Cover sheet! (PIC, logo)
Introduction
Global Experience, Local Approach
22 Global experience, local approach
INDEX
1. Introduction: KH International Projects Mission, Company values, Company structureMarket segmentsServices fields
2. Complete EngineeringProcess, Piping, Process Control, Mechanical, Civil, Electrical &Instrumentation
3. Project ManagementHealth Safety Environment (HSE)Safety Management System
4. Scope of Supply 5. Brownfield projects6. Project Resumes
7. Unique competencesiTANK – integrated Logistic Solutions for terminals and tank farm industries iMAC – independent Main Automation ContractoriBOP – innovated Balance of Plant
8. Contacts
33 Global experience, local approach
KH Engineering
“Offering solutions which keep our clients competitive and completely compliant with the
law is the focus of our service ...
…Our strategy for success is to give its customers a direct and transparent approach
for technical know-how… ”
� C.J. VonkBusiness Development
KH International Projects b.v.
Founded in 1949 in the Netherlands, KH Engineering is an independently engineering company, and EPC contractor, providing engineering, procurement, and construction services to customers within a wide range of industries.
The oil & gas, petroleum industries contribute to the bulk of the company’s assignments. In addition, chemical plants, pharmaceuticals, food production, heavy industry, infrastructure and utility, and aerospace are important areas where the company realised and implemented many industrial and infrastructure projects.
KH Engineering established in 1949, under the name of Keynes, in the Rotterdam industrial port. Some years later, it merged with the Mathew Hall Group and Became the Mathew Hall Keynes Group (MHK). Eventually, the current name of Konings Haven (KH) Engineering was adopted in 1998. Presently, the company conducts 25% of its business internationally, with the Middle East and Europe holding the most new prospects.
Back to IndexBack to Index
44 Global experience, local approach
Mission
To provide innovative technological solutions
By matching knowledge, techniques and new work
methods
mission, vision & objectives
To create value for our customers and share holders
With a flexible approach delivering high quality solutions
in a complex technical environment
To ensure sustainabilityand stability of our operations
With a continuous focus on people, safety and environment
respecting general accepted values
Back to IndexBack to Index
55 Global experience, local approach
Glo
bal
E
xp
eri
en
ceL
oca
l A
pp
roa
ch
JV Values
Working together, we can bring value added solutions (both technically and economically) to our clients.
Local presence, enables us to be close to our clients, not only geographically, but also in spirit and understanding.
Back to IndexBack to Index
66 Global experience, local approach
JV Structure
Netherlands RomaniaBelgium Abu Dhabi
Knowledge Centers
Project Management, Procurement, Subcontracting and Construction Management
Process PipingProcess Control
& InstrumentationCivil & Structural ElectricalMechanical
CompetenceManagement
Safety & QualityControl
Computing & ITHuman Resources
Cost Control and business Development
Back to IndexBack to Index
Benyan – KH Engineering L.L.C. Middle EastBenyan – KH Engineering L.L.C. Middle East
77 Global experience, local approach
Expertise in services & solutions Industries experience
Turn-KeyProjects
EnvironmentalSolutions
IntegratedPlant Information
Systems
EPCM Services
Process ControlSolutions
Power & Infrastructure
Energy & Utility
Heavy Industry
Chemical
Oil & Gas
Food & Pharma
(for each solution / discipline)
Market splitExpertise and Experience
(for each solution / discipline)
ReferenceList
ProjectResume
CompetenceProfile
ReferenceList
ProjectResume
CompetenceProfile
Waste TreatmentSolutions
Back to IndexBack to Index
88 Global experience, local approach
Vopak / Odfjell
Steering Tank TerminalsRotterdam - Singapore
2000 – 2004Automation
Market Segments
Al Furat Petroleum Co.
Omar Powerplant Extension projectOmar, Syria
BDE, EPC, plant commissioning
S.C. IASI S.A.
Fuel Gas Treatment Project CET
Romania, 2006
EPCM
PETROM
Gas Inline Blending Project
Romania - Ploiesti2007 – 2009
Lumpsum Turnkey
Oil & Gas
Chemical
Refining
Environment
Utility
Siemens
Mymensingh Power Station Phase III
Mymensingh, BangladeshEngineering
Energy
Benyan - KH
Heavy Industry
Oleicola El Tejar
Olive Waste to Energy
Spain, 2010
Business Case
Waste to Energy
Gasunie LNG
Replacement LNG control system
LNG Maasvlakte1997-2001 (5 yrs)
Oleicola El Tejar (OET)
TATA Group
Oxysteelfactory 2 Quick-Exchange Head
The Netherlands
Detail Engineering/ Modelling in Inventor
Back to IndexBack to Index
99 Global experience, local approach
Services Fields
Unique competencesComplete Engineering Project Management
Engineering services and consultancy for complete engineering. Disciplines include:
• Process
• Piping
• Process Control
• Mechanical
• Civil
• Electrical
• Instrumentation
60 year successful experience on project management for various types of industrial projects:
• Green field projects
• Brown field projects
o Revamp
o Debottlenecking
o Turnaround
Besides, for contract management projects, we provide:
• Umbrella / Call-off agreements
• FEED / Conceptual
• Engineering, Procurement, Construction (management) projects
• Turnkey & Lump Sum TurnKey Projects
To satisfy specific needs/request from the clients in different industries, special packages delivering our in-house unique competences, a so-called “Product-Market Combinations” (PMCs) can be delivered to different industrial clients:
• i NVESTIMATE
• i BOP (Balance of Plant)
• i MAC (independent Main Automation Contractor)
• i Tank
• i DMS (Documentation Management System)
• KH Safety
Back to IndexBack to Index
1010 Global experience, local approach
Complete Engineering
Single discipline:
Process
Piping
Process Control
Mechanical
Civil
Electrical
Instrumentation
Back to IndexBack to Index
1111 Global experience, local approach
Benyan - KH Engineering recognises that process engineering is a very broad but important discipline formany industrial projects for example, oil & gas, chemical plants and refineries. Below is the main activities that KH process engineering carries out, and which add values in projects.
• Process simulations (ASPEN, HTRI, HYSYS)• Heat exchange calculations• Process safety (HAZOP, SIL)• Hydraulics calculations• Compliance checks• Risk assessments• HSE studies• Conceptual Design• PFD & P&ID design• Basic / Detailed Engineering
Process Engineering
01LRCV-001
DesignPressure 60 barg
V10001
LRC
001
Thermal or FireRelief Setting 60 barg
01UZ-100
01PRCA
001
H HH
002
01PZ
IA
120 Bar
Hydrocarbons
01PRCV-00101PZA-002
01PZA-002
Vopak TerminalTotal RefineryShell Chemical PlantRWE-Essent Power Plant
Single discipline:
Process
Piping
Process Control
Mechanical
Civil
Electrical
Instrumentation
Back to IndexBack to Index
1212 Global experience, local approach
Piping Engineering
Single discipline:
Process
Piping
Process Control
Mechanical
Civil
Electrical
Instrumentation
Odfjell TerminalSabic Chemical Shell Chemical PlantSiemens Power Plant
The Piping Engineering department at Benyan - KH Engineering provides professional design/drafting, 3D-modelling for plant design, technical studies like stress analysis in industries.
• Design/Drafting/3D-modelling• Codes and Standards compliance• Piping elements & specialties• Pipe hydraulics & sizing• Plot plan• Equipment layout• Process piping layout• Utility piping layout• Dynamic analysis• Transient Fluid Flow Analysis• Supports & Expansion joints• Material Take Off (MTO)
Back to IndexBack to Index
1313 Global experience, local approach
Process Control
Single discipline:
Process
Piping
Process Control
Mechanical
Civil
Electrical
Instrumentation
Shell RefineryShell RefineryProviron Huntsman
Benyan - KH Process Control department deals with architectures, mechanisms and algorithms to obtain the specific process within the client’s desired range. By providing the best programmable logic controller (PLC), or Distributed Control System (DCS) or SCADA system for client’s ideal plants, KH process control engineers deliver full range service package for clients’ control systems including the control rooms.
• Instrumentation data sheet• Control loop• Hardware design• Software design
Control room building
Console area
Console-, desk en counter designPictorial lay-out
Back to IndexBack to Index
1414 Global experience, local approach
Mechanical Engineering
Single discipline:
Process
Piping
Process Control
Mechanical
Civil
Electrical
Instrumentation
Tata Vosta Esa-Estec
Benyan - KH Engineering Mechanical department delivers the best choice for having the best rotating, static or handling equipment for the client’s operations and assets. KH mechanical engineers provide consultancy, diagnostics & troubleshooting, construction & inspection, analysis & testing and engineering services for the following equipments:
• Rotating equipment selection• Hoisting & Lifting equipments• Static equipment design• Logistics/Transporting system• Material & Solid handling
Besides engineering, you will find access for advices on Authority and Governmental regulations like CE Marking and PED.
Back to IndexBack to Index
1515 Global experience, local approach
Civil Engineering
Single discipline:
Process
Piping
Process Control
Mechanical
Civil
Electrical
Instrumentation
Huntsman Chemical SiteSiemens-Essent CHP PlantSabTankPurac- PPH Plant
As one of the oldest disciplines for projects, Benyan - KH Civil Engineering Department provides a broad range of engineering services to the clients, such as structural engineering, steelwork for process model, 3D design, inspections and etc.
• Issuing packages for building permits including consultation with welfare and building inspectorate;• Advice with relation to geo-technical, environmental-, construction- and structural-technical aspects including marginal aspects;• Perform structural inspections including report; • Repair advices
Back to IndexBack to Index
1616 Global experience, local approach
Benyan - KH E&I branch is a integrated expert team with experienced engineers and specialists from both electrical and instrumentation disciplines. Main activities include:
• Power network studies• Electrical network philosophy • Cable calculations & sizing• Layouts design• Hazardous area classification• Various specifications (e.g. transformers, HV-/LV-cables, HV/LV switchgear, UPS)• Electrical heat tracing systems• Equipment specifications• Energy distribution systems • MCC (switchgears)
Electrical & Instrumentation (E&I)
Single discipline:
Process
Piping
Process Control
Mechanical
Civil
Electrical
Instrumentation
Shin-Etsu Chemical PlantVopak TerminalGasunieShell Refinery
Back to IndexBack to Index
1717 Global experience, local approach
Project Management
Benyan - KH Project Management serves as an overall program manager on complex large-scale industrial projects. KH project managers sees every project with different project drivers. With diverse backgrounds and different cultures of project environments and (sub-)contractors, our project manager integrates the activities of engineering, procurement, and construction (EPC) functions with managerial tools for a success of the overall project. During the project lifecycle, health, safety and environmental (HSE), security, quality management system (QMS) will be applied to ensure the quality and reliability of the project.
Especially, with high transparency in project execution and project management, we are willing to share our experience and know-how to the clients in the below characterized brown field projects:
• Revamp • Debottlenecking • Turnaround
Back to IndexBack to Index
1818 Global experience, local approach
Benyan - KH is fully committed to complying with applicable National and International safety, health and environmental regulations and directives and to doing its utmost to prevent injury to persons, damage to property or harm to the environment. This policy is implemented in all areas of company activity, including administration of personnel, project execution (design, procurement and construction) and assignment of personnel.
HSE PolicyBack to IndexBack to Index
1919 Global experience, local approach
Benyan - KH has developed a 4 volume SMS safety handbook for issue to all employees of KH to give them a basic understanding of the Safety Management System (SMS).
The "Safety Management System" covers all aspects of safety management, including the organizational structure, responsibilities, practices, procedures and resources, necessary for the implementation of the Company Safety Policy.
The SMS procedures and their implementation by the various departments have been audited by Lloyd's Register Quality Assurance Ltd., and in January 2004 the Company was re-awarded VCA two star certification. The certification covers all areas of Company production activities (engineering, design, procurement, project management and construction management) and also office safety.
Safety Management System (SMS)Back to IndexBack to Index
2020 Global experience, local approach
As subject for the Company Corporate and Safety Policy specific safety training program is developed for their particular function, e.g.:
• Safety in engineering• Safety for personnel working at construction sites.• First aid and life saving
In addition Benyan - KH personnel are assigned to tasks with consideration to their experience and their mental and physical competence.
Improvement of safety awareness is established by the regular meetings in the company.
