Introduction about the “11th Five-Year Plan”National Science and Technology supporting plan
YUAN QING HUA Guangdong provincial general station for supervision & Testing of Quality &
Safety of Construction Engineering
2
Contents
Preface
Brief introduction
The significance of system development and foundation
National “11th Five-Year Plan”subject research
Summary
3
PrefaceToday I will mainly introduce our task of the National supporting plan’s sub-subject “City Construction Project Quality & Safety Supervision Management Information System Research .
The content has four parts:The Chinese Construction Project Quality And
Safety supervision Management modeThe Significance Of System Development And FoundationThe“ 11th Five-Year Plan National Subject Research”Summary
4
Brief introduction
Chinese construction project quality & safetysupervision management mode1.1 Quality & safety supervision management
department and structureAll the local construction administrative department, e.g. provincial construction department, city construction bureau, county construction bureau, and so on, have the responsibility for construction quality & safety supervision management
5
Brief introduction
Each administration bureau has quality & safety sub-departments, combined as one in some region, they have the responsibility for specific project supervision management
local construction administrative director
department
construction quality supervision management
construction safety supervision management
projects projects
6
Brief introduction
1.2 Quality & safety department's supervision kernel
Quality & safety department's supervision kernel mainly has two parts:
• Behavior supervision • Entity supervision
7
Brief introduction
----Behavior supervision According to our country related laws and rules,the supervision departments supervise on the entities, who have the responsibility of carrying out quality & safety production and obligation
8
Brief introduction
----Entity supervision By checks and important part supervision during the construction process , the supervision departmentssupervise on the behavior.
9
The significance of system development and foundation
2.1 Purpose of system development2.1.1 Changing the government’s supervision mode
• Improving the government’s supervision and service level
• Setting up digital supervision system by data collecting,processing and dispatching so thatgovernment can be improved from rough management to exact management
10
The significance of system development and foundation
2.1.2 Data share realization,society resource optimization reconfiguration
With the system’s help, the government can share its information with project participators, can lighten rate of work of government supervisor, reduce supervision data repetition, make project under fully and dynamic control, improve project quality & safety, and save costs.
11
The significance of system development and foundation
2.1.3 Standardization of project supervision, improvement of information application level
The system development bases on profession data standard research, by this way the system establishes the construction project quality & safety supervision data standard, and collects data from the project’s beginning to the end, standardizes the supervision behavior, achieves project information supervision goal.
12
The significance of system development and foundation
2.2 Related foundation2.2.1 Government policy support
In recent years, State Department and Ministry of Construction issue• Construction Project Quality Management
Regulations• Construction Project Safety Production Management
Regulations• Construction Project Quality Supervision Guide• Construction Project Safety Production Supervision
Management Regulations
13
The significance of system development and foundation
• All of above require local department to enhance the supervision management and provide foundation for supervision system development and implement.
14
The significance of system development and foundation
2.2.2 Technology foundation
Early in 2002, Guangdong provincial general station for supervision & Testing of quality & safety of Construction Engineering had invited Guangzhou Huaruan company , Guangzhou 3H company, and so on to take part in the research together, applied in many cities of Guangdong province, and established construction project quality & safety information supervision network system.
15
National “11th Five-Year Plan ”subject research
3.1 Subject and participatorsThe national “11th Five-Year Plan” Science and Technology supporting plan---“The city construction project quality & safety supervision management information system research” is the sub-subject of “The key technology research and demonstration about city construction project digital supervision”Carried out by Guangdong provincial general station for supervision & Testing of quality & safety of Construction Engineering, Guangzhou Huaruancompany , Guangzhou 3H company, and other 10 local supervision and testing organizations. Their relationship is as below:
16
National “11th Five-Year Plan” subject research
Frame workStruct
ure
Under-taker
collaborators
Participators
Guangdong Q&S
Testing General station
Guangzhou
HuaRuan
Guangzhou
Sanhe
Guangzhou
Quality Supervision三tation
Guangzhou
SafetySupervision
HuizhouQuality Supervision
HuizhouSafety
Supervision
Dongguan
Safety Supervisi
on
Dongguan
Quality Supervision
Foshan Quality
Supervision
Foshan Safety
Supervision
Foshan Testin
gstation
ShaoguangQ&S station
Qingyuan
Quality Supervision
Qingyuan
Safety Supervision
17
National “11th Five-Year Plan "subject research
3.2 Technology route
This sub-subject uses such technology route which begins from “basic research” to
“standardization”, finally back to “applications ”
18
National “11th Five-Year Plan" subject research
3.3 Main research work
Establishing city construction project quality total evaluation model, enhances construction project supervision ways and science base
Setting up “ City Construction Project quality testing data standard” and “ City Construction Project quality & safetysupervision data standard ”
19
National “11th Five-Year Plan "subject research
Developing city construction quality & safetysupervision management information system
Developing city construction quality testingmanagement information system
Applying these systems as a model to daily work in Guangdong Province construction project quality& safety supervision management
Now I will give the introduction about the above points.
20
National “11th Five-Year Plan "subject research
3.3.1 The research of city construction project quality general evaluation model
This research work is to make a regional integrated evaluation according to difference construction project evaluation levels, and to divide the modelinto 3 level index.
