March 1996 in the Public Sector Undertakings i.e. National Buildings Construction Corporation Ltd., Housing and Urban Develpment Corporation Ltd., and Hindustan Prefab Ltd.

Group/Class Permanent/ Total Numberof Scheduled Temporary Employees Castes

Percentage to total

employees

Scheduled Tribes

Percentage to totat

employees

Remarks

1 2 3 4 5 6 7 8

Group A (Cl. 1)

Group B (Cl. II)

Group C (CI.III) Group D (Cl. IV) (excluding Sweepers)

Grade D (Cl. IV) (Sweepers)

Permanent (i) Other than

Lowest rung of Cl. I

(ii) Lowest rung of Cl. I

813

172

Total:

Temporary (i) Other than

lowest rung of Cl. !

(ii) Lowest rung of Cl. I

Total:

Permanent Temporary

Permanent Temporary

Permanent Temporary

985

-

-

-

514

1382

Permanent Temporary

2152 259 12.0

28 28 100

100

36

136

-

-

-

89

310

12.3 10

20.9 3

13.8 13

- -

-

-

17.3

22.4

-

-

9

34

22

-

1.23 -

1.74 -

1.31 -

- -

-

-

-

-

1.75 -

2.46

1.01

-

Note: (1) This Statement relates to person and not to posts. (2) Persons on deputation included in the establishement of the borrowing offices and not in parent Office. (3) Persons permanent in one grade but officiating or holding temporary appointment in the higher grades am show in in the figures relating

to the class of service in which the higher grade concerned is included. *

Appendbc-IX

(Vide Chapter 2 Pam 30)

Number of reserved vacancies filled by member of Scheduld Castes and Scheduled Tribes as on 31st march 1996 in the Public Sector Undertakings i.e. National Building Construction Corporation Ltd., Housing & Urban

Development Corporation Ltd. and Hindustan Prefab Ltd.

Class of Post

SCHEDULED CASTES SCHEDULEDTRIBES

Total No. No. of No. of No. of No. of No. of No. of No. of No.of No. of No. of Re- of vacan- vacancies SC SC ST can- wser- VtMXlWieS ST ST SCs mser- marks

ties b

reserved can- vacan- didates vation tWWVd s N - vation did&M ties ap- lap=d

Noti- Fill- Out diciE3 an”zi3 cjidzis lapsed

out ap- carded pointed after Out fied ed

out ap- canied ap- after of of pointed forward against carry- of

Cal. Cal. from vacan- ing Col. of pointed forward poinoed early-

Cl. from against 2 3 pfevi- ties re- forwafd 2 3 - previ- vacan- forw2

ous served for 3 ous ties re- for 3 year for SCs years year setied years

in the for 3rd year STs. of carry in the fotwaKl 3rd

year of

carry- forward

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

I Posts filled bv Direct Recruitment 0th *El lowest 29 29 1 1 - - - - 1 2 1 1 - --

rung of Class 1 Lowest rung - - - - - - - - - - - - - -

of Class

Class II - - - - - - - - - - - - -

Class Ill 36 24 10 3 3 - - - 9 4 4----

class IV 3 3 2 2 2---l -----I-

(exchhktg (S-we@ Class IV (S-Per4 - - - - - - - - L - - - - - -

II Posts filled by Promotion

Other than lowest 185 180 76 16 26 - - -- - - - - -- rung of Class I Lowest’ rung of 44 44 8 8 13 - - - 2 5 - - - - - Class I Class II 90 88 13 13 16 - - - 5 5 3----

Class III 93 112 14 22 27 4 - -1 1 - 18 - -- Class IV (excluding 62 26 23 23 5 1 - - 2 2 - 5 - --

(Sweepers) Class IV (Syveepers) - - - - - - - - - - - - - - -

Appendix-X

(Vide Chapter 2 para 53)

Department-wise details of outstanding Inspection Reports/Audit objections as on 31-3-96 in respect of M/OUA&E and its Attached/Subordinate Offiies

Office/Department Inspection Reports (No.) Audit Objections (No.)

Directorate of PrintingNational Buildings OrganisationController of PublicationsGovt. of India Stationery Office

134 6 4056 314 36

15 9

E R R A T A

Occuring atPage No.

para Line For Read

4

4

4

4

6

29

34

41

83

5 5&6

Revised Est imates1995-96 (Gross Figures)

(of para 6)

Budget Estimates19%97 (Gross figures)

(of para 6)

-do-

19 I

3 1

Annexure-III Col. 9Sl. No. 2.

1 7 1

6.2 22

Demand Nos.81.82 & 83

Demand No. 81Plan Non-Plan Total3.40 186.85 190.25

90.42 295.15 385.57

Demand No. 81Demand No. 82Demand No. 83

Demand No. 82Plan Non-Plan T o t a l4.50 199.43 203.93

84.98 315.85 400.83

report

Centrally schemesponsored

31.12.96

National Committee on

Urban Basic forthe Poor

Demand Nos.82.83 & 84

Demand No. 81Plan Non-Plan Total3.40 376.85 380.25

90.42 105.15 195.57

Demand No. W.Demand No. 83Demand No. 84

Demand No. 83Plan Non-Plan Total4.50 404.83 409.33

8498 110.45 195.43

regard

Centrally sponsoredscheme

31.3.96

National Committee for

Urban BasicServices far thepoor