HSE ImplementationBack to IndexBack to Index
2121 Global experience, local approach
Environment Issues
Design Criteria
Proposal Eval.
Layout optim.
Supp. Pre-qual.
Specification
CompleteEngineering,Procurement,Training AndManagement
Package.
DetailedEngineering
Suppl. ident.RFI
FeasibilityStudies
Capex-Opex
Business Plan
DataCollection
Site Invest.
Pre-Project
Supervision
Diagnostic& Expert system
ModificationOptimization
QA / QC
Commissioning
ImplementationConceptualEngineering
Scope of SupplyBack to IndexBack to Index
2222 Global experience, local approach
INDUSTRYINDUSTRY
GREEN FIELD
BROWN FIELDBROWN FIELD
REVAMPSAFETY ENVIRONMENT
Drive CustomizedDriveDrive Drive Drive
DE-BOTTLENECKING
SPECIAL REQUIREMENTS
Legislation
Company Status
Return on Investment
License force
Technologies
Utilities requirements
Product variation
Operational optimization
Maintenance improved
Reliability
Legislation force
Lifetime extention
Utilities requirements
Capacity increase
Unique demands
Fixed investment
Time constraint
Special resources
Localization
Standardization
Emerging markets
Long-term revenue
New products demands
Global expansion
Plentiful raw materials
Cheap resources
Legal environment
Company Status
Culture/Behavior
Experience & Un-Ex.
Ergonomic improve
Clients’ knowledge
Brown Field Project DriversBack to IndexBack to Index
CHEMICAL
Client
Project
Location
Contract Duration
CAPEX
Type of Work
Air Liquide
Debottlenecking HYCO3
GEP site, Bergen op Zoom
9 months
Euro 6,8 million
EPCM
Description:
The project involved debottlenecking of the existing HYCO3 plant at the General
Electric site in Bergen op Zoom. The work was executed within severe timing
constraints due to an early, pre-planned shutdown and a shutdown period of only two
weeks. Furthermore no field welds were allowed.
Scope of Work:
KH-Engineering executed the engineering and
procurement of bulk materials, itemised
instrumentation and also provided engineering
assistance during construction. Furthermore
KH-Engineering performed the HAZOP and the
authority engineering (Stoomwezen). Due to the
above-mentioned project constraints, much effort
was spent on site surveys and crosschecks of the
as-built documentation.
CHEMICAL
Client
Project
Location
Contract Duration
CAPEX
Type of Work
D MS Description:
Revamp of the recycle part in fertiliser plant, section 4, consists of:
• simplifying process routing between head of bucket elevators and moulding screws that also resulted in:
- reducing number of apparatus;
- less frequent occurring of interruptions (both technical and production technique);
- optimize process operation;
- higher on-stream time and higher production;
• improvement of working circumstances to present-day norms;
• optimisation of granulation process by measuring relevant process quantities;
• replacement of existing 4 undusting cyclones by one big cyclone;
• adjustment of existing elevator and moulding screw for the increase of capacity.
Revamp of ammonia logistic systems consists of:
• adjustment of ammonia intake systems:
- wagon (train) shipment;
- in-harbour shipment (river vessels);
- outer harbour shipment (sea-going vessels);
- freeze in installation;
- ammonia storage;
• modernisation of out of date systems according to the latest Nuisance Act requirements and CPR 13.
DSM Agro IJmuiden B.V.
Revamp Section 4
IJmuiden, The Netherlands
24 months
Euro 2,7 million
ECM
CHEMICAL
Client
Project
Location
Contract Duration
CAPEX
Type of Work
General Electric Plastics
Stretch Noryl Project
Bergen op Zoom
8 months
Euro 5 million
Basic engineering, detailed engineering, procurement, construction assistance, EPCm
Description:
Noryl is one of the raw materials for plastics produced by GEP in Bergen op Zoom. The
goal for this project was to debottleneck the existing Noryl plant in order to increase the
production capacity with 10%. Four main bottlenecks were identified and for this reason
the project was divided in four separate parts. The main part was to increase the
capacity of extruder lines 6&7 with 50%. This included a revamp of the existing
extruders itself and various modifications to the auxiliary equipment (larger product
bins, piping system, filters, etc.).