21
National “11th Five-Year Plan "subject research
Every index bases on difference inspected domain, and statisticsconception, and is added differenceinspected points weighted index.By using all these indexes the final evaluation is made.
3 level model structure as below:
22
National “11th Five-Year Plan "subject research
General quality Appraising Index
Construction quality Acceptation index
Supervising Testing Index
Society inspection Index
Once Up-to-grade Index Qualified-After-Amending Index Qualified thoughimpression Index
Spot-check Qualified Index on Quality of entity
Quality Back-check Qualified
Index on engineering
Engineering Quality Monitoring Index
Quality prosecution Index Engineering Quality Index on repairing
Been monitored EngineeringQuality Monitoring Index
Fatal Quality Accidence Index
Encouraging Engineering Index
Plan censoring Index
Fatal Quality Accidence Index
Encouraging Engineering Index
23
National “11th Five-Year Plan "subject research
---With the lower level’s data reintroducing, and using mathematical model method, the higher level regional general data is formed. The general integrated evaluation base on the three-dimensional level of county,city and province quality evaluation. All these provide base to the higher level supervision department.
24
National “11th Five-Year Plan" subject research
City Quality Appraising Indexi
City Quality Appraising Index
Provincial qualityProvincial qualityAppraising IndexAppraising Index
County QualityAppraising Index
County QualityAppraising Index
County QualityAppraising Index
County QualityAppraising Index
……
……
----City contraction project quality total integrated evaluation model is
pyramid structure, shown below:
25
National “11th Five-Year Plan" subject research
3.3.2 Data standard research
Setting up “City Construction Project
Quality testing data standard”and “City Construction Project Quality & safety supervision data standard”,unifying data definition, category and
coding, solving no uniform data problem. So far, the
second edition has been finished.
26
National “11th Five-Year Plan" subject research
3.3.3 City construction project quality & safety supervision management information system research
Main functions :project supervision information databaseproject total quality evaluation modelquality & safety supervision process managementproject completion data recording management
27
National “11th Five-Year Plan" subject research
project remote video supervision managementproject safe production dynamic management supervision organization daily work managementGIS servicenote servicesupervision organization website and data exchange
28
National “11th Five-Year Plan" subject research
System’s frame The information system bases on B/S structure, and adopts popular multi-layer design,bottle up are: data access layer, business logical layer, presentation layer.
29
National “11th Five-Year Plan" subject research
WEB Form、User Control、Master Page
System main interface
Chat Database Business Database CFG
Object Model
CFG fileaccess class
SQL SERVER access class
Supervision management chat LIB
supervision business data LIB
user rights LIB Etc.
ASP.NET 2.0 + AJAX
Project management interface
Form interface Data browse
Presentation Layer
Business Logic Layer
Data Access Layers
30
National “11th Five-Year Plan" subject research
System main functions. Main function illustration below
Sub-system of Project quality & safety data integrated platform
Center Database
Sub-system of project quality & safety supervision management
Supervision Database
Accept supervisionDaily supervision project completionResource recording management …
Sub-system of construction responsible entity management
Enterprise Database
Accept supervision on WebCheck application…
Sub-system of PDA data collection
Local supervisionDatabase
Data Collecting
Sub-system of remote video inspection
VideoDatabase
Locale video inspection;Video data collecting;… …
Information issueInformation issue,,serviceserviceProject informationSupervision schemeSupervision reportProject completionBadness behavior publicizeConstruction locale testingReform/stand-down notify… …
31
National “11th Five-Year Plan "subject research
3.3.4 System of city construction project quality testing
Description of functions:
Acceptation:accept and identify testing sample, register its information into system, and print sample label.Testing: finish data collecting by entering directly or auto
collection; after data entering, system will compute and make result automatic.
32
National “11th Five-Year Plan" subject research
Reporting: after the result audited, system can print out the result, andfinally dispatched.Charging: according to the charge standard, system count the sum,and print notes
Equipment management: before testing, system will authenticate related equipments whether expiredor not.Quality management: with this function, managers can take a view of all the testing result, and know about which one is problematic, which one is not.
33
National “11th Five-Year Plan "subject research
Information management: this section includes many basic system-running parameters
Interface and dispatch: with this section, the other applications or equipments can interact with this system.
Testing data exchange: By using the data exchange platform ( based on internet), all the supervision departments can share their information about all projects.
34
National “11th Five-Year Plan" subject research
Testing data integrated management platform :
gathers the local region testing data, and realizes the city
construction project supervision and macro-control, and
can make supervision on project quality testing market.
35
National “11th Five-Year Plan "subject research
3.3.5 City construction project quality & safety digital supervision system demonstration projects
According to the “11th Five-Year Plan” National Science and Technology supporting plan, so far, we have set up demonstration application model base in Guangzhou, Qingyuan, Shaoguan and Chaozhou of Guangdong Province, which have made active influence, and gained society and economy benefit.
36
Summary
All in all, construction supervision management digitizing and networking is the trend of our nation’s construction industry development.
37
Summary
According to requirement of “11th Five-Year Plan” National Science and Technology supporting plan, researching and applying“ Construction Project Quality & Safety Supervision Management Information System ” can help make project supervision work more efficient, networking,standardization and improve government’s management level, saving costs. All these have wide industrialization foreground, social and economic benefits.