A critical success factor of this project was to realise a major part of the construction
activities within a shutdown period of two weeks.
The project was executed as a fast track project.
Scope of Work:
For this project the KH scope included Basic
Engineering, Detailed Engineering and
Procurement for and on behalf of GEP.
Furthermore KH provided the required engineering
assistance during the construction period.
CHEMICAL
Client
Project
Location
CAPEX
Type of Work
Resolution Europe
EOCL Reduction
Pernis-Holland
Euro 6 million
EPCM
Description:
The project involved upgrading of the existing AC/ECH/facilities at Resolution Pernis. Upgrading consisted of a “Shell Package” of process integrated measures to reduce the emission of Extractable Organic Chlorine (EOCI). Capacity of the facilities is 80 kton/year.
The following equipment was installed/upgraded: pumps, 6 PTFE lined reactor loops and installation trays on the purification column, 20 pumps and 3 vessels.
Scope of Work:
KH-Engineering executed basic of design, basic engineering and construction, detail engineering and procurement for the project, including:• 3D Autoplant modelling of the equipment, piping and structural steel;• Instrument Engineering and Design by using IN-Tools;• Piping stress calculations;• Electrical Engineering and Design with specific attention for the electrical interfaces with the vessel equipment;
• Preparation of mechanical specifications;• Process design (Process Flow Diagrams and Heat & Material balance);• Debottlenecking;• Revamp;• HAZOP and Ergonomical studies;• Project Management;• Construction Management;• Procurement;• Estimating;• Planning/Cost Control.
CHEMICAL
Client
Project
Location
Contract Duration
CAPEX
Type of Work
Shell Nederland Chemie
Bacara
Pernis
12 months
Confidential
Detail Engineering and Safety Study
Description:
Debottlenecking of existing facilities for SNC-CVP plant including safety study and
revamp of potassium hydroxide and phosphoric acid storage facilities.
Scope of Work:
Detailed engineering and design of minimum flow and overpressure protection
systems for a propane-oxide pump.
A safety study of the above storage facilities incorporating storage tank blanketing and
overflow systems, two levels of overpressure protection and dynamic simulations of
nitrogen break through from road tanker unloading systems towards the storage tanks.
The dynamic simulations being performed by KH-Engineering software package.
Detailed engineering and design for demolition
of existing storage facilities and replacement by
increased capacity storage facilities, comprising
of road tanker unloading systems, storage tanks
and heating systems, product pumping facilities,
safety-shower and utility stations. The results of
the safety study were implemented in the detail
design of the new facilities.
CHEMICAL
Client
Project
Location
Contract Duration
CAPEX
Type of Work
Shell Nederland Chemie
ECOS (Epikote Continue Opwerking Specialiteiten)
Pernis
1 year
Euro 9 million
Feasibility Study, Basic & Detail Engineering, Construction Assistance
Description:
Revamp of an existing Resins plant, comprising of product treatment and storage
facilities. The existing wet-product reactors were used for a smaller range of products,
resulting in a larger capacity for these products. The existing dry-product reactors
(previously moth-balled) were to be used for the remainder of the products. These
reactors and their treatment cycles were modified to handle a different product range.
Because of the increased total production capacity, additional storage capacity was
needed and created by re-alignment of existing storage tanks and the addition of new
storage tanks. As the existing plant was built in circa 1960, the entire facility was
reviewed, taking into consideration the revised authority requirements. This review
included a HAZOP and IPF classification for the dry-product train.
Scope of Work:
KH-Engineering assisted in all phases of the
project, including customer assistance in
producing the Basis of Design. In total circa
1400 m pipe was used in the modifications.
CHEMICAL
Client
Project
Location
Contract Duration:
CAPEX
Type of Work
Description:
New Glycol Ether Plant for Shell Pernis.
KH-Engineering carried out overall project management.
The project consisted of a new distillation and reactor section Unit 3000 and a major
revamp of all outside battery limit units like tankfarms, cooling water, product storage
and offloading and re-instrumentation and integration of the process control systems,
including upgrade of the control rooms.
KH-Engineering executed the design in an integrated 3D model.
Scope of Work:
KH-Engineering re-executed the basic
engineering. The detailed engineering was
executed by KH-Engineering. Procurement was
executed for and on behalf of SNC. During
construction assistance on discipline level was
given to SNC.
Shell Chemical Nederland
GE 2000
Pernis
14 months
Euro 38,5 million
Basic/Detail Engineering, Procurement and Construction Assistance
REFINING
Description:
Odfjell Terminal Rotterdam (OTR) intends to extend its distillation capacity by installing a new multi-purpose distillation unit for petroleum products.The new unit should be capable of distilling various petroleum fractions into gas oil both as top and bottom product, naphtha and intermediate products. To allow for this operation the unit has to operate under vacuum conditions as well as with overpressure.
The new distillation unit required extension of several site utilities as cooling water, fire water, and power supply. Furthermore, the existing hot oil unit was revamped to increase capacity, meet new NOx requirements and be able to use off-gas from 4 distillation units to fuel the burners.
An IPPC study was performed to check if modifications were necessary to existing systems in accordance with Best Available Techniques.
The project concerned Basic Engineering for the new unit resulting in a 10% estimate.
Scope of work:
• Risk analysis;• IPPC sudy;• Aspen simulations (incl. sensitivity analysis);• Heat integration studies (HTRI);• Plot lay-out and piping studies;• Area classification;• Re-design cooling water intake station;• Revamp hot oil unit;• Project schedule;• 10% estimate.
Client
Project
Location
Contract Duration
CAPEX
Type of Work
ODFJELL TERMINALS ROTTERDAM (PID)
New Distillation Column
BOTLEK - Holland
7 months
Confidential
BDEP
REFINING
Client
Project
Location
Contract Duration
CAPEX
Type of Work
Description:
Meeting the future Sulphur Specification of 0.05% wt in 1996 required a major revamp
of Irish Refining’s existing Hydrofiner.
Features:
• Major revamp of the unit based on the addition of a new, much larger reactor
• Close collaboration with the catalyst supplier throughout the project
• Expansion of capacity from 5,000 BSD (design) to 10,000 BSD
• Allowance for future more severe specifications
Scope of Work:
AMEC London executed the feasibility and FEED
phases in close collaboration with the catalyst
supplier. The EPC phase of the project was
executed in
KH-Engineering’s Schiedam office, with
construction and project management assistance
from the London office. Local constructors were
successfully engaged for the execution of
fabrication and construction work.
Irish Refining PLC
Hydrofiner Revamp
Whitegate, Ireland
1 year
Euro 8 million
Engineering, Procurement, Construction and Project Management
REFINING
Client
Project
Location
Contract Duration
CAPEX
Type of Work
PETROM Member of OMV Group
Tank Farm Optimization PETROM
Romania - Ploiesti
1 year
Euro 120 million
Front-end engineering / 10% Estimate
Description:
The current tank farm situation at Petrom refinery- Petrobrazi is predominated by a low
grade of automation, a unit focused tank farm configuration (each unit has its own feed
and product tank, often pumping from one product tank to the next feed tank instead of
direct operation), an environmental situation which is worthy of improvements (in
particular to full fill future European standards) and reduce high operating cost (e.g.
operation, maintenance, utility consumption). Therefore Petrom/OMV is executing a
Tank Farm Optimization Petrom (TFOP) to implement an operational measures and an
investment roadmap of short/middle and long term improvements.
Scope of Work FEED:
Front End Engineering Design for the inside-
battery-limits (ISBL) of the TFOP including utility
services. The design package also covers the
associated feed and product lines, as well as a
10% estimate.
KH’s Investimate was used to comply with Cost
Classification requirements in acc. AACE
specifications. Furthermore KH implemented 3D
scanning / roundness scanning and was
responsible for the Management of the site
inspection programs.
REFINING
Client
Project
Location
Contract Duration
CAPEX
Type of Work
Description:
As part of a major overhaul, expansion and renovation of part of the existing refinery for
Shell Nederland Raffinaderij (PER+ programme). KH-Engineering executed a complete
revamp, refurbishment and addition of new units to the existing Catcracker 2 and
Gasplant 3 installations, in order to adapt the design and installation of three new units
for the PER+ Refinery configuration.
These consist of a Gasoline Splitter Unit, a Gasoline Treater Unit, a new Waste Water
Boiler including Denox installation, and an Ammonia Storage Facility.
Scope of Work:
KH-Engineering undertook a basic design and engineering package including a ± 10%
capital estimate for the Catcracker 2 and Gasplant 3 revamps.
Shell NederlandRaffinaderij B.V.
Catcracker 2 (FCCU) and Gasplant 3 Revamp
Pernis
1 year
N/A
Basic engineering and ± 10% estimate
REFINING
Client
Project
Location
CAPEX
Type of Work
PETROM Member of OMV Group
Tank Farm Optimization PETROM Phase 1
Romania - Ploiesti
Euro 20 million
LSTK
Description:
Implementation of Tank Farm Optimization Petrom (TFOP) in phases.
First phase executed, where KH’s Investimate was used as Project
Management tool to control scope of work.
Scope of Work LSTK Phase 1:
4 tanks 5.000/1.000 m3 revamped/repaired +
fire fighting
1 new double wall floating roof 60.000 m3 tank
OIL & GAS
Client
Project
Location
Contract Duration
CAPEX
Type of Work
Gasunie LNG Maasvlakte
Replacement LNG control system
LNG Maasvlakte
8 years
Confidential
E/I detail engineering
Description:
The LNG Maasvlakte is a gas peak-shaving plant and will be used if pressure drops in the gasnet will occur (i.e: during strong winters). The buffer capacity of the LNG Maasvlakte will be only for a few days.
The project consists of a total field revamp of an old pneumatic operated plant to a fully electronic field instruments operated plant for Gasunie LNG location Maasvlakte.
The scope of work consists of: replacement of all existing transmitters, junction boxes, cables; replacement of existing Enraf level and temperature transmitters; replacement of existing fire, gas and warning detection systems; replacement of existing control cabinets by new DCS interface cabinets; implementation of new telephones in an existing system; replacement of existing video-monitors to new consoles; integration of existing local panel controls to the new DCS system; replacement of existing rotating No-break set by a new static No-break power supply; replacement of several distribution boards; replacement of old interposing cabinets by new and re-arrange the field cabling for local start/stop; safety switch for electrical driven motors; several studies, electrical and mechanical solutions.
Scope of work:KH Engineering executed detail engineering for the
project, including:• Project Management• Planning/Cost Control• Instrument Engineering and Design• Preparation of instrument specifications• Fire and Gas detection system study• Electrical Engineering and Design• Preparation of electrical specifications• Electrical load studies power system• Assistance to Construction Management
3636 Global experience, local approach
Views of i TANK (Integrated Logistic Solutions)
Piping
Mechanical
Civil
Process
Electrical/Instrumentation
Process Control
Back to IndexBack to Index
3737 Global experience, local approach
Views of iMAC (Independent Main Automation Contractor)
independent MAC
KH International ProjectsKH International Projects Supplier
Typically represented or leaded by a reputable technology/ hardware supplier.
As a result, the “selected” solution will be ALWAYS concentrated around its own technology/ hardware.
Truly independent Engineering and Contracting Group
Not being linked to any hardware/ technology supplier, allows us to ALWAYS select the best suitable overall solution for the client. Often this may imply different hardware/ technology suppliers.
Back to IndexBack to Index
3838 Global experience, local approach
consists of the remaining systems, components, and structures that comprise a complete plant or system and which are not included in the compiling packages
(such as gas turbine, steam turbine, sour water and sulphur train, waste heat boiler, etc.).
Views of iBoP (Innovated Balance of Plant)Back to IndexBack to Index
3939 Global experience, local approach
Contact Us
Abu Dhabi Business Development KH International
Middle East
Tel: +971 (2) 6725322
Fax: +971 (2) 6724323
KH International Projects
Tel: +971 (2) 6725322
Fax: +971 (2) 6724323
KH International Projects
Tel: +31 (0)10 2088888Fax: +31 (0)10 2088777
Area Manager:
Mr. Peter Verboom
Tel: +971 (0)56 7957456
Business Development Manager:
Mr. Kees Vonk
Tel: +31 (0)10 2088 514
Chief Executive Officer:
Mr. Jan Morang
Tel: +31 (0)6 55821028
Back to IndexBack to